sistemas de rega fotovoltaicos desenvolvidos por maslowaten€¦ · integrar o sistema fv no...
TRANSCRIPT
![Page 1: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/1.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Luis Narvarte
Coordenador, MASLOWATEN
Instituto de Energía Solar
Universidad Politécnica de Madrid
Sistemas de rega fotovoltaicos desenvolvidos
por MASLOWATEN
![Page 2: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/2.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 225/01/2016
NÃO DESLIGUEM OS TELEMÓVEIS
• WEB: www.maslowaten.eu
• Twitter: @maslowaten
• Facebook: @maslowaten
26/6/2017
![Page 3: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/3.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 325/01/2016
O custo da electricidade para agricultores e Associações de Regantes
• FENAREG : aumento dos custos 773%
• 40% - 50% do total dos custos de produção
• Energia: 75% do preço da água para rega
Mercado Potencial
• Sul da Europa: 14 milhões de Ha -16GW – 24.000M€
• Norte de África (Rede eléctrica + diésel): 1,5GW – 2.250 M€
ANTECEDENTES
26/6/2017
![Page 4: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/4.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 425/01/2016
¿Por que nós sabemos de bombagem FV e qualidade?
Bombagem FV
PRS (UE, 1993):
- 600 bombas; UPM: controlo de qualidade
Desde 1995:
- Marrocos, Argélia, Tunísia:53 bombas
- Egipto: 5 bombas
Rega (MICCIN, 2012):
- Protótipo em Villena
Qualidade técnica em Project Finance – Due diligence
Projectos:
- 78 centrais FV multiMW – 12 países - 302 MW
Empresas:
- Acciona, Guascor, Conergy, Unión Fenosa, Fotosolar, Atersa, Nobesol, Proener, Epuron, Ateia, ElementPower, Gehrlicher, Solon, Gadir, Cadmos, Dresser-Rand, Bosch, Gestamp, IM2, Scorpio, Sky Solar, Alten, Lugec, WOK, Abalados
Bancos:
- Santander, BBVA, BARCLAYS, BANESTO, Pastor, Caja Navarra, Banco de Vasconia, Sabadell Atlántico, Caja Madrid, Guipuzcuano, Caja Rural de Navarra, Bancaja, Caja Murcia, KUTXA, Espírito Santo, Zaragozano, Valencia, Caja Laboral Popular, La Caixa, Caja de Galicia
- West LB, Caixa Geral, HSH Nordbank AG, KfW, Leasink, Intesa Sanpaolo, BayernLB,
26/6/2017
![Page 5: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/5.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 525/01/2016
O que não é:
• MPPT no variador
• Solução preparada desde fábrica
• Ter de adaptar a rede de rega ao PV
• Pressão constante = Aumentar o tamanho do sistema PV a um depósito
O pobre estado de arte:
• 4 ofertas feitas a uma associação de regantes:
• Tamanho: de 90 kWp a 250 kWp
• Preço: de 1€/Wp a 2,7€/Wp
• Não é que estejam enganados; trata-se de um conhecimento novo
O que NÃO é adaptar o FV à rega?
26/6/2017
![Page 6: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/6.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 625/01/2016
O que é:
• Resolver os problemas associados à variabilidade do PV
• Ajustar a produção PV às necessidades de rega
• Integrar o sistema PV no sistema de rega existente
• Assegurar a fiabilidade durante 25 anos
O que SIM é adaptar o FV à rega?
