Page 1: SIKA AT WORK SYDNEY CRICKET GROUND LOWER CONCOURSE · PROJECT OVERVIEW & REQUIREMENTS PROJECT DESCRIPTION The Sydney Cricket Ground, originally built in 1882, is one of the most …

SIKA AT WORKSYDNEY CRICKET GROUNDLOWER CONCOURSEProduct: Sikafloor 160, Sikafloor 264

Page 2: SIKA AT WORK SYDNEY CRICKET GROUND LOWER CONCOURSE · PROJECT OVERVIEW & REQUIREMENTS PROJECT DESCRIPTION The Sydney Cricket Ground, originally built in 1882, is one of the most …

PROJECT OVERVIEW & REQUIREMENTS

PROJECT DESCRIPTIONThe Sydney Cricket Ground, originally built in 1882, is one of the most iconic sporting stadiums in Australia and home to a number of sporting teams including the Sydney Sixers cricket team and the Sydney Swans. With a capacity of 48,000, the stadium is an important part in Australia’s sporting culturewith the ground hosting over 100 cricket test matches, includ-ing the most recent Ashes series.

Given the arena supports many teams and hosts events all year round, millions of spectators pass through its gates every year. This results in a need for constant maintenance of the stadium, including its numerous high-traffic flooring areas.

Page 3: SIKA AT WORK SYDNEY CRICKET GROUND LOWER CONCOURSE · PROJECT OVERVIEW & REQUIREMENTS PROJECT DESCRIPTION The Sydney Cricket Ground, originally built in 1882, is one of the most …

PROJECT REQUIREMENTSThe project required a flooring solutions for the lower con-course of the Bradman, Noble and Messenger stands. Given the high levels of foot traffic the area would receive, the flooring solution needed to be extremely tough, durable while being easy to clean and somewhat aesthetically pleasing.

A challenge for this project was the time restraints. With the ground set to be home for the impending 3 match series of Major League Baseball, with two teams from the US and Team Australia competing there, a rapid solution was required for the 2000m2 area. Firmstone flooring was appointed to apply the floor and was given approximately 10 days to prep and lay.

PROJECT OVERVIEW & REQUIREMENTS

SIKA’S DURABLEFLOORING SOLUTION

SIKA SOLUTIONFirmstone Flooring Specialists, with their extensive knowl-edge and application experience were sub-contracted by AW Edwards for the project.

Working quickly to have the project finished on time, Sikafloor 160 was utilised as a primer for the 2000m2 area, followed by two coats of of Sikafloor 264 with a 60 mesh Aluminium oxide.

Page 4: SIKA AT WORK SYDNEY CRICKET GROUND LOWER CONCOURSE · PROJECT OVERVIEW & REQUIREMENTS PROJECT DESCRIPTION The Sydney Cricket Ground, originally built in 1882, is one of the most …

SIKA’S DURABLE FLOORINGSOLUTION

SIKA SOLUTION CONT.Sikafloor®160 is a 2-part solvent free epoxy primer and binder,modular Sikafloor system, and has been used in past projects such as the MCG flooring, the retail flooring in the refurbished DFO Homebush Homemaker Hub in Sydney, as well as the Perth Arena.

Sikafloor® 264 is a 2-component solvent free pigmented epoxy resin based flooring system and has a high build roll coat.

Both of these components combined provided a tough and non-slip surface that will provide a valuable service to one of Australia’s most iconic sporting venues for years to come.

Page 5: SIKA AT WORK SYDNEY CRICKET GROUND LOWER CONCOURSE · PROJECT OVERVIEW & REQUIREMENTS PROJECT DESCRIPTION The Sydney Cricket Ground, originally built in 1882, is one of the most …

Our most current general sales conditions shall apply. Please refer to the relevant data sheet prior to any use or processing.

SIKA AUSTRALIA55 Elizabeth StreetWetherill Park, NSW, 2164Australia

ContactPhone +61 2 9725 1145Fax +61 2 9725 2605aus.sika.com

PROJECT DETAILSDate: March 2014Location: Moore Park, Sydney, New South WalesContractors: FirmstoneSika Representative: Lindsay Wright

SIKA’S DURABLE FLOORINGSOLUTION