shower screen and door kit instructions - everton€¦ · everton.com.au 1 important notice...
TRANSCRIPT
Shower Screen and Door Kit Instructions Step by step guide
everton.com.au
WARNINGFor personal safety when handling glass ALWAYS wear appropriate eye protection, full length clothing, gloves and steel-capped shoes.
everton.com.au 1
IMPORTANT NOTICEIMPORTANT: The glass panels used for Highgrove frameless shower screens are made from Grade A Toughened Safety Glass that complies with the relevant Australian Standards. Although it is very tough, it can still be damaged and break if not handled correctly. Please read all instructions, prior to installation.
1) DO NOT rest or place the glass panels on hard surfaces like tiles, concrete, other glass panels or metal surfaces. Always cushion the edges with cardboard, soft timber or rubber mat.
2) DO NOT install the glass panels with just one person. The glass panels are heavy and you should have another person assist you to avoid injury.
3) DO NOT attempt to cut, drill or grind the glass panel. Toughened Safety Glass is not like ordinary glass.
Any such actions would cause the entire panel to shatter into thousands of tiny pieces. (This is not because of inferior quality but it is part of the design criteria specified by Australian Standard AS2208 to avoid large shards of glass in case of accidental breakage).
4) DO NOT use abrasive cleaners or powders to clean the glass panels or components.
5) DO NOT use any acidic or caustic Silicone or chemicals on any part of the shower screen assembly.
6) DO NOT impact or scratch the glass panels with any sharp metallic objects or tools.
7) DO NOT knock one glass panel against another glass panel. Take special care to avoid any impact during the installation as this may cause damage or result in breakage.
If you are unclear about any part of these instructions, please contact GALE Pacific.
Australia New ZealandPhone 1800 331 521 Phone 0800 555 171
Web everton.com.au Web evertonglass.co.nz
Email [email protected] Email [email protected]
WARNINGFor personal safety when handling glass ALWAYS wear appropriate eye protection, full length clothing, gloves and steel-capped shoes.
everton.com.au 2
Before handling glass panels ensure correct Personal Protective Equipment (PPE) is worn; eye protection, full length clothing, gloves and steel-capped shoes.
If glass panels need to be rested on the ground during installation, ensure timber or rubber blocks are used to protect the edge of the glass panel on hard surfaces.
IMPORTANT — GLASS IS FRAGILE AND CAN SHATTER
2 PEOPLE ARE REQUIRED FOR GLASS PANEL INSTALLATION TO AVOID GLASS DAMAGE AND SERIOUS INJURY.
Ensure you read all instructions completely before commencing.
WARNINGSTRICTLY
2 PERSON LIFT
everton.com.au 3
Before commencing installation, ensure you have the following components:
Shower Screen
E) 1 x Allen key
G) 4x mounting brackets
L) 2x 25mm Phillips head screws
M) 2x 15mm Phillips head screws
K) 4x masonry / ceramic plugs
I) 2x clear rubber glazing blocks
N) 4x 2mm gasket - bottom of mounting bracket
O) 4x thin gasket - side of mounting bracket
Shower Door Kit
E) 1 x Allen key
G) 4x mounting brackets
L) 2x 25mm Phillips head screws
M) 2x 15mm Phillips head screws
K) 4x masonry / ceramic plugs
I) 2x clear rubber glazing blocks
N) 4x 2mm gasket - bottom of mounting bracket
O) 4x thin gasket - side of mounting bracket
F) 2x hinges
J) 4x black rubber adhesive gaskets
D) 8x screw caps
H) 1x door handle
FIXED PANEL (A)
1175 x 2000mm
or
875 x 2000mm
or
600 x 2000mm
HINGE PANEL
(B)
254 x 2000mm
DOOR PANEL (C)
600 x 1995mm
(to allow for
door swing)
Throughout this instruction booklet, the following glass panels will be referred to as; Panel A, Panel B and Panel C.
Shower Screen Shower Door Kit
everton.com.au 4
You will also need the following tools:
A) Pencil for marking lines (ensure you use a pencil or marker that can be removed from tiles)
B) Drill
C) 6mm diamond core drill bit
D) Utility knife
E) Spirit level
F) Phillips head screw driver
G) A suitable bathroom silicone with mould inhibitor and caulking gun
H) Water spray bottle
I) Gloves, safety glasses and silicone spatula (Recommended pack: Highgrove Glass Installation Kit 1142367 — 2 sets of gloves and silicone spatula)
J) Timber or rubber blocks to rest glass on
A) B) C) D)
E) F) G)
H) I) J)
D x 8 E x 2 F x 2 J x 8 K x 8 L x 8G x 8 H x 1 I x 4
M N M
D) G) H) I) J) K) L)E) F)
M) N) O)
D x 8 E x 2 F x 2 J x 8 K x 8 L x 8G x 8 H x 1 I x 4
M N M
D x 8 E x 2 F x 2 J x 8 K x 8 L x 8G x 8 H x 1 I x 4
M N M
D x 8 E x 2 F x 2 J x 8 K x 8 L x 8G x 8 H x 1 I x 4
M N M
everton.com.au 5
STEP 1On the base of the shower mark two HORIZONTAL centre lines (A) that will guide the installation and placement of your panels. For a fixed shower panel these lines will be the panel width (600mm, 875mm or 1175mm). For a door panel kit, the measurement will be 865mm to the internal side of the fixed panel.
