simplifying data center design/ build

42
1 Simplifying Data Center Design/Build A new approach to deliver speed, cost, and performance (availability, efficiency, scalability)

Upload: schneider-electric

Post on 15-Jan-2015

398 views

Category:

Technology


7 download

DESCRIPTION

When it comes to designing, building, and operating mission-critical data centers, simple is better. Data centers are faster and cheaper to build, and more reliable with lower total cost of ownership (TCO), when they start with a dramatically simplified design and build process that incorporates these elements: reference designs, pre-fabricated/modular architecture, partners that bring comprehensive capabilities into play, and coordinated planning around software, operations, and service. What you will learn: The top 5 weaknesses of today’s design/bid/build approach A simplified approach using reference designs and pre-fab products can preserve Day 1 capital and improve speed to market An integrated solution provider (Design, Build, Hardware and Operations) can optimize CapEx, OpEx and TCO.

TRANSCRIPT

Page 1: Simplifying Data Center Design/ Build

1

Simplifying Data Center Design/Build

A new approach to deliver speed, cost, and performance (availability, efficiency, scalability)

Page 2: Simplifying Data Center Design/ Build

2

Your ability to compete relies on the design, build, and operation of your data center

Whether you are an Enterprise or in the data center business

Page 3: Simplifying Data Center Design/ Build

33

Trends

Page 4: Simplifying Data Center Design/ Build

4

The Internet of Everything is driving the need for large amounts of computing power, bandwidth and storage

Source: Cisco IBSG, April 2011

Number ofconnections

Number ofmeaningful interactions

It would take you 5 years to view the video crossing IP networks each second

It would take you 5 years to view the video crossing IP networks each second

Page 5: Simplifying Data Center Design/ Build

55

IT Trends

Social technologies

Servers without UPSCloud

computing

Energy consciousness

Lower tiers Mobile devices

Converged IT Prefabricated modular data centers

New cooling techniques

Relaxed operating standards

ColocationRising security concerns

Page 6: Simplifying Data Center Design/ Build

6

The move to Cloud Computing is reinforcing the need for speed, cost, and performance

Promises made by cloud providers

>lower costs

>more modularity and portability

>instant scalability and capacity

>greater application flexibility and portability

Page 7: Simplifying Data Center Design/ Build

7

Room for improvement in performance, cost, and speed

In today’s traditional Design/Bid/Build processes

1. Long design time leading up to construction documents

2. Multiple design and/or equipment changes drive up cost and construction time

3. Multiple vendor management

4. Multiple markups driving higher overall cost

5. Coordination and integration challenges increasing both cost and construction time

Top 5 Weaknesses

Lower Performance

HigherCost

SlowerSpeed

Page 8: Simplifying Data Center Design/ Build

88

How Schneider Electric Can Work With You

Page 9: Simplifying Data Center Design/ Build

9

We provide the supply model you prefer

Complex Data Center systems that are key pieces of Data Center domains – IT Room, Facility Power, Facility Cooling, Security, DCIM

SubsystemsInnovative combination of technology, products, and services providing an integrated, high value response to Data Center customer needs

Solutions100,000+ catalog of Data Center components and individual software modules

Components

Page 10: Simplifying Data Center Design/ Build

10

We can work with you in many ways

To solve your business challenges

TurnkeyProvider

Trusted Advisor

Facility Operator

DCIM Integrator

TurnkeyProvider

Trusted Advisor

Facility Operator

DCIM Integrator

Power Quality Software SupplierPower Quality Software Supplier

Switchgear SupplierSwitchgear Supplier

Building Operations Software SupplierBuilding Operations Software Supplier

UPS SupplierUPS Supplier

IT Room Management Supplier

IT Room Management Supplier

IT Rack SupplierIT Rack Supplier

Remote Monitoring Provider

Remote Monitoring Provider

UPS Maintenance Provider

UPS Maintenance Provider

Software InstallerSoftware Installer

Arc-flash AssessorArc-flash Assessor

Project ManagerProject Manager

Design AssistantDesign Assistant

SolutionsSolutions

Hardware & SoftwareHardware & Software Services Services

Page 11: Simplifying Data Center Design/ Build

1111

Schneider Electric Approach

Page 12: Simplifying Data Center Design/ Build

12

The Schneider Electric approach is to dramatically SIMPLIFY the process in order to improve performance, cost, and speed

>Services for the life cycle

>Broad offer

>DCIM Software

>Prefabrication – modular standardization

>Tools and Reference designs

Page 13: Simplifying Data Center Design/ Build

1313

Services for the life cycle

Page 14: Simplifying Data Center Design/ Build

14

Schneider Electric as a Data Center service provider

Can support all projects> Small and large

> New and retrofit

Offer complete range of life cycle services

On-site and off-site support> Depth and bench

strength

Minimize risks, expenses, and timeframe

Toolsets with standardized record keeping> History

> Data access

> Entitlements

Processes are documented and mature

Clear escalation paths Globally consistent standards,

offer, coverage, and support Simplified experience means a

“one-stop-shop” for managing all physical infrastructure service needs

Service personnel are trained and certified

Considered to be industry and subject matter experts

Leverage experience to implement and improve best practices

Can attain “Trusted Advisor” status

Page 15: Simplifying Data Center Design/ Build

15

Holistic service…

One company to assess, plan, design, manufacture/build and operate your data center....to improve performance, cost, and speed

Page 16: Simplifying Data Center Design/ Build

16

Schneider’s design/build capabilities NAM...

