sg 27/1/2014
DESCRIPTION
SG 27/1/2014. Muon week format. ATLAS week. Need to find a speaker for the muon system Proposal: Giulio Aielli or Ed Moise others???. OTP. OTP tables almost filled still missing: CSC DAQ Calibration Toroid field map calculation - PowerPoint PPT PresentationTRANSCRIPT
Muon week format
Monday Tuesday Wednesday Thursday Friday
Morning SoftwareSmaller
upgrades / Pashe 2
Performance NSW Plenary
AfternoonLS1 and prep. for
run 2NSW NSW
DAQ workshop
and IB
ATLAS week
• Need to find a speaker for the muon system – Proposal: Giulio Aielli or Ed Moise – others???
OTP
• OTP tables almost filled still missing:– CSC– DAQ– Calibration– Toroid field map calculation
• There are some of the activities that are not really reasonable:– MDT requirement = 8 all filled (with many people that have not
been in this activity since long time)– DQA requirement = 6 almost all filled (and we know that there is no
people working on it) • I think that we should try to revise this activities within this
week.
Qualification tasks
• Each activity should keep up to date the list of qualification tasks– https://twiki.cern.ch/twiki/bin/viewauth/Atlas/Qu
alificationList• This is one of the ONLY way to get new people
in the game.
2013 financial BOOK CLOSING
PAYMENTS
2013 Muon T577100 565.2 MDT T577110 4.2 RPC T577130 19.4 TGC T577140 16.3
605.2
In-Kind
-
Other -
OPEN COMMITMENTS 31.7 31.7
CET
Income 2013 639.0
Past - Future 16.0 Other -
655.0
less 2013 income received 2012 MPI 17.0
Chile 2.0 (19.0) 636.0
less Payments 2013 605.2
Other - (605.2) 30.9
plus Carry over from 2012 118.5
Carry Over to 2014 149.4
Payments breakdown
Various orders 123.5
Epool rental 20.2
Workshop 1.7
Stores 17.3
Subsistence 292
GSM 5.3
TIDs 180.8
Transport 2.3
605.2
Total budget for 2014 was 650 KCHF Spent 605 Open commitments 32