Manufacturing ProcessGyeongsang National University
Ship Building Process
Su-jin Kim
![Page 2: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/2.jpg)
Manufacturing ProcessGyeongsang National University
Index
1. Design
2. Steel Cutting
3. Block Assembly
4. Painting
5. Block Erection
6. Launching & Outfitting
7. Sea trial & Delivery
![Page 3: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/3.jpg)
Manufacturing ProcessGyeongsang National University
Design Part
![Page 4: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/4.jpg)
Manufacturing ProcessGyeongsang National University
Design Part◈ Basic design
1. A basis modeling which taking a carrying
capacity and speed
2. A performance assessment to a computer
simulation.
3. And computer float analysis
![Page 5: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/5.jpg)
Manufacturing ProcessGyeongsang National University
Design Part
1. The design are firm to the iron board of the at
least to the maximum and to develop fast
speed.
2. Many simulation about the body of ship
structure and computation need.
◈ Hull design
![Page 6: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/6.jpg)
Manufacturing ProcessGyeongsang National University
Design Part
1. A machinery and tools of the boiler room conduit
install task.
2. install the cabin interior, the Electrical wire and
pipe.
◈ Outfitting design
![Page 7: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/7.jpg)
Manufacturing ProcessGyeongsang National University
Steel Cutting
Steel Cutting
The work that the steel place is automaticallycut based upon production design in information
![Page 8: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/8.jpg)
Manufacturing ProcessGyeongsang National University
Steel Cutting
Cutting Progress
1. Marking by NC machine
2. Marked steel
![Page 9: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/9.jpg)
Manufacturing ProcessGyeongsang National University
Steel Cutting
Cutting Progress
1.
3. Cutting
4. In order assembly pregress
![Page 10: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/10.jpg)
Manufacturing ProcessGyeongsang National University
Steel Cutting
Cutting Equipment
Gas based cutterMajor method, by oxygen- acetylene gas Cutting steel that use high-handed oxygen and groove
![Page 11: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/11.jpg)
Manufacturing ProcessGyeongsang National University
Steel Cutting
Cutting Equipment
Plasma cutting When electric discharge occur, It`s plasma Cutting that melt steel and high-handed gas
Laser cutting Cutting that use molting, evaporation and high-handed gas It`s method that can cut 5~7mm steel for the present In oder to apply, need to more development than now
![Page 12: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/12.jpg)
Manufacturing ProcessGyeongsang National University
Block Assembly
Synthesis of
Piece Assembly, Sub Assembly,
Cutting/Bending and so on work that assemble area of ship hull space.
![Page 13: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/13.jpg)
Manufacturing ProcessGyeongsang National University
Image in block assembly factory
Image that set Pin Jig on curved surface of ship hull
![Page 14: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/14.jpg)
Manufacturing ProcessGyeongsang National University
On bottom of a ship department traveling sale frame sticking
Image that is built on Tank Top’s upside.Flat position of welding is proceeded because do turnover after attach traveling sale here
![Page 15: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/15.jpg)
Manufacturing ProcessGyeongsang National University
Image that stern tube block is worked
Some innards and block assembly together worked image
![Page 16: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/16.jpg)
Manufacturing ProcessGyeongsang National University
Image that move block by Heavy Lift Transporter
Image of block that come by painting shop for painting
![Page 17: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/17.jpg)
Manufacturing ProcessGyeongsang National University
Painting
Surface preparationSurface Inspection
Painting
Dry
Touch upDry
Final inspection (Block)
![Page 18: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/18.jpg)
Manufacturing ProcessGyeongsang National University
PaintingBlock
Assembly
Inspection for 2nd surface preparation
High pressure steam cleaning
Touchup
External painting
Dry
Inspection (Hull exterior)
Launching
![Page 19: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/19.jpg)
Manufacturing ProcessGyeongsang National University
Block Erection
• The process of building a ship afterwards the welding, after moving the blocks (which was made on the ground) by using the Gantry Crane.
![Page 20: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/20.jpg)
Manufacturing ProcessGyeongsang National University
PE : Pre-Erection
• PE : Pre-Erection - PE is the process of
making large before moving blocks to the dock.
![Page 21: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/21.jpg)
Manufacturing ProcessGyeongsang National University
Keel Laying & Lord Point
• Keel Laying
- The standard block in the Erection process
• Lord point
- The connection point between the wires and the block.
![Page 22: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/22.jpg)
Manufacturing ProcessGyeongsang National University
Floating Dock
- Samsung Heavy Industries
SLS : Skid Launching System
- STX Shipbuilding
![Page 23: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/23.jpg)
Land Building - Hyundai Heavy Industries
DAM - Hanjin Heavy Industries
Manufacturing ProcessGyeongsang National University
![Page 24: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/24.jpg)
Launching
• Major Methods
1. Slip-way launching
2. Float-out launching
3. Lift-on launching
Manufacturing ProcessGyeongsang National University
![Page 25: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/25.jpg)
Manufacturing ProcessGyeongsang National University
Launching
![Page 26: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/26.jpg)
Manufacturing ProcessGyeongsang National University
Outfitting
• Methods
Each mechanic part assembling & pipe laying & electronic equipment installing .
![Page 27: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/27.jpg)
Manufacturing ProcessGyeongsang National University
Sea trial & Delivery
Once the construction of the vessel is completed a sea trial is conducted in the presence of the ship’s owner register of shipping.
< Sea trials >
![Page 28: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/28.jpg)
Manufacturing ProcessGyeongsang National University
speed test( 속력시험 )
a rear guard test( 후진시험 )
Turning test( 선회 시험 )
steering test( 조타 시험 )
acceleration test( 가속성시험 )
the amount of fuel consumed test
( 연료 소비량 시험 )
the continuation of a voyage test ( 속항 시험 )
The test lists of sea trial
![Page 29: Ship Building](https://reader036.vdocument.in/reader036/viewer/2022062500/5695cf2f1a28ab9b028cf6a8/html5/thumbnails/29.jpg)
Manufacturing ProcessGyeongsang National University
Once the vessel is completed, it is named, and this naming process is called Naming ceremony.
< Naming ceremonyNaming ceremony >