SAFER, SMARTER, GREENER DNV GL © Pål Rylandsholm 23 May 2018 Commercial in confidence Shaping the future of digital standards, requirements and information management 1 A Joint Industry Program (JIP), call for participation, plan forward Initiated by the Sector Board Petroleum LO - Norwegian Confederation of Trade Unions

Upload: dangque

Post on 29-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

DNV GL ©

Commercial in confidence

23 May 2018 SAFER, SMARTER, GREENERDNV GL ©

Pål Rylandsholm

23 May 2018

Commercial in confidence

Shaping the future of digital standards, requirements and information management

1

A Joint Industry Program (JIP), call for participation, plan forward

Initiated by the Sector Board Petroleum

LO - Norwegian

Confederation of

Trade Unions

DNV GL ©

Commercial in confidence

23 May 2018

Purpose and Content

Part 1:

▪Context

▪Scope and deliverables

Part 2:

▪Overall plan for execution

▪Budgets and financing

▪Project governance

▪Agreement

▪Next step

2

My goal is to provide an overview of the scope, deliverables and plans for the NORSOK Z-

TI JIP. I will also try to clarify what we need from you towards a possible kick-off.

DNV GL ©

Commercial in confidence

23 May 2018

NORSOK Z-TI is important to DNV GL, and we are proud to be given the task of establishing this initiative as a Joint Industry Project

3

3

▪ More than 150 years history with standardization and assurance; we classify, certify, verify and test

▪ Long experience with solving challenges in close collaboration with industry

▪ Currently DNV GL manages more than 100 Joint Industry Projects in the global Oil and Gas industry

▪ Together with the industry, we have started our digitalization journey

▪ Projects with our customers and partners

▪ Digitalization of all core services and DNV GL standards, Assurance, Risk Management, Classification and

Certification

DNV GL ©

Commercial in confidence

23 May 2018

Taking over a «sailing ship»: A lot of very good work has been done already

4

Managed by: Bjørn Berli on behalf of Standard Norway

Funded by: Sector Board Petroleum

Contribution from the following: Statoil, ConocoPhillips, AkerBP, EPIM, Aibel, Aker Solution, UiO/SIRIUS and DNVGL

Input from EPIM’s Standardisation Project (STI)

Managed by: DNV GL

Funded by : JIP participants

All players in the Norwegian Oil and Gas Industry are invited to participate.

Siginificant contributions from participating organisations are required

Input from EPIM’s Standardisation Project (STI)

Pre-project Joint Industry Project(JIP)

DNV GL ©

Commercial in confidence

23 May 2018

WP3- Proposal for updated and digital NORSOK Z-TI (Technical Information) requirements

Z-001 - Documentation for operation (DFO) Z-018 - Supplier’s documentation of equipment Z-DP-002 - Coding System Z-CR-002 - Component identification system

WP2- Framework for requirements governance and distribution

The JIP will have three main deliverables: Standards, Technology and Services

Access and distributionZ-003 - Technical information flow requirements

WP1 - Methodology and tools for digital

requirements

5

WP4 - ISO Standardisation: ISO 15926 – 14 Technical Report Common language

WP0 -JIP Management

Standards

ServicesTechnology

Note: Final scope and list of deliverables will be set by the JIP steering committee. The NORSOK owners represented by Standards Norway will have the ownership to the final deliverables from the JIP.

Implementing World Wide Web Consortium

(W3C) recommendations for semantics

DNV GL ©

Commercial in confidence

23 May 2018

Relevant results from the project will be fed into international standards like ISO/IEC for standardisation and to organisations like IOGP for alignment

6

Standardisation

AlignmentEtc.

ISO 15926

Basic principlesfor modellingrequirements

NORSOK requirements

Facility/company Specif ic requirements

IOGP

IECISO

International

Association of Oil

& Gas Producers

DNV GL ©

Commercial in confidence

23 May 2018

WP1 - Methodology and tools for digital requirements and technical information

7

Systematic method for representing asset information, vocabularies and

requirements (rules)

Tool support for capturing, structuring and digitalizing requirements

Standards Compliant Asset Model• Test and explore effect of requirements• Support sharing of digital asset

information along the life cycle, and along the value chain

DNV GL ©

Commercial in confidence

23 May 2018

WP2- Framework for requirements governance and distribution

▪ Common web based services ensuring

access for humans and machines

▪ Governance model including business

case/plan

▪ Update of NORSOK Z-003 Information

Flow

8

Database with

NORSOK Z-TI

requirements

DNV GL ©

Commercial in confidence

23 May 2018

ISO

API

WP3 - Proposal for updated and digital NORSOK Z-TI (Technical Information) requirements

9

Z-018

(2013)

Z-001

(1998)

Database with

NORSOK Z-TI

requirements

Other

standards

Z-CR-

002

(1996)

Aibel MMDAker PUSH

etc.

