sheet 2 of 12 - planning inspectorate... · (ww1690-esu-mod-nwr-000001) and verified using google...
TRANSCRIPT
![Page 1: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/1.jpg)
POND
MILL
COTTAGE
MILL HOUSE
WORSTON
MILL (PH)
WORSTON MILL
STABLES
WORSTON
HALL
LITTLE
BRIDGFORD
RIVERSIDE
FARM
FOXGLEN
EMMYS
COTTAGE
HURST FARM
COTTAGES
BARRACKS
ROW
WHITEHART
FARM
THE
COTTAGE
ROSE
COTTAGE
ROSE VILLA
FARM
BRIDGEFORD
HURST FARM
POND
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-2
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Marsh/marshy Grassland
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Hedgeline (to be reinstated where practical and appropriate)
Woodland and Scrub within temporary working areas
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 1 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-1 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
![Page 2: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/2.jpg)
RIVER SOW
D
R
A
IN
POND
UNDERBRIDGE 1
UNDERBRIDGE 1A
UNDERBRIDGE 2
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-1
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Arable
Watercourse
Hedgerow
Marsh/marshy Grassland
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Woodland and Scrub
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Woodland and Scrub within temporary working areas
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 2 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-02 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
TEMPORARY ACCESS THROUGH HEDGEROW
EXTENT OF HEDGEROW LOSS SUBJECT TO
FINAL LOCATION OF HAUL ROADS AND
PIPELINE ROUTES AND STORAGE AREAS
RIVER CROSSINGS
CROSSING POINTS AND METHODOLOGY TO BE
AGREED PRIOR TO COMMENCEMENT OF
WORKS.
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
![Page 3: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/3.jpg)
YELDS ROUGH
MARL PIT
(DISUSED)
M
E
E
C
E
B
R
O
O
K
POND
RIVER SOW
POND
UNDERBRIDGE 2
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Arable
Ponds and wetland
Watercourse
Marl pit vegetation
Hedgerow
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Tall Ruderals (within temporary working area)
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Woodland and Scrub within temporary working areas
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 3 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-3 1:1000@A1 07/06/13
GDR
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
RIVER CROSSINGS
CROSSING POINTS AND METHODOLOGY TO BE
AGREED PRIOR TO COMMENCEMENT OF
WORKS.
![Page 4: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/4.jpg)
POND
POND
POND
YELDS ROUGH
ISSUES
YELDS ROUGH
YELDS ROUGH
OVERBRIDGE 3
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-5
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Arable
Woodland and Scrub
Ponds and wetland
Hedgerow
Dry Ditch
Marsh/marshy Grassland
Potential woodland loss through required management to exposed
woodland edge. Extent subject to Arboricultural inspection following
removal of woodland
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Buildings and associated land
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Highways
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 4 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-4 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
TEMPORARY ACCESS THROUGH HEDGEROW
EXTENT OF HEDGEROW LOSS SUBJECT TO
FINAL LOCATION OF HAUL ROADS AND
PIPELINE ROUTES AND STORAGE AREAS
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
TEMPORARY ACCESS THROUGH HEDGEROW
EXTENT OF HEDGEROW LOSS SUBJECT TO
FINAL LOCATION OF HAUL ROADS AND
PIPELINE ROUTES AND STORAGE AREAS
POTENTIAL FURTHER WORKS TO WOODLAND
EDGE
INSPECT AND MANAGE TO MAKE SAFE AND
CREATE GRADUATED WOODLAND EDGE MARGIN
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
![Page 5: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/5.jpg)
POND
MARL PIT
(DISSUSED)
RODGELEY
LODGE
MARL PIT
(DISSUSED)
POND
POND
TENNIS COURT
THE
BUNGALOW
HILL
CREST
POND
POND
POND
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-7
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-4
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Arable
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained and protected throughout duration of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 5 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-5 1:1000@A1 07/06/13
GDR
TEMPORARY ACCESS THROUGH HEDGEROW
EXTENT OF HEDGEROW LOSS SUBJECT TO
FINAL LOCATION OF HAUL ROADS AND
PIPELINE ROUTES AND STORAGE AREAS
OVERHEAD CABLE WORKS
NO DIRECT EFFECT AT GROUND LEVEL
![Page 6: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/6.jpg)
MOUNT VILLA
S
T
A
T
I
O
N
R
O
A
D
S
T
A
T
I
O
N
R
O
A