Focused exclusively on data centers

Perform site evaluations, assessments and capacity planning – IT Room, Power, Cooling, DCIM, Security, Safety

Fully licensed engineering and construction

Able to plan, design, estimate, construct and manage turn-key data center projects

Fixed price, Owner’s agent, CM (contract manufacturer) – flexible delivery methods

Competitive advantage: best in industry $$/kW and fastest delivery

Page 17: Simplifying Data Center Design/ Build

17

Schneider is now a Design/Build firm specializing in simplifying the delivery of data center solutions

Relationship & Accountability

Long-term partner for performance

Global Supply Chain

Single point of accountability

Turn-key solution provider

Competitive delivery $$/kW

Improved Speed-to-Market

Page 18: Simplifying Data Center Design/ Build

18

Maintenance coverage includes simple maintenance to full operations and

optimization services

Maintenance Services

ONE Data Center Contract

Multi-Vendor Maintenance

Managed Services

SE UPS & Cooling

SE UPS, Cooling, ED, Security

All vendor UPS, Cooling, ED, Security

Scheduling, Resources on-site

On-Site DataCenter Operations

Attached

HighlyConsultative

Operations

Page 19: Simplifying Data Center Design/ Build

19

Facility Operation…simple designs and improved controls reduce operational risk and complexity

Emergency Preparation

Maintenance Management

Facility Optimization

Reporting & Analysis

Crisis Planning

Crisis Management

Incident Management

Safety Program

Vendor Management

Maintenance Programs

Energy Management

Reliability Engineering

Space Planning

Regulatory Compliance

Audit Compliance

Capacity Planning

Page 20: Simplifying Data Center Design/ Build

20

With the largest team of expertsSchneider Electric is here for you

With over 7,000 service experts including

>Technicians

>Program managers

>Support staff

>Solution Architects

And a dedicated service supply chain

Page 21: Simplifying Data Center Design/ Build

2121

Broad Offer

Page 22: Simplifying Data Center Design/ Build

22

Modular UPSModular PDU

Rack PDU

Security and Environmental Busway

Rack Systems

Room/Rack/RowCooling

Cable Management

Flexible Air Containment

Row Modular UPS

MV Switchgear

LV Switchgear

LV Panelboards & Switchboards

MV Transformers

Cooling - VSD

Meters

Lighting ControlResource Advisor

Data Center Operation

Building Operation

Power and Data Center Expert

Schneider Electric Data Center Solutions RACK to ROW to ROOM to BUILDING RACK to ROW to ROOM to BUILDING

Page 23: Simplifying Data Center Design/ Build

2323

DCIM Software

Page 24: Simplifying Data Center Design/ Build

24

Data Center Expert

Resource Advisor

Cooling Monitoring ExpertMonitor and control data center cooling

Power Monitoring ExpertAdvanced power monitoring and power quality analysis

Data Center Operation

Manage Data Center assets, operational and capital costs

Advanced monitoring and automation

Track and manage enterprise energy and carbon costs

Comprehensive DCIMComprehensive DCIM

Page 25: Simplifying Data Center Design/ Build

25

StruxureWare Expert software monitors and manages power, cooling and security

Data Center Expert

•PDU’s, RPP’s

•RM PDU’s, Environmental

•Busway, Security

•Panelboards

•UPS

•Security

Power Monitoring Expert

•Switchgear MV & LV

•Metered Breakers & Panelboards, PDU’s, RPP’s

•Busway, Transformers, UPS

•Generators and ATS

Page 26: Simplifying Data Center Design/ Build

26

We make it easy to manage all of your data center assets and operational costs

Data Center Operation● Improved electrical and operational efficiency

● View of overall energy asset utilization to better plan for growth and dynamic change

Page 27: Simplifying Data Center Design/ Build

2727

PrefabricationModular Standardization

Page 28: Simplifying Data Center Design/ Build

28

Data Center components that Schneider Electric offers as prefabricated functional building blocks

