SFOBB East Span Seismic Safety Project

Sarah Picker

Duty Senior

Toll Bridge Program, Caltrans

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review for the SFOBB Self-

Anchored Suspension Span/Yerba Buena Island

(ECR SAS/YBI)04-012064

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Caltrans is asking for Contractor input

• We want to hear from you now

• We value your knowledge and experience

SFOBB East Span Seismic Safety Project

• Enhanced Constructibility Review SAS/YBI is the opportunity for Contractor to comment on constructibility of plans, specifications and items before advertisement

SFOBB East Span Seismic Safety Project

We take Brainstorming

SFOBB East Span Seismic Safety Project

ECR SAS/YBI

• build a safe bridge

• biddable job

• increase competition

• prevent costly change orders

SFOBB East Span Seismic Safety Project

Contractors can comment on

• Safety

• NO BID item

• NO BID Specification

• Risk

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Phase 1

• Contractor Outreach Handout contents

• posted on Caltrans Office Engineer Website• http://www.dot.ca.gov/hq/esc/oe/ecr/index.html

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Phase 1

• initiation March 18

• three weeks to review and comment

• submit constructibility review comments by April 8

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• provide comments to SFOBB Duty Senior [email protected]

• include contract number 04-012064

• include company name, phone number and name of commenter

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI Disclaimer

• ECR SAS/YBI are not contract plans or specifications and items

• the contract documents will be bid on

SFOBB East Span Seismic Safety Project

IDEAS

• ability to place steel tower

• temporary detour

• access to the work on YBI steep slope

• milestone completion

SFOBB East Span Seismic Safety Project

IDEAS

• steel market and fabrication

• bonding capacities

• working days

• foundation issues

• schedule

• other

SFOBB East Span Seismic Safety Project

SAS/YBI 04-012064

• Advertisement Fall 2002

• Contract documents available from Plans and Document Section

• http://www.dot.ca.gov/hq/esc/oe/project_status/order_bid_location.html

• (916) 654-4490 or 4492

SFOBB East Span Seismic Safety Project

Slide Show available

http://www.dot.ca.gov/hq/esc/tollbridge/index.html

SFOBB East Span Seismic Safety Project

Web Addresses for DBE information

http://www.dot.ca.gov/hq/bep/index.htm

SFOBB East Span Seismic Safety Project

WEB ADDRESS FOR ECR SAS/YBI

http://www.dot.ca.gov/hq/esc/oe/ecr

SFOBB East Span Seismic Safety Project

BUY AMERICA WAIVER APPROVED BY FHWA

• Tower Saddle (Upper Portion)

• S-Wire Cable Wrapping

• MacAlloy Bars

SFOBB East Span Seismic Safety Project

Requested Buy America Waiver but not approved

PPWS Strand

SFOBB East Span Seismic Safety Project

REQUEST FOR SOLE SOURCE ITEM APPROVED

• Tower Saddle (Upper Portion)

• S-Wire Cable Wrapping

• Macalloy Bars

• Swivel Joint Seal Assembly

• Epoxy Asphalt Concrete

SFOBB East Span Seismic Safety Project

SOLE SOURCE ITEM Requested but not approved

PPWS Strand

Cable Wire Rod