simulationanticipated construction timeline march 2012 start of telecommunication construction. july...

2
SUMMER 2012 PROJECT UPDATE Project Simulation EXISTING SIMULATION For More Information Website: www.sce.com/eitp Toll-free information line: (866) 977-3487 Make sure to like us on Facebook and follow us on Twitter to get energy efficiency tips, breaking news and crucial safety information. www.facebook.com/socaledison www.twitter.com/socaledison Eldorado-Ivanpah Transmission Project Accessing Solar Energy Resources 2244 Walnut Grove Avenue c/o Public Involvement & Education GO 1, Quad 4C, 472 B Rosemead, CA 91770 Existing view of 115 kilovolt transmission line facing west from Primm Valley Casino Resorts in Primm, Nevada. Simulation of proposed 220 kilovolt lattice steel structure transmission line facing west from Primm Valley Casino Resorts in Primm, Nevada.

Upload: others

Post on 13-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIMULATIONAnticipated Construction Timeline March 2012 Start of telecommunication construction. July 2012 Construction of Ivanpah Substation expected to begin. August 2012 Removal

SUMMER 2012 PROJECT UPDATE

Project SimulationEXISTING

SIMULATION

For More InformationWebsite: www.sce.com/eitp

Toll-free information line: (866) 977-3487

Mak

e su

re to

like

us

on F

aceb

ook

and

follo

w

us o

n Tw

itter

to g

et e

nerg

y ef

ficie

ncy

tips,

br

eaki

ng n

ews

and

cruc

ial s

afet

y in

form

atio

n.

ww

w.fa

cebo

ok.c

om/s

ocal

edis

on

ww

w.tw

itter

.com

/soc

aled

ison

Eldorado-Ivanpah Transmission ProjectAccessing Solar Energy Resources

2244

Wal

nut G

rove

Ave

nue

c/o

Publ

ic In

volv

emen

t & E

duca

tion

GO

1, Q

uad

4C, 4

72 B

Rose

mea

d, C

A 9

1770

Existing view of 115 kilovolt transmission line facing west from Primm Valley Casino Resorts in Primm, Nevada.

Simulation of proposed 220 kilovolt lattice steel structure transmission line facing west from Primm Valley Casino Resorts in Primm, Nevada.

Page 2: SIMULATIONAnticipated Construction Timeline March 2012 Start of telecommunication construction. July 2012 Construction of Ivanpah Substation expected to begin. August 2012 Removal

Anticipated Construction TimelineMarch 2012 Start of telecommunication construction.

July 2012 Construction of Ivanpah Substation expected to begin.

August 2012 Removal of existing 115 kV transmission line and construction of

220 kV transmission line expected to begin.

July 2013 Project is planned to be completed and in-service.

Project DescriptionThe project includes the following major components:

• Construction of a new 220/115 kilovolt (kV) Ivanpah Substation in San Bernardino County,

California

• Replacement of a portion of an existing SCE 115 kV line with a 35-mile double-circuit 220

kV transmission line, connecting the new Ivanpah Substation to SCE’s Eldorado Substation,

near Boulder City, Nevada

• Upgrades at Eldorado Substation to support the connection of new transmission line

• Installation of fiber optic and microwave communication equipment to connect the project

to SCE’s existing telecommunications system

• Construction of a new distribution line to provide light and power to Ivanpah Substation

and the microwave telecommunications site in Nipton

About Southern California EdisonAn Edison International (NYSE:EIX) company, Southern California Edison is one of the

nation’s largest electric utilities, serving a population of more than 14 million via 4.9 million

customer accounts in a 50,000-square-mile service area within Central, Coastal, and

Southern California. SCE is committed to expanding and renewing essential distribution and

transmission networks in our service territory, making the power grid greener and more

reliable for our customers.

CLARK COUNTY

SAN BERNARDINO COUNTY

164

95

0 5 10 MILES

NNipton Road

JEAN

BrightSource Energy's Ivanpah Solar Project

33-kVDistribution Line 33-kV

Distribution Line& Microwave Site

500-kV Eldorado-LugoTransmission Line

NEVADACALIFORNIA

NIPTON

BO

ULD

ER

CITY LIMITS

PRIMM

MOJAVE NATIONAL PRESERVE

15

15

Transmission line upgradeTelecommunication Path 1New Substation

Primm ValleyGolf Club

PROPOSED PROJECT

TELECOMMUNICATION PATH 2Section 1 abovegroundSection 2 undergroundSection 3 microwave

MOUNTAIN PASS SUBSTATION

ELDORADO SUBSTATION

IVANPAH SUBSTATION

(new)

Protecting Environmental ResourcesThe project went through an extensive environmental review process by state and

federal agencies, which identified environmental resources in the project area, evaluated

potential environmental impacts, and proposed mitigation measures where appropriate.

The agencies reviewed the project in accordance with the California Environmental

Quality Act, the National Environmental Policy Act, and Nevada’s Utility Environmental

Protection Act.

SCE is working closely with federal, state and local partners to mitigate potential

environmental impacts. SCE is implementing conservation and design features to avoid

or minimize disturbance to sensitive biological resources and protect cultural resource

sites. In addition, SCE uses on-site environmental monitors in sensitive areas and requires

construction workers to undergo environmental training.

Construction Underway on Transmission Project to Bring Solar Energy to the GridSouthern California Edison (SCE) is committed to delivering electricity from renewable energy resources, helping to make the power grid greener for both California and Nevada. To help meet those important goals, SCE is building the Eldorado-Ivanpah Transmission Project. The project will provide the electrical facilities and additional transmission capacity needed to interconnect and deliver up to 1,400 megawatts of new renewable generation (primarily solar) near the southern California-Nevada border, including BrightSource Energy’s Ivanpah Solar Project (nearly 400 megawatts of new solar generation).

Construction on the project is currently underway. SCE plans to build the project in three construction stages. The first stage will be to provide start-up power to the Ivanpah Solar Project. The second stage will be to construct portions of the project such as the new Ivanpah Substation to enable a portion of the Ivanpah Solar Project to generate power. The third stage will be to complete the remainder of the project such as the transmission line to interconnect and enable generation from the entire Ivanpah Solar Project. The project is planned to be completed and in-service by July 2013.