088598
4162
4177
DRAINAGERESIDUE LOT 4271
RESIDUELOT 4272
RESIDUELOT 4272
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4054
4055
4056
4057
4058
4059
4060
4061
4062
40634064
4065
4066
40674068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
40864087
4088
4089
4090
4091
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
41154116
41174118
4119
4120
4121
4122
4123
4124
4125
4126
4127
4128
4129
4130
4131
4132
41334134
4135
4136
4137
4138
4139
4140
4141
4142
4143
4144
4145
4146
4147
4148
41494150
4151
4152
4153
4154
4155
4156
4157
4158
4159
4160
4161
4163
4164
4165
4166
4167
4168
4169
41704171
4172
4174
4173
4254
4253
4260
4255
4262
42644175
4176
4178
4268
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4229
4230
4231
4232
4233
4234
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4250
4251
4252
4266
4256
4263
4257
4261
4259
4258
4265
4267
4269
4270
36554
36555
36556
36558
938714
938721
HOOKINS AVENUE
ELARA BVD
SUN
DEW
PARAD
E
938720
938719
ELARA BOULEVARD
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
ROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
RIBBO
NWOOD C
RESCEN
T
CONSTRUCTEDUNDER URS19233
ELARA BVD
ELARA BVD
MARSDENIA AVENUE
RIBBONW
OO
D CRESCENT
HOOKINS AVENUE
36620
947576
947577
947578
9475
79
9475
80
9475
81
947582
9475
83
947584
947585
947586
947587
947588
947589
947590
9475
92
9475
93947594
9475
95
947596
947597
947657
947598
947599
947600
9476
01
947602
947603
947604
947605
9476
56
9476
55 947606
947607
947608
947610
947609
9476
11
947621
947654
947653
947652
947623
947618
947619
947620
947612
947613
947614
947617
947615
947616
947622
947591
//
/
947914
947916
947917
947926
947915
947918
9479
27
9479
19
947920
947921
947922
947923
947924
947925
S153846
S153845
ELARA BOULEVARD
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
RIBBO
NWOOD C
RESCEN
T
947928
APPLEBERRY STREET
947914
947916
947917
947915
947918
9479
19
947920
947921
947922
947923
947924
947925
947928
S153375
153377
153391A
S153415
S153422
149858 S149862
S153390
153376
S1533
78
153373
S153
370
153371
153372
153374
153376A
153377A
153391
153392
S153388
153389
S153387
153392A
S153382
1533
79
153380
1533
81S15
3383
153384
153385
153386
153386A
153389A
S153393
153394
S153395
153398A
153398B
153398
153397
S153396
153400
153402
153401A
153401
153402A
S153430
153431S153403
153404
153405
153408
S153409
153407A
S153407
153411
153412
153413153414
1534
16
S1534
17
1534
17A
S1534
26
153420
1534
21
153419
S153418
S153423
153424
153425
153424A
153406
153427
1534
28
S153429
153425A
ELKHORN ST
FUTURELOT
No.6042
FUTURELOT
No.6041
TO BE CONSTRUCTEDUNDER URS20472
TO BE CONSTRUCTEDUNDER URS20472
TO BE CONSTRUCTEDUNDER URS20472
1
2
3
4
5
6
7
8
9
10
11
12
13
14 15
161718
19
2021
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3839
40
41
42
43
4445
46 47
48
49
50
5152
5354
5556
57
5859
60
61
62
63
646566
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B1 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
AUTHORISATION OF ESTIMATE VALUEOF ENDEAVOUR ENERGY FUNDED ASSETS
Signed:
Print Name:
Service Number:
Funding Amount: $
Date:
Substation N/A N/A
LV Mains N/A (km) N/A
HV Mains N/A (km) N/A
AssetAsset Cost
Estimate ($)Unit
QuantityNet Asset
Capacity (kVA)Original CustomerUtilization (kVA)
MaximumReimbursement
Amount ($)
Pro-Rata Reimbursement for Customer's Load Over 50kVA
Pioneer Cost Share Reimbursement SCHEME - Expiry Date : N/ASignature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This design complies with Endeavour Energy's relevant standards as current at thistime & as listed on the Endeavour Energy Accredited Service Provider's Internetsite. These standards include, but are not limited to:
· CP: Connection Policy,· EMS: Environmental Management Standard,· MCI: Mains Construction Instruction,· MDI: Mains Design Instruction,· PDI: Protection Design Instruction,· SDI: Substation Design Instruction,· SAD: Design Drawing Standard,· MMI: Mains Maintenance Instruction,· SMI: Substation Maintenance Instruction,· LDI: Public Lighting Electrical Design Element.·Additionally, where relevant, the design complies with AS/NZS7000 "Overhead LineDesign - Detailed Procedures" published by The Australian Standards.
Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damageresulting from non-compliance of the design with the above standards.
Service Provider Number: 2486Name:
Signed:
Date:
DESIGN COMPLIANCE AND INDEMNITY
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
APPROVAL TO CONNECT TO PUBLIC LIGHTING
THIS APPROVAL IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S GENERAL TERMS &CONDITIONS FOR CONNECTION OF PUBLIC LIGHTING AND IS SPECIFICALLY FOR
DRAWING NO. ____________ AMENDMENT _____ .
REVIEWERS NAME:
DATE APPROVED:REVIEWERSSIGNATURE:
L McKinnon L McKinnon
16.07.2018
14. Existing Assets:Have all the existing assets been field checked and are accurate at the time ofdesign? YES
13. Telecommunications:Telecommunications assets are NOT effected by the proposed works.
12. Pollution Controls:All the requirements of the Environmental Protection Authority pollutioncontrol legislation is to be strictly adhered to.
11. Environmental Management plan:EMP EMS0001 is part of this design (refer to EIA for details).
10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must beavoided. the following alternatives should be considered: · mobile generators and substations,· live line work,· design alternatives,· low voltage parallels,· work practices/standards.the cost is to be funded by the customer/developer.
9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent afterthe works have been competed and the letter of acceptance has been issued.The reimbursed amount is shown in the "Funding Arrangements for Scope ofWork table" . Any disagreement with the amount should be resolved withendeavour energy prior to the commencement of works.
8. WARNING: Live Endeavour Energy cables & other services in this area.Please contact "Dial Before You Dig" on telephone: 1100 for searches two daysprior to excavation.
7. ATTENTION:The preparation of this design has been undertaken giving due consideration tothe location of existing services. The Constructor is however responsible for theverification of services and permanent survey marks prior to the commencementof construction. No responsibility nor liability will be accepted by the designer fordamage to existing services as a result of this design.
6. ATTENTION:All services searches must be checked before construction.
5. ATTENTION:Permanent survey marks may exist in this area, these are to be located by asurveyor prior to commencement of work.
4. Accredited Service Provider to notify Endeavour Energy asset data customerdepartment daily when cable works is in progress. (ph. 131 081).
3. Design certification shall lapse where:
(i) notice of intent has not been received within six (6) months of this certification,or
(ii) construction has been interrupted for more than six (6) months.
where design certification has lapsed the design must be resubmitted forcertification by the accredited designer.
2. Endeavour Energy Contact Phone: 131081.
1. This drawing is to be read in conjunction with the relevant Endeavour EnergyNetwork Standards and Connection Policy.
NOTES
MATERIAL QUANTITIES SPECIFIED ON THIS DESIGN: The quantities or dimensions specified on this design are based oninformation supplied by the developer, DBYD, the Endeavour GIS, fieldbooks and site conditions at the time of the design. As quantities anddimensions are subject to change, the Constructor must check all quantitiesand dimensions on site prior to tendering, ordering and construction.
DBYD searches indicates the presence of serviceswithin the proposed work-site. The Level 1 ASP
/Constructor is to confirm the location of "all" servicesprior to the commencement of works.