D
NORTON BRIDGE
T
H
E
G
L
E
B
E
S
T
L
U
K
E
S
C
L
O
S
E
N
E
W
S
T
R
E
E
T
M
E
A
D
O
W
C
O
U
R
T
POND
POND
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-5
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-7
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Arable
Woodland and Scrub
Ponds and wetland
Marl pit vegetation
Hedgerow
Dry Ditch
Highways
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Improved Grassland (to be reinstated on mitigation earthworks)
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Tall ruderals
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Arable land (to be reinstated on mitigation earthworks)
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 6 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-6 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
VEGETATION TO BE RETAINED AND
PROTECTED THROUGHOUT DURATION OF
WORKS
TEMPORARY ACCESS THROUGH HEDGEROW
EXTENT OF HEDGEROW LOSS SUBJECT TO
FINAL LOCATION OF HAUL ROADS AND
PIPELINE ROUTES AND STORAGE AREAS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
OVERHEAD CABLE WORKS
NO DIRECT EFFECT AT GROUND LEVEL
![Page 7: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/7.jpg)
OV
ER
BR
ID
GE
10A
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-5
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-7
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Arable
Woodland and Scrub
Ponds and wetland
Marl pit vegetation
Hedgerow
Dry Ditch
Highways
Tall ruderals
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Improved Grassland (to be reinstated on mitigation earthworks)
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Buildings and associated land
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (to be reinstated on mitigation earthworks)
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 7 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-7 1:1000@A1 June 2013
GDR
MITIGATION EARTHWORKS
TEMPORARY LOSS OF AGRICULTURAL LAND,
PERMANENT LOSS OF EXISTING LANDFORM
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
![Page 8: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/8.jpg)
GOLF COURSE
M
E
E
C
E
B
R
O
O
K
LEVEL CROSSING
HAMMERHOUSE FARM
MOUNT VILLA
S
T
A
T
I
O
N
R
O
A
D
OVERBRIDGE 5A
INTERSECTION BRIDGE 5
UNDERBRIDGES 6 & 6A
OVERBRIDGE 7
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-7
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-9
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Semi Improved Neutral
Grassland
Ponds and wetland
Watercourse
Hedgerow
Highways
Marsh/marshy Grassland
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Improved Grassland (to be reinstated on mitigation earthworks)
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Semi Improved Grassland (within temporary working area)
Marsh/marshy Grassland (within temporary working area)
Woodland and Scrub (including
garden trees)
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Buildings and associated land
Woodland and Scrub within temporary working areas
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 8 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-8 1:1000@A1 June 2013
GDR
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
TEMPORARY LAND TAKE AREAS
VEGETATION TO BE RETAINED AND
PROTECTED THROUGHOUT DURATION OF
WORKS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
MITIGATION EARTHWORKS
TEMPORARY LOSS OF AGRICULTURAL LAND,
PERMANENT LOSS OF EXISTING LANDFORM
OVERHEAD CABLE WORKS
NO DIRECT EFFECT AT GROUND LEVEL
![Page 9: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/9.jpg)
UNDERBRIDGE 11
OVERBRIDGE 5A
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-7
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-8
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Semi Improved Neutral
Grassland
Arable
Woodland and Scrub
Watercourse
Hedgerow
Marsh/marshy Grassland
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Improved Grassland (to be reinstated on mitigation earthworks)
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgeline (to be reinstated where practical and appropriate)
Buildings and associated land
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (to be reinstated on mitigation earthworks)
Marsh/marshy Grassland (within temporary working area)
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 9 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-9 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
VEGETATION TO BE RETAINED AND
PROTECTED THROUGHOUT DURATION OF
WORKS
MITIGATION EARTHWORKS
TEMPORARY LOSS OF AGRICULTURAL LAND,
PERMANENT LOSS OF EXISTING LANDFORM
OVERHEAD CABLE WORKS
NO DIRECT EFFECT AT GROUND LEVEL
RIVER CROSSINGS
CROSSING POINTS AND METHODOLOGY TO BE
AGREED PRIOR TO COMMENCEMENT OF
WORKS.
