www.siemens.com/drives Medium-Voltage Drive SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

Upload: others

Post on 07-Mar-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

www.siemens.com/drives

Medium-Voltage Drive

SINAMICS PERFECT HARMONY GH180Type 6SR41

Reference Manual

Edition 02/2019

Tests carried out on drivesThis documentation pertains to

GH180F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95

M61 N30 N35 N44 N75 M08 U10 Y15

Page 2: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

14.02.2019 14:41V8.00

Page 3: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Medium-Voltage Drive

SINAMICS PERFECT HARMONY GH180Type 6SR41

Reference Manual

This documentation pertains toGH180

F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

Edition 02/2019

Introduction 1

General scope of services 2

Tests 3

Page 4: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Legal informationWarning notice system

This manual contains notices you have to observe in order to ensure your personal safety, as well as to prevent damage to property. The notices referring to your personal safety are highlighted in the manual by a safety alert symbol, notices referring only to property damage have no safety alert symbol. These notices shown below are graded according to the degree of danger.

DANGERindicates that death or severe personal injury will result if proper precautions are not taken.

WARNINGindicates that death or severe personal injury may result if proper precautions are not taken.

CAUTIONindicates that minor personal injury can result if proper precautions are not taken.

NOTICEindicates that property damage can result if proper precautions are not taken.If more than one degree of danger is present, the warning notice representing the highest degree of danger will be used. A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property damage.

Qualified PersonnelThe product/system described in this documentation may be operated only by personnel qualified for the specific task in accordance with the relevant documentation, in particular its warning notices and safety instructions. Qualified personnel are those who, based on their training and experience, are capable of identifying risks and avoiding potential hazards when working with these products/systems.

Proper use of Siemens productsNote the following:

WARNINGSiemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems. The permissible ambient conditions must be complied with. The information in the relevant documentation must be observed.

TrademarksAll names identified by ® are registered trademarks of Siemens AG. The remaining trademarks in this publication may be trademarks whose use by third parties for their own purposes could violate the rights of the owner.

Disclaimer of LiabilityWe have reviewed the contents of this publication to ensure consistency with the hardware and software described. Since variance cannot be precluded entirely, we cannot guarantee full consistency. However, the information in this publication is reviewed regularly and any necessary corrections are included in subsequent editions.

Siemens AGProcess Industries and DrivesPostfach 48 4890026 NÜRNBERGGERMANY

Document order number: 8888888888-000088Ⓟ 02/2019 Subject to change

Copyright © Siemens AG 2019.All rights reserved

Page 5: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Table of contents

1 Introduction...................................................................................................................................................7

2 General scope of services ............................................................................................................................9

2.1 Routine test ............................................................................................................................11

2.2 Visual inspection ....................................................................................................................12

2.3 Function tests.........................................................................................................................13

2.4 Insulation test .........................................................................................................................14

3 Tests...........................................................................................................................................................15

3.1 Visual inspection ....................................................................................................................163.1.1 Rating plate ............................................................................................................................163.1.2 Housing degree of protection .................................................................................................163.1.3 Electrical cabinet components ...............................................................................................173.1.4 Cable installation....................................................................................................................173.1.5 Cable markings ......................................................................................................................183.1.6 Setting values of circuit breakers, if used...............................................................................183.1.7 Dimensions ............................................................................................................................18

3.2 Function test...........................................................................................................................203.2.1 Auxiliary voltages ...................................................................................................................203.2.2 Door limit switches .................................................................................................................203.2.3 Door interlocking system........................................................................................................203.2.4 Anti-condensation heating......................................................................................................213.2.5 Socket outlets and lighting .....................................................................................................223.2.6 Remote access via digital and analog inputs and outputs .....................................................223.2.7 Phase offset of the output voltage in the three-phase system ...............................................233.2.8 Local control via the operator panel .......................................................................................233.2.9 Local control via pushbutton ..................................................................................................243.2.10 Phase offset between output voltage and current with output reactor ...................................243.2.11 Operating state indicator lights...............................................................................................253.2.12 Digital inputs and outputs for line synchronization .................................................................253.2.13 Checking the evaluation unit for external temperature sensors .............................................263.2.14 Remote access via network connection.................................................................................273.2.15 Mechanical door interlock ......................................................................................................273.2.16 Switched three-phase auxiliary power output ........................................................................283.2.17 Switched single-phase auxiliary power output .......................................................................283.2.18 Grounding switch ...................................................................................................................293.2.19 Failure of a power semiconductor module .............................................................................303.2.20 Temperature monitoring – infeed transformer........................................................................313.2.21 Fan failure with redundant fans..............................................................................................313.2.22 Fan failure ..............................................................................................................................323.2.23 Fan change operation ............................................................................................................323.2.24 Overtemperature, output reactor or sine-wave filter...............................................................333.2.25 Bypass ...................................................................................................................................333.2.26 Load test without motor..........................................................................................................34