Position a spirit level on the centre lines next to BOTH fixed shower walls and make a VERTICAL line to 2000mm (B).
This will be the top of your shower screen.
NOTE: A spirit level must be used to ensure vertical straightness.
2000mm
TOP OF SHOWER SCREEN HEIGHT
(B)
2000mm
TOP OF SHOWER SCREEN HEIGHT
(B)
PANEL ORDOOR KIT WIDTH
(A)
PANEL ORDOOR KIT WIDTH
(A)
VIDEO INSTRUCTIONS ARE AVAILABLE AT www.everton.com.au/diy-hub/shower-screen-install
everton.com.au 6
STEP 2Along the VERTICAL centre lines created in STEP 1, mark the position of the WALL mounted brackets at 200mm and 1800mm from the floor.
Along the HORIZONTAL centre lines created in STEP 1, mark the position of the FLOOR mounted brackets at 50mm from the wall and 100mm from the end of Panel A.
Where an optional door kit is to be installed: Along the HORIZONTAL centre line created in STEP 1, mark the position of the FLOOR mounted brackets at 50mm and 200mm from the adjacent wall.
Mark the position of the screw holes to be drilled.
STEP 3Check for a gasket in the wall bracket. If there is a clear gasket, remove it.
Peel the paper from the back of the gasket (O) and insert it into the mounting brackets (G) to the side opposite the grub screw.
Using a 6mm diamond core drill bit, drill the marked holes (four holes) from Step 2 as follows: Floor holes 15mm, wall holes 25mm
As the waterproof membrane may be breached when drilling the mounting hole, we recommend that you put a small amount of silicone into the hole.
Insert plugs (K) into each hole and cut off any excess protruding from the wall or floor.
Fix the mounting brackets (G) to the walls and floor with the provided screws (L & M) and tighten so that the head of the screw does not protrude. Ensure the screw side of each bracket faces the inside of the shower.
Ensure grub screws have been loosened and do not protrude into the internal section of the bracket. Make sure the plastic cap is in place on the grub screw.
1800mm
FOR DOOR PANEL KIT
FOR SHOWER SCREEN PANEL
1800mm
200mm
50mm
200mm
100MM
50mm
200mm
SIDE WITHOUT GRUB SCREW TO FACE OUTSIDE OF SHOWER
ENSURE GRUB SCREW IS NOT PROTRUDING INSIDE THE BRACKET
everton.com.au 7
STEP 4Insert the 2mm gaskets (N) into the brackets to cover the screws and the metal surface.
Clean any marks you have made with your marker or pencil.
Cut the supplied clear rubber blocks to approximately 6mm and place in front of each floor mounted bracket to protect Panel A and Panel B edges from damage.
The blocks will be trimmed once the glass has been installed.
The glass panel must be permanently supported by rubber blocks and not rest on the metal mounting brackets.
If your floor is not flat, the glazing blocks can cut to different thicknesses and used to level the screen.
STEP 5Before handling glass panels ensure correct Personal Protective Equipment (PPE) is worn; eye protection, full length clothing, gloves and steel-capped shoes.
If glass panels need to be rested on the ground during installation, ensure timber or rubber blocks are used to protect the edge of the glass panel on hard surfaces.
Ensuring you have Panel A up the correct way, with the Highgrove logo positioned at the bottom of the panel - remove the black corner protectors. Carefully lower the panel into the FLOOR brackets and onto the rubber blocks.
Once inserted into the floor brackets, you can now carefully slide Panel A into the WALL brackets.
Ensure Panel A is level. If not, adjust the size of the clear rubber blocks, they can be cut to the desired thickness. Do not exceed a 12mm gap between Panel A and the wall.
Once Panel A is level, HAND tighten using Allen key provided. If you are not installing a door kit, skip to step 7.
IMPORTANT — GLASS IS FRAGILE AND CAN SHATTER
2 PEOPLE ARE REQUIRED FOR GLASS PANEL INSTALLATION TO AVOID GLASS DAMAGE AND SERIOUS INJURY.
Ensure you read all instructions completely before commencing.
