simplifying electronic document review and approval …fm.sap.com/data/upload/files/simplifying...
TRANSCRIPT
©2012 Waters Corporation 1
Simplifying Electronic Document Review and
Approval With WebDynpro and Active
Directory
John Mayhew
©2012 Waters Corporation 2
Introduction
Challenge to Waters
Problem statement
Solution
Roadmap
Agenda
©2012 Waters Corporation 3
A partner Yesterday, Today and Tomorrow . . .
Global leader with complementary analytical technologies
Separations Sciences (Liquid chromatography)
Mass Spectrometry
Chemistries
Scientific data management applications
Year founded: 1958
Publicly traded corporation
(NYSE:WAT), $1.8B, 2012 Revenues
Headquartered in Milford,
Massachusetts
Number of Employees: 5,000,
including 2,400-strong sales
and service Personnel in 27 countries
©2012 Waters Corporation 5
Pharma &
Biotech - 57%
Industrial, Food &
Environmental - 25%
Academic /
Government - 18%
A partner Yesterday, Today and Tomorrow . . .
Core Competencies: A Total Systems Solution Approach
©2012 Waters Corporation 6
Waters challenge . . .
COMPANY STRATEGY/APPROACH FOR MEETING CUSTOMER’S NEEDS AND HOW WATERS SEE’S ITSELF HAS CHANGED OVER TIME . . .
Discrete component provider
Integrated systems provider
Complete solutions provider
It’s gotten complicated . . .
Waters Design Authority is now Distributed
Major acquisitions are now integrated from an internal PDM
perspective
Global development teams working from the same documents to
govern their product development efforts
©2012 Waters Corporation 7
Waters challenge . . .
EASY ACCESS TO DOCUMENTS
SIMPLE INTERFACE (anyone can understand)
CONTEXT SENSITIVE User Interface (no one can see
what they can’t do . . .)
“USER CENTRIC’ APPROACH (Favorites, recent items,
easy search, etc.)
©2012 Waters Corporation 8
The problem for Waters . . .
User credential authentication inconsistent from one environment to another
Senior Management viewed process for R/3 electronic review and approval to be extremely cumbersome
Casual users continually required re-training - R/3 required too many steps to complete a review and approval transaction
Review/approval comment and mark-ups not easily obtained allowing authors to collate and incorporate into originals when necessary
©2012 Waters Corporation 9
The Solution For Waters . . .
Introduce Active Directory to eliminate credential
authentication issues
Replace R/3 GUI with WebDynpro GUI for Electronic
Document Review and Approval
Replace OOTB R/3 transaction with more intuitive,
flexible and context sensitive transactions
©2012 Waters Corporation 10
The Solution For Waters . . .
Enable document access for review/approval from
multiple access points
Ensure solution is 21-CFR Compliant with electronic
signature rule
Implement a markup tool that facilitates collation /
incorporation of review/approval comments
©2012 Waters Corporation 11
A closer look at the Waters Solution (back office)
Document Types and Document Status Networks
Document Type (PRJ / PRX) Project Documents Sub Document Types -MRD (Market Requirements Document) -PRJPLN (Design & Development Plan) -UREQMT (User Requirements) -PREQMT (Product Requirements) -TSTPLN (Test Plan)
Document Type (QAX) Quality Documents Sub Document Types -PROCED(Process and Procedures) -POLICY (Policies) -WINST (Work Instructions)
©2012 Waters Corporation 12
Author
(UA) Under Approval
Reject Or
Approve
(UA) Under Approval
Reject Or
Approve
(UR) Under Review Review Pass
Or Review Fail
(UR) Under Review Review Pass
Or Review Fail
Document Status Network
(CP) Concept Check In
(OR) Out For Review
(UR) Under Review Review Pass
Or Review Fail
(IW) In Work
Check-Out (RC) Review Complete
(OP) Out For Approval
(UA) Under Approval
Reject Or
Approve
Review Fail
Review Pass
(RG) Release General
Approved
Rejected
Start
End
A closer look at the Waters Solution (back office)
©2012 Waters Corporation 13
Signature Strategies and Review and Approval Strategy Tables
A closer look at the Waters Solution (back office)
©2012 Waters Corporation 14
Signature Strategies and Review/Approval Strategy & Project Tables
A closer look at the Waters Solution (back office)
©2012 Waters Corporation 15
A closer look at the Waters Solution (user interface)
Prior to review or approval
Standard R/3 Presentation
WebDynpro Presentation
©2012 Waters Corporation 16
Review and Approval Agents are displayed
A closer look at the Waters Solution (user interface)
©2012 Waters Corporation 19
A closer look at the Waters Solution (user interface)
Lotus Notes Notification “Review Action Required”
Note: also available using: -R/3 Inbox -Portal Project Collaboration Rooms -Portal UWL
©2012 Waters Corporation 21
A closer look at the Waters Solution (user interface)
WebDynpro Presentation
Standard R/3 Presentation
©2012 Waters Corporation 23
A closer look at the Waters Solution (user interface)
Electronic Signature applied /Comments Entered
©2012 Waters Corporation 24
Notification of completed reviews
Note: Reviews remain open until “Review By” date is reached. Delinquent reviews force emails indicating review pass due.
A closer look at the Waters Solution (user interface)
©2012 Waters Corporation 25
Road Map
Improved 2-D Document Viewing & Markup with BRAVA
Integration (Summer 2013)
Integration with multiple authoring environments (IBM’s
Rational Tool Suite (Summer 2013)
Dynamic document approval strategies. (2014)
©2012 Waters Corporation 27
Roadmap IBM’s Rational (DOORs) Integration
IBM’s Rational DOORs
Key Design Traceability Document Sourcing
Middleware
COM
component (SAPSSOexe)
Calls SAP DIR create Transactions and returns
related metadata
SAP’s Document
Management System
Formal document review and approval
©2012 Waters Corporation 29
Our DMS Platform Solution For Product Development
Review and Approval
Embedded
Markup &
Viewing Tool
BRAVA
Document Management
System
Leveraging common tools provides universal methods for managing documents.
DOORS Authoring Environment
Tool Suite
Change
• Requirements Management • Objective
Evidence • Test Case
Library
• Design Defect Tracking • Test Case Management • Enhancement
Requests
MS Office Authoring Environment
• Plans • Reports • Matrices • Indexes • Certificates • Minutes
Portal Project
Collaboration Rooms/
Document Viewer
Project Room Categories of Folders
• Misc/Ancillary Docs* • WPDP Deliverables • Workflow Deliverables • Optional Deliverables * NOTE: No Review or
Approval required
Doors/SAP Interface
Review and Approval
Access Points
• Portal UWL • Lotus Notes • Project Rooms • R/3 Inbox
Uploaded to & Launched
from Project Room