PO MILL COTTAGE MILL HOUSE WORSTON MILL (PH) WORSTON MILL STABLES WORSTON HALL LITTLE BRIDGFORD RIVERSIDE FARM FOXGLEN EMMYS COTTAGE HURST FARM COTTAGES BARRACKS ROW WHITEHART FARM THE COTTAGE ROSE COTTAGE ROSE VILLA FARM BRIDGEFORD HURST FARM POND MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-2 Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing 5102711-001, dated 25th May) and topographic survey (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief ST13360-JL001 EXTENT OF WORKING AREA: Permanent and temporary working areas. Site boundary to be defined by fixed site security fencing. PERMANENT HABITAT LOSS Improved Grassland Marsh/marshy Grassland TEMPORARY HABITAT LOSS Applies to landscape altered through mitigation earthworks and returned to agricultural land. In addition to all land included within the working boundary encompassing compounds, storage and haul roads Improved grassland (within temporary working area) - Extent subject to locations of working compounds, pipeline routes, storage areas and haul roads Hedgerow and Field Trees within temporary working areas to be retained where possible and protected throughout duration of the works Hedgeline (to be reinstated where practical and appropriate) Woodland and Scrub within temporary working areas Broad-leaved Semi-natural Woodland Broad-leaved Plantation Woodland Coniferous Plantation Woodland Scattered Scrub Scattered Trees with Negligible Potential to Support Roosting Bats Poor Semi-improved Grassland Semi-improved Neutral Grassland Marsh/marshy Grassland Improved Grassland Swamp Standing Water Running water Arable Land Amenity Grassland Native species-poor Hedge Species-poor Defunct Hedge Fence Dry Ditch Residential Area Buildings Bare Ground Legend Trees with Low Potential to Support Roosting Bats Trees with Medium Potential to Support Roosting Bats Trees with High Potential to Support Roosting Bats Wet Ditch Other Tall Herb and Fern: Tall Ruderal Phase 1 Ecological Habitat Plan Atkins Drawing No. 5102711-001 DO NOT SCALE FROM THIS DRAWING Copyright Reserved c DRAWN BY CHECKED BY (HEAD OFFICE) STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191 NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244 WEST BROMWICH TEL 0121 580 0909 LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431 LEIGH TEL 01942 260101 CLIENT PROJECT DRAWING TITLE DRG No. SCALE DATE APPROVED BY (HEAD OFFICE) STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191 NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244 WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311 LONDON TEL 020 7287 2872 LEIGH TEL 01942 260101 Draft for Comment Network Rail Norton Bridge - Additional Works HABITAT LOSS Sheet 1 of 12 Overlay to Phase 1 Habitat Plan ST13360-101-1 1:1000@A1 June 2013 GDR TEMPORARY LAND TAKE AREAS EXTENT OF HABITAT LOSS SUBJECT TO FINAL LOCATION OF HAUL ROADS, PIPELINE ROUTES, COMPOUNDS AND STORAGE AREAS

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

POND

MILL

COTTAGE

MILL HOUSE

WORSTON

MILL (PH)

WORSTON MILL

STABLES

WORSTON

HALL

LITTLE

BRIDGFORD

RIVERSIDE

FARM

FOXGLEN

EMMYS

COTTAGE

HURST FARM

COTTAGES

BARRACKS

ROW

WHITEHART

FARM

THE

COTTAGE

ROSE

COTTAGE

ROSE VILLA

FARM

BRIDGEFORD

HURST FARM

POND

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-2

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Marsh/marshy Grassland

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Hedgeline (to be reinstated where practical and appropriate)

Woodland and Scrub within temporary working areas

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 1 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-1 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

Page 2: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

RIVER SOW

D

R

A

IN

POND

UNDERBRIDGE 1

UNDERBRIDGE 1A

UNDERBRIDGE 2

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-1

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Arable

Watercourse

Hedgerow

Marsh/marshy Grassland

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Woodland and Scrub

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Woodland and Scrub within temporary working areas

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 2 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-02 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

TEMPORARY ACCESS THROUGH HEDGEROW

EXTENT OF HEDGEROW LOSS SUBJECT TO

FINAL LOCATION OF HAUL ROADS AND

PIPELINE ROUTES AND STORAGE AREAS

RIVER CROSSINGS

CROSSING POINTS AND METHODOLOGY TO BE

AGREED PRIOR TO COMMENCEMENT OF

WORKS.