Always protect the corners and edges of the glass panels which are vulnerable to damage.
WARNINGSTRICTLY
2 PERSON LIFT
CUT BLOCK TO 6mm FOR RESTING THE GLASS PANEL
6mm
INSERT INTO FLOOR BRACKETS FIRST
INSERT INTO WALL BRACKETS SECOND
PANEL A
DO NOT EXCEED 12mm GAP BETWEEN PANEL & WALL
12mm
everton.com.au 8
STEP 6 – DOOR KIT ONLY
REPEAT STEPS 1–5 FOR PANEL B
Ensuring you have Panel B up the correct way, with the Highgrove logo positioned at the bottom of the panel, now carefully lower the panel into the FLOOR brackets and onto the rubber blocks.
Once inserted into the floor brackets, you can now carefully slide Panel B into the WALL brackets.
IMPORTANT — GLASS IS FRAGILE AND CAN SHATTER
2 PEOPLE ARE REQUIRED FOR GLASS PANEL INSTALLATION TO AVOID GLASS DAMAGE AND SERIOUS INJURY.
Ensure you read all instructions completely before commencing.
WARNINGSTRICTLY
2 PERSON LIFT
PA
NE
L
B PANEL A
606mm
606mm
everton.com.au 9
Ensure Panel B is level. If not, adjust the size of the clear rubber blocks. Do not exceed a 12mm gap between Panel B and the wall.
Before tightening all grub screws for Panel B, ensure the door opening is 606mm from the end of Panel A.
Once Panel B is level and 606mm from the end of Panel A, HAND tighten all grub screws.
STEP 7Using a suitable bathroom silicone with mould inhibitor, fill the joints between Panels A and B and the wall. Spray water over the sealed area before using an Highgrove silicone spatula to scrape off the excess.
Repeat this action until the excess silicone is cleared.
Repeat the step on both sides of the glass and allow the silicone to cure (refer to manufacturers specifications) before hanging the door.
If you are not installing a door kit, skip to step 10.
STEP 6 Cont.
PA
NE
L
B PANEL A
606mm
606mmDO NOT EXCEED 12mm GAP BETWEEN PANEL & WALL
12mm
everton.com.au 10
STEP 8DO NOT ATTEMPT TO HANG THE DOOR UNTIL SILICONE HAS FULLY CURED.
Attach the hinges to the recesses in Panel B ensuring the Allen head screws are facing the inside of the shower.
Ensure hinges are square and level on the glass panel, as per the below images.
STEP 9Always protect the corners and edges of the glass panels which are vulnerable to damage. Place two rubber blocks in the door opening to prevent damage and allow for proper door clearance.
Before handling glass panels ensure correct Personal Protective Equipment (PPE) is worn.
SLOWLY lift Panel C (Door) into position on the rubber blocks, ensuring the door is facing the right way up.
Fix the Panel B hinges to Panel C, ensuring gaskets are fitted to EACH side of the glass when installing hinges.
Before tightening hinge screws, ensure there are even gaps between Panel B and Panel C, and Panel C and the edge of Panel A.
IMPORTANT — GLASS IS FRAGILE AND CAN SHATTER
2 PEOPLE ARE REQUIRED FOR GLASS PANEL INSTALLATION TO AVOID GLASS DAMAGE AND SERIOUS INJURY.
Ensure you read all instructions completely before commencing.
WARNINGSTRICTLY
2 PERSON LIFT
NOTE: USE LEVEL TO ENSURE HINGE IS LEVEL AND FLUSH WITH GLASS EDGES BEFORE TIGHTENING.
GRUB SCREWS FACE TOWARDS INSIDE OF SHOWER
GRUB SCREWS FACE TOWARDS INSIDE OF SHOWER
PANEL B
RECESS
NOTE: USE LEVEL TO ENSURE HINGE IS LEVEL (AS ABOVE)
everton.com.au 11
STEP 10Tighten the hinges and carefully remove the rubber blocks from under the door.
Cut the excess blocks away (installed in Step 4) from the bottom of Panel B and Panel A, ensuring you leave a rubber section directly under Panel B and Panel A for support.
Seal the bottom gap of Panel B and Panel A according to step 7.
Inspect hinges and mounting brackets regularly and adjust and tighten as necessary. Ensure silicone between joints is in good condition.
We recommend cleaning glass regularly with water and mild detergent using a microfibre cloth.
STEP 9 Cont.
PA
NE
L B
PANEL APANEL C
3mm
3mmENSURE TOP & BOTTOM ARE ALIGNED/LEVEL
WARNINGFor personal safety when handling glass ALWAYS wear appropriate eye protection, full length clothing, gloves and steel-capped shoes.