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 5

Page 6: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.27 Display devices in the cabinet door........................................................................................34

3.3 Cooling system test................................................................................................................363.3.1 Air flow direction.....................................................................................................................36

3.4 Interface test ..........................................................................................................................373.4.1 Interfaces ...............................................................................................................................37

3.5 Additional optional tests .........................................................................................................383.5.1 Temperature-rise test.............................................................................................................383.5.2 Temperature behavior of the infeed transformer....................................................................383.5.3 Power factor measurement ....................................................................................................393.5.4 Efficiency and loss measurement ..........................................................................................393.5.5 Harmonics ..............................................................................................................................393.5.6 Noise measurement without load...........................................................................................40

Index...........................................................................................................................................................41

Table of contents

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

6 Reference Manual Rev.201902141441 GH180

Page 7: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Introduction 1This document describes the preconditions when testing drives. The fulfillment of these preconditions is the basis for achieving the smoothest possible testing process and maximum possible customer satisfaction.

The following drive tests are described:

● Routine tests

● Tests that are offered as standard

Note

If the scope of testing and inspection cannot fulfill all customer requirements, please consult your Siemens sales advisor at head office.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 7

Page 8: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Introduction

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

8 Reference Manual Rev.201902141441 GH180

Page 9: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

General scope of services 2A variable-speed drive can include the following components:

● Induction motor, synchronous motor or PEM motor with or without speed encoder

● SINAMICS drives

● Drive transformer

● Cooling unit for water-cooled drives

● Small PLCs with drive functionality.

The Nuremberg Vogelweiherstrasse factory offers test equipment adapted to these types of systems.

Note

Contact your sales person if additional components must be taken into account for your particular project.

Scope of services offeredUnless otherwise stated in the quotation, the scope of services includes all activities, equipment, materials and expendables required to perform the specified tests. The deadline and testing period stated, and the quoted cost, can be met only if all the test and inspection procedures to be performed are clarified in detail in advance. Due to the high capacity utilization of the associated equipment, it might not be possible to carry out individual inspections and tests that are requested late if the planned test is already in progress.

If you have received specific requirements from your customer, please send these as soon as possible – with the necessary key data – to the Nuremberg Vogelweiherstrasse factory.

Sequence of a customer acceptanceA customer acceptance test is generally executed in the sequence:

1. Installation and commissioning of the components before the customer arrives.

2. Kickoff with presentation of the test schedule and discussion of individual steps in the acceptance test workflow.

3. Execution of the tests according to the test schedule

4. Discussion of the test results

5. Preparation of test documentation for the customer. The test documentation is created before or after the customer leaves depending on the scope of testing and the time schedule.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 9

Page 10: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Components provided by customerComponents provided by the customer must be available in plenty of time so that tests can be carried out on time. The Nuremberg Vogelweiherstrasse factory has no access to components that are not within the PD LD scope of supply. This also applies to components ordered from other Siemens' Groups. The technical data for these components is required at the latest eight weeks before the start of the acceptance test, e.g.:

● Dimensions

● Weights

● Energy Requirement

● Interfaces

Location of the customer acceptanceAll customer acceptance tests in the test fields for drives are performed as part of the manufacturing process.

NoteLimited number of persons in the test field

For safety reasons, the number of persons in the test field is limited. In addition to the regional sales partner, only two persons from the customer are permitted in the test field at the same time.

NoteTest without load motors or multipulse infeeds via transformers in the test field

Some tests are simulated or performed in test mode with limited rated data.

NoteTests with the customer's own cooling units or excitation equipment

If the customer's own cooling units or excitation equipment are to be tested, a system test can be ordered with option F97.

General scope of services

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

10 Reference Manual Rev.201902141441 GH180

Page 11: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

2.1 Routine testDuring production, the drive is subject to an internal routine test.

General scope of services2.1 Routine test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 11

Page 12: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

2.2 Visual inspectionThe visual inspection is performed to ensure that the equipment complies with the order specifications. The tests are carried out with the drive in a no-voltage condition.

The visual inspection together with the customer – or with the company accepting the equipment – is carried out with the drive installed and labeled. Each test step is documented in the acceptance report with the specific results of the step.

The visual inspection is part of the function test (F72, F73).

Visual inspection Order codesWithout the customer present

With the cus‐tomer present

● Rating plate● Housing degree of protection● Electrical cabinet components● Cable installation● Cable markings● Setting values of circuit breakers, if used● Dimensions

-

F03

See alsoVisual inspection (Page 16)

General scope of services2.2 Visual inspection

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

12 Reference Manual Rev.201902141441 GH180

Page 13: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

2.3 Function testsThe drive functions are tested according to IEC 61800-5-1. In addition, excerpts from additional standards apply, which are listed in the relevant chapters as well as internal Siemens directives within the scope of quality assurance.