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
OVERHEAD CABLE WORKS
NO DIRECT EFFECT AT GROUND LEVEL
![Page 10: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/10.jpg)
LOWER HEAMIES
UNDERBRIDGE 11
MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-9
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Improved Grassland
Semi Improved Neutral
Grassland
Arable
Watercourse
Marsh/marshy Grassland
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Semi Improved Grassland (within temporary working area)
Marsh/marshy Grassland (within temporary working area)
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (to be reinstated on mitigation earthworks)
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Woodland and Scrub
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 10 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-10 1:1000@A1 June 2013
GDR
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
DONAR SITE FOR FEN AND SWAMPLAND
SUITABLE VEGETATION FOR RELOCATION
WITHIN RIVER REALIGNMENT AND FLOODPLAIN
WORKS
TEMPORARY LAND TAKE AREAS
VEGETATION TO BE RETAINED AND
PROTECTED THROUGHOUT DURATION OF
WORKS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
![Page 11: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/11.jpg)
UPPER HEAMIES COTTAGES
COLD NORTON
WHITE HOUSE FARM
POND
OVERBRIDGE 7
UNDERBRIDGE 8
FOOTBRIDGE 9
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-12
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Semi Improved Neutral
Grassland
Arable
Hedgerow
Highways
Hedgerow and Field Trees
TEMPORARY HABITAT LOSS
Improved Grassland (to be reinstated on mitigation earthworks)
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Semi Improved Grassland (within temporary working area)
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Woodland and Scrub not indicated within Phase One habitat
plan - to be retained and protected throughout duration of the
works
Hedgeline (to be reinstated where practical and appropriate)
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Arable land (within temporary working area) - Extent subject to
locations of working compounds, pipeline routes, storage areas
and haul roads
Arable land (to be reinstated on mitigation earthworks)
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 11 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-11 1:1000@A1 June 2013
GDR
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS
TREES AND HEDGEROW WITHIN FORMER
ROADSIDE VERGE
TREES AND ROADSIDE VEGETATION TO BE
RETAINED AND PROTECTED FOR DURATION OF
WORKS
MITIGATION EARTHWORKS
TEMPORARY LOSS OF AGRICULTURAL LAND,
PERMANENT LOSS OF EXISTING LANDFORM
TREES WITHIN FORMER ROADSIDE VERGE
EXTENT OF VEGETATION REMOVALS TO ALLOW
ACCESS FOR FARMER - TO BE CONFIRMED ON
SITE TO RETAIN SIGNIFICANT TREES
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
DISCUSSIONS WITH LAND OWNER
![Page 12: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief](https://reader035.vdocument.in/reader035/viewer/2022070902/5f518884c9a88909de1d05ae/html5/thumbnails/12.jpg)
UNDERBRIDGE 8
FOOTBRIDGE 9
MA
TC
HLIN
E F
OR
C
ON
TIN
UA
TIO
N S
EE
D
WG
N
O. S
T13360-101-11
Plans to be read in conjunction with the landscape design brief
ST13360-JL001
EXTENT OF WORKING AREA: Permanent and temporary working areas. Site
boundary to be defined by fixed site security fencing.
PERMANENT HABITAT LOSS
Arable
TEMPORARY HABITAT LOSS
Applies to landscape altered through mitigation earthworks and
returned to agricultural land. In addition to all land included within
the working boundary encompassing compounds, storage and haul
roads
Improved grassland (within temporary working area) - Extent
subject to locations of working compounds, pipeline routes,
storage areas and haul roads
Hedgerow and Field Trees within temporary working areas to
be retained where possible and protected throughout duration
of the works
Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing
5102711-001, dated 25th May) and topographic survey
(WW1690-ESU-MOD-NWR-000001) and verified using Google
Earth Aerial imagery
Broad-leaved Semi-natural Woodland
Broad-leaved Plantation Woodland
Coniferous Plantation Woodland
Scattered Scrub
Scattered Trees with Negligible Potential to Support
Roosting Bats
Poor Semi-improved Grassland
Semi-improved Neutral Grassland
Marsh/marshy Grassland
Improved Grassland
Swamp
Standing Water
Running water
Arable Land
Amenity Grassland
Native species-poor Hedge
Species-poor Defunct Hedge
Fence
Dry Ditch
Residential Area
Buildings
Bare Ground
Legend
Trees with Low Potential to Support Roosting Bats
Trees with Medium Potential to Support Roosting Bats
Trees with High Potential to Support Roosting Bats
Wet Ditch
Other Tall Herb and Fern: Tall Ruderal
Phase 1 Ecological Habitat Plan
Atkins Drawing No. 5102711-001
DO NOT SCALE FROM THIS DRAWING
Copyright Reservedc
DRAWN BY CHECKED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909
LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431
LEIGH TEL 01942 260101
CLIENT
PROJECT
DRAWING TITLE
DRG No. SCALE DATE
APPROVED BY
(HEAD OFFICE)
STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191
NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244
WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311
LONDON TEL 020 7287 2872
LEIGH TEL 01942 260101
D
r
a
f
t
f
o
r
C
o
m
m
e
n
t
Network Rail
Norton Bridge - Additional Works
HABITAT LOSS
Sheet 12 of 12
Overlay to Phase 1 Habitat Plan
ST13360-101-12 1:1000@A1 June 2013
GDR
TEMPORARY LAND TAKE AREAS
EXTENT OF HABITAT LOSS SUBJECT TO FINAL
LOCATION OF HAUL ROADS, PIPELINE ROUTES,
COMPOUNDS AND STORAGE AREAS
TREES WITHIN TEMPORARY LAND TAKE AREAS
TREES TO BE RETAINED WHERE POSSIBLE AND
PROTECTED THROUGH OUT DURATION OF THE
WORKS