  • Shallow Water Pipeline Removal Process

    Shallow Water Pipeline Removal ProcessRemoval Process

    B M h d

    Removal Process

    B M h dBay MarchandGulf of MexicoBay MarchandGulf of Mexico

    Prepared by: Ted RochePrepared by: Ted Roche

    Date: 9/20/2010Date: 9/20/2010

  • Diver Emergency DrillDiver Emergency DrillDiver Emergency DrillDiver Emergency Drill

  • Gulf of Mexico Pipeline System (F d l W t )

    Gulf of Mexico Pipeline System (F d l W t )(Federal Waters)(Federal Waters)

    Bay Marchand

  • Bay Marchand FieldBay Marchand Field

  • Pipeline Removal PhasesPipeline Removal PhasesPipeline Removal PhasesPipeline Removal Phases

    Pipeline Abandonment Plan & PermittingPermitting

    Diver Hands on survey

    Pipe Prep

    Pipe Pulling

  • Geodetic Survey Mapping of seabed d i l i di t t

    Geodetic Survey Mapping of seabed d i l i di t tused in planning diver survey strategyused in planning diver survey strategy

    Date 7

  • Diver Hands On SurveyDiver Hands On Survey

    Date GIL 3 PowerPoint Template

  • “Diver Live Boating” & “Hands On S ”

    “Diver Live Boating” & “Hands On S ”Surveys”Surveys”

    Date GIL 3 PowerPoint Template

  • Track Link Sending Unit Attached to Diver Emergency Bail Out

    Track Link Sending Unit Attached to Diver Emergency Bail Out

    Bottle Bottle

    Date 10

  • Track Link Receiving UnitTrack Link Receiving Unitgg

    Date 11

  • Diver Entering Water With Down LineDiver Entering Water With Down LineDiver Entering Water With Down Line Diver Entering Water With Down Line

    Date GIL 3 PowerPoint Template

  • Diver recovery on Starboard Mid-ShipDiver recovery on Starboard Mid-ShipDiver recovery on Starboard Mid Ship Diver recovery on Starboard Mid Ship

    Date 13

  • P i Pi li S ti FP i Pi li S ti FPreparing Pipeline Sections For Removal

    Preparing Pipeline Sections For Removal

    Slice & Dice”Slice & Dice”

    Date GIL 3 PowerPoint Template

  • “Slice & Dice Plan” W/ SJA established f S 371 3

    “Slice & Dice Plan” W/ SJA established f S 371 3for Seg 371 - 3for Seg 371 - 3

    Date 15

  • Lift Boats Preparing P/L Sections For Flushing and Removal

    Lift Boats Preparing P/L Sections For Flushing and RemovalFlushing and Removal Flushing and Removal

    Date 16

  • Pipeline cutting under containment dome

    Pipeline cutting under containment domedome dome

    Date 17

  • Sealed pipelines hot tapped for entry Sealed pipelines hot tapped for entry

    Date 18

  • Pipeline Cut with Guillotine SawPipeline Cut with Guillotine Saw

  • Plumbers Plug W/Wing NutPlumbers Plug W/Wing Nut

    Date 20

  • Pneumatic Plug W/Plug Dog (PPWPD)Pneumatic Plug W/Plug Dog (PPWPD)Pneumatic Plug W/Plug Dog (PPWPD)Pneumatic Plug W/Plug Dog (PPWPD)

    Date 21

  • Modified New Pipe Plug along side T-grip with Plug dog

    Modified New Pipe Plug along side T-grip with Plug dog

    Date 22

  • Pipe Caps used to hold nut type plugs in place

    Pipe Caps used to hold nut type plugs in place

    Date 23

  • Riser RemovalRiser Removal

    Date 24

  • Sharp bends are cut out of pipe section ends

    Sharp bends are cut out of pipe section ends

    Date 25

  • Valves etc. on pipeline pick up ends are permissible

    Valves etc. on pipeline pick up ends are permissible

    Date 26

  • Short spans of pipe sections recovered by Slice & Dice Prep Vessel

    Short spans of pipe sections recovered by Slice & Dice Prep Vesselby Slice & Dice Prep Vessel by Slice & Dice Prep Vessel

    Date 27

  • PIPELINE REMOVAL PROCESSPIPELINE REMOVAL PROCESS

    Date GIL 3 PowerPoint Template

  • Pulling Vessel: L/B EaglePulling Vessel: L/B Eagle

    Date 29

  • Pac Man II Pipe Recovery & Containment Unit Bow to Stern

    Pac Man II Pipe Recovery & Containment Unit Bow to Stern

    View View

    Date 30

  • 40,000# Pulling Winch 40,000# Pulling Winch

    Date 31

  • Portable Hydraulic System Station Portable Hydraulic System Station

    Date 32

  • “Pac Man II” Overhead View Stern to Bow

    “Pac Man II” Overhead View Stern to Bow

    Date 33

  • Bow End Adjustable Hydraulic Stinger Bow End Adjustable Hydraulic Stinger

    Date 34

  • Safety Slips Rigged for Diver Installation

    Safety Slips Rigged for Diver InstallationInstallation Installation

    Date 35

  • “Slammer Clamp” Rigged for Diver “Slammer Clamp” Rigged for Diver

    Date 36

  • Diver Being Briefed and Dressed for Pipe Recovery

    Diver Being Briefed and Dressed for Pipe RecoveryPipe RecoveryPipe Recovery

    Date 37

  • Diver Lowered to Seabed From StageDiver Lowered to Seabed From Stage

    Date 38

  • Attaching Crane Line To Pipe End and Safety Slips With Winch to Pipe End

    Attaching Crane Line To Pipe End and Safety Slips With Winch to Pipe End

    Date 39

  • Diver Up and Standing Clear to Assist Diver Up and Standing Clear to Assist

    Date 40

  • Pipe End Lifted to SurfacePipe End Lifted to Surface

    Date 41

  • Pipe End Being Drug Into Stinger Pipe End Being Drug Into Stinger

    Date 42

  • Pipe End Pulled Over Trough Pipe End Pulled Over Trough

    Date 43

  • Pipe Dogged Down Pull Tension Relaxed

    Pipe Dogged Down Pull Tension RelaxedRelaxed Relaxed

    Date 44

  • “Frog Cutter” Being Attached For Pipe Severing

    “Frog Cutter” Being Attached For Pipe SeveringSevering Severing

    Date 45

  • Making Cut With “Frog Cutter” Trough Catching Fluid

    Making Cut With “Frog Cutter” Trough Catching FluidCatching Fluid Catching Fluid

    Date 46

  • Pipe Cut and Released From “Frog Cutter”

    Pipe Cut and Released From “Frog Cutter”Cutter Cutter

    Date 47

  • 100% Norm Survey Performed100% Norm Survey Performed

    Date 48

  • 30’ Pipe Joint Being Loaded Into “Bundle Rack”

    30’ Pipe Joint Being Loaded Into “Bundle Rack”Bundle Rack Bundle Rack

    Date 49

  • Adjusting Severed Pipe Joint Into Bundle Rack

    Adjusting Severed Pipe Joint Into Bundle Rack

    Date 50

  • Coupons From Frog Cut and Coatings Captured in Trough

    Coupons From Frog Cut and Coatings Captured in TroughCaptured in TroughCaptured in Trough

    Date 51

  • All Captured Pipeline Fluids Are Transported to Shore for Disposal All Captured Pipeline Fluids Are

    Transported to Shore for Disposal p pp p

    Date 52

  • Recovered solids are transported to shore for disposal in 15 bbl

    tti b

    Recovered solids are transported to shore for disposal in 15 bbl

    tti bcutting boxes cutting boxes

    Date 53

  • Pull rigging and cable being attached for next pull

    Pull rigging and cable being attached for next pull

    Date 54

  • Tension applied to pipe to confirm connection Chain is certified

    t t d S t 10

    Tension applied to pipe to confirm connection Chain is certified

    t t d S t 10tested Spectrum 10 tested Spectrum 10

    Date 55

  • Dogging connection is released for pull Dogging connection is released for pull

    Date 56

  • Pipe Pull Sequence VideoPipe Pull Sequence VideoPipe Pull Sequence VideoPipe Pull Sequence Video

  • Pipe Bundle being transferred from “Bundling Rack” to “Ready Rack Bundle

    Pipe Bundle being transferred from “Bundling Rack” to “Ready Rack BundleBundling Rack to Ready Rack BundleBundling Rack to Ready Rack Bundle

    Date 58 GIL 3 PowerPoint Template

  • Full “Ready Rack” 44,000# of pipe Full “Ready Rack” 44,000# of pipe

    Date 59 GIL 3 PowerPoint Template

  • Bundles being loaded to supply boat

    Bundles being loaded to supply boat

    Date 60 GIL 3 PowerPoint Template

  • Cargo vessel arriving at the Transfer Dock In Leeville La

    Cargo vessel arriving at the Transfer Dock In Leeville LaDock In Leeville, LaDock In Leeville, La

    Date 61 GIL 3 PowerPoint Template

  • Spread Production RatesSpread Production RatesSpread Production RatesSpread Production Rates

    • Mid-June to mid-October- removed• Mid-June to mid-October- removedMid June to mid October removed approximately 95,000’ of pipe

    • Pipe size range included 3” 4” 6” 8” 10”

    Mid June to mid October removed approximately 95,000’ of pipe

    • Pipe size range included 3” 4” 6” 8” 10”• Pipe size range included 3 , 4 , 6 8 , 10 , 16”24 h 8” 1000’ 1200’

    • Pipe size range included 3 , 4 , 6 8 , 10 , 16”24 h 8” 1000’ 1200’• 24 hour average 8” -1000’-1200’ recovered

    • 24 hour average 8” -1000’-1200’ recovered

    • 24 hour average 4” -2500’ recovered• 24 hour average 4” -2500’ recovered

  • SummarySummarySummarySummary

    • Cost effective approach for shallow water• Cost effective approach for shallow waterCost effective approach for shallow water pipeline removal

    • Tools and methodology are adaptable to

    Cost effective approach for shallow water pipeline removal

    • Tools and methodology are adaptable to• Tools and methodology are adaptable to other locations and water depthsD t il d d d ti l

    • Tools and methodology are adaptable to other locations and water depthsD t il d d d ti l• Detailed procedures and operational discipline are keys to Incident-free

    ti

    • Detailed procedures and operational discipline are keys to Incident-free

    tioperationsoperations

  • Questions?Questions?Questions?Questions?