The function tests are performed and documented in the Siemens test field by internal test field personnel. For the function test, the drive is in the test mode with restricted monitoring functions.

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

See alsoFunction test (Page 20)

General scope of services2.3 Function tests

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 13

Page 14: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

2.4 Insulation testThe insulation resistance is measured before and after the high-voltage test. The insulation test can only be ordered and carried out together with the function test (F72, F73).

Insulation test Order codesWithout the customer present

With the cus‐tomer present

● High-voltage test● Measuring the insulation resistance

F76

F77

The successful test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate.

The insulation test is performed on a separate acceptance day prior to the function test.

General scope of services2.4 Insulation test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

14 Reference Manual Rev.201902141441 GH180

Page 15: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Tests 3In the following you will find the tests that can be additionally ordered for a drive.

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 15

Page 16: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.1 Visual inspectionThe visual inspection is performed to ensure that the drive complies with the requirements of the order. The individual test steps are performed with the drive in a no-voltage condition.

The test together with the customer – or his representative – is carried out with the drive installed and labeled. The results of all of the tests are documented in the acceptance report.

3.1.1 Rating plate

FundamentalsThe technical data and ordered options on the rating plate and the routine test certificate are checked to ensure that they match up.

Test procedure1. The data on the rating plate and the routine test certificate are visually compared.

ResultThe test is passed if the data match up.

3.1.2 Housing degree of protection

FundamentalsA check is made as to whether the housing degree of protection ordered complies with what is described in the catalog.

Test procedure1. The housing degree of protection is identified based on what is stamped on the rating plate.

2. Depending on the version, the following components are visually checked, e.g.:

– Canopies

– Cooling slots

– Fittings and rubber seals in the doors and between the cabinet units

– Cable entries

– Openings for water pipes, if available

– Additional components, if available

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

16 Reference Manual Rev.201902141441 GH180

Page 17: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

ResultThe test is passed if the components required for the specified housing degree of protection are available.

3.1.3 Electrical cabinet components

FundamentalsA visual inspection is made to see whether the electrical cabinet components are installed as defined in the layout diagram and/or circuit diagram.

Test procedure1. The customer selects electrical cabinet components by random sampling.

2. The selected electrical cabinet components are visually checked to ensure that they are correctly installed and marked.

ResultThe test is passed if the selected electrical cabinet components are installed as specified in the layout diagram and/or circuit diagram.

3.1.4 Cable installation

FundamentalsVisual and mechanical checks are made to ensure that cables and conductors have been installed correctly and are connected correctly according to the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

2. The following is inspected:

– Are the cables firmly connected?

– Have edge protectors been attached to sharp edges?

– Are the cables routed according to the circuit diagram?

ResultThe inspection is passed if the cable installation does not exhibit any deficiencies and matches the information in the circuit diagram.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 17

Page 18: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.1.5 Cable markings

FundamentalsA visual inspection is made to see whether cables and conductors are marked as defined in the circuit diagram.

Test procedure1. The customer selects cables or conductors by random sampling.

– Are the cable end tags and conductor colors of cables and conductors marked as defined in the circuit diagram?

ResultThe test is passed if the cable and conductor markings match what is specified in the circuit diagram.

3.1.6 Setting values of circuit breakers, if used

FundamentalsThe circuit breaker settings are visually checked against what is specified in the circuit diagram.

Test procedure1. The customer selects circuit breakers by random sampling.

2. The circuit breaker settings are visually checked against what is specified in the circuit diagram.

ResultThe test is passed if the circuit breaker settings match what is specified in the circuit diagram.

3.1.7 Dimensions

FundamentalsThe drive dimensions are measured. The basis for the visual inspection is the order-specific dimension drawing.

Test procedure1. The external dimensions, length, width and height of the drive are measured.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

18 Reference Manual Rev.201902141441 GH180

Page 19: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

ResultThe test is passed if the dimensions match with what is specified in the dimension drawing.

Tests3.1 Visual inspection

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 19

Page 20: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2 Function test

3.2.1 Auxiliary voltages

FundamentalsTests are performed according to DIN EN 60146-1. The auxiliary voltages are visually checked using indicator lights or using a voltmeter.

Test procedure1. The drive power section is switched off.

2. The auxiliary voltages are switched on.

3. The auxiliary voltages are checked.

ResultThe test is passed if all of the auxiliary voltages are available.

3.2.2 Door limit switches

Fundamentals The doors of the drive power section are monitored using limit switches. This monitoring function ensures that when the doors are open, the medium voltage cannot be switched-in.

Test procedure1. The auxiliary voltage is present. All drive doors are closed. -K51 has energized.

2. One door of the drive power section is opened.-K41 drops out and prevents the medium voltage from being switched-inIt is not permissible that -K41 has energized.

ResultThe test is passed if the switching states listed above are complied with.

