  • 8/8/2019 sing Communication Expenses

    1/22

    0

    OPTIMISATION OF

    TELECOMMUNICATION

    COSTS( PRI + VOIP)

    PROJECT LEADER : MR. AJIT JAIN

    AHMEDABAD BRANCH

    SPONSOR : MR. MOHAN NAIR

  • 8/8/2019 sing Communication Expenses

    2/22

    1

    Optimizing tele-communication cost at all branchesCrack team leader: Mr. Ajit Jain; Sponsor : Mr. Mohan Nair

    Initiative Description

    Initiative Description

    Reduce communication expense at the

    branches by installing digital PRI, VOIPs

    at branches

    Phase 1: Demand assessment

    List the present Communication and Data

    Transmission needs at a sample branch

    Map telecommunication bill between branches in "to"

    to "from" format

    Identify branches with highest telecom expenses

    Phase 2: Create baseline cost structure Estimate the average cost of the various utilities

    List the different schemes under which these utilities

    are registered

    Classify branches in different buckets based on

    demand assessment and cost structure

    Phase 3: Defining customized solutions

    Review all possible options available e.g. BRI from

    PRI, FCT, Voice Over IP

    Find viable technical solutions with help of GIL

    Analyze the options available and cost benefit todefine custom solutions for branches

    Phase 4: Pilot at Ahmadabad branch

    Phase 5: National rollout and review

    Establish the savings based on the Pilot

    Implement the solution at 10 other branches

    Review for 3 mths, If successful, implement at all

    locations

    Activity Plan

    Time line

    15/05/09

    30/05/09

    15/06/09

    30/06/09

    15/09/09

    15/12/09

    : Current stage

    Rationale

    Rationale

    Telecommunication costs can be significantly reduced by:

    a. Moving to digital from analogue boxes

    b. Installing digital PRIs

    c. Hire lease lines for branches with high telecom costs

    Savings estimates

    Savings estimates

    Total telecommunication cost from branches= ~90 lacs

    Estimated share to other branches and HO = 40% => 36 lacs

    Telecom bill from HO to all branches = 25 lacs

    Total telecom bill = 61 lacs

    Number of lease lines required to connect all branches = 40

    Total cost of lease lines @60,000 per line = 24 lacs/annum

    Total savings = 37 lacs

    Team members

    Team members

    Mr. Mohan Nair, Mr. Cyril Lobo, Mr. Anil Joshi, Miss Khurshid F.

    Laher.

    Commercial Division/ L&D function Wave 1

  • 8/8/2019 sing Communication Expenses

    3/22

    2

    VARIOUS COMMUNICATION & DATA FACILITY AT

    BRANCH

    Mobile to Mobile

    Landline

    Fax

    RF Connectivity Lease Line

    ISDN Lines

    Data Transmission

    Video Conferencing Internal Communication

    Communication between Branch Locations

    Communication with HO & Branches

    VOIP

  • 8/8/2019 sing Communication Expenses

    4/22

    3

    MAP TELECOMMUNICATION BILL

    To prepare a format to capture the

    information.

    Identify landline communication from

    (total bill amount) and expected percentage

    of communication from Branch to HO.

    Details of Landline.

  • 8/8/2019 sing Communication Expenses

    5/22

    4

    AREAS OF SAVINGS

    Landline to Mobile

    ISDN Rentals

    ISDN Pulse Rate Video Conferencing

    Warehouse to Office Landline Communication

    Intra-Branch and HO Communication

    ISDN Data Communication Cost

    Showroom to Office Landline Communication Cost

  • 8/8/2019 sing Communication Expenses

    6/22

    5

    SAMPLE CASE OF EXPECTED SAVINGS -

    AHMEDABAD BRANCH

    S. No. DescriptionMode of

    Saving

    Expected

    Saving p.m.

    Installation

    CostRemarks

    1 Landline to Mobile Installing FCT Rs. 5000/- Rs. 8500/- Installed

    2 ISDNBRI Card

    Rs. 2400/-

    Rs. 45000/- Installed

    (6 Lines)

    3 ISDN Data Cost

    Reducing Pulse

    Rate from Rs.

    1.10 to Re. 0.65p.

