site context map - milwaukee€¦ · 4. vertical datum for the project survey is ngvd 1929....
TRANSCRIPT
![Page 1: SITE CONTEXT MAP - Milwaukee€¦ · 4. vertical datum for the project survey is ngvd 1929. benchmark for the project survey is conc. monument at the southwest corner of section 4-6-22](https://reader035.vdocument.in/reader035/viewer/2022071216/60480c6b57b5cf513a051366/html5/thumbnails/1.jpg)
1,000 feet
Site Entrance
Amenities within 1,000 ft
Traffic Connection Points
Zillman Park
KK CommercialCorridor
KK RiverTrail
Lincoln Field
Baran Park
SITE CONTEXT MAP
District 2 HQ
![Page 2: SITE CONTEXT MAP - Milwaukee€¦ · 4. vertical datum for the project survey is ngvd 1929. benchmark for the project survey is conc. monument at the southwest corner of section 4-6-22](https://reader035.vdocument.in/reader035/viewer/2022071216/60480c6b57b5cf513a051366/html5/thumbnails/2.jpg)
XX
XX
XX
XX
XX
XX
XX
XX
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E
E
E
E
BES
BES
BES
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G FO
FO
FO
X
X
X
X
X
X
X
X
EXISTINGBUILDINGS
GRAVEL/DIRTPARKING AREA
GRAVEL/DIRTPARKING AREA
GRASS
GRASS
WOODED
GRAVEL/DIRT
COMPOSTINGAREA
GRASS
GRASS
GRAVEL
GRAVEL
GATE
GATE
GATE
METAL FENCE
CONCRETE WALK
CONCRETE CURB
CONCRETE
BARRIER
CONCRETE
DRIVE
GRAVEL
GRAVEL
GR
AVEL DR
IVE
GRAVEL DRIVE
WOODED
METAL FENCE
CONCRETE WALK
STONE CURB
METAL FENCE
METAL FENCE
CONCRETE WALK
CONCRETE WALK CONCRETE W
ALK
EXISTINGBUILDING
RAMP
RAIL
REM
NANT
S
#2181
#2151
N0°
32'
33"
W10
0.58
'N
0° 3
2' 3
3"W
588
.32'
N51° 00' 37"E 2
09.13'
N32° 03' 50"W29.37'
N51° 00' 37"E
100.00'
Parcel87652 sq. ft.
2.012 ac.
S53° 24' 34"W
428.09'
S4°
26' 1
5"E
92.9
3'
S53° 24' 34"W
145.06'
S32° 03' 50"E 440.59'
S32° 03' 50"E 160.50'
S53° 24' 34"W
669.13'
S. LINE SW1/4 SEC. 4-6-22
24.79'
50'
60'
W. L
INE
SW
1/4
SE
C. 4
-6-2
2
SW CORNERSW 1/4 SEC. 4-6-22CONC. MON.W/ BRASS CAP
(13) Land described inQuit Claim Deed Doc. 4207323
(12) 17' Spur or Switch TrackAgreement Doc. 944790
Cobb Real Esta
te Holdings
#187 Becher St.
Parcel189336 sq. ft.
4.347 ac.
1
2
ALT
A/A
CS
M L
AN
D T
ITLE
SU
RV
EY
1 OF 1
DRWNG NO.
DRAWN BY: B.M.R.
DATE: 2-27-2015
PROJECT NO: 15155
CHECKED BY: KAS
APPROVED BY: CTC
NO. REVISION DATE BY
SHEET NO.:
MIL
HA
US
PR
OJE
CT
2151
& 2
181
S. R
OB
INS
ON
AV
MIL
WA
UK
EE
, WIS
CO
NS
IN
15155 boundary.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
1) Additional topo obtained on March 9,2015, B.M.R.