3.2.3 Door interlocking system

FundamentalsTests are performed in accordance with IEC 61800-5-1

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

20 Reference Manual Rev.201902141441 GH180

Page 21: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

To avoid accidents, the drive doors must be closed during operation. This is guaranteed by the electromagnetic door interlocking system. The doors of the power section remain interlocked until an appropriate safety wait time has elapsed.

Test procedure1. The auxiliary voltage is present.

2. All drive doors have been closed.

3. The medium voltage is available.The electromagnetic door interlocking system locks the power section doors.

4. The power section doors cannot be opened.

5. The power section power supply is switched off. The safety wait time elapses. The power cells discharge themselves.

6. If a grounding switch is installed, it is closed manually.

7. The selector switch on the drive is set to "OFF". The EMERGENCY STOP is pressed. The power section doors can be opened.

ResultThe test is passed if the door interlocking system functions as described.

3.2.4 Anti-condensation heating

FundamentalsA check is made as to whether the anti-condensation heating heats up after switching on. This prevents the formation of condensation in the drive when it is not operational.

Test procedure1. The temperature of the anti-condensation heating is measured using an infrared

thermometer.

2. The auxiliary voltage for the anti-condensation heating is switched on.The anti-condensation heating elements heat up.

3. The temperature is measured again.

ResultThe test is passed if the anti-condensation heating elements heat up after they have been switched on.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 21

Page 22: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.5 Socket outlets and lighting

FundamentalsSocket outlets and lighting are checked.

Test procedure1. The voltage at the socket outlets is measured.

2. The lighting is checked.

ResultThe test is passed if the correct voltage is available at the socket outlets and the lighting functions.

3.2.6 Remote access via digital and analog inputs and outputs

Fundamentals With the drive in the remote mode, a check is made as to whether it can be controlled via digital and analog inputs and outputs.

Test procedure1. The drive is switched into the remote mode using the "Local-Remote switch".

2. The following operating states are set and monitored at the test station:

– Ready to switch on

– Remote mode

– Drive on

– Drive off

– Various points along the U/f characteristic

– Reset fault

– Remote inhibit

– Emergency Off

ResultThe test is passed if the corresponding operating states and specified values occur.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

22 Reference Manual Rev.201902141441 GH180

Page 23: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.7 Phase offset of the output voltage in the three-phase system

FundamentalsA check is made whether the three phases of the output voltage have a 120° phase offset.

Test procedure1. The drive is switched on.

2. The output voltages at measuring points VMA, VMB, VMC are displayed on an oscilloscope.

ResultThe test is passed if the phase offset is 120°.

3.2.8 Local control via the operator panel

Fundamentals With the drive in the local mode, a check is made as to whether it can be controlled from the operator panel.

Test procedure1. The drive is switched into the local mode using the "Local-remote switch".

2. The following operating states are set and monitored at the operator panel or at the test station:

– Drive on

– Drive off

– Various points along the U/f characteristic

– Reset fault

– Emergency Off

– Local control priority

ResultThe test is passed if the corresponding operating states and specified values occur.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 23

Page 24: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.9 Local control via pushbutton

Fundamentals With the drive in the local mode, a check is made as to whether it can be controlled using the pushbutton and potentiometer at the drive.

Test procedure1. The drive is switched into the local mode using the "Local-Remote switch".

2. The following operating states are set using the operator controls and monitored at the operator panel or at the test station:

– The converter is in the local mode.

– Drive on

– Drive off

– Various points along the U/f characteristic

– Reset fault

ResultThe test is passed if the corresponding operating states and specified values occur.

3.2.10 Phase offset between output voltage and current with output reactor

FundamentalsIt is tested whether the voltage per phase has a 90° phase offset with respect to the current.

Test procedure1. The drive is switched on.

2. The phase offset is displayed between the following measuring points using an oscilloscope.

– VMA and IFA

– VMB and IFB

– VMC and IFC

ResultThe test is passed if the phase offset is 90°.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

24 Reference Manual Rev.201902141441 GH180

Page 25: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.11 Operating state indicator lights

FundamentalsThe operating state indicator lights of the drive are tested.

Test procedureDuring the various tests, different operating states arise. The signaling of the following states is recorded during the test.

● Fault (red)

● Alarm (yellow)

● Drive in Operation (green)

● Drive ready (white)

● Local operation (white)

ResultThe test is passed if the operating state indicator lights light up in accordance with the operating states.

3.2.12 Digital inputs and outputs for line synchronization

FundamentalsDigital inputs and outputs are available for the line synchronization; their evaluation and control is tested using test software.

Test procedureThe function of the inputs and outputs is tested using switches and/or test LEDs.

● Input for Up Transfer Request signal

● Input for Down Transfer Request signal

● Input for Line Contactor Acknowledge signal

● Input for VFD Contactor Acknowledge signal

● Output for Down Transfer Complete feedback

● Output for Up Transfer Complete feedback

● Output for Down Transfer Permit feedback

● Output for Up Transfer Permit feedback

● Output for Line Contactor Unlatch feedback

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 25

Page 26: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

ResultThe test is passed if the corresponding digital inputs and outputs can be correctly switched.

