single line tethered glider team p14462 sub-system level design review jon erbelding paul grossi...
TRANSCRIPT
![Page 1: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/1.jpg)
Single Line Tethered Glider
Team P14462Sub-System Level Design Review
Jon ErbeldingPaul Grossi
Sajid Subhani
Kyle BallMatthew DouglasWilliam Charlock
![Page 2: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/2.jpg)
9/30/2013 Systems Level Design Review P14462
Team Introduction
Team Member Major
Sajid Subhani Industrial Engineer - Team Lead
Paul Grossi Mechanical Engineer
Matt Douglas Mechanical Engineer
Jon Erbelding Mechanical Engineer
Kyle Ball Mechanical Engineer
Bill Charlock Mechanical Engineer
![Page 3: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/3.jpg)
9/30/2013 Systems Level Design Review P14462
Agenda
● Project Description Review● Engineering Requirements Review● Functional Decomposition Review● Top 3 Concepts from Last Review● Concept Feasibility
● Glider Analysis and Feasibility● Base Station Analysis and Feasibility
● Project Planning● Work Breakdown Structure
![Page 4: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/4.jpg)
9/30/2013 Systems Level Design Review P14462
Project Description Review
● Goal: Design, build, and test a tethered, small-scale, human-controlled glider.
● Critical Project Objectives:○ Maintain maximum tension on the tether○ Sustaining horizontal and vertical flight
paths○ Measure and record tether tension and
position○ Understand the influential parameters for
sustained, tethered, unpowered flight
Glider
Tether
Base Station
Operator w/controller
![Page 5: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/5.jpg)
9/30/2013 Systems Level Design Review P14462
Engineering Requirements
![Page 6: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/6.jpg)
9/30/2013 Systems Level Design Review P14462
Functional Decomposition
![Page 7: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/7.jpg)
9/30/2013 Systems Level Design Review P14462
Review of Top 3 System Concepts
3 Single Axis Load Cell IMU with Single Axis Load Cell 2 Potentiometers with Single Axis Load Cell
![Page 8: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/8.jpg)
9/30/2013 Systems Level Design Review P14462
Glider Analysis
![Page 9: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/9.jpg)
9/30/2013 Systems Level Design Review P14462
Choosing the Glider
Bixler v1.1 EPO Foam Wing span: 1.4 [m] Chord length: 0.2 [m] Mass: 0.65 [kg] Middle mounted propeller Only EPO Foam
Phoenix 2000 EPO Foam Wing span: 2 [m] Chord length: 0.3 [m] Mass: 0.98 [kg] Front mounted propeller Reinforced
![Page 10: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/10.jpg)
9/30/2013 Systems Level Design Review P14462
Choosing the Glider
The smaller Bixler glider creates less tension for a larger operating range
Able to operate with an affordable load cell
![Page 11: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/11.jpg)
9/30/2013 Systems Level Design Review P14462
Flight Orientation
![Page 12: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/12.jpg)
9/30/2013 Systems Level Design Review P14462
Flight Orientation
![Page 13: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/13.jpg)
9/30/2013 Systems Level Design Review P14462
Flight Analysis
Wind Speed: ~ 11 mph
![Page 14: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/14.jpg)
9/30/2013 Systems Level Design Review P14462
Flight Analysis
Wind Speed: ~ 22 mph
![Page 15: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/15.jpg)
9/30/2013 Systems Level Design Review P14462
Flight Analysis
Wind Speed: ~ 44 mph
![Page 16: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/16.jpg)
9/30/2013 Systems Level Design Review P14462
Qualitative DOE
Slower wind speed: lower tension
Larger flight path radius: lower tension
Beta angle peaks: ~ 94-95°
Tension peaks: ~ 20 [m] tether length
Tension must be less than 5000 [N] (1100 lbs)
![Page 17: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/17.jpg)
9/30/2013 Systems Level Design Review P14462
Quantitative DOE
Choosing flight configuration Inputs
Maximum allowable tension Observed wind speed
Outputs Beta angle Tether length Flight path radius
![Page 18: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/18.jpg)
9/30/2013 Systems Level Design Review P14462
Bridle and Tether Setup
Use a tension of 3000 lbs as an overestimate.