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

Page 3: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

YELDS ROUGH

MARL PIT

(DISUSED)

M

E

E

C

E

B

R

O

O

K

POND

RIVER SOW

POND

UNDERBRIDGE 2

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Arable

Ponds and wetland

Watercourse

Marl pit vegetation

Hedgerow

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Tall Ruderals (within temporary working area)

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Woodland and Scrub within temporary working areas

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 3 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-3 1:1000@A1 07/06/13

GDR

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

RIVER CROSSINGS

CROSSING POINTS AND METHODOLOGY TO BE

AGREED PRIOR TO COMMENCEMENT OF

WORKS.

Page 4: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

POND

POND

POND

YELDS ROUGH

ISSUES

YELDS ROUGH

YELDS ROUGH

OVERBRIDGE 3

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-5

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Arable

Woodland and Scrub

Ponds and wetland

Hedgerow

Dry Ditch

Marsh/marshy Grassland

Potential woodland loss through required management to exposed

woodland edge. Extent subject to Arboricultural inspection following

removal of woodland

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Buildings and associated land

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Highways

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 4 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-4 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

TEMPORARY ACCESS THROUGH HEDGEROW

EXTENT OF HEDGEROW LOSS SUBJECT TO

FINAL LOCATION OF HAUL ROADS AND

PIPELINE ROUTES AND STORAGE AREAS

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

TEMPORARY ACCESS THROUGH HEDGEROW

EXTENT OF HEDGEROW LOSS SUBJECT TO

FINAL LOCATION OF HAUL ROADS AND

PIPELINE ROUTES AND STORAGE AREAS

POTENTIAL FURTHER WORKS TO WOODLAND

EDGE

INSPECT AND MANAGE TO MAKE SAFE AND

CREATE GRADUATED WOODLAND EDGE MARGIN

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

Page 5: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

POND

MARL PIT

(DISSUSED)

RODGELEY

LODGE

MARL PIT

(DISSUSED)

POND

POND

TENNIS COURT

THE

BUNGALOW

HILL

CREST

POND

POND

POND

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-7

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-4

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Arable

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained and protected throughout duration of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 5 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-5 1:1000@A1 07/06/13

GDR

TEMPORARY ACCESS THROUGH HEDGEROW

EXTENT OF HEDGEROW LOSS SUBJECT TO

FINAL LOCATION OF HAUL ROADS AND

PIPELINE ROUTES AND STORAGE AREAS

OVERHEAD CABLE WORKS

NO DIRECT EFFECT AT GROUND LEVEL

Page 6: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

MOUNT VILLA

S

T

A

T

I

O

N

R

O

A

D

S

T

A

T

I

O

N

R

O

A

D

NORTON BRIDGE

T

H

E

G

L

E

B

E

S

T

L

U

K

E

S

C

L

O

S

E

N

E

W

S

T

R

E

E

T

M

E

A

D

O

W

C

O

U

R

T

POND

POND

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-5

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-7

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Arable

Woodland and Scrub

Ponds and wetland

Marl pit vegetation

Hedgerow

Dry Ditch

Highways

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Improved Grassland (to be reinstated on mitigation earthworks)

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Tall ruderals

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Arable land (to be reinstated on mitigation earthworks)

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 6 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-6 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

VEGETATION TO BE RETAINED AND

PROTECTED THROUGHOUT DURATION OF

WORKS

TEMPORARY ACCESS THROUGH HEDGEROW

EXTENT OF HEDGEROW LOSS SUBJECT TO

FINAL LOCATION OF HAUL ROADS AND

PIPELINE ROUTES AND STORAGE AREAS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

OVERHEAD CABLE WORKS

NO DIRECT EFFECT AT GROUND LEVEL

Page 7: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

OV

ER

BR

ID

GE

10A

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-5

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-7

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Arable

Woodland and Scrub

Ponds and wetland

Marl pit vegetation

Hedgerow

Dry Ditch

Highways

Tall ruderals

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Improved Grassland (to be reinstated on mitigation earthworks)

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Buildings and associated land

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (to be reinstated on mitigation earthworks)

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 7 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-7 1:1000@A1 June 2013