    Rs. 6000/-

    4HO

    CommunicationVOIP Rs. 20000/-

    Pending

    implementation

    TOTAL Rs. 33400/-

  • 8/8/2019 sing Communication Expenses

    7/22

    6

    TIPS FOR REDUCING

    TELECOMMUNICATION

    EXPENSES WITH THE

    AVAILABLE

    INFRASTRUCTURE ATBRANCHES

  • 8/8/2019 sing Communication Expenses

    8/22

    7

    Approach to Optimise Tele-communication Costs at Branches

    Branch

    prioritization

    Levers

    identification

    Target setting and

    implementationTracking

    Collect data on tele-

    communication costs

    across all branches

    Analyze tele-communication coststo identify top branches

    and prioritize

    One location multiple

    landlines to be covered

    under single plan.

    Converting landlines to PRI

    lines.

    Fixing of FCT.

    Creating awareness of

    various pulse rates.

    Increase mobile-to-mobile

    use with CUG.

    Using PRI to BRI card for

    ISDN and VC.

    Using VOIP.

    Create monthly work

    plan for each branch

    Implement identified

    initiatives/levers ineach branch

    Monthly reporting from

    each identified branch

    on the levers

    Track the financial

    benefit from the

    implemented levers

    Identify furtheropportunities for tele-communication cost

    reduction

    14 Apr, 09 01 May, 09 15 May, 09 15 June, 09 30 June, 09

    Completed

    Near completion

    Started

  • 8/8/2019 sing Communication Expenses

    9/22

    8

    Average Tele-communication Costs of Branches

    T C C AT

    8 8 8

    98%99% % % % % % % % % % %

    8%

    9%

    6%

    %

    66%

    7

    %

    8

    %88%

    9

    %

    %

    %

    8 %

    %

    A

    A

    T

    C

    TA

    %

    %

    8 %

    %

    C

    C

    T

    A

    ! "

    #

    $

    % &

    '

    ( )

    '

    ( %

    ' 0 '

    8'

    8'

    8'

    )

    '1

    '1

    '

    (

    '

    (

    '

    &

    '

    &

    '

    &

    '

    &

    '

    &

    '

    &

    '

    &

    '

    &

    '

    &

    '

    2

    3

    4 4 5

    ! "

    #

    $

    % &

    ' 6

    )

    '

    7

    0 '1

    8'

    ) )

    '

    8 7

    '

    8%

    '

    88' 0 6 ' 0

    8' 0 0 '

    ( & & ( & & ( & & ( & & ( & & ( & & ( & & ( & & ( & & ( & &

    9 @ A

    B

    2 A

    ! !

    #

    B

    C D @ E

    #

    "

    #

    F

    #

    !

    $

    #

    @ D

    G

    A

    4

    H

    #

    I

    #

    3

    !

    2 A

    #

    !

    H

    B $

    #

    A

    F A D

    P #

    @

    Q

    #

    B

    P

    3

    C D

    A B

    #

    " !

    #

    R

    B S

    #

    !

    H

    3

    4

    T 2 Q

    U

    #

    B

    P

    3

    V

    3

    E ! D

    W

    F A

    3

    W

    #

    !

    X

    Y

    3

    W

    #

    A

    #

    " B

    Q

    #

    !

    A B

    3

    4

    I

    #

    B

    a b

    H

    #

    I

    #

    H

    c B

    X

    A

    #

    E

    # P #

    "

    8I

    II

    II

    II

    II

    A = nformation Awaited

    nformation flow difficult

    being highly technical

  • 8/8/2019 sing Communication Expenses

    10/22

    9

    Top branches account for almost 0 of total

    Tele-Communication Costs

    Tele-Communication Costs of BranchesTele-Communication Costs of Branches

    d

    e

    d

    f

    d

    g

    d

    h

    d

    i d d

    Hyderab

    ad

    MumbaiRanchiGuwahatiBhuwane

    shwar

    LucknowJaipurNCRTrivandru

    m

    PatnaKochiRaipurBhopalChandigarh

    PuneAhmedab

    adDelhi Chennai Kolkatta Bangalor

    e

    Focus on these branches in first wave

    .75 . . 9 . . 5 . . . 3 . . 3 . 9 . IA IA IA IA IA IA IA IA

    Tel. Exps.

    (Rs Lacs.)

