This presentation deals with the training in Indian Railways.Basically it focus on Siganaling & Telecommunication.It has Basically 3 aspects- 1) how the pesengers are going to interect with Indian railways. 2) how the train are going to occupy speciic track. 3) How the various railway stations all over india are interconnected with each other -"RAILNET"

TRANSCRIPT

Page 1: Signalling and telecommunication

Presented by:-Vishwajeet Singh

SIGNALING &TELECOMMUNICATION

Page 2: Signalling and telecommunication

P Ressenger

esservation System

SystemU Tnreserved icting

&R IRrout elay nterlockingPanelRAILway TELecommunication

Page 3: Signalling and telecommunication

PRS :-PRS is computerized reservation system for any train from anywhere in country, launched on 15th November 1985.

The system works both on the optical fiber cable & the microwave communication at the data rate of 4.8 kbps or 9.6 kbps.

Page 4: Signalling and telecommunication
Page 5: Signalling and telecommunication

Provide Reserved

Accommodation On Any Train

From Any Counter

Accounting Of Money

Collected

Preparation Of Train Charts

Objective

Page 6: Signalling and telecommunication

MODEM Multiplexin

g Equipment

END TERMINAL

Equipment used in PRS:-

Modem means modulate and demodulate.We can use modems to log on to micro, mini, main frame computer for line processing.

It is the process of converting multi inputs signal into one output signal

MUX

I0

I1

I2

I3

S0 S1

O/P

The end terminal of the system is the station where tickets are to be printed out. It consists of a company system with a dot matrix printer

Page 7: Signalling and telecommunication

It is a computerized system used to issue the tickets for the unreserved compartments of train .

The system is programmed according to the type of the train.

The system works at the data rate of the 64 kbps .

UTS:-

Page 8: Signalling and telecommunication

BLOCK DIAGRAM :-

Page 9: Signalling and telecommunication

Equipment used in UTS:-

Terminal and

terminal server

Baseband Modem

Router

It is the end point of the network from where tickets are to be printed out .It consists of a monitor, a keyboard and a matrix printer.

This device is used to interconnect user devices with each other over 2-wire circuits. The ports available for the interfacing are G-703, V.35, V.24, V.11.

Router is used to detect the quality samples from different branches and start sending data from that branch which has good quality ratio. The router has 25 input terminals, which means that 25 branches can be connected to the router. 

Page 10: Signalling and telecommunication

RRI PANNEL :-

It will display the position of trains, signals aspects &point conditions. The panel contains switches for performing different operations.The panel contain 2 seven segment display .One speaker is also placed for making necessary appointments. 

Page 11: Signalling and telecommunication

TMS CONTOL CENTER AT MUMBAI :-

Page 12: Signalling and telecommunication

Screen Shot Of Signaling Layout Display In Control Room:-

Page 13: Signalling and telecommunication

Route Selection:-

Page 14: Signalling and telecommunication

Route Occupation Display:-

Page 15: Signalling and telecommunication

Tracking The Movement Of The Train:-

Page 16: Signalling and telecommunication

The Train Has Released The Points:-

Page 17: Signalling and telecommunication

Two Trains Are Displayed:-

Page 18: Signalling and telecommunication

A Second Route Is Selected:-

Page 19: Signalling and telecommunication

The Third Trains Arrives:-

Page 20: Signalling and telecommunication

Train 6460 Moves Towards The Siding:-

Page 21: Signalling and telecommunication

The Third Route Is Set Up:-

Page 22: Signalling and telecommunication

Two Routes Freed For Up And Down Train To Procced:-

Page 23: Signalling and telecommunication

RAILTEL :-

Rail net is an internet for railways.Important information and data can be transformed from one division to other division.

Within less time in railways current position of train can be obtained in PRS.

The connectivity of different reservation take place with the help of rail net.

Page 24: Signalling and telecommunication

BLOCK DIAGRAM :-

Page 25: Signalling and telecommunication

CONCLUSION:-

These 3 aspect which i presented in front of you are the building block of railway.

Which deals with detail study of signal, control and communication.

Which in turn help me to develop a practical view of the subject which I have learnt in my engineering period.

Page 26: Signalling and telecommunication

THANK YOU:-