Ref: 13261839 Date: 14 Nov 2017
DIAL BEFORE YOU DIG
Design Safety Report (DSR) 29 Jan 2018
Summary Environmental Report (SER) part of EMS 0001 29 Jan 2018
Document Name Notation Date
The Certification of this project is supported by the following key documentsKEY DOCUMENTS TABLE
(see breakdown to the left) Total EE Capital Contributions (excl PM & Design)
$ 307,536Total EE Capital Contribution (HV Reimbursed)
$ 337,368
All other works and materials including but notlimited to:· Substation establishment & installation,· Excavation & Trenching,· Under-bores,· Duct Installation,· Cable Installation (Pulling & Laying),· Cable Jointing,· Installation of Earthing,· Removal of Redundant Assets.
NIL
Assets to be Returned to the nearest EndeavourEnergy Depot by Level 1 ASP.
24 July 2018
Endeavour Energy Funded & Level 1 ASPConstructed - Reimbursement (exc GST) Co-ordination Supply Required Date
NIL NILNil
Customer Funded Contestable Works Existing Duct Usage Charges (exc GST)
Works Required Prior toCompletion of Customer
Contestable Project
Works Required inAssociation of Customer
Contestable Project
· All works associated with the inspection, testing,switching and the commissioning associated withthis project.
Including but not limited to:· Pegging of easements, property boundaries andinfrastructure locations,· Registering of Easements,· Provide Site Access,· Own Service and Service connections,· Confirm ground levels.
Endeavour Energy Funded & Constructed
NIL
Endeavour Energy Supplied Materials Customer FundedNon-Contestable Works Customer Funded
ASP Level 1 Electrical Works Customer
FUNDING ARRANGEMENTS FOR SCOPE OF WORKS
Modify/Uprate HV Switchgear $1630
4 x PM Substation Culvert $4892
4 x Plinth $4932
4 x Size 14 Fibreglass Cubicle $15712
4 x LV Switchgear CAT 1 FFIFF $27188
-1 x Siemens RTR HV Switchgear - $10745
2 x Siemens RTRR HV Switchgear $34308
3 x Siemens RTR HV Switchgear $32235
4 x Value of 500kVA 11kV Transformer only $54388
Install 4 x Sub Culvert $9280
Install 4 x New PM Substation $11440
Padmount Substation
9 x PM Sub Term (HV) $27459
3 x STJ in Trench (HV) $4431
Excavate 15m for 3 x STJ in Trench (HV) $1515
Joints
(C) 11kV 240mm² Al 3C XLPE $35937
(LC) Lay HV Cable Directly Buried in Trench $8790
(PC) Pull HV Cable Through Ducts $840
Lay Cable
(D) Lay HV Ducts in SL/LV Trench $30107
(LD) Lay HV 125mm Ducts in Trench $1380
(T&R) HV Light Trenching & Reinstatement $11817
Trenching & Ducts
Endeavour Energy Funded & Level 1 ASP Constructed - Reimbursement(exc GST)
DEVELOPMENT CONSENT APPLICATION - BLACKTOWN COUNCIL
URS20162 2017/04198/001 4001 - 4270 270 Winten Property Group Tana Sainsbury (J Wyndham Prince Pty Ltd) (02) 4720 - 3319
C.A.P. No. FILE No. LOTNUMBERS
No. OFLOTS DEVELOPER DEVELOPERS REPRESENTATIVE CONTACT No.
THIS DRAWING SUPPLIES 270 LOTS (SUBDIVISION OF LOT 3 & 7 DP1225885 & 1078187)
TOTAL 3236 m
Street Light Trenching 193 m
Low Voltage Trenching 2365 m
High Voltage Trenching 678 mTRENCH LENGTH
NOTETHE CONSTRUCTION OF THIS DESIGN AND
THE SUPPLY TO THIS SUBDIVISION ISDEPENDENT ON WORKS UNDER URS19233
BEING SUCCESSFULLY COMPLETED.
High Voltage Trenching/ / / / /
Low Voltage Trenching
Lay 40mm P.V.C. Service Conduits
New Pillar Excavation location
Existing Pillar
Existing Column
Establish New Padmount Substation
Existing Street Light Lantern
Padmount Substation - Existing
Existing Conduits (Ducts)
Install New Conduits (Ducts)
LEGEND
8.5m streeltight support column
5.5m streeltight support column
Install New Street Light Lantern
Site Overview
Prop
erty
Bou
ndar
y
HVØ81
HVØ81
SpareØ125
SpareØ125LV
Ø55LV
Ø55
C SLG
TØ100
725
880
1050
1100
350
600 450
690 820 960
75
50
25Minimum depth for HV
electrical services (750)
Minimum depth for gas &LV electrical services (600)
Minimum depth forTelco services (450)
Final Ground Level
TYPICAL TRENCH CROSS SECTION(Refer to Technical Bulletin -0105c for further details)
All dimensions in millimetres
5050
G
C
SL
Consumers Conduit (Ø40mm)
Streetlight Conduit (Ø50mm)
Gas Pipe (Ø50mm)
Telecommunications Duct
TØ100
Col
umn
Cen
trelin
e
100
150
1340 1640
300
MinimumSeparation (Telco's)
MinimumSeparation (Gas)
MinimumSeparation (HV)
MinimumSeparation (LV)
DUCT END LOCATION DETAIL
GROUND LEVEL
300m
m
DEVELOPER TO ATTACHPVC MARKER TAPE
TO DUCT ENDTYPICAL ROAD CROSSING CONFIGURATION
Dimensions are in Millimetres
900m
m
-6
00m
m
900mm
900mm
Kerb Line
Property Line
Boundary
RoadcrossingDucts
900mm
600m
m
900m
m
Cable Trench
-600mmBoundary
Property Line
Road
Roadcrossing
Ducts
PMS
Roa
d
SCALE 1:200020m0m 40m 60m 80m 100m 120m 140m 160m 180m 200m
Padmount SubstationEasement Requirements
The easement shall be flat & level over theentire easement area, and be above the
1:100 year flood level.Services such as drains, piping or wiring are
not permitted to pass through either thesubstation easement or the ground below it.If a retaining wall is to be installed, approval
from council is required.
Painting of ColumnsLocal council requires a certificate
from the manufacturer suppliedconfirming the power coated columns
are in accordance with therequirements of AS/NZ 4506-2005.
Streetlight ColumnsAll streetlight columns are to be
installed 350mm from the propertyboundaries unless otherwise
indicated.
SURVEY MARKSPermanent survey marks may existin this area, these are to be located
by survey prior to thecommencement of works.
WARNING A current services search of all
utilities must be carried out prior tothe commencement of works.
FINAL GROUND LEVELThe constructor is to confirm finished
ground level with the developer prior tothe commencement of construction.
ROUTE LENGTHSAll route lengths are to be confirmed
on site by the constructor prior toordering materials.
WARNINGTelecommunications assets in this
area. Constructor to contact relevantprovider prior to the commencement
of works.
Streetlight LV SupplyAll active conductors extending from
LV pillars to service streetlightcolumns to be fitted with a 16A in
line fuse.
WARNINGExisting live electrical assets located
in this vicinity, appropriate safetyprecautions must be utilised.
SERVICE DUCTSThe end of service ducts must not be
placed under proposed driveways.(Refer to Developers Representative
for details for details)
Duct RequirementsA continuous spare 125mm duct is tobe installed in all trenches where HVand LV mains cables are installed.
(maximum of 1x HV & 1x LV)
Proposed Ducts/ConduitsAll Proposed 125mm ducts / conduitsare to have a minimum 750mm cover.
(in accordance with MDI0028)
Existing ConduitsAll conduits are to be mandrelled,
proven clear, free of foreign material,and deformation prior to the
installation of cables.