    Vishakha

    patnami

    IA = Information Awaited

    Information flow difficult

    being highly technical

  • 8/8/2019 sing Communication Expenses

    11/22

    10

    8 categories of levers identified to reduce Tele-Communication Costs

    Not all levers will be applicable to all branches, specific levers to be identified for each branch

    Commercial leversCommercial levers

    Convert all lines into one rental minimum pulse rate withgroup billing

    Advantage of total rental as Free Calling Value withminimum pulse rate.

    Converting Landlines to PRI Lines Tata offers PRI line with 30 channels at 65 p. pulse rate. Convert to PRI where billing more than Rs. 15000/-. EPABX worth Rs. 3.5 L. offered free.

    A

    A2

    A1

    Fixing of FCT Check IP instrument availability. Install FCT card at multiple locations. Cover them under CUG Plan.

    A3

    Non commercial leversNon commercial levers

    Creating awareness of various pulse rates Different usage attract different pulse rate. Matrix to be made and create awareness for

    optimising use. Sample matrix given.

    Converting ISDN lines to BRI lines Wherever PRI lines available, install PRI to BRI card.Advantage of pulse rate from Rs. 1.10 to Rs. 0.06p. Rental zero (included in PRI rent)* Showroom to office / Video Conferencing.

    Increase mobile-to-mobile use with CUG Depending on Service provider, encourage different

    businesses to go into one service provider. Maximise mobile-to-mobile use under CUG.

    B2

    B1

    B

    A4

  • 8/8/2019 sing Communication Expenses

    12/22

    11

    8 categories of levers identified to reduce Tele-Communication Costs

    Not all levers will be applicable to all branches, specific levers to be identified for each branch

    Encourage use of mobile for STD Mobile to mobile / mobile to landline, STD rate per

    minute is Re. 1/-. STD outside circle Rs. 1.30. Encourage use of mobile for STD.

    Installing VOIP Check for statutory compliance. Wherever IP instrument available install VOIP.Arrange for 64 KBPS extra band width. Communicate through VOIP for STD inter-branch /

    HO communication.

