sfrey tail5 design updatesv02 -...

9
THEMIS ARTEMIS THEMIS T il 5 U d t THEMIS Tail 5 Update S. Frey SSL UCB SSL UCB Design Drivers Design Drivers Line-up with MMS Tail Season 5 THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 1 San Francisco, CA, 12/10/2011

Upload: others

Post on 20-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS

THEMIS T il 5 U d tTHEMIS Tail 5 UpdateS. Frey

SSL UCBSSL UCB

• Design Drivers• Design Drivers• Line-up with MMS • Tail Season 5

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 1 San Francisco, CA, 12/10/2011

Page 2: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Orbit Design DriverTHEMIS outlook 2012 -2017: P3,P4,P5

• Maintain conjunctions near apogee in 24h orbits*• Keep one probe within 0.5 Re of NS during conjunctions• Vary formation twice per year to address latest science

• Tail season 5, dayside 5• Conjunctions with new missions to enhance science

RBSP LD in 2012 large separations along orbit• RBSP LD in 2012, large separations along orbit• MMS LD in 2014, align with MMS tetrahedron in tail

• Current orbitsCurrent orbits• Finite fuel budget

*after 2014 P3 may go to 5/4 TS referenced to MMS

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 2 San Francisco, CA, 12/10/2011

after 2014 P3 may go to 5/4 TS, referenced to MMS

Page 3: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Line-Up With MMS

Conjunction with MMS in 2014 and 2016, 2017Id ll L P3 i t 1 1 t 1 09 R i 2012 ASAPIdeally: Lower P3-perigee to ~1.1 to 1.09 Re in 2012 ASAP

Raise P3 apogee to ~15 Re in 2016, T3=5/4TSCONSIDERABLE FUEL COST for THEMIS T5 +MMS setup

Estimated Remaining Fuel AfterFuel D4 T5 dm D5

CONSIDERABLE FUEL COST for THEMIS T5 +MMS setup

TBA:Fuel [kg]

D4 T5 dmfuel D5

P3 25.8 17.6 8.2 12.3P4 22 4 18 4 4 0 18 4

TBA:•Can we adjust to launch delay•Is it worth the fuel•Is there an alternativeP4 22.4 18.4 4.0 18.4

P5 12.5 8.1 4.4 7.9•Is there an alternative•Does it conflict with Tail5

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 3 San Francisco, CA, 12/10/2011

Page 4: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Tail Season 5 Desired Conjunctions of P3,P4,P5• Small string of pearls formation at -2 Re < Y-GSM < 8 Re • Azimuthal separation(dy) > vertical separation (dz)• dy~2000km, dz~500km • Crossing NS

Dist. To NS vs. Radial Dist.• Crossing NSTime Frame• WD: 23 06 2012 09:30 UT

P3 P4 P5

• WD: 23-06-2012 09:30 UT • 22 May 2012 -22 Aug 2012 (WD-32d to WD+60d)(WD 32d to WD 60d)WORK IN PROGRESS• Final perigee altitudes

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 4 San Francisco, CA, 12/10/2011

• dy>dz

Page 5: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Tail 5 ConjunctionsA) T i MMSA) Targeting MMSB) Targeting T5 A B

Y

•Smaller scales are triangles near apogee Y

X

near apogee

•Small dx,dzi l drequire larger dy

•Trend into Dusk:

ZSmall dz on outbound phase

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 5 San Francisco, CA, 12/10/2011

X

Page 6: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Tail 5 OptionsWd 24d WD+24d

dy34 [km] dz34 600 min 170

dy34 [km] dz34 3120 min 940

Wd-24d-WD+24d

dz bound by860 median 1420

1290 max 19706040 median 18106300 max 2780

dInc34 ~1 degdAper34 ~10 deg

Y

Z outbound

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 6 San Francisco, CA, 12/10/2011

Page 7: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS

Thank You

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 7 San Francisco, CA, 12/10/2011

Page 8: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS Tail 5 Options 2

Y

X

Z

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 8 San Francisco, CA, 12/10/2011

Y

Page 9: sfrey tail5 design updatesV02 - THEMISthemis.igpp.ucla.edu/events/Winter2011SWG/sfrey_tail5_design_updatesV02.pdfP4 22 4 18 4 40 18 4 •Can we adjust to launch delay •Is it worth

THEMIS

ARTEMIS CONJUNCTIONS T4, D4

Y Y

X X

Z Z

Y

Z

X

Z

THEMIS/ARTEMIS SWG S.Frey , Tail 5 Update 9 San Francisco, CA, 12/10/2011

TAIL 4 DAY 4