shada edaeki | cwmag conference | amp 7: future modelling challenges… · 2019. 10. 4. ·...
TRANSCRIPT
Planning for Growth … (Myself and the Industry)
Shada Edaeki | CwMAG Conference | AMP 7: Future Modelling Challenges | 9th October 20191
Theoretical ProjectPressures reaching below 10m -Client X requires Model Build for:
› Strategic investment planning› Monitoring of day to day
operational activities3 critical areas identified to ensurevalue and service to the customer isattained
Project X
Digital
Client X
Site GDC
Minimum Pressure
(< 10.00)
(10.00 – 15.00)
(15.00 – 20.00)
(> 20.00)
2
Site – Traditional Methods
3
Messy site notes
Difficult to locate assets in rural areas
Over here!!!
Site – New Methods with Existing Technology
4
You can see where you are in relation to assets
in real time!!
Survey 123 Arc Collector
5
Missing Logger ID
Site – New Methods with Existing Technology
Logger Photos for Logger Check Report Defective Assets
Survey 123
Site – New Methods with Existing Technology
6
No Manual Input of Results = Less Error in Output
More Accurate Analysis
Survey 123
Site – New Methods with Existing Technology
7
Information Saved Automatically on Online Platform
Theoretical ProjectPressures reaching 10 - 15m
› Inadequate for client delivery
Project X
Digital
Client X
Site GDC
Minimum Pressure
(< 10.00)
(10.00 – 15.00)
(15.00 – 20.00)
(> 20.00)
8
FMAWaves of Digital Technology
9
What is the Model Build Tool?
Output
Data Exchange
Efficiency and accuracy
Client savings in model builds
Enhanced Customer Experience
Overall Benefits
10
Theoretical ProjectPressures reaching minimum 15 –20m benchmark
› Adequate for client delivery basedon current network pressures
› A calmer network, optimised for thefuture is required
Project X
Digital
Client X
Site GDC
Minimum Pressure
(< 10.00)
(10.00 – 15.00)
(15.00 – 20.00)
(> 20.00)
11
GDC Communication
12
Outside of (+- 1m) Tolerance
Innovation NETWORK WATCHFTP
Digital
Non-stop Productivity
Theoretical ProjectPressures reaching more than 20m:
› Healthy Network› Happy Customer› Happy Life
Project X
Digital
Client X
Site GDC
Minimum Pressure
(< 10.00)
(10.00 – 15.00)
(15.00 – 20.00)
(> 20.00)
13
Following the Right Path to Success!
14
Conventional Model BuildsInternal (UK) team only
Innovation
Customer Satisfaction
Digital
Traditional Site Surveys
Thank you
15