26/6/2017
![Page 7: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/7.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 725/01/2016
Destabilização e paragem brusca do variador:
• Golpe de ariete: reduz o tempo de vida da parte hidráulica
• Sobretensões: reduz o tempo de vida do variador e da motobomba
O Problema da Variabilidade do FV:
Día 18 de septiembre
0
200
400
600
800
1000
1200
6:0
0
7:0
0
8:0
0
9:0
0
10:0
0
11:0
0
12:0
0
13:0
0
14:0
0
15:0
0
16:0
0
17:0
0
18:0
0
19:0
0
20:0
0
21:0
0
Hora
G (
W/m
2)
0
20
40
60
80
100
120
Tc (
ºC)
G (W/m2)
Tc (ºC)
253m
26/6/2017
![Page 8: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/8.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 825/01/2016
Seguidor N-S:
Ajustar a produção FV às necessidades de rega:
m3/dia
mês
0
1000
2000
3000
4000
5000
6000
7000
8000
0 1 2 3 4 5 6 7 8 9 10 11 12
- €
0,05 €
0,10 €
0,15 €
0,20 €
0,25 €
0,30 €
0,35 €
m3/día
€/kWh Red
€/m3 Red
m3 / dia Coste €
26/6/2017
![Page 9: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/9.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 925/01/2016
Reduzir o grau de novidade:
• O agricultor continua a fazer o mesmo
• Incentivo para reduzir o consumo de água
Integrar o sistema FV no sistema de rega existente
26/6/2017
![Page 10: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/10.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1025/01/2016
Sistemas de qualidade = fiabilidade:
• Especificações técnicas
• Controlo de qualidade
• Incluídas no contrato
Seguidor:
• Provado
Assegurar a fiabilidade durante 25 anos
26/6/2017
![Page 11: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/11.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1125/01/2016
METODOLOGIA:
• 5 “primeiras aplicações de mercado:
• Alicante (Espanha): 360 kWp
• Valladolid (Espanha): 160 kWp
• Alentejo (Portugal): 140 kWp
• Marraquexe (Marrocos): 120 kWp
• Sardenha (Itália): 40 kWp
• Validação técnica e económica
• Penetração no mercado:
• Visitas técnicas aos demostradores
• Exposições e feiras
• Acreditações e especificações técnicas
MASLOWATEN
TRANSFERÊNCIA de TECNOLOGIA:
• Transferência pelo menos a 20 PMES
• Pelo menos 5GW no sul da Europa em 2018
• Seminários internacionais
26/6/2017
![Page 12: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/12.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1225/01/2016
Tamalelt (120 kWp): híbrido rede-PV, gota a gota, pressão constante
Sistemas de rega fotovoltaica para o mercado:
26/6/2017
![Page 13: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/13.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1325/01/2016
Valladolid (160 kWp): só PV, pivot com aspersores baixa pressão, pressão constante
26/6/2017
![Page 14: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/14.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1425/01/2016
Uri (40 kWp): só PV, a um depósito e aspersores a pressão constante
26/6/2017
![Page 15: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/15.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1525/01/2016
Villena (360 kWp): PV, Balsa
26/6/2017
650.000 m3/ano288 m
63 l/s
![Page 16: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/16.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1625/01/2016
Alter do Chão (140 kWp): híbrido PV-diesel, gota a gota, pressão constante
26/6/2017
![Page 17: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/17.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1725/01/2016
Exemplo de Alter do Chão (2016)
Gastos prévios em diesel: 500 l/dia → 375 €/dia
Poupanças em diesel: 400 l/dia → 300 €/dia → 36,000 €/ano
Investimento: 168,000€
Exemplo de Alaejos
Gastos prévios em diesel : 1000€/ha de beterraba sacarina
Energia média: 3000 kWh/ha
Custo da electricidade do fotovoltaico: 0.09 €/kWh → 270€/Ha de beterraba sacarina
Primeiros resultados
26/6/2017
![Page 18: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/18.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Page 1825/01/2016
Exemplo de Villena (2017)
Primeiros resultados
26/6/2017
Dados reais de 1 Janeiro 2017 a 31 Agosto 2017
Água total bombeada 399,694 m3
Energia total bombeada 467,751 kWh
Custo da eletricidade da rede 10.5 c€/kWh
Poupança em 8 meses 49,114€
Poupança esperada em 12 meses 70,468€
Custo do investimento 432,000€
![Page 19: Sistemas de rega fotovoltaicos desenvolvidos por MASLOWATEN€¦ · Integrar o sistema FV no sistema de rega existente 26/6/2017. This project has received funding from the European](https://reader036.vdocument.in/reader036/viewer/2022081617/60492743c5056309ba1c88b5/html5/thumbnails/19.jpg)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No640771
Thanks for your attention, for more information please visit:
www.maslowaten.eu
WEB: www.maslowaten.eu
Twitter y Facebook: @maslowaten
Para contactar connosco