Sherman Minton Bridge

Upload: others

Post on 23-Nov-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sherman Minton Bridge

Sherman Minton Bridge

Page 2: Sherman Minton Bridge

P j B k dProject Background

Page 3: Sherman Minton Bridge

Metropolitan AreaLouisville Metropolitan Area

Location

p

I-64 over Ohio River Link between IN & KY

Page 4: Sherman Minton Bridge

ridgeSherman Minton Bridge

Structure Information

g

Structure Information Tied Arch 2 – 800 foot spans 2 – 800 foot spans Double-deck structure Navigable waterway underneath Navigable waterway underneath

Page 5: Sherman Minton Bridge

Inspection Historyp y

Initial construction – 1961 Initial construction 1961

NBIS requires 2 year Inspection Cycle NBIS requires 2-year Inspection Cycle

P i I i Yi ld d V i Fi di Previous Inspection Yielded Various Findings Cracks detected in multiple welds

Page 6: Sherman Minton Bridge

Wh i Ti d A h?What is a Tied Arch?

Page 7: Sherman Minton Bridge

What is a Tied Arch?

WEIGHT OF BRIDGE HANGS FROM HANGERSWEIGHT OF BRIDGE ….. HANGS FROM HANGERS

Think of a bow and arrow…. Stand it on a table like shown P h d th b Push down on the bow What would happen if we cut the string?

Page 8: Sherman Minton Bridge

Tie Girder

Tied arches are FRACTURE CRITICAL bridges.Tied arches are FRACTURE CRITICAL bridges.Loss of the tie = likely collapse of the entire span

Page 9: Sherman Minton Bridge

Web Plate(s)

Flange Plate(s)

Page 10: Sherman Minton Bridge

Wh A Th P bl ?What Are The Problems?

Page 11: Sherman Minton Bridge

Why Sherman Minton?y

Type of Material Type of Material “T1” Steel VERY high strength steelg g Susceptible to FRACTURE at cold temperatures and with

small cracks

Sensitive Details Tie girder welds Diaphragm plates Lateral bracing details

Page 12: Sherman Minton Bridge

Tie Girder Welds

176 Individual welds per tie x 2 ties x 2 spans = 704 potential fracture sitesp p p

Page 13: Sherman Minton Bridge

Tie Girder Welds

Page 14: Sherman Minton Bridge

Tie Girder Concerns

…the serious consequences of weld cracking associated with the q gtie girder of a tied arch structure should not be overlooked.

Fracture Critical Tie Girder

Lack of Internal Redundancy of the welded Tie Girder

Source: 1978 FHWA Technical Advisory

Page 15: Sherman Minton Bridge

Diaphragm Lugsp g g

33 diaphragms per tie x 2 ties x 2 spans x 8 lugs per diaphragm x 2 legs = 2112 weldsp g p p g p p g g

Page 16: Sherman Minton Bridge

Diaphragm Lugsp g g

gmPlat

e

Diaphragm lug

Dia

phra

Web

P

Flange Plate

Page 17: Sherman Minton Bridge

Lateral Bracing Platesg

11 panels x 2 plates per panel x 2 ties x 2 spans = 88 connection platesp p p p p p

Page 18: Sherman Minton Bridge

Lateral Bracing Platesg

Page 19: Sherman Minton Bridge

Fi H d RFirst-Hand Response

Page 20: Sherman Minton Bridge

Inspection & Testingp g

COMPLETE hands-on visual inspection of EVERY pINCH of weld metal on the tie girder What can we find?

Nondestructive testing What can we find that we can’t even see?

Extensive sampling of bridge materials How strong, how tough, how big of a crack is “too big”?C ff MOST h i i l Current effort MOST comprehensive visual, nondestructive testing and physical testing program, ever conductedever conducted

Page 21: Sherman Minton Bridge

Hands On Visual Inspectionp

Page 22: Sherman Minton Bridge

Non-Destructive Testingg

Performance Testing Performance Testing of Technicians

Page 23: Sherman Minton Bridge

Tie Girder Welds

Its what we CAN’T see that’s the problem…. Its what we CAN T see that s the problem….

