settlement system under abt regime -prepared by -v.balaji, -chief manager(comml), -srldc, bangalore...

38
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Upload: arline-barber

Post on 30-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Settlement System under ABT Regime

-Prepared by-V.Balaji,-Chief Manager(comml),-SRLDC, Bangalore

-Presented by -P.Bhaskara Rao-DGM (comml)

Page 2: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

WHAT IS SETTLEMENT ?

• “ Settlement means Closing the payment/receipt/adjustment process of

bill for the period under consideration”• To be FAIR and EQUITABLE• To RECOVER DUES at the EARLIEST

(Billing Cycle)• TRANSPERANCY• Dispute Resolution• Reconciliation

Page 3: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Capacity charge:

Capacity charge is based on Annual Fixed Charge and will be related to availability of generating station. Availability means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its rated ex-bus output capability.

Energy charge:

Energy charge is related to the scheduled ex-bus energy to be sent out from the generating station and will be worked out on the basis of paise per KWh.

Page 4: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

AVAILABILITY TARIFF(ABT)(a) CAPACITY CHARGE(b) ENERGY CHARGE(c) ADJUSTMENT FOR DEVIATIONS

(UI CHARGE)

(a) = a function of Ex-bus MW availability of power plant for the day declared before the day starts x SEB’s % share

.(b) = MWh for the day as per ex=bus drawl schedule for the SEB

finalized before the day starts x Energy charge rate

(c) =Σ(Actual energy interchange in a 15 min time block – scheduled energy interchange for the time block) x UI rate for the time block.

TOTAL PAYMENT FOR THE DAY =(a) + (b)± ( c)

Page 5: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

SETTLEMENT SYSTEMFor the day: 0000 hrs. to 2400 hrs.

Central Generating Stations 1 2 3

Ex-Bus Capability x1 x2 x3(Forecast) ____ ___ ___

SEB-A’s share a1 a2 a3SEB-B’s share b1 b2 b3SEB-C’s share c1 c2 c3

For a particular 15 minute time block

SEB-A’s requisition a’1 a’2 a’3SEB-B’s requisition b’1 b’2 b’3SEB-C’s requisition c’1 c’2 c’3

___ ___ ___CGS’s schedule x1’ x2’ x3’

MW

SRLDC/Comml/IEGC/37

Page 6: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

1000MW

800

600

400

200

00 6 12 18 HRS 24

Forecast ex-bus capability of power plant

SEB - A’s entitlement (40%)

Entitlement for which Capacity chargesAre payable by SEB-A

Schedule for which Energy chargesAre payable by SEB- A

Declared Capability for which Capacity chargesAre recieveable by ISGS

Gen.Sched. for which Energy chargesAre recieavable by ISGS

Page 7: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

SETTLEMENT SYSTEM

Total capacity charge payable to CGS-1 for the day= x1 * capacity charge rate of CGS-1

Total Energy charge payable to CGS-1 for the day

= x1’ * Energy charge rate of CGS-1 4

Total capacity charge payable by SEB-A for the day

= a1 * capacity charge rate of CGS-1

+ a2 * -do- CGS-2

+ a3 * -do- CGS-3Total Energy charge payable by SEB-A for the day

= (a1’) * Energy charge rate of CGS-1 ( 4 )

+ (a2’) * -do- CGS-2 ( 4 )

+ (a3’) * -do- CGS-3 ( 4 )

All capacity charge and Energy charge payments to be made by SEBs directly to CGS.

SRLDC/Comml/IEGC/38

Page 8: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

SETTLEMENT SYSTEM

Actual (metered) injection of CGS-1 in the time block = X1 MWh.

Excess injection = (X1 – x1’ ) MWh.

4

Amount payable to CGS-1 for this =(X1-x1’) * pool price for the block.

4

SEB-A’s scheduled drawl for time block = a1’+a2’+a3’ = a’ MW (ex-CGS Bus)

SEB-A’s NET drawal schedule = (a’ – Notional Transm. Loss) MW

= (a’ – Notional Transm. Loss) = A’ MWH

4

Actual (metered) net drawal of SEB-A during time block = A MWH

Excess drawal by SEB-A = (A-A’) MWh.