3.2.13 Checking the evaluation unit for external temperature sensors

FundamentalsThe evaluation unit for external temperature sensors is checked.

Option DescriptionL81 2 x 2 thermistor protection relayL82 3 x 2 thermistor protection relayL91 2 x Pt100 evaluation units each with 3 inputsL93 Pt100 evaluation unit with 6 inputs and 2 analog outputsL95 Pt100 evaluation unit with 6 inputs for explosion-protected motors and 6 analog outputs

Test procedure1. The drive is switched on.

2. The signal cable for "Alarm" is interrupted.The drive remains switched on. The following message is displayed on the test station computer."Motor Protect Relay Warn" (= motor overtemperature)

3. The signal cable for "Fault" is interrupted.The drive is shut down. The following message is displayed on the test station computer."Motor Protect Relay Trip" (= motor overtemperature fault)

ResultThe test is passed if the appropriate messages are displayed on the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

26 Reference Manual Rev.201902141441 GH180

Page 27: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.2.14 Remote access via network connection

FundamentalsTwo networks are optionally available to connect to the higher-level process control system (PLC, S7, ...). With the drive in the remote mode, a check is made as to whether the network interface can be controlled.

Network Option Network version1 G21

G22G28 G91

Mod Bus PlusMod Bus RTUMod Bus EthernetProfi Bus DP

2 G31G32G38G93

Mod Bus PlusMod Bus RTUMod Bus EthernetProfi Bus DP

Test procedure1. The network cable is inserted in the interface.

2. The drive is switched into the remote mode using the "Local-Remote switch".

3. The following operating states are set and monitored at the test station via network:

– Drive on

– Drive off

– Reset fault

ResultThe test is passed if the drive responds as described.

3.2.15 Mechanical door interlock

Fundamentals The door interlock system locks are tested. The primary key allows access to one or several secondary keys. The primary key can only be removed if all of the secondary keys are in the key exchange unit.

Test procedure1. All drive doors have been closed and interlocked.

2. The locks are locked using the secondary keys.

3. The secondary keys are withdrawn.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 27

Page 28: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

4. The secondary keys are inserted in the key exchange unit and interlocked by turning.

5. The primary key is released and withdrawn.

ResultThe test is passed if the primary key can be withdrawn.

3.2.16 Switched three-phase auxiliary power output

Fundamentals The switched, three-phase auxiliary power output is used for the separately-driven fan of the motor, for example.

The auxiliary power is output when the drive is operational. No auxiliary power is output when the drive is switched off.

Option Power at 400 V 3AC 50 Hz /460 V ... 480 V 3AC 60 Hz

Motor circuit breaker

N30N31N32N33

4 / 4.8 kW7 / 8 kW

11 / 12.7 kW15 / 17.5 kW

9 A ... 12.5 A14 A ... 20 A18 A ... 25 A28 A ... 40 A

Test procedure1. The drive is switched on.

-K30 energizes.

2. The drive is switched off.In the OFF state, -K30 deenergizes.

ResultThe test is passed if -K30 appropriately responds.

3.2.17 Switched single-phase auxiliary power output

Fundamentals The switched, single-phase auxiliary power output is used for the motor anti-condensation heating, for example.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

28 Reference Manual Rev.201902141441 GH180

Page 29: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

No auxiliary power is output when the drive is operational. The auxiliary power is output when the drive is switched off.

Option Power at 230 V 1AC 50 Hz / 120 V 1AC 60 HzN35N36N37N38

1.2 / 0.7 kW2.2 / 1.2 kW3.5 / 1.8 kW 4.5 / 2.4 kW

Test procedure1. The drive is switched off

-K38 energizes.

2. The drive is switched on.-K38 deenergizes.

ResultThe test is passed if -K38 responds appropriately.

3.2.18 Grounding switch

Fundamentals Depending on the particular version, the drive is equipped with one or two grounding switches. The switching logic and switching states of the grounding switch are tested. The procedure is the same for one or two grounding switches.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 29

Page 30: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Test procedure1. The drive is switched on.

2. The drive is switched off and grounded according to the following scheme.

Action Switching states-Q1 / Q2 -K21 -K22 -K41 -K51

Initial state with the drive switched on off off off on onDrive off off off off on onMedium voltage off off off off on onWait 600 s off off off on onLocal-remote switch off and actuate Emer‐gency Off

off off on off on

Connect grounding switches -Q1 / Q2 on on on off onOpen the doors on on on off off

3. The drive is switched off and grounded, the doors are open.

Action Switching states-Q1 / Q2 -K21 -K22 -K41 -K51

Initial state with the drive switched off on on on off offClose the doors on on on off onOpen grounding switches -Q1 / Q2 off off on off onLocal-remote switch to "Local" and re‐lease Emergency Off

off off off on on

Medium voltage on off off off on onDrive on off off off on on

ResultThe test is passed if the corresponding switching states occur.