Maximum allowable stress for Bixler glider: 30 MPa
Bridle attached at two points on the fuselage causes structural failure at the wing root with 180 MPa
![Page 19: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/19.jpg)
9/30/2013 Systems Level Design Review P14462
Proposed Tether and Bridle Design
![Page 20: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/20.jpg)
9/30/2013 Systems Level Design Review P14462
Ideal Bridle Location Analysis
Optimum tether location: 0.51 m from root. Optimum tether angle: 54 deg from airplane
![Page 21: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/21.jpg)
9/30/2013 Systems Level Design Review P14462
Wing Stress Analysis
![Page 22: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/22.jpg)
9/30/2013 Systems Level Design Review P14462
Wing Stress Analysis
Maximum stress: 15 MPa
![Page 23: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/23.jpg)
9/30/2013 Systems Level Design Review P14462
Fuselage Stress Analysis
![Page 24: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/24.jpg)
9/30/2013 Systems Level Design Review P14462
Tether and Bridle Configuration
![Page 25: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/25.jpg)
9/30/2013 Systems Level Design Review P14462
Base Station Analysis and Feasibility
![Page 26: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/26.jpg)
9/30/2013 Systems Level Design Review P14462
2 Potentiometers and Single-Axis Load Cell
Concept 1
![Page 27: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/27.jpg)
9/30/2013 Systems Level Design Review P14462
Vertical Rotation
![Page 28: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/28.jpg)
9/30/2013 Systems Level Design Review P14462
Static Analysis
∑ 𝑀𝑜=𝑇𝑟𝑠𝑖𝑛 (𝛿𝜑 )−𝑊 𝐿𝐶𝑑𝑐𝑜𝑠 (𝜃 )−𝑀𝑝𝑜𝑡−𝑀𝑏𝑒𝑎𝑟=0∴𝑇=
𝑀𝑝𝑜𝑡+𝑀𝑏𝑒𝑎𝑟+𝑊 𝐿𝐶𝑑𝑐𝑜𝑠(𝜃)𝑟𝑠𝑖𝑛(𝛿𝜑)
![Page 29: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/29.jpg)
9/30/2013 Systems Level Design Review P14462
Dynamic Analysis
∑ 𝑀𝑜=𝑇𝑟𝑠𝑖𝑛 (𝛿𝜑 )−𝑊 𝐿𝐶𝑑𝑐𝑜𝑠 (𝜃 )−𝑀𝑝𝑜𝑡−𝑀𝑏𝑒𝑎𝑟=𝐼𝐿𝐶𝛼∴𝑇=
𝐼𝐿𝐶𝛼+𝑀𝑝𝑜𝑡+𝑀𝑏𝑒𝑎𝑟+𝑊 𝐿𝐶 𝑑𝑐𝑜𝑠(𝜃)𝑟𝑠𝑖𝑛(𝛿𝜑)
![Page 30: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/30.jpg)
9/30/2013 Systems Level Design Review P14462
Dynamic Analysis Continued
![Page 31: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/31.jpg)
9/30/2013 Systems Level Design Review P14462
3 Single-Axis Load Cells
● Created 3-D model of the system in SolidWorks● Works well when the ball joints are kept in
tension as seen in Fig 1.● Ball joints fail when they are put into
compression as seen in Fig 2.
Fig. 1 Fig. 2
![Page 32: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/32.jpg)
9/30/2013 Systems Level Design Review P14462
Base Station EquipmentPhidgets 3140_0 – S Type Load
CellBourns 3540S-1-103L Potentiometer
![Page 33: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/33.jpg)
9/30/2013 Systems Level Design Review P14462
Initial Base Station Budget Comparison
P14462 Purchase List for 3 Load Cell Base Station
Part Description Unit Price Qty Individual TotalPhidgets 3140_0 - S Type Load Cell 50 3 150.00Ball End Joint Rod 3.78 6 22.68
Shipping 0.00
Total Order Price 172.68
P14462 Purchase List for Potentiometer Base Station
Part Description Unit Price Qty Individual TotalPhidgets 3140_0 - S Type Load Cell 50 1 50.00Bourns 3540S-1-103L Potentiometer 20 2 40.00Miniature Aluminum Base-Mounted Stainless Steel Ball Bearings—ABEC-3 14.92 2 29.84Flanged Open 1/2 Inch Ball and Roller Bearing 7.61 1 7.61
Shipping 0.00
Total Order Price 127.45
![Page 34: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/34.jpg)
9/30/2013 Systems Level Design Review P14462
Project Planning
![Page 35: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/35.jpg)
9/30/2013 Systems Level Design Review P14462
Project Planning
![Page 36: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/36.jpg)
9/30/2013 Systems Level Design Review P14462
Work Breakdown Structure (10-12)
● Paul: ● Jon: ● Kyle: ● Matt: ● Saj: ● Bill:
![Page 37: Single Line Tethered Glider Team P14462 Sub-System Level Design Review Jon Erbelding Paul Grossi Sajid Subhani Kyle Ball Matthew Douglas William Charlock](https://reader036.vdocument.in/reader036/viewer/2022062407/56649dce5503460f94ac2c0e/html5/thumbnails/37.jpg)
9/30/2013 Systems Level Design Review P14462