00 50' 100'
CATCH BASINREBAR FOUND/SET
HYDRANT
MANHOLE
GUY WIRE
CHAIN LINK FENCE
PROPERTY LINE
OVERHEAD UTILITY LINE
WATER MAIN
ELECTRIC
SANITARY SEWER
STORM SEWER
CONIFEROUS TREE (Diameter)
DECIDUOUS TREE (Diameter)
LIGHT POLE
IRON PIPE FOUND/SET
UTILITY PEDESTAL
TELEPHONE
BENCHMARK
MONUMENT
CHISELED CROSS FOUND/SET
PK NAIL FOUND/SETSPIKE/NAIL
ELECTRIC METER
UTILITY POLE
TRAFFIC SIGNAL
SOIL BORING
WATER VALVE SIGN
BUSH
FORCE MAIN
FIBER OPTICCABLE TV
TREE LINE
EASEMENT
LEGEND
SECTION 1/4 SECTION LINE
GASEXISTING MAJOR CONTOUR
GAS METER
GAS VALVE
POST
MONITORING WELL
ROOF DRAIN
CATCH BASIN (ROUND)PK
GUY POLE
X X X X X X X X X X
GUARD RAILMETAL FENCEWOOD FENCE
OH OH OH OH
E E E E E
T T T T T
FO FO FO FO
CTV CTV CTV CTV
SAN SAN SAN SAN
FS FS FS FS
ST ST ST ST
W W W W W
G G G G G
EXISTING MINOR CONTOUR
8"
8"
HANDHOLE
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELDMARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCALMUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY ANDCOMPLETENESS CANNOT BE GUARANTEED.
CULVERT END
Vicinity Map:
SW 1/4 SEC. 4, T6N, R22EScale: 1" = 1000'
GENERAL NOTES:
1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDSFURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BEGUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARENOT SHOWN.
2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALLBE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION.
3. DRAWING IS BASED ON FIELD SURVEY COMPLETED BY B. ROZITE ON UNDER WINTER CONDITIONS WITH HEAVY SNOWCOVER. GRAVEL EDGES AND SOME GROUND FEATURE DATA FROM AERIALS.
4. VERTICAL DATUM FOR THE PROJECT SURVEY IS NGVD 1929. BENCHMARK FOR THE PROJECT SURVEY IS CONC. MONUMENTAT THE SOUTHWEST CORNER OF SECTION 4-6-22 WITH AN ELEVATION OF 585.66, AS PUBLISHED BY SEWRPC.
5. BEARINGS BASED ON WISCONSIN STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NAD 1927, WITH THE WEST LINE OFTHE SW 1/4 OF SECTION 4-6-22 BEARING N 0°32'33" W.
6. SITE DOES NOT FALL WITHIN FLOODPLAIN PER FEMA FIRM PANEL 55079C0093E, EFFECTIVE DATE OF 9-26-2008.
7. ZONING: PARCEL 1 IS ZONED IH; PARCEL 2 IS ZONED LB-2. ZONING DATA NOT PROVIDED BY INSURER. DATA SHOWN HEREFROM CITY WEBSITE FOR REFERENCE ONLY.
ZONE IH SETBACKS:Front = noneStreet side = noneInterior side = noneRear = none
ZONE LB-2 SETBACKS:Front = none (min.); avg. (max.)Street side = none (min.); 5' (max.)Interior side = noneRear = none
8. PARCEL 1 AREA IS 189341 SQ. FT. OR 4.35 AC; PARCEL 2 AREA IS 87653 SQ. FT. OR 2.01 AC.SE CORNERSW 1/4 SEC. 4-6-22CONC. MON.W/ BRASS CAP
![Page 3: SITE CONTEXT MAP - Milwaukee€¦ · 4. vertical datum for the project survey is ngvd 1929. benchmark for the project survey is conc. monument at the southwest corner of section 4-6-22](https://reader035.vdocument.in/reader035/viewer/2022071216/60480c6b57b5cf513a051366/html5/thumbnails/3.jpg)