sign - iabpiabp.co.uk/wp-content/uploads/2018/06/revised_current...2 17 98 11a sign mtght client:...

1
2 17 98 11A Sign Client: Drg Title: Drg No: Scale: Date: IABP Masterplan Layout L(90)002 Revision: 1:2500 @ A3 03.04.18 Attenuation Pond A Attenuation Pond B Site 1 Site 2 2/1 Site 3 Site 4 Attenuation Pond E Attenuation Pond C Attenuation Pond F Site Site AC Site 1 Area 9.3 Site 2 Area 6.1 Site 3 Area 16.8 Site 4 Area 12.6 TOTAL 48.1 Attenuation Sqm Attenuation Pond A 900 Attenuation Pond B 1,500 Attenuation Pond C 1,300 Attenuation Pond E 1,800 Attenuation Pond E 1,650 Site Site Office Commercial Hotel Plot AC Sqft Sqft Beds Site 1 1/1 1.3 12,500 1/1 1.1 8,200 1/3 1.9 17,500 1/4 1.9 17,500 Site 2 2/1 2.5 12,500 2/2a 0.93 10,600 2/2b 0.5 5,000 2/3a 1.0 16,000 2/3b 0.5 6,450 Site 3 3/1 0.6 10,000 3/2 0.6 10,000 3/3 0.6 10,000 3/4 1.2 15,000 3/5 1.2 15,000 3/6 0.6 6,000 3/7 0.6 6,000 3/8 0.6 6,000 3/9 0.6 6,000 3/10 2.0 29,000 3/11 2.3 15,350 3/12 0.7 9,500 Site 4 4/1 2.0 120 4/2 1.4 3,000 4/3 2.5 120 4/4 2.1 120 4/5 2.4 100 Total Area 33.63 60,000 187,100 460 1. 3. 2. 4. Water pumping station Main Airport access road joining A96 Inverness - Aberdeen Inverness Airport Terminal Dalcross Industrial Estate 2/2a 2/3a 3/2 3/1 3/3 3/4 3/5 3/6 3/7 3/8 3/9 3/12 3/11 3/10 4/1 4/2 4/3 4/4 4/5 1/1 1/2 1/3 1/4 Access to future phases of development Access to future phases of development Future Roundabout R3 Future Roundabout R4 Future Roundabout R2 Existing Roundabout R1 Future pedestrian link Site 4 to Terminal 2/2b 2/3b

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sign - IABPiabp.co.uk/wp-content/uploads/2018/06/Revised_Current...2 17 98 11A Sign MTGHT Client: Drg Title: Drg No: Scale: Date: IABP Masterplan Layout L(90)002 Revision: 1:2500 @

2

1798

11A

Sign

MTGHT

Client:

Drg Title:

Drg No:

Scale: Date:

IABP

Masterplan Layout

L(90)002

Revision:

1:2500 @ A3 03.04.18

Attenuation Pond A

Attenuation Pond B

Site 1

Site 2

2/1

Site 3

Site 4

Attenuation Pond E

Attenuation Pond C

Attenuation Pond F

Site Site

AC

Site 1

Area 9.3

Site 2

Area 6.1

Site 3

Area 16.8

Site 4

Area 12.6

TOTAL 48.1

Attenuation Sqm

Attenuation Pond A 900

Attenuation Pond B 1,500

Attenuation Pond C 1,300

Attenuation Pond E 1,800

Attenuation Pond E 1,650

Site Site Office Commercial Hotel

Plot AC Sqft Sqft Beds

Site 1

1/1 1.3 12,500

1/1 1.1 8,200

1/3 1.9 17,500

1/4 1.9 17,500

Site 2

2/1 2.5 12,500

2/2a 0.93 10,600

2/2b 0.5 5,000

2/3a 1.0 16,000

2/3b 0.5 6,450

Site 3

3/1 0.6 10,000

3/2 0.6 10,000

3/3 0.6 10,000

3/4 1.2 15,000

3/5 1.2 15,000

3/6 0.6 6,000

3/7 0.6 6,000

3/8 0.6 6,000

3/9 0.6 6,000

3/10 2.0 29,000

3/11 2.3 15,350

3/12 0.7 9,500

Site 4

4/1 2.0 120

4/2 1.4 3,000

4/3 2.5 120

4/4 2.1 120

4/5 2.4 100

Total Area 33.63 60,000 187,100 460

1.

3.

2.

4.

Water pumping station

Main Airport access road joining

A96 Inverness - Aberdeen

Inverness Airport

Terminal

Dalcross Industrial Estate

2/2a

2/3a

3/2

3/1

3/3

3/4

3/5

3/6

3/7

3/8

3/9

3/12

3/11

3/10

4/1

4/2

4/3

4/4

4/5

1/1

1/2

1/3

1/4

Access to future phases

of development

Access to future

phases

of development

Future

Roundabout

R3

Future

Roundabout

R4

Future

Roundabout

R2

Existing

Roundabout

R1

Future pedestrian link

Site 4 to Terminal

2/2b

2/3b

AutoCAD SHX Text
FP
AutoCAD SHX Text
GP
AutoCAD SHX Text
PE
AutoCAD SHX Text
FV
AutoCAD SHX Text
FV
AutoCAD SHX Text
MTGHT