GDR

MITIGATION EARTHWORKS

TEMPORARY LOSS OF AGRICULTURAL LAND,

PERMANENT LOSS OF EXISTING LANDFORM

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

Page 8: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

GOLF COURSE

M

E

E

C

E

B

R

O

O

K

LEVEL CROSSING

HAMMERHOUSE FARM

MOUNT VILLA

S

T

A

T

I

O

N

R

O

A

D

OVERBRIDGE 5A

INTERSECTION BRIDGE 5

UNDERBRIDGES 6 & 6A

OVERBRIDGE 7

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-7

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-9

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Semi Improved Neutral

Grassland

Ponds and wetland

Watercourse

Hedgerow

Highways

Marsh/marshy Grassland

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Improved Grassland (to be reinstated on mitigation earthworks)

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Semi Improved Grassland (within temporary working area)

Marsh/marshy Grassland (within temporary working area)

Woodland and Scrub (including

garden trees)

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Buildings and associated land

Woodland and Scrub within temporary working areas

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 8 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-8 1:1000@A1 June 2013

GDR

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

TEMPORARY LAND TAKE AREAS

VEGETATION TO BE RETAINED AND

PROTECTED THROUGHOUT DURATION OF

WORKS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

MITIGATION EARTHWORKS

TEMPORARY LOSS OF AGRICULTURAL LAND,

PERMANENT LOSS OF EXISTING LANDFORM

OVERHEAD CABLE WORKS

NO DIRECT EFFECT AT GROUND LEVEL

Page 9: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

UNDERBRIDGE 11

OVERBRIDGE 5A

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-7

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-8

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Semi Improved Neutral

Grassland

Arable

Woodland and Scrub

Watercourse

Hedgerow

Marsh/marshy Grassland

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Improved Grassland (to be reinstated on mitigation earthworks)

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgeline (to be reinstated where practical and appropriate)

Buildings and associated land

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (to be reinstated on mitigation earthworks)

Marsh/marshy Grassland (within temporary working area)

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 9 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-9 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

VEGETATION TO BE RETAINED AND

PROTECTED THROUGHOUT DURATION OF

WORKS

MITIGATION EARTHWORKS

TEMPORARY LOSS OF AGRICULTURAL LAND,

PERMANENT LOSS OF EXISTING LANDFORM

OVERHEAD CABLE WORKS

NO DIRECT EFFECT AT GROUND LEVEL

RIVER CROSSINGS

CROSSING POINTS AND METHODOLOGY TO BE

AGREED PRIOR TO COMMENCEMENT OF

WORKS.

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

OVERHEAD CABLE WORKS

NO DIRECT EFFECT AT GROUND LEVEL

Page 10: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

LOWER HEAMIES

UNDERBRIDGE 11

MATCHLINE FOR CONTINUATION SEE DWG NO. ST13360-101-9

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Improved Grassland

Semi Improved Neutral

Grassland

Arable

Watercourse

Marsh/marshy Grassland

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Semi Improved Grassland (within temporary working area)

Marsh/marshy Grassland (within temporary working area)

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (to be reinstated on mitigation earthworks)

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Woodland and Scrub

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 10 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-10 1:1000@A1 June 2013

GDR

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

DONAR SITE FOR FEN AND SWAMPLAND

SUITABLE VEGETATION FOR RELOCATION

WITHIN RIVER REALIGNMENT AND FLOODPLAIN

WORKS

TEMPORARY LAND TAKE AREAS

VEGETATION TO BE RETAINED AND

PROTECTED THROUGHOUT DURATION OF

WORKS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

Page 11: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

UPPER HEAMIES COTTAGES

COLD NORTON

WHITE HOUSE FARM

POND

OVERBRIDGE 7

UNDERBRIDGE 8

FOOTBRIDGE 9

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-12

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Semi Improved Neutral

Grassland

Arable

Hedgerow

Highways

Hedgerow and Field Trees

TEMPORARY HABITAT LOSS

Improved Grassland (to be reinstated on mitigation earthworks)

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Semi Improved Grassland (within temporary working area)

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Woodland and Scrub not indicated within Phase One habitat

plan - to be retained and protected throughout duration of the

works

Hedgeline (to be reinstated where practical and appropriate)

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Arable land (within temporary working area) - Extent subject to

locations of working compounds, pipeline routes, storage areas

and haul roads

Arable land (to be reinstated on mitigation earthworks)

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 11 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-11 1:1000@A1 June 2013