    A6

    A5

    Commercial levers

    A

  • 8/8/2019 sing Communication Expenses

    13/22

    12

    8 levers to reduce Tele-Communication Costs

    Convert all lines into one rental minimum pulse rate with group billing

    Converting Landlines to PRI Lines

    Fixing of FCT

    Converting ISDN lines to BRI lines

    2

    3

    4

    1

    TBC

    TBC

    TBC

    TBC

    Levers descriptionLevers description Savings estimateSavings estimate

    Encourage use of mobile for STD

    Installing VOIP

    Creating awareness of various pulse rates

    Increase mobile-to-mobile use with CUG

    5

    6

    7

    8 TBC

    TBC

    TBC

    TBC

  • 8/8/2019 sing Communication Expenses

    14/22

  • 8/8/2019 sing Communication Expenses

    15/22

    14

    Specific levers for each branch being identified currently

    BranchesBranches

    DELHI

    CHENNAI

    KOLKATTA

    BANGALORE

    AHMEDABAD

    PUNE

    CHANDIGARH

    BHOPAL

    RAIPUR

    KOCHI

    PATNA

    TRIVANDRUM

    One rentalOne rental

    Landlines to

    PRI Lines

    Landlines to

    PRI Lines

    Fixing

    FCT

    Fixing

    FCT

    Use Mobile

    for STD

    Use Mobile

    for STD

    Installing

    VOIP

    Installing

    VOIP

    Awareness of

    Pulse Rates

    Awareness of

    Pulse Rates

    Mobiles under

    CUG

    Mobiles under

    CUG

    ISDN to

    BRI Lines

    ISDN to

    BRI Lines

    Illustrative For discussion only

    Commercial Levers Non-Commercial Levers

  • 8/8/2019 sing Communication Expenses

    16/22

    15

    BHUWANESHWAR

    GUWAHATI

    RANCHI

    MUMBAI

    HYDERABAD

    VISHAKAPATNAM

    Specific levers for each branch being identified currently

    BranchesBranches

    NCR

    JAIPUR

    LUCKNOW

    One rentalOne rental

    Landlines to

    PRI Lines

    Landlines to

    PRI Lines

    Fixing

    FCT

    Fixing

    FCT

    Use Mobile

    for STD

    Use Mobile

    for STD

    Installing

    VOIP

    Installing

    VOIP

    Awareness of

    Pulse Rates

    Awareness of

    Pulse Rates

    Mobiles under

    CUG

    Mobiles under

    CUG

    ISDN to

    BRI Lines

    ISDN to

    BRI Lines

    Illustrative For discussion only

    Commercial Levers Non-Commercial Levers

  • 8/8/2019 sing Communication Expenses

    17/22

    16

    HIGHLIGHTS OF MINUTES OF MEETING WITH

    MR. CYRIL LOBO

    1. Installation of FCT with the existing EPABX will reduce the cost forpeople dialling from Landline to Mobile, specially the back officepeople. In the long run, it may be also beneficial to provide mobiles toback office persons, who interact with either sales or warehouseteams regularly.

    2. Wherever possible install PRI to BRI card, wherever ports areavailable, to do away with ISDN lines, specially used for connectivitybetween 2 locations in the same branch, like showrooms.

    3. At length it was discussed on the benefits of VOIP for which logicalpartitioning will be required to be done at HO and which your team hasindicated is possible to do.

    4. The infrastructure and hardware required to implement VOIP isavailable at Mumbai, but depending on the model of EPABX, hardwarewill have to be installed at branches for making it compatible.

  • 8/8/2019 sing Communication Expenses

    18/22

    17

    HIGHLIGHTS OF MINUTES OF MEETING WITH

    MR. CYRIL LOBO

    5. With GIL a oint meeting will be held with your team, which Mr. Mohan Nair will co-

    ordinate for the technical help required to spare the lease line bandwidth or go in for

    additional band width.

    . To start with in the coming week or two, two ma or branches like Delhi, Chennai and

    one medium sized branch like Ahmedabad can be taken as a sample for installation of

    VOIP.

    All of us have ointly agreed that this can bring in good savings and reduction in

    telecom expenses.

    . With the calling rates from mobile-to-mobile coming down, it was also discussed that

    negotiations with Tata should be done to reduce their pulse rate from Rs. 0. 5 p. to

    atleast Rs. 0.30 p.

    8. Reliance has launched their new product with high speed, Broadband Plus and we

    should look into the possibility of getting a static IP address for suitability for data

    communication between two locations within the same branch.

  • 8/8/2019 sing Communication Expenses

    19/22

    18

    HIGHLIGHTS OF MINUTES OF MEETING WITH

    MR. CYRIL LOBO

    . To negotiate with Reliance people, a team at Mumbai / Ahmedabad, for possibility of

    having the Broadband Plus connectivity at lower hardware cost and fixed charges for

    unlimited use.

    10. It was suggested that for Ahmedabad we can buy one or two sample hardware of

    Broadband Plus and then experiment for various utilities.

    11. It was also discussed that it is possible to connect VOIP if IP EPABX is not available

    through digital phones, like warehouse to office, but whether we will be able to restrict

    these calls getting diverted to conference in another service providers services is to be

    reviewed.

    The details prepared of various options to this cost by Ahmedabad branch should be

    circulated and explained more in detail to all concerned.

    12. If Tata agrees to pool the billing of showroom and office, and if office billing is more

    than Rs. 50,000/-, then PRI connection at showroom can also be thought of.

    13. The BRI port can also be used for video conferencing.

  • 8/8/2019 sing Communication Expenses

    20/22

    19

    LOGICAL PARTITIONING LEGAL

    Circular from the Secretary of

    Communication giving clearance of

    logical partitioning

    making VOIP legal.

  • 8/8/2019 sing Communication Expenses

    21/22

    20

    HIGHLY TECHNICAL

    Branches unable to give correct information.

    Suggestion :

    1. Appoint technical person

    (Person in Ahmedabad identified and ready to

    work at 3 of Hardware cost, travel and stayextra)

    2. E & E to co-ordinate.

  • 8/8/2019 sing Communication Expenses

    22/22

    21

    TECHNICAL TERMS

    BRI - Basic Rate Interface ( 4 Kbps)

    PRI - Primary Rate Interface ( 4x30+128 Kbps for

    Digital)

    VPN - Virtual Private Network

    ISDN - Inter Server Digital Net

    FCT - Fixed Cellular Terminal