3.2.19 Failure of a power semiconductor module

FundamentalsThe power section must shut down if a power semiconductor module fails. The failure is simulated by withdrawing the fiber-optic cable connector from the gating module of a power semiconductor module. This interrupts the control.

Test procedure1. The auxiliary voltage is present.

2. The fiber-optic cable connector of a gating module is withdrawn.A message is displayed on the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

30 Reference Manual Rev.201902141441 GH180

Page 31: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

ResultThe test is passed if the appropriate message is displayed on the test station computer and the inverter is inhibited.

3.2.20 Temperature monitoring – infeed transformer

Fundamentals The temperature monitoring of the infeed transformer is checked.

Test procedure1. The drive is switched on.

2. The signal cable for "Alarm" is interrupted.The drive remains switched on. The following message is displayed on the test station computer. "Xformer OT Alarm" (= alarm, transformer overtemperature)

3. The signal cable for "Fault" is interrupted.The drive remains switched on. The following message is displayed on the test station computer."Xformer OT Trip Alarm" (= fault announcement, transformer overtemperature)

4. The drive is switched off if the fault announcement is uninterrupted for 60 s.The following messages are displayed on the test station computer:"Xformer OT Trip" (= fault transformer overtemperature)"SOP issued MV input trip" (= drive switches off the supply)

ResultThe test is passed if the appropriate messages are displayed on the test station computer.

3.2.21 Fan failure with redundant fans

FundamentalsDepending on the version, the cabinet and/or each cabinet unit (transformer unit, cell unit) is equipped with one or two fans and a redundant fan.

A check is made that when one of the fan fails, the redundant fan is switched on. In order to maintain drive operation, at least one fan per cabinet unit must be active.

Test procedure1. The drive is switched on.

2. The fan power supply of a cabinet unit is interrupted. The redundant fan switches on. A fan failure message is displayed on the test station computer.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 31

Page 32: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3. The power supplies of all fans of a cabinet unit are interrupted. The fault announcement of the cooling system ("Cooling Sys-Trip Alarm") is displayed on the test station computer.

4. If no fan is switched in again within a specified time, then the drive shuts down.The following messages are displayed:

– "Cooling Fail VFD / MV Trip" (= cooling system fault)

– "SOP issued MV Input Trip" (= circuit breaker trip)

ResultThe test is passed if the appropriate messages are displayed on the test station computer, and the drive switches off if a fan is no longer running.

3.2.22 Fan failure

FundamentalsDepending on the version, the cabinet and/or each cabinet unit (transformer unit, cell unit) is equipped with one or two fans.

In order to maintain drive operation, at least one fan per cabinet unit must be active.

Test procedure1. The drive is switched on.

2. The power supplies of all fans of a cabinet unit are interrupted. On the test station computer, a fan failure message and a fault announcement of the cooling system ("Cooling Sys-Trip Alarm") are displayed.

3. If no fan is switched in again within a specified time, then the drive shuts down. The following messages are displayed:

– "Cooling Fail VFD / MV Trip" (= cooling system fault)

– "SOP issued MV Input Trip" (= circuit breaker trip)

ResultThe test is passed if the appropriate messages are displayed on the test station computer, and the drive switches off if a fan is no longer running.

3.2.23 Fan change operation

FundamentalsThe fans are controlled alternating in order to guarantee that the operating time is evenly distributed across the individual fans. A check is made as to whether this alternating operation functions.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

32 Reference Manual Rev.201902141441 GH180

Page 33: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Test procedure1. The auxiliary voltage is present.

2. An operating time of 100 s is entered on the test station computer.

3. The drive is switched on.

ResultThe test is passed if the fans switch over after the specified time.

3.2.24 Overtemperature, output reactor or sine-wave filter

FundamentalsThe temperature monitoring of the output reactor and/or the sine-wave filter is checked.

Test procedure1. The drive is switched on.

2. The signal cable for "Alarm" is interrupted.The drive remains switched on. The following message is displayed on the test station computer. "Reactor OT Alarm" (= overtemperature alarm)

3. The signal cable for "Fault" is interrupted.The drive remains switched on. The following message is displayed on the test station computer."Reactor OT Trip Alarm" (= fault announcement, overtemperature)

4. The inverter is switched off if the fault announcement is uninterrupted for 60 s.The following message is displayed on the test station computer:"Reactor OT Trip" (= overtemperature fault)

ResultThe test is passed if the appropriate messages are displayed on the test station computer.

3.2.25 Bypass

FundamentalsThe appropriate bypass contactor must energize if a power semiconductor module fails. The failure is simulated by withdrawing the fiber-optic cable connector from the gating module of a power semiconductor module. This interrupts the control.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 33

Page 34: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Test procedureThe test is carried out with reduced power across an inductive load.