Amount payable by SEB-A for this = (A-A’) * pool price for the block.

All above payments for deviations from schedules to be routed through a pool A/C operated by RLDC

SRLDC/Comml/IEGC/39

Page 9: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

AVAILABILITY

• Availability in relation to a generating station for any period means the average of the DCs for all the days during that period expressed as a percentage of the installed capacity of generating station minus normative auxiliary consumption in MW and shall be computed as per the following formula:

Page 10: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Present Definition Capacity charges

% Availability = i=1

N

DCi/ {NxICx(100-Auxn) }%10000

Where DCi = Average Declared Capacity for i th day of the period in MW N = Total no. of days during the period Auxn = Normative Auxiliary Consumption as % of gross Gen.

IC= installed capacity in MW

% Availability forms the basis for calculations

i=1

N

SGi/ {NxICx(100-Auxn) }%10000PLF =

Page 11: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Recovery of Annual fixed charges100% recovery

if % Availability >=Target Availability- Pro-rata reduction

if %Avb<T.Avb.

- Target Avb. For Fixed ch recovery - Target PLF for incentive -Both to be Notified by CERC-Financial Year forms the basis for calculations

ISGS Target Avb. Target PLF

RSTPS 80% 80%

NLC 75% 75%

Page 12: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Monthly Capacity charges receivable by an ISGS:1 st Month = (1xACC1)122 nd Month = (2xACC2-1ACC1)12….….12 th month = (12xACC12-11ACC11)12where ACC1,ACC2…….ACC12 = Annual capacity charges corresponding to the cum. Availability up to the corresponding month.

Monthly Capacity charges payable by a beneficiary :1 st Month = (1xACC1xWB1)122 nd Month = (2xACC2xWB2-1ACC1xWB1)12….….12 th month = (12xACC12xWB12-11xACC11xWB11)12where WB1,WB2…..WB12 = Weighted average % share up to the corresponding month.

Page 13: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Name Of ISGS

Aux.

Consumption

Variable

Charges (Ps)

RSTPS 7.93% 85.96

NLC II/1 10.00% 67.99

NLC II/2 10.00% 94.61

NLC TPS 1 (EXP)

9.50% 98.11

TALCHER-

STAGE II

7.50% 44.02

Fixed/Variable

Page 14: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Energy charges

The Energy Charges Payable by beneficiary to the ISGS =

Variable Charge of ISGS X

Requisition of beneficiary from The ISGS

The Energy Charges Receivable by ISGS from beneficiaries =

Variable Charge of ISGS X

Despatch schedule of ISGS

Page 15: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

• Flat rate of 25ps/u

• For ex-bus Schedule Energy in Excess of ex-bus energy corresponding to Target PLF

Incentive as per existing norms

Page 16: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Settlement Systems* On weekly basis : For seven day period ending on penultimate Sunday

•RLDC to furnish Scheduling & Metering data to REB• Sectt. by Thursday noon

•REB Sectt. to issue Weekly UI a/c by Tuesday

•Pool a/c operated by RLDC•Settlement for UI on weekly basis•All accounts open for 20 days

SRLDC/Comml/IEGC/34

Page 17: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Settlement System contd..

• On monthly basis :• REB to issue REA specifying % Avb, %

Net Entitlement, % Energy charges, Wt. Avg. Ent. for Tr. Ch. etc.

• Capacity and Energy Charges, Incentive etc.

• –billed directly by ISGS based on REA issued by REB

Page 18: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

WEEKLY ENERGY ACCOUNTING:

WEEKLY CYCLE : 00 HRS OF EACH MONDAY TO 24 HRS; OF THE THE FOLLOWING SUNDAY

ACTIVITIES MONDAY MORNING : SEM DATA DOWNLOADED TO DCD

: DCD DATA LOADED TO A LOCAL PC: DATA SENT TO RLDC via E-MAIL

(LATEST TUESDAY MORNING )THURSDAY NOON : RLDC CONVEYS PROCESSED DATA TO

REBTues day : WEEKLY UI a/c & Reactive charges

issued BY REBBILLING

Cap. Charge : BILLED MONTHLY based on DAILY DC BY ISGS

ENERGY CHARGE : BILLED MONTHLY based on DAILY DRAWL SCHEDULES ISSUED BY RLDC

UI a/c Paid/Disbursed as per UI a/c issued by REB

REACTIVE a/c

Page 19: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Variations in actual generation/drawal and scheduled generation /drawal are accounted through UI. This is a frequency linked charge which is worked out for each 15 minute time block.

Charges for all UI transaction, based on average frequency have following rate of paise per KWh from 01.01.03 up to 31.03.04.

UI rate (Paise per KWh)

Average Frequency of time block50.5 Hz. and above 0.0Below 50.5 Hz. and upto 50.48 Hz. 5.6Below 49.04 Hz. and upto 49.02 Hz. 414.4Below 49.02 Hz. 420.0Between 50.5 Hz. and 49.02 Hz. Linear in 0.02 Hz. step

Unscheduled Interchanges (UI)

Page 20: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

UI rate w.e.f 01.04.04 to 30.09.04 UI rate (Paise per KWh)

Average Frequency of time block50.5 Hz. and above 0.0Below 50.5 Hz. and upto 50.48 Hz. 8.0Below 49.04 Hz. and upto 49.02 Hz. 592.0Below 49.02 Hz. 600.0Between 50.5 Hz. and 49.02 Hz. Linear in 0.02 Hz. step

Page 21: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

• UI rate w.e.f 01.10.04 UI rate (Paise per KWh)

Average Frequency of time block (Hz,)Below Not below ----- 50.50 0.050.50 50.48 6.050.48 50.46 12.0----- ----- ----- ----- ----- ----- 49.84 49.82 204.049.82 49.80 210.049.80 49.78 219.049.78 49.76 228.0----- ----- ----- ----- ----- ----- 49.04 49.02 561.049.02 ----- 570.0(Each 0.02 Hz. Step is equivalent to 6.0 paise/kWh in the 50.5-49.8 Hz. Frequency range and to 9.0 paise/kWh in the 49.8-49.0 Hz. Frequency range).

Page 22: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Energy transactions of UI from/to Pool

Over Gen. By ISGS-1

Under drawl by SEB-A

UI import from IR-1

Under gen. By ISGS-2

No one to one correspondence

System frequency UI

RateRegional Pool

Over drawl by SEB-BUI Export to IR-2

Page 23: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Operation of Pool

Separate Pool a/cs operated by RLDCs on behalf of REBs for UI, IRE and Reactive charges

Regional Pool

Payable by ISGS-2

Payable by SEB-BPayable by IR-2at its UI rate

Receivable by ISGS-1 (up to DC) Receivable by SEB-A Receivable by IR-1

at its UI rateNo one to one correspondence

No cross adjustments allowed between the constituents

Page 24: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Where do SEMs come into picture?

• Only measuring Deviations from Schedulei.e. UI

• To measure 15 min block-wise Energy and Frequency

Issues concerned :-Specifications-Location criterion-Main/Check/Standby philosophy

Page 25: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

SEMs Specification

• Static type• Composite meter • Highest accuracy available in the power industry• 3 Phase – 4 wire connections/measurement• Direct measurement in whrs and varh on the CT/PT

secondaries– 110 V Ph to Ph /63.51 V Ph – N– 1 amp or 5 amp– VA burden not more than 10 on any of the phases

• Works on real time clock• No calibration required

Page 26: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

FEATURES OF SPECIAL ENERGY METERS :• ACCURACY : 0.2 S AS PER OEC -687, 1992

• STATIC, TOTALLY TAMPER - PROOF, SEALED FOR LIFE

• GALVANIC ISLATION AND SURGE SUPRESSION

• TWO STANDARD MODELS : 110V, 1A AND 110V, 5A

• NON - VOLATILE MEMORY FOR 10 DAYS

• HARMONICS FILTERED OUT AND ONLY FUNDAMENTAL ENERGY RECORDED

• ALL MEASUREMENTS, RECORIDNG IN SECONDARY QUANTITIES. CT AND VCT RATION APPLIED IN REGIONAL COMPUTATION

• NET ENERGY ( WH) EXCHANGE IN EACH 15 MIN. BLOCK

• CUMULATIVE WH TRANSMITTAL AT EACH MIDNIGHT

• AVERAGE FREQUENCY IN EACH 15 MIN. BLOCK

• CUMULATIVE REACTIVE ENERGY EXCHANGE WHILE VOLTAGE IS 97% OR BELOW

• CUMULATIVE REACTIVE EXCHANGE WHILE VOLTAGE IS 103% OR ABOVE.

Page 27: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

FEATURES OF SPECIAL ENERGY METERS : contd….

• HIGH-ACCURACY OF INTERNAL CLOCK: ONE MINUTE/MONTH,WITH RESTRICTED ADVANCE/ RETARD FACILITY

• TAGGING OF DATA WITH DATE, TIME METER NO. IDENTIFICATION OF TIME BLOCK WHEN VT SUPPLY DISTRUBED

• NO SEPARATE AUXILIARY SUPPLY ; ONLY OPTICAL COUPLER FOR DATA COLLECTION ( WEEKLY)

• DISPLAYS TO APPRISE THE SUBSTATION OPERATOR AS TO WHAT IS BEING RECORDED IN METERS MEMORY

Page 28: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
Page 29: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Raw dataWEEK FROM 0000 HRS OF 06-01-01 TO 0837 HRS OF 15-01-01NP-0185-A 91858.5 99968.5 39195.5 06-01-01 00 51 +21.57 48 +21.68 50 +21.71 49 +21.33 04 19 +20.61 23 +20.80 19 +21.05 00 +21.3508 00 +24.95 00 +24.95 00 +25.09 00 +24.38 12 71 +24.38 52 +23.98 30 +23.81 13 +24.0316 00 +23.37 00 +23.52 00 +22.87 00 +21.66 20 00 +25.75 00 +25.32 00 +25.40 00 +25.37 NP-0185-A 94117.2 99968.5 40313.5 07-01-01 00 59 +20.94 54 +21.01 59 +20.79 58 +21.05 04 33 +20.05 38 +20.17 37 +20.49 28 +20.9008 00 +22.99 06 +23.10 00 +22.81 00 +22.94 12 85 +20.93 51 +20.65 21 +20.79 00 +19.89 16 07 +20.14 01 +20.53 00 +20.72 00 +20.6620 05 +23.62 08 +23.23 16 +23.25 27 +23.40 NP-0185-A 96172.2 99968.5 41236.9 08-01-01 

Page 30: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Computed Mwh data230 kV Neyveli line at PondicherryCTR = 600 PTR = 2091PO-02 NP-0185-A 06-01-01 2833.8145 0.0 1402.60000 27.061722 27.199728 27.237366 26.760618 0100 26.911171 26.547337 26.735525 25.907490 0200 26.196047 25.932583 26.522243 26.622612 0300 26.509697 26.321507 25.844761 25.644024 0400 25.857307 26.095678 26.409328 26.798256 0500 26.785711 27.839575 28.567242 28.780525 0600 29.458008 29.269817 30.072762 30.198221 0700 31.126625 31.314816 31.289724 31.214447 0800 31.302271 31.302271 31.477915 31.603374 0900 31.603374 31.289724 31.402639 31.553190 1000 30.775339 31.201902 31.565735 31.515553 1100 31.603374 30.198221 30.424049 30.235861 1200 30.587147 30.085308 29.872025 30.148039 …. ….. ….. ….. …..2300 27.726660 27.350279 26.760618 26.346600  

Page 31: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Active energyENERGY ACCOUNTING USING SPECIAL ENERGY METER FOR a typical day--------------------------------------------TIME PONDY YANAM Net Drawal PO-02 PO-06 IN Mwhr--------------------------------------------00:00 +31.77 +1.83 +33.6000:15 +31.68 +1.83 +33.5100:30 +32.06 +1.85 +33.9000:45 +31.59 +1.77 +33.3601:00 +31.11 +1.54 +32.6501:15 +30.76 +1.62 +32.3901:30 +30.94 +1.57 +32.5101:45 +31.06 +1.79 +32.8502:15 +31.04 +1.85 +32.88-------------------------------------------------------------------------------------23:15 +27.38 +1.90 +29.2723:30 +27.00 +1.91 +28.9023:45 +26.48 +1.89 +28.37--------------------------------------------TOTAL +3060.16 +176.12 +3236.28---------------------------------------------

Page 32: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
Page 33: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

REACTIVE ENERGY CHARGE :

PAYABLE FOR :

1. VAR DRAWALS AT VOLTAGES BELOW 97%2. VAR INJECTION AT VOLTAGES ABOVE 103%

RECEIVABLE FOR:

1. VAR INJECTION AT VOLTAGES BELOW 97%2. VAR DRAWAL AT VOLTAGES ABOVE 103%

APPLIED FOR VAR EXCHANGES BETWEEN :

A) BENEFICIARY SYSTEM AND ISTS- THROUGH A POOL ACCOUNT

B) TWO BENEFICIARY SYSTEMS ON INTER-STATE TIES- BY THEMSELVES

RATE: @ Rs. 51.05/MVArh (for 205-06)Basic Rate : 4 paise/kvArh ( for the year 2000-01 )

5% ESCALATION PER YEAR

Page 34: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

Issues in Reactive Energy charges

• Deficit in pool (SR & ER)-due to continuous High voltages in SR

Surplus in Pool (NR &WR)

Utilization of Accruals

Disputes in payments between Beneficiaries for Reactive charges in Inter-state Lines

Page 35: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

SOUTHERN REGIONAL ELECTRICITY BOARDABT based U.I. AccountFOR A TYPICAL WEEK

NNOTE:

1.     MAPS & KGS not covered under ABT; hence UI reduced to zero, under all conditions.     IR Exchanges:          - Metering points – For WR it is Chandrapur South Bus.

- For ER it is Gazuwaka East Bus & Talcher stage I&II interconnecting bus. ii)              UI for IR exchanges with ER has been calculated at ER frequency.iii)    UI charges with WR and ER has been taken as first charge, as per decision taken in Special Committee meeting held on 17.12.2002.

Page 36: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

 

A.     ABSTRACT OF UNSCHEDULED INTERCHANGES ( UI figures in Rs. Lakhs)

Utilities UI

PayableUtilities UI Receivable

KPTCL 720.47741 TNEB 641.48459

KSEB 457.19673 APTRANSCO 269.73260

PONDY 124.38710 ER 188.40533

NLC_II_2 14.72798 RSTPS 84.30154

NLC_II_1 13.81846 GOA 10.67606

TALCHER_II 2.36108 NLC_I_EXP 2.25996

    WR 1.32476

TOTAL1332.9687

6TOTAL 1198.18484

Page 37: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

A.     ABSTRACT OF UNSCHEDULED INTERCHANGES (restricting to the lesser of the two as per the 126th SRE Board decision). (UI figures in Rs. Lakhs)Utilities UI Payable Utilities UI Receivable

KPTCL 647.62591 TNEB 641.48459

KSEB 410.96701 APTRANSCO 269.73260

PONDY 111.80962 ER 188.40533

NLC_II_2 13.23876 RSTPS 84.30154

NLC_II_1 12.42120 GOA 10.67606

TALCHER_II 2.12234 NLC_I_EXP 2.25996

    WR 1.32476

TOTAL 1198.18484 TOTAL 1198.18484

Page 38: Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)

payable to Pool

receivable from

APTRANSCO 516417KPTCL 1998690KSEB 231733TNEB 3185840

B.NET REACTIVE ENERGY CHARGES BETWEEN BENEFICIERIES:

280

0

APTRANSCOKPTCLKSEBAPTRANSCOKPTCL

11,410

0235,924

KPTCLTNEB

00

TNEBGOA

04,853

APTRANSCOKSEB

0APTRANSCO0

TNEBPONDY

0

A.REACTIVE ENERGY CHARGES WITH THE POOL :

( Amount in Rupees)

BY BENEFICIERY

FROM BENEFICIERY

KPTCL

AMOUNT RECEIVABLE

in Rupees

Beneficiaries Beneficiaries

GOA

KPTCL

KSEB

TNEB

PONDY

0

(as per decision in the 132nd meeting of SRE Board)