NORSOK

Z-001

Intelligent data

STI

Z-DP-

002

(1996)

Z-003

(1998)

Company

specific

requirements

Vocabularies

Requirements

Methodology Tools Asset model

Work

gro

ups

DNV GL ©

Commercial in confidence

23 May 2018

WP4 - ISO Standardisation: ISO 15926 – 14 TR (Technical Report)

10

Etc.

ISO 15926

Basic principlesfor modellingrequirements

NORSOK requirements

Facility/company Specif ic requirements

• A standardised «digital language»

for representing technical

information and requirements

• Full and faithfull implementation of

W3C OWL2 DL (Web Ontology

Language Direct Semantics)

• Enables automated reasoning - a

key requisite for quality, efficiency

and scalability

NORSOK Z-TI

Methodology

NORSOK Z-TI

requirements

Generic

Specific

DNV GL ©

Commercial in confidence

23 May 2018

To minimise risk and keep momentum, the project will be executed in three phases

▪ Steering commitee Decision Gates between phases

▪ Financial commitment for participants per phase. Current commitment will be for Phase 1

▪ Planning (SoW, budget and schedule) for next phase included in ongoing phase

▪ Total duration is estimated to 24 months after kick-off

11

2017 2018 2019

Phase 1

2020

Kick-Off DG1 EndInitiation DG2Phase 1 Phase 2 Phase 3

Phase 2

Phase 2

Solid outline = JIP Phase 1 Scope

DNV GL ©

Commercial in confidence

23 May 2018

Possible interfaces, related initiatives and projects

12

2017 2018 2019

Phase 1

2020

Kick-Off DG1 EndInitiation DG2Phase 1 Phase 2 Phase 3

Phase 2

Phase 2Standardisation Initiative – STI

“Tverrsektoriell digitaliseringspilot” – Standard Norge

Company/Industry value realisation projects

Digitalising other NORSOK standards

NORSOK Z-TI Standardisation

TIRC - Technical Information Requirements Catalogue (Separate contract)

Solid outline = JIP Phase 1 Scope

DNV GL ©

Commercial in confidence

23 May 2018

Scope Phase 1: Information requrements for a valve segment from early phase engineering to operations

▪ WP3:

– Re-structured and digital NORSOK Z-018, Z-001 and Z-CR-002 and Z-DP-002

covering valve segments (Initial update)

– Including elements from several disciplines and systems (valves, control loop,

instrumentation, piping, etc)

▪ WP2:

– Initial web based service (Minimum Viable Product/Proof of Concept)

– Initial update of NORSOK Z-003, efficient information sharing

WP1:

– Capture learning from work group, and update accordingly

▪ WP4:

– ISO 15926-14 TR Proposal ready for ballot

▪ WP0:

– JIP Initiation

– Project Management

– External communication

– Specification of next Phase

13

DNV GL ©

Commercial in confidence

23 May 2018

The total budget is estimated to NOK 27.5 mill In addition approximately 14 000 hours in-kind is requested from participants

14

WP Title

Phase 1 Total

Cash

[kNOK]

In-kind

[hrs]

Cash

[kNOK]

In-kind

[hrs]

0 JIP Management 2 300 0 6 800 0

1Methodology and supporting tools for digital

requirements500 300 1 700 900

2Framework for requirements governance and

distribution1000 300 4 600 900

3 Update of NORSOK Z-TI 1 300 1 200 12 600 12 000

4 ISO Standardisation: ISO 15926-14 Technical Report 700 0 1 300 0

Travel and other expenses 200 0 500 0

Total 6 000 1 800 27 500 13 800

DNV GL ©

Commercial in confidence

23 May 2018

Operators will have to carry the main part of the cash contributions Contractors and suppliers will mainly provide in-kind contributions to the project

15

Category

Requested for Phase 1 Remaining phases Total

Cash

[kNOK]

In-kind

[hrs]

Cash

[kNOK]

In-kind

[hrs]

Cash

[kNOK]

In-kind

[hrs]

Large sized owner/operator1) 2 000 500 7 000 1 000 9 000 1 500

Medium sized owner/operator1) 1 500 500 3 500 1 000 5 000 1 500

Small sized owner/operator1) 300 250 900 750 1 200 1 000

EPC Contractor 50 2) 700 502) 1 300 100 2) 2 000

Equipment/System Vendor 0 400 0 600 0 1 000

Authorities3) 50 200 50 – 950 400 100 – 1 000 600

Others 50 2) 200 502) 400 1002) 600

1) Operators categorized according to http://www.norskpetroleum.no/en/developments-and-operations/number-and-diversity-of-companies/ ..and the corresponding spreadsheet http://www.norskpetroleum.no/wp-content/uploads/71-Aktører-på-norsk-sokkel-fordelt-på-størrelse-2000-2016-03022017.xlsx

2) Can be compensated as in-kind. 3) Authorities are also invited to participate as “Observer”

DNV GL ©

Commercial in confidence

23 May 2018

Each signing party will have a seat in the steering committee, which is the governing body of the project

16

Work Group n etc...

Steering CommitteeAll partners have one representative

Project ManagerDNV GL

JIP supportContract, economy, etc.

WP 3 - Proposal for updated and digital NORSOK Z-TI

WP 4 - ISO 15926-14 Technical ReportWP 2 - Framework

and governance

WP 1 - Methodology and tools

Work Group 1 – «Valve Segment»

Project sponsorDNV GL

Quality

DNV GL ©

Commercial in confidence

23 May 2018

DNV GL’s “Multiparty Project Agreement” is the contractual basis

▪ Customised to be aligned with the Sector Board

Petroleum’s intentions for the NORSOK Z-TI project

▪ The principles are approved by an Interim Steering Group

appointed by the Sector Board Petroleum, and any

amendments will only be entered into in exceptional cases

▪ The intention is that all parties shall sign identical

Agreements

▪ The Agreement will be submitted to potential parties after

the launch meetings

DNV GL ©

Commercial in confidence

23 May 2018

Next steps: Towards Kick-Off

1. Flag interest to participate

2. Sign contract

3. The project starts when

1. The whole value chain is represented in the project, ideally at least 3

operators, 2 EPC Contractors, 3 Equipment/System Vendors

2. Sufficient cash funding is committed to cover Phase 1

4. Kick-Off meeting

– Tentative dates are June 20th or August 14th 2018

– Only for contracted JIP members, letter-of-intent organisations or

authorities (observers)

– Only contracted members will have a vote in the Steering Committee

– For June 20th: The agreement needs to be signed by all parties by June

15th

18

DNV GL ©

Commercial in confidence

23 May 2018

Summary

19

NORSOK Z-TI JIP will deliver standards, services and technology

JIP results will be fed into global standard organisations and initiatives for further standardisation and alignment

The JIP depends on contributions from players in the entire value chain. To join phase 1 of the project, please flag your interest to: [email protected]

DNV GL ©

Commercial in confidence

23 May 2018

SAFER, SMARTER, GREENER

www.dnvgl.com

The trademarks DNV GL®, DNV®, the Horizon Graphic and Det Norske Veritas®

are the properties of companies in the Det Norske Veritas group. All rights reserved.

http://www.dnvgl.com/NORSOK-Z-TI-JIP

20

Pål Rylandsholm

[email protected]

+47 976 73 822

DNV GL ©

Commercial in confidence

23 May 2018

Work

Groups

The work groups will be the “engine” of the JIP

21

Steering Committee (project status and decision forum)

Seek and document solution/proposal

Send out solution/proposal to JIP members

Go through comments from JIP members

Workshop

Sessions

Review proposal

Review/close out comments

Propose decision, agreement

Core Work Group: Planning

DNV GL ©

Commercial in confidence

23 May 2018

Key stakeholders have agreed to key principles regarding deliverables and IPR

The right to exploit the project results will be governed by the following

general principle:

1. The NORSOK owners represented by Standards Norway have exclusive

rights to exploit project results that reflect what is currently the content of

the NORSOK Z-TI standards.

2. Generic final deliverables, in particular methodology and generic

ontologies, shall be released for use, distribution and further development

and commercialisation once the JIP/Z-TI has finished, subject to "adequate"

license terms safeguarding the purpose of the project.

22

DNV GL ©

Commercial in confidence

23 May 2018

Regarding background IP, owners of deliverables and user rights

▪ Any input IPR remains with the originators and only materials developed as part of

the JIP will be regarded as deliverables.

▪ JIP deliverables must have designated owners (one owner per deliverable)

▪ All members of the JIP will have full access to input, work-in-progress materials and

deliverables during the JIP as part of the JIP execution.

▪ Upon completion of the JIP all members will be granted user rights to the

deliverables at given conditions reflecting JIP participation.

▪ Business/governance models as developed in the JIP will regulate terms and

conditions for the deliverables after completion of the JIP.

23