•75% of web plate welds contained “rejectable” jindications”

Page 24: Sherman Minton Bridge

Tie Girder Welds – Past Repairsp

Use of selected Use of selected “coring” repairs

Page 25: Sherman Minton Bridge

Why Even Small Cracks Can Mattery

120

100Basic Material Strength

tren

gth

80

ress

, KSI

ety

Base

d on

St

40

60

Crit

ical

Str

Base

dtu

re

Assumed / Computed LoadingSafe

20

Safe

ty B

on F

ract

00.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00

Flaw Size, inches

Page 26: Sherman Minton Bridge

Bridge Closedg

Page 27: Sherman Minton Bridge

Retrofit Options Consideredp

Option #1 Local Plating Option #1 Local Plating 50 / 100 ksi local plating of joints

Option #2 – Global Plating Option #2 Global Plating Extension of Option #1 with extra full length plates

Option #3 – Tie Post Tensioning Option #3 – Tie Post Tensioning Full length PT of the tie to fully or partly decompress

the section

Option #4 – Tie Replacement Sequential replacement of the tie in place Sequential replacement of the tie in place

Page 28: Sherman Minton Bridge

3D Model

Page 29: Sherman Minton Bridge

Local Model Details

Page 30: Sherman Minton Bridge

PT Deformations x50

Vertical and horizontal deformations approximately 6” each

Page 31: Sherman Minton Bridge

Global Plating Alternateg

Page 32: Sherman Minton Bridge

Local Plating Alternateg

Page 33: Sherman Minton Bridge

Tie Replacement Alternatep

Page 34: Sherman Minton Bridge

Comparison Matrixp

Working Options Description

Duration in    

MonthsOpen to Traffic 

DateEstimated 

CostRemaining Service Life Value Level of Public Safety

1 Local Plating  xx xx xx xx xx xx

2 Global Plating xx xx xx xx xx xx

3 Post Tensioning xx xx xx xx xx xx

4 Tie Replacement xx xx xx xx xx xx

5Superstructure Replacement xx xx xx xx xx xx

6 Bridge Replacement xx xx xx xx xx xx6 Bridge Replacement xx xx xx xx xx xx

Page 35: Sherman Minton Bridge

Discovery & Solution TimelineDiscovery & Solution Timeline

Inspection NTP to Intermediate Repair

y

Inspection NTP to Intermediate Repair 3.5 months

Intermediate Repair to Finding which closed the Intermediate Repair to Finding which closed the bridge 3 weeks

Bridge Closure to Complete NDT work 3 weeks

Bridge Closure to Advertisement of Contract Documents 3 k 3 weeks

Page 36: Sherman Minton Bridge

SOLUTION

Sherman Minton Bridge Solution Sherman Minton Bridge Solution Global plating Bolt supplemental/alternate tie (plates) along side both sides pp / (p ) g

of ties Complete redundancy / alternate load path

$13 8 Milli (+/ ) $13.8 Million (+/-) 4.5 months (+/-) Open bids 18 October 2011Open bids 18 October 2011

Page 37: Sherman Minton Bridge

High Profileg

Page 38: Sherman Minton Bridge

Lessons Learned - Teamwork / Trust/

CONSULTANTOWNER CONSULTANT

Page 39: Sherman Minton Bridge

Procurement & Process

DESIGN CONSTRUCTIONDESIGN CONSTRUCTION• Design / Bid / Build??• Expedited Contracts• Procuring Unexpected $$$• Design Addendums

• Shifting Staff• Long Hours

• Short Advertisements• Incentives & Disincentives

• Independent Review• Aggressive Deadlines• War Room

Page 40: Sherman Minton Bridge