Updated 07/31//2019 DEPARTMENT OF COMMUNITY PLANNING, HOUSING and DEVELOPMENT Inspection Services Division 2100 Clarendon Blvd., Suite 1000, Arlington, VA. 22201 Tel 703-228-3800 Fax 703-228-7046 www.arlingtonva.us WATER /SEWER ENGINEERING AND UTILITIES SERVICES OFFICE Address of Building: __________________________________________________________ Name of Owner: _____________________________________________________________ Applicant Name: _____________________________________________________________ Phone (s): _________________________________ Date: ___________________________ The following conditions must be met or agreed upon by the Water/Sewer Engineering Section and the Utilities Services Office of the Department of Environmental Services (DES) prior to approval of this demolition request. 1. The water and sewer account must be closed and the final bill must be paid prior to issuing the demolition permit. 2. The existing sewer lateral must be capped at the property line by the Owner and inspected by the Inspections Services Division prior to issuing the demolition permit. If during inspection, it is determined that they lateral cannot be used, then the lateral must be capped at the sewer main, and a new sewer lateral is required. For inspection of capped service lateral call 703-228-3800. 3. Per County Code 26-8, the issuance of a demolition permit shall constitute an implied request by and permission from the property Owner for discontinuance of the water service connection. 4. As a courtesy, temporary use of the water service connection will be allowed for construction purposes only. In order to do this you will need to request a temporary construction account from the Utility Services Office. Is temporary retention of existing water service requested by applicant for construction purposes? (Check one) YES NO The temporary service for construction purposes will be automatically disconnected upon installation of the new, permanent water service for the property. DES requires that all new construction must pay for a new water service prior to the connection of the new water service line. 5. If the land disturbed exceeds 2500 square feet, or if any of the area is in Chesapeake Bay Resources Protection Area (RPA), then the applicant must comply with Chesapeake Bay Preservation Ordinance (revised and effective February 8, 2003) and apply for a Land Disturbance Activity Permit (LDA Permit). Application for an LDA Permit requires an Existing Conditions Plan, Demolition and Grading Plan, Erosion and Sediment Control/Storm Water Management Plan, and a Conservation Plan. Four (4) sets of these plans are required. ____________________________________________________________________________________________________________ Signature of Owner or Authorized Agent Date Site Information Disclaimer Letter From Utility Requirement 1. Have your service address and account number ready. These are needed for the discontinuation of water service. Please note, only an owner or authorized agent of the owner can request discontinuation of service. 2. Submit payment to the Treasury Department. The various payment options are available at: https://capp.arlingtonva.us. It can take up to 3 days for your payment to be applied to your utility account. Please leave adequate time for this step to occur. To expedite this step, you can send a copy of a receipt or other electronic proof of payment to [email protected] and we can apply the final amount to your account within 1 business day. 3. Request to retain the existing water service for construction purposes. If you plan on using water for construction purposes, a new water-only account must be requested and established after the existing account is finalized. This temporary service will be disconnected when the new water service is installed. Note: It may take up to 7 business days for a read and a calculation of the amount outstanding on your account to occur. Please allow adequate time for this process to occur. Note: Utility billing demo permits are processed by the DES Customer Contact Center. You can initiate this process by calling the Contact Center at 703-228-5000.

Upload: others

Post on 21-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Site Information Disclaimer€¦ · DES requires that all new construction must pay for a new water service prior to the connection of the new water service line. 5. If the land disturbed

Updated 07/31//2019

DEPARTMENT OF COMMUNITY PLANNING, HOUSING and DEVELOPMENT

Inspection Services Division

2100 Clarendon Blvd., Suite 1000, Arlington, VA. 22201 Tel 703-228-3800 Fax 703-228-7046 www.arlingtonva.us

WATER /SEWER ENGINEERING AND UTILITIES SERVICES OFFICE

Address of Building: __________________________________________________________

Name of Owner: _____________________________________________________________

Applicant Name: _____________________________________________________________

Phone (s): _________________________________ Date: ___________________________

The following conditions must be met or agreed upon by the Water/Sewer Engineering Section and the Utilities Services Office of the Department of Environmental Services (DES) prior to approval of this demolition request.