Power

Cooling

IT

Page 29: Simplifying Data Center Design/ Build

29

We have introduced a broad offer of prefabricated data center modules

> 90kW All-in-One

> 110kW Single Module

> 205kW Single Module

> 240kW Dual Module

> 250-1.2MW Hydronics Modules

> 250kW – 1.2 MW Packaged Chillers

> Ecobreeze Air Economizer

> 250kW – 500 KW Enclosures

> 1.2 MW Skid Mounted

IT Room Modules Cooling Modules Power Modules

Page 30: Simplifying Data Center Design/ Build

30

Prefabricated Data CentersPerformance, cost, and speed advantages vs. traditional Data Centers

Predictable Performance> The density, availability, and efficiency

you expected

> The cost you were promised

> Project timing as you planned

Faster Deployment> Less decisions necessary for

planning and design

> Up to 60% less time for deployment

> Delivery in 12 weeks or less: PO to ship

Flexibility and Scalability> Defer capital expenses and

maximize cash flow

> Adjust for changing requirements

> Deploy in various configurations of density and availability

Page 31: Simplifying Data Center Design/ Build

31

StruxureWare DCIM Fully instrumented and programmed in each Building Block

Page 32: Simplifying Data Center Design/ Build

32

StruxureWare DCIM dashboard compatibility

Page 33: Simplifying Data Center Design/ Build

33

Modular scalable deployments improve the use of your capital

Power & Cooling

IT Pods

Cooling

PowerCooling

IT

Page 34: Simplifying Data Center Design/ Build

3434

Tools and Reference Designs

Page 35: Simplifying Data Center Design/ Build

35

Our tools and designs are the best around

Customer Access to White Papers, TradeOff Tools, and Education

Library of Complete Data Center Reference Designs from 200 kW to 20MW

White Papers Education

Reference Designs

Page 36: Simplifying Data Center Design/ Build

36

Industry collaboration and “open source” is gaining momentum

With the goal of standardizing components, architectures, and processes

Challenge convention by custom designing servers and data centers from the ground up – and then share these technologies as they evolve

Schneider Electric is the Project Chair for Data Center Design

Challenge convention by custom designing servers and data centers from the ground up – and then share these technologies as they evolve

Schneider Electric is the Project Chair for Data Center Design

Open industry consortium to create a common set of metrics, and develop technical resources and educational tools

Schneider Electric is a founding member and President of The Green Grid

Open industry consortium to create a common set of metrics, and develop technical resources and educational tools

Schneider Electric is a founding member and President of The Green Grid

HP, AMD, VMWare, IBM, Seagate, Facebook, Microsoft, Intel, Schneider Electric and many more

Page 37: Simplifying Data Center Design/ Build

37

Data Center Reference Designs

> Library of engineered reference

designs

> 1, 2, 3.3 and 20 MW deployment

sizes

> Uptime Tier II and III designs

> Design Methodology and Explanation

> System level technical specifications

> Available load, PUE, Density, Layout

> Complete schematics and BOMs

Page 38: Simplifying Data Center Design/ Build

38

Reference Design Options

Semi-Prefabricated Data Center

A Data Center comprised of building blocks

and traditional “stick built”

Fully Prefabricated Data CenterA Data Center comprised completely of

prefabricated IT, Power, and Cooling modules

Could be outside or in a building/warehouse

Traditional “Stick Built” Data Center

Page 39: Simplifying Data Center Design/ Build

39

Schneider Electric traditional “stick built”

> Fully Engineered Design

> 1 MW Tier III

> 140 racks at 6.5 kW/rack

> 2N 1200 kW UPS

> 2N 1200 kW Chillers

> 1000 kW Hydronics Modules

– Calculated PUE = 1.40

– 10-12 Month Greenfield Delivery

– Competitive cost

Reference Design #9

http://designportal.apc.com/dcrd/resources/pdf/en/RD9DSR0.pdf

Page 40: Simplifying Data Center Design/ Build

40

Schneider Electric traditional “fully prefabricated”

> Fully Engineered Design with

prefabricated Power, Cooling and IT

> 2 MW Tier III

– 176 racks at 10 kW/rack

– 2N 1200kW Power Skids

– 2N 3X500 kW Chillers

> 2X1000 kW Hydronics Modules

– Calculated PUE = 1.39

– 12-16 Week Greenfield Delivery

– Competitive cost

Reference Design #36

http://designportal.apc.com/dcrd/resources/pdf/en/RD36DSR0.pdf

Page 41: Simplifying Data Center Design/ Build

41

Customer focused experts

Worldwide teams of experts…>Planning and Design experts>Data Center Solution Architects>Project Managers>Strategic Partners>Solution Centers

Leveraging teamwork to support you

Page 42: Simplifying Data Center Design/ Build

42

Schneider Electric has simplified design and build to improve speed, cost and performance

(availability, efficiency, scalability)

We are streamlining Plan and Design phases with Reference Designs

We are simplifying Design and Build process with prefabricated Data Centers

We employ a worldwide team of Design and Build experts