GDR

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS

TREES AND HEDGEROW WITHIN FORMER

ROADSIDE VERGE

TREES AND ROADSIDE VEGETATION TO BE

RETAINED AND PROTECTED FOR DURATION OF

WORKS

MITIGATION EARTHWORKS

TEMPORARY LOSS OF AGRICULTURAL LAND,

PERMANENT LOSS OF EXISTING LANDFORM

TREES WITHIN FORMER ROADSIDE VERGE

EXTENT OF VEGETATION REMOVALS TO ALLOW

ACCESS FOR FARMER - TO BE CONFIRMED ON

SITE TO RETAIN SIGNIFICANT TREES

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

DISCUSSIONS WITH LAND OWNER

Page 12: Sheet 2 of 12 - Planning Inspectorate... · (WW1690-ESU-MOD-NWR-000001) and verified using Google Earth Aerial imagery Plans to be read in conjunction with the landscape design brief

UNDERBRIDGE 8

FOOTBRIDGE 9

MA

TC

HLIN

E F

OR

C

ON

TIN

UA

TIO

N S

EE

D

WG

N

O. S

T13360-101-11

Plans to be read in conjunction with the landscape design brief

ST13360-JL001

EXTENT OF WORKING AREA: Permanent and temporary working areas. Site

boundary to be defined by fixed site security fencing.

PERMANENT HABITAT LOSS

Arable

TEMPORARY HABITAT LOSS

Applies to landscape altered through mitigation earthworks and

returned to agricultural land. In addition to all land included within

the working boundary encompassing compounds, storage and haul

roads

Improved grassland (within temporary working area) - Extent

subject to locations of working compounds, pipeline routes,

storage areas and haul roads

Hedgerow and Field Trees within temporary working areas to

be retained where possible and protected throughout duration

of the works

Proposals plan overlaid onto Phase 1 Habitat plan (Atkins drawing

5102711-001, dated 25th May) and topographic survey

(WW1690-ESU-MOD-NWR-000001) and verified using Google

Earth Aerial imagery

Broad-leaved Semi-natural Woodland

Broad-leaved Plantation Woodland

Coniferous Plantation Woodland

Scattered Scrub

Scattered Trees with Negligible Potential to Support

Roosting Bats

Poor Semi-improved Grassland

Semi-improved Neutral Grassland

Marsh/marshy Grassland

Improved Grassland

Swamp

Standing Water

Running water

Arable Land

Amenity Grassland

Native species-poor Hedge

Species-poor Defunct Hedge

Fence

Dry Ditch

Residential Area

Buildings

Bare Ground

Legend

Trees with Low Potential to Support Roosting Bats

Trees with Medium Potential to Support Roosting Bats

Trees with High Potential to Support Roosting Bats

Wet Ditch

Other Tall Herb and Fern: Tall Ruderal

Phase 1 Ecological Habitat Plan

Atkins Drawing No. 5102711-001

DO NOT SCALE FROM THIS DRAWING

Copyright Reservedc

DRAWN BY CHECKED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909

LONDON TEL 020 7287 2872 LIVERPOOL TEL 0151 494 5431

LEIGH TEL 01942 260101

CLIENT

PROJECT

DRAWING TITLE

DRG No. SCALE DATE

APPROVED BY

(HEAD OFFICE)

STOKE-ON-TRENT TEL 0845 111 7777 CARDIFF TEL 029 2072 9191

NEWCASTLE UPON TYNE TEL 0191 232 0943 SHEFFIELD TEL 0114 245 6244

WEST BROMWICH TEL 0121 580 0909 EDINBURGH TEL 0131 555 3311

LONDON TEL 020 7287 2872

LEIGH TEL 01942 260101

D

r

a

f

t

f

o

r

C

o

m

m

e

n

t

Network Rail

Norton Bridge - Additional Works

HABITAT LOSS

Sheet 12 of 12

Overlay to Phase 1 Habitat Plan

ST13360-101-12 1:1000@A1 June 2013

GDR

TEMPORARY LAND TAKE AREAS

EXTENT OF HABITAT LOSS SUBJECT TO FINAL

LOCATION OF HAUL ROADS, PIPELINE ROUTES,

COMPOUNDS AND STORAGE AREAS

TREES WITHIN TEMPORARY LAND TAKE AREAS

TREES TO BE RETAINED WHERE POSSIBLE AND

PROTECTED THROUGH OUT DURATION OF THE

WORKS