1. The water and sewer account must be closed and the final bill must be paid prior to issuing the demolition permit.

2. The existing sewer lateral must be capped at the property line by the Owner and inspected by the Inspections Services Division priorto issuing the demolition permit. If during inspection, it is determined that they lateral cannot be used, then the lateral must be cappedat the sewer main, and a new sewer lateral is required. For inspection of capped service lateral call 703-228-3800.

3. Per County Code 26-8, the issuance of a demolition permit shall constitute an implied request by and permission from the property

Owner for discontinuance of the water service connection.

4. As a courtesy, temporary use of the water service connection will be allowed for construction purposes only. In order to do this youwill need to request a temporary construction account from the Utility Services Office.

Is temporary retention of existing water service requested by applicant for construction purposes?

(Check one) YES NO

The temporary service for construction purposes will be automatically disconnected upon installation of the new, permanent water service for the property. DES requires that all new construction must pay for a new water service prior to the connection of the new water service line.

5. If the land disturbed exceeds 2500 square feet, or if any of the area is in Chesapeake Bay Resources Protection Area (RPA), then theapplicant must comply with Chesapeake Bay Preservation Ordinance (revised and effective February 8, 2003) and apply for a LandDisturbance Activity Permit (LDA Permit). Application for an LDA Permit requires an Existing Conditions Plan, Demolition and GradingPlan, Erosion and Sediment Control/Storm Water Management Plan, and a Conservation Plan. Four (4) sets of these plans are required.

____________________________________________________________________________________________________________ Signature of Owner or Authorized Agent Date

Site Information

Disclaimer

Letter From Utility Requirement

1. Have your service address and account number ready. These are needed for the discontinuation of water service. Please note, only an owner or authorized agent of the owner can request discontinuation of service.

2. Submit payment to the Treasury Department. The various payment options are available at: https://capp.arlingtonva.us. It can take up to 3 days for your payment to be applied to your utility account. Please leave adequate time for this step to occur. To expedite this step, you can send a copy of a receipt or other electronic proof of payment to [email protected] and we can apply the final amount to your account within 1 business day.

3. Request to retain the existing water service for construction purposes. If you plan on using water for construction purposes, a new water-only account must be requested and established after the existing account is finalized. This temporary service will be disconnected when the new water service is installed.

Note: It may take up to 7 business days for a read and a calculation of the amount outstanding on your account to occur. Please allow adequate time for this process to occur.

Note: Utility billing demo permits are processed by the DES Customer Contact Center. You can initiate this process by calling the Contact Center at 703-228-5000.

Page 2: Site Information Disclaimer€¦ · DES requires that all new construction must pay for a new water service prior to the connection of the new water service line. 5. If the land disturbed

Address of Building: ________________________________________________________________________________________________

Name of Owner: ___________________________________________________________________________________________________

Applicant Name: ___________________________________________________________________________________________________

The following service connections and appurtenant equipment, such as meters and regulators, have been removed or sealed and plugged in a safe manner.

Electric Service

Gas Service

Sewer Services: Inspection of Sewer Cap-Off on Property

Water and Sewer Account: No Accounts Payable

Land Disturbance Activity: LDA Permit Issued

Asbestos Certification

Rodent infestation certificate of treatment is required to be submitted with this sheet

prior to issuance of demolition permit.

Written Notice of Demolition or excavation shall be delivered to the Owner of each potentially affected adjoining lot, building or structure at least one (1) week prior to

the commencement of work. A copy of the Notice of Demolition is required with submission of this form.

Dominion Electric Power Company

Washington Gas Company

Inspection Services Division, Suite 1000 Department of Community Planning, Housing and Development

Utilities Services Office, 703-228-5000 or [email protected] Department of Environmental Services

Permitting & Customer Service Counter, Suite 1000 Department of Environmental Services

Inspection Services Division, Suite 1000 Department of Community Planning, Housing, and Development

Note: