1SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
Integrated ProjectIntegrated Project
Co-operative Systems for Road Safety Co-operative Systems for Road Safety
““Smart Vehicles on Smart Roads”Smart Vehicles on Smart Roads”
SP1 – SAFESPOTSP1 – SAFESPOT
In-Vehicle Sensing and PlatformIn-Vehicle Sensing and Platform
Elena Bianco
Centro Ricerche FIAT (Italy), [email protected]
SAFESPOTSAFESPOTSAFESPOTSAFESPOT
2SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
Administrative issues
3SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
4SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
Participants MM for SP1
# Name WP1.1 WP1.2 WP1.3 WP1.4 WP1.5
TOTAL
1 CRF 3.5 7.0 15.0 5.0 30.5 3 REGIENOV 0.0 2.0 3.0 0.0 5.0 4 VOLVO 0.8 2.5 2.5 2.0 7.8 5 BOSCH 2.0 3.0 17.0 4.0 26.0
11 PIAGGIO 0.0 3.0 3.0 2.0 8.0 13 IBEO 0.0 3.0 5.0 5.0 13.0 19 SVDO 0.0 2.0 3.0 1.5 6.5 29 ICCS 0.8 5.0 10.0 4.0 19.8 32 MIRA 0.0 5.0 0.0 0.0 5.0 51 MMSE 0.0 3.0 7.0 1.5 11.5
TOTAL 7.1 35.5 65.5 25.0 133.1
SAFESPOT – SP1
Sub-project Effort (18 months plan)
SIEMENS
5SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
BOSCH
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP1.1 284 282 - 0.7% No needed
WP1.3 1756 2110 + 20.16% Further development of open source traffic simulator for scenario dependent detection analysis in Java.
Detailed scenario definition and use case analysis with the provided traffic simulator.
Further improvement of the SAFEPROBE architecture design.
Actual version: Guyancourt diagram
6SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
CRFAll the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP1.1 83 80 -3.61% No needed
WP1.3 549 555 -1.09% No needed
7SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
REGIENOV
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP1.3 197 87 - 55.84% Synchronisation of the Data Fusion process with the SAFESPOT global architecture.
Contribution with JAUS approach for perception and fusion of the data.
8SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
VOLVO
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP1.1 89 108 + 21.35% Participated in the SP1 meeting in Pontedera
Participated in the Annual review at EC
Could you please justify better?
WP1.3 257 265 + 3.11% No needed
WP1.4 72 Started the planning of the work within WP1.4 – Implementation for SP1
9SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
PIAGGIO
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP3 294 322 + 9.52% No needed
10SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
IBEO
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP3 586 800 + 36.51 % The preparation of the cooperative pre-data fusion specification required a lot of discussions between the different subprojects which are still ongoing. Especially, the specification of the V2V/ V2I data required for the cooperative pre-data fusion is still in a critical phase and requires additional harmonization work between the subprojects.
11SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
SIEMENS
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP3
12SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
ICCS
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP1 90 90 0 No needed
WP3 954 920 - 3.56 % No needed
13SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
MMSE
All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet
Justifications are taken from the Interim Activity Report when available
Planned Actual Delta
(Planned – Actual)/Planned * 100
Justification
WP3 659 688 + 4.4 % No needed
14SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
EC review meeting
26-27 March 2007
IP Consensus report
See SF-IP_consensus_report_year1_reviw.pdf
http://bscw.safespot_eu.org/bscw/bscw.cgi/d81909/SF_IP_consensus_report_year1_review.pdf
15SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
Recommendation Comment Responsible Due date
IP IP.R1 Add due date on deliverables
Change the deliverable templates, plus check/introduce in all Delivs. Under preparation
Amditis + retrofit all deliverable already structured under preparation
ASAP
IP IP.R2 Common architecture with CVIS; COOPERS, ….
On Going -- but planning to be respected. See common actions and WG
check dates
IP IP.R3 Requirements satisfaction by specification
Necessary to introduce a revised requirement table with a check column
Mokaddem 30/09/2007
IP IP.R4 Synchronization with other projects and back-up
Define what we expect from other projects and define back-up solutions
All - to Brignolo for synthesis
30/06/2007
IP IP.R5 Commitment of non-partners providing contribution to the projects
generate a risk analysis procedure extended also to other risks
Andreone by next CG meeting
IP IP.R6 Other communication solutions
Prepare the answer, but generally SAFESPOT relay on other systems ( e.g. CVIS) when other links are needed
Brignolo by next CG meeting
16SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
Recommendation Comment Responsible
Due date
IP IP.R7 Sensors analysis Provide cost-benefit analysis (CBA) of the adopted solutions. The information will be useful also for the global CBA in SP6
Spence 30/06/2007
IP IP.R8 Planning inconsistencies detection
For each SP Split activities and provide a detailed planning up to the prototypes delivery. Needs from other SPs or external devices must be highlighted
all SP leaders 10/07/2007 draft ASAP
IP IP.R9 Dissemination activities monitoring
Provide a tool for this monitoring Amditis 30/06/2007
IP IP.R10 Business aspects,…. Provide support to SP6. Han Zwjinenberg will provide a request table to all SPs and a reference will be appointed in each Sps for each topic.
Zwjinenberg ASAP
IP IP.R11 Scientific dissemination, address IEEE conferences
Diffuse the request to partners SP leaders ASAP
IP IP.R12 Detailed test site planning Contact TS leaders and organize a global kick-off of test sites in first half of September
Brignolo 06/06/2007
IP IP.R13 Physical part demonstration
From planning analysis provide proposal for next review demonstration
SP1 to SP5 leaders 10/07/2007
17SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
Recommendation Comment Responsible
Due date
SP1 SP1.R1 Ensure interoperability vs. other SPs
Detailed interface description, already planned Zott Continuous
SP1 SP1.R2 Highlight innovation aspects in next deliverables
Introduce a specific note in each deliverable ( update the template accordingly -- Amditis)
Zott, All SP-Leaders, Amditis
before Deliverables submission
SP1 SP1.R3 Describe clearly the process from requirement to architecture
To be described in SP7 but also in single deliverables?
Mokaddem, all SP leaders 24/07/2007
SP1 SP1.R4 Focus on relevant scenarios
SP1 is already working in that direction Zott Continuous
18SF- SP1 – Plenary Meeting June 14th and 15th 2007 - Santorini
SAFESPOT – SP1
D1.2.1Vehicle probe use case and test scenarios accepted - somewhat weak
D1.2.2 System Analysis
Not accepted
Irmgard Heiber proposed to
send her a letter with
comments and proposed
actions to the specific points
/ comments made by the
reviewers.