SETTLEMENT AGREEMENT EXHIBIT B Case 5:16-cv-07013-LHK Document 375-4 Filed 10/07/19 Page 1 of 2

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SETTLEMENT AGREEMENT EXHIBIT B...SETTLEMENT AGREEMENT EXHIBIT B Case 5:16-cv-07013-LHK Document 375-4 Filed 10/07/19 Page 1 of 2

SETTLEMENT AGREEMENT

EXHIBIT B

Case 5:16-cv-07013-LHK Document 375-4 Filed 10/07/19 Page 1 of 2

Page 2: SETTLEMENT AGREEMENT EXHIBIT B...SETTLEMENT AGREEMENT EXHIBIT B Case 5:16-cv-07013-LHK Document 375-4 Filed 10/07/19 Page 1 of 2

Sheet:

Dwg File Name:

Job No.:

MARK REVISIONDATE

Exhibit-B.dwg

Scale:

Santa Clara, CA

19-008

Project:

Sheet Description:

Revisions:

4900 Centennial Blvd.

Seal:

ISSUED FOR REVIEW09/14/19

LEVI STADIUMACCESSIBILITY

1421 Guerneville Road, Suite 230, Santa Rosa, CA 95403Tel.: 707/523-0849 Cell: 707/479-3872

Email: [email protected]

Pacific Access Consulting&

Gary Waters Architect

SITE PLANGATES A, B, C, E, & F

AS SHOWN

BEXHIBITScale: NTS

Site Plan - Gates A, B, C, E & F

STADIUM ENTRY GATE A - ACCESSIBLE ROUTEFULL LENGTH X 8 FOOT WIDE EACH SIDE

ACCESS TO ELEVATOR B1 & LEVEL 300ACCESSIBLE SEATING, LEVEL 400 CLUB &ACCESSIBLE SEATING

ENTRY DOOR TO 49ERS MUSEUM & ELEVATORSB5 & B6 WITH ACCESS TO LEVEL 300ACCESSIBLE SEATING, LEVEL 500 SUITES, LEVEL700 ACCESSIBLE SEATING

BOX OFFICE WINDOWS

TO ELEVATORS A4 & A5 ACCESS TO FIELD LEVELACCESSIBLE SEATING, 300 LEVEL ACCESSIBLESEATING, 500 LEVEL SUITES & 700 LEVELACCESSIBLE SEATING

ENTRY DOORS TO ELEVATORS A6 & A7 ACCESSTO 300 LEVEL ACCESSIBLE SEATING, ACCESS TO400 LEVEL CLUB

ENTRY DOOR WITH ACCESS TO FIELD LEVELSEATING & ELEVATORS A1, A2 & A3 WITHACCESS TO ADMINISTRATIVE OFFICES, 400LEVEL CLUB, 500 LEVEL SUITES

ENTRY DOOR TO ELEVATORS

ACCESSIBLE ROUTE OF TRAVEL

ACCESSIBLE ROUTE - 8 FOOT WIDEMINIMUM

See Exhibit C

For Path of Travel ContinuationSee Exhibit J

For Path of Travel ContinuationSee Exhibit J

For Path of Travel ContinuationSee Exhibit J

1

2

3

4

5

6

7

12

3

4

5

6

7

THE COMPLETED ACCESS BARRIER REMOVAL WORK SHALLCOMPLY WITH THE 2010 AMERCIANS WITH DISABILITIES ACTSTANDARDS AND THE CALIFORNIA BUILDING CODE IN EFFECTAT THE TIME OF THE WORK.

Case 5:16-cv-07013-LHK Document 375-4 Filed 10/07/19 Page 2 of 2