share 2012 planning meeting 9/6/12 expected collection date: 1 day between september 17-25 th sensor...

9
SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target Update: Communications: chk email & GO/NO GO Check message at 585-475-7676 Twitter 9AH_DIRS Timeline: Spectral Measurements Flag System: Team assignments: Food / Hardware Runner _______________ Radiosonde Assistant: AnneMarie and __________ ASD #1 Kelly and ________ ASD #2 RCR AnneMarie and _________ SpectraVista: John K and students Jamie/Emmett Shadow Target Deployment and __________ Erin Ontiveros & 10 T-shirt models _______ Ground Based LIDAR: Kerry and ________ Shea LIDAR targets _________ Test Target Deployment week of Sept 10-14 when John K returns Thurs/Friday Next week early pack Trailer Contact: Nina Raqueno [email protected] 585-281-3846 cell Can you help? Respond to Doodle Poll

Upload: jasmine-lambert

Post on 28-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

SHARE 2012 Planning Meeting 9/6/12

Expected Collection Date: 1 day between September 17-25th

Sensor Update: No NRL SAR, chance of terrasar-xPI Target Update:Communications: chk email & GO/NO GO Check message at 585-475-7676 Twitter 9AH_DIRSTimeline:Spectral Measurements Flag System:Team assignments:

Food / Hardware Runner _______________Radiosonde Assistant: AnneMarie and __________ASD #1 Kelly and ________ASD #2 RCR AnneMarie and _________SpectraVista: John K and studentsJamie/Emmett Shadow Target Deployment and __________Erin Ontiveros & 10 T-shirt models _______Ground Based LIDAR: Kerry and ________Shea LIDAR targets _________Test Target Deployment week of Sept 10-14 when John K returns Thurs/FridayNext week early pack Trailer

Contact: Nina Raqueno

[email protected] cell

Can you help?Respond to Doodle Poll

Page 2: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

SHARE 2012 Planning Meeting Expected Collection Date: 1 day between September 17-25th

Timeline:Night Before Weather Decision and Stand-by6:00AM Final Weather Decision and CHK for email or Call in 7:00AM Meet at RIT carpool7:45 Arrive at AVON Site8:00-10:00 Deploy Targets10:00 Radiosonde #1 Launch10-11:15 Start Spectral Measurements10:15 SIGNAL 2 HORN BLASTS - WASP to begin10:30 AVON WASP Overflights Begin EW then NS11:15 SIGNAL 5 HORN BLASTS when WASP starts NS Everyone under Pavilion or Tshirts in Place

11:30 AVON SpecTIR Overflights begin12:00PM All Aircraft Clear Avon Start Conesus, Hemlock, Quarry Resume ASD Measurements & Move Targets to PM 12:00 SIGNAL 2 Sets of 3 HORN BLASTS Aircraft Clear move targets12:39 WV2 overpass12:30 Radiosonde #2 (plan A)12:45 SIGNAL 5 HORN BLASTS 1:00-2:00 Aircraft Return to Avon Site2:30 Radiosonde #2 (plan B)3:00 5th Aircraft Polarmetric

Page 3: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

SpecTIR Timeline

11:00 LaunchDowntown Roc 15 min imaging

ferry & coordinate w other aircraft 15 min11:30 Avon 30 min imaging wide range of targets from bright white tyvek to black fabric panels fly FL1 & FL2 once fly short FL3 twice

ferry & coordinate w other aircraft 15 min12:15 Conesus Water 15 min imaging adjust gain for water target

ferry & coordinate w other aircraft 15 min12:45 Hemlock Forest 15 min imaging

ferry & coordinate w other aircraft 15 min optimize for vegetation1:15 Quarry 15 min imaging

ferry & coordinate w other aircraft 15 min optimize for bright minerals1:45 Avon 30 min imaging fly FL1 & FL2 once fly short FL3 twice wide range of targets from bright white tyvek to black fabric panels2:15 Done2:30 Airport

Page 4: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

WASP/LIDAR Timeline

10:15 Launch ferry to site

10:30 - 12:00 Avon 1.5 hour imaging Center NS FL ALL EW FLS ALL NS FLS

ferry & coordinate w other aircraft 15 min12:15 Conesus Water 15 min imaging adjust gain for water target

ferry & coordinate w other aircraft 15 min12:45 Hemlock Forest 15 min imaging

ferry & coordinate w other aircraft 15 min optimize for vegetation1:15 Quarry 15 min imaging

ferry & coordinate w other aircraft 15 min optimize for bright minerals1:45 Avon 45 min imaging fly condensed PM FLs wide range of targets from bright white tyvek to black fabric panels2:30 Done2:45 Airport

Page 5: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target
Page 6: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

SHARE 2012 Target ASD / GPS Naming System

Expected Collection Date: 1 day between September 17-25th

Contact: Nina Raqueno

[email protected] cell

https://docs.google.com/spreadsheet/viewform?formkey=dERESHozUXpMeDU4ZVphdDRfY3NCQnc6MQ

Request ASD Measurements here:

Page 7: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

PI NameInitial

Spectra

GPS/Camera

Spectra/GPS Filename: PAGRY1_F

A place for PI to describe measurement

SUBJECT DESCRIPTIONMeasurement Details Ref/Rad

Page 8: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

Kelly CanhamC

Spectra

GPS/Camera

CASND1_F

Volleyball Sand Reflectance Measurement

Anytime OK Does not move

PI last name initial

AM or PM

location

3 Letter Code for Material

Mode: ReFlectance (F)or RAdiance (A)

Measurement Number 1-9

__ Space Reserved for Measurement

Retakes/Mistakes/Clouds starting with b,c,d,e,f....

Page 9: SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25 th Sensor Update: No NRL SAR, chance of terrasar-x PI Target

Kelly CanhamC

Spectra

GPS/Camera

CPZZZ1_A

New Target of Opportunity found in the field during afternoon

flightTake 4 measurements in

Radiance mode

PI last name initial

AM or PM

location

3 Letter Code for Material

Mode: ReFlectance (F)or RAdiance (A)

Measurement Number 1-9

__ Space Reserved for Measurement

Retakes/Mistakes/Clouds starting with b,c,d,e,f....