1. The drive is switched on.

2. A fiber-optic cable connector of a gating module is withdrawn for each phase.The corresponding bypass contactor of the failed power semiconductor module energizes.An alarm message is displayed on the test station computer.

3. The fiber-optic cable connector of an additional gating module is withdrawn.The inverter is shut down.A fault message is displayed on the test station computer.

ResultThe test is passed if the appropriate messages are displayed on the test station computer.

3.2.26 Load test without motor

Fundamentals The internal measuring device of the drive is checked for an inductive load. The calibrated measuring equipment is used as reference.

When testing a version with 60 Hz input transformer on a 50 Hz line supply, the power is reduced.

Test procedure1. The drive is switched on in a test mode.

2. The inverter is enabled.

3. The rms values of voltage, current, apparent and active power are measured at the input and output of the drive.

ResultThe test is passed if the values displayed on the test station computer match the reference values with a tolerance of ±5 %.

3.2.27 Display devices in the cabinet door

Fundamentals Three display devices are mounted in the cabinet door of the control section. During the "Load test without motor", a check is made whether the displayed values correspond to the measured values of the calibrated measuring equipment.

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

34 Reference Manual Rev.201902141441 GH180

Page 35: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Test procedure1. The "Load test without motor" is carried out

The following values are displayed:

– Output current from 0 to +100 %

– Output voltage 0 to +100 %

– Speed in the range from -100 % up to +100 %

ResultThe test is passed if the display device values match the reference values with a tolerance of ±5 %.

See alsoLoad test without motor (Page 34)

Tests3.2 Function test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 35

Page 36: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.3 Cooling system test

3.3.1 Air flow direction

FundamentalsIt is only guaranteed that the drive is correctly cooled when the fan rotates in the correct direction of rotation.

Test procedure1. The auxiliary voltage is present.

2. The drive is switched on.The fans switch on.

3. The air flow direction is checked at the ventilation grilles.

ResultThe test is passed if the air flows from the doors up to the roof section.

Tests3.3 Cooling system test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

36 Reference Manual Rev.201902141441 GH180

Page 37: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.4 Interface test

3.4.1 Interfaces

FundamentalsThe customer or its representative parameterize and test the communication of selected interfaces with their own test equipment. Factory personnel are available to operate the test station. Only auxiliary power is provided. The interface test is limited to five hours.

Test procedure1. Using his own test equipment, the customer establishes the hardware connection to the

drive.

2. Factory personnel switch on the auxiliary voltage.

3. The customer establishes the software connection to the drive.

4. The customer parameterizes and tests the communication of selected interfaces.

ResultThe interface test has been completed after five hours.

Tests3.4 Interface test

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 37

Page 38: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

3.5 Additional optional tests

3.5.1 Temperature-rise test

FundamentalsUsing the temperature-rise test, the temperatures under load at defined measuring points are determined.

Test procedure1. The drive is operated for eight hours in the test mode the same as in the "Load test without

motor".

2. The temperature is measured after eight hours at the following measuring points:

– Air discharge 1 at the transformer unit: Fan -E31

– Air discharge 2 at the cell unit: Fan -E32

– Transformer core: At the upper side of the core close to terminals T1:H1, T1:H2, T1:H3

– Reactor core: At the upper side and center of the core (only for option L09)

– Ambient temperature

ResultThe measured values are documented together with the "Functional test plan".

See alsoLoad test without motor (Page 34)

3.5.2 Temperature behavior of the infeed transformer

Fundamentals In addition to the temperature-rise test, the temperature of each of the windings of the infeed transformer is measured before and after the temperature-rise test. This test can only be ordered in conjunction with a temperature rise test.

Test procedure1. The temperatures of the individual windings are determined before the temperature rise test.

2. The drive is operated for eight hours in the test mode the same as in the "Load test without motor".

3. The temperatures of the individual windings are determined after the temperature rise test.

Tests3.5 Additional optional tests

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

38 Reference Manual Rev.201902141441 GH180

Page 39: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

ResultThe maximum temperature rise of the individual windings must not exceed the appropriate limit values. The measured values are documented together with the "Functional test plan".

3.5.3 Power factor measurement

Fundamentals The power factor is measured at different operating points.

Test procedure1. The drive is operated in the test mode the same as in the "Load test without motor".

2. The power factor is measured at the input and output at 50 %, 75 % and 100 % load.

ResultThe measured values are documented in the "Functional test plan".

3.5.4 Efficiency and loss measurement

Fundamentals Efficiency and losses are measured at various operating points.

Test procedure1. The drive is operated for 20 minutes each in the test mode, the same as in the "Load test

without motor".

2. Efficiency and losses are measured at two minute intervals at the input and output for 50 %, 75 % and 100 % load.

ResultThe measured values are documented in the "Functional test plan".

3.5.5 Harmonics

Fundamentals The effects of the drive on the supply grid/line supply are determined by recording the harmonics.

Tests3.5 Additional optional tests

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 39

Page 40: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Test procedure1. The drive is operated in the test mode the same as in the "Load test without motor".

2. The first 50 harmonics are measured for each phase, and the average of the harmonics calculated on a proportional basis.

ResultThe test is passed if the corresponding average limit values are not exceeded.

3.5.6 Noise measurement without load

Fundamentals The noise measurement is conducted in operation without load, but with the main fans running according to EN ISO 3744.

Test procedure1. The drive is switched on.

2. The measuring points defined are documented in the report and evaluated.

ResultThe results of the noise measurement are separately recorded and documented together with the "Functional test plan".

Tests3.5 Additional optional tests

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

40 Reference Manual Rev.201902141441 GH180

Page 41: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Index

CComponents provided by customer, 10Cooling system test

Air flow direction, 36Customer acceptance inspection, 9

EEfficiency and loss measurement, 39

FF03, 12F04, 38F05, 38F06, 38F07, 38F14, 39F15, 39F28, 40F29, 40F48, 39F49, 39F68, 39F69, 39F76, 14F77, 14F79, 37Function tests, 13

Anti-condensation heating, 21Auxiliary voltages, 20Bypass, 33Checking the evaluation unit for external temperature sensors, 26Digital inputs and outputs for line synchronization, 25Display devices in the cabinet door, 34Door interlocking system, 21Door limit switches, 20Failure of a power semiconductor module, 30Fan change operation, 32Fan failure, 32Fan failure with redundant fans, 31Grounding switch, 29Load test without motor, 34Local control via pushbutton, 24

Local control via the operator panel, 23Mechanical door interlock, 27Operating state indicator lights, 25Overtemperature, output reactor or sine-wave filter, 33Phase offset between output voltage and current with output reactor, 24Phase offset of the output voltage in the three-phase system, 23Remote access via digital and analog inputs and outputs, 22Remote access via network connection, 27Socket outlets and lighting, 22Switched single-phase auxiliary power output, 28Switched three-phase auxiliary power output, 28Temperature monitoring of the infeed transformer, 31

GG21, 27G22, 27G28, 27G31, 27G32, 27G38, 27G91, 27G93, 27

HHarmonics, 39

IInsulation test, 14Interface test, 37

KK20, 25K21, 34K29, 24

LL09, 33

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15 Reference Manual Rev.201902141441 GH180 41

Page 42: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

L29, 25L50, 22L55, 21L81, 26L82, 26L91, 26L93, 26L95, 26

MM08, 27M09, 27M10, 27M38, 27M61, 31, 32

NN30, 28N31, 28N32, 28N33, 28N35, 28N36, 28N37, 28N38, 28N44, 29N45, 29Noise measurement without load, 40

PPower factor measurement, 39

TTemperature behavior of the infeed transformer, 38Temperature-rise test, 38

UU10, 33U11, 33

VVisual inspection, 12, 16

Cable installation, 17

Cable markings, 18Dimensions, 18Electrical cabinet components, 17Housing degree of protection, 16Rating plate, 16Setting values of circuit breakers, if used, 18

YY15, 24, 33

Index

SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

42 Reference Manual Rev.201902141441 GH180

Page 43: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180
Page 44: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

8888888888 000088 01 EN 01

*888888888800008801EN01* 888888888800008801EN01

Further Information

www.siemens.com/drives

Siemens AGProcess Industries and DrivesPostfach 48 4890026 NÜRNBERGGERMANY

Page 45: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Process Industries and Drives

Siemens AG, PD LD P MF-NMA EN, Postfach 47 43, 90025 Nürnberg

Department PD LD P MF-NMA ENTel. +49 (911) 433-6422Fax +49 (911) 433-6921Email [email protected]

mOur ref. 8888888888000088Date 14.02.2019

Documentation for 6SR41Your order no. - 000010

AL: N ECCN: N UL: DEStWanr (CD): 85234045, StWanr (Print): 49011000

Dear Sir / Madam,

Many thanks for your order, the documentation for which is enclosed.

Yours very truly,

*888888888800008801EN01*

Page 46: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180
Page 47: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180

Spine label for binder 50 mm (120 g/m2)

SINAMICS PERFECT HARMONY GH180

6SR41

GH180

F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75

M08 U10 Y15

Tests carried out on drives

Spine label for binder 162 mm (120 g/m2)

SINAMICS PERFECT HARMONY GH180 6SR41GH180

F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61 N30 N35 N44 N75 M08 U10 Y15

Tests carried out on drives

Page 48: SINAMICS PERFECT HARMONY GH180 - Siemens · SINAMICS PERFECT HARMONY GH180 Type 6SR41 Reference Manual Edition 02/2019 Tests carried out on drives This documentation pertains to GH180