Service DuctsThe end of service ducts must not be
placed under proposed driveways.(Refer to Developers Representative
for details for details)
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
//
//
/
//
//
/
//
//
/ / //
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/ / /
//
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
4162
4177
DRAINAGERESIDUE LOT 4271
RESIDUELOT 4272
4012
4013
4014
4015
4016
4017
4018
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
4087
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
4122
4123
4124
4125
4126
4127
4128
4129
4140
4141
4142
4143
4144
4145
4146
4147
4148
41494150
4151
4152
4153
4154
4155
4156
4157
4158
4159
4160
4161
4163
4164
4165
4166
4167
4168
4169
41704171
4172
4174
4173
4254
4253
4260
4255
4262
42644175
4176
4178
4268
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4229
4230
4231
4232
4233
4234
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4250
4251
4252
4266
4256
4263
4257
4261
4259
4258
4265
4267
4269
4270
36555
36556
ELARA BOULEVARD
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
ROSEPARK DRIVE
SILKPOD STREET
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
ELARA BVD
MARSDENIA AVENUE 36620
947576
947577
947578
9475
79
9475
80
9475
81
947582
9475
83
947584
947585
947586
947587
947588
947589
947590
9475
92
9475
93947594
9475
95
947596
947597
947657
947605
9476
56
9476
55 947606
947607
9476
11
947621
947654
947653
947652
947623
947618
947619
947620
947622
947591
A0
A2
A3
A4
A5
A6
A7
A8
B1
B2
B3
B4
B5
B6
C0
C1
C2 C3
C4
C5
C6
C7
C8
C9
D0
D1D2
D3
D4
D5
D7
D8
D9
E0
E1
E2
E3
E4
E5
E6
E7
E8
E9
F0
F1
F2
F3
F4F5
F6
F7
F8
H6
H7
H8
J7
J8
J9
K0
K1 K2
K3
K4
K5
K6 K8
L8
L9
M0
M1
M2
M3
M4
M5
M6
M7
M8
M9
N0
N1
N2
N3
N4
N5
N6
N7 N8
N9
P1
P2
P3
P4P5
P6
P7
Q0
Q1
Q2
R5
R6R7
R8
R9
S1
B7
F9
//
//
//
/
947914
947916
947917
947926
947915
947918
9479
27
9479
19
947920
S153846
S153845
ELARA BOULEVARD
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
Ra
P8947928
APPLEBERRY STREET
947914
947916
947917
947915
947918
9479
19
947920
947928
153391A
S153415
S153422
S1533
78
153377A
153391
153392
S153388
153389
S153387
153392A1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
153400
153402
153401A
153401
153402A
S153403
153404
153405
153408
S153409
153407A
S153407
153411
153412
153413153414
1534
16
S1534
17
1534
17A
S1534
26
153420
1534
21
153419
S153418
S153423
153424
153425
153424A
153406
153427
1534
28
S153429
153425A
TO BE CONSTRUCTEDUNDER URS20472
D9a
1
2
3
4
5
6
7
8
9
10
11
12
13
14 15
161718
19
2021
22
23
24
25
26
27
28
29
30
31
3839
40
41
42
43
4445
46 47
48
49
50
5354
5556
57
5859
//
//
/
//
//
/ / //
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/ / /
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
/
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
//
/
4162
4177
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4054
4055
4056
4057
4058
4059
4060
4061
4062
40634064
4065
4066
40674068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
40864087
4088
4089
4090
4091
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
41154116
41174118
4119
4120
4121
4122
4123
4124
4125
4126
4127
4128
4129
4130
4131
4132
41334134
4135
4136
4137
4138
4139
4140
4141
4142
4143
4144
4145
4146
41474160
4161
4163
4164
4165
4166
4167
4168
4169
41704171
4172
4174
4173
4175
4176
4178
4268
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4269
4270
36554
36555
36556
36558
ELARA BOULEVARD
MISTFLOWER STREET
ROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
RIBBO
NWOOD C
RESCEN
T
ELARA BVD
MARSDENIA AVENUE
RIBBONW
OO
D CRESCENT
36620
947584
947585
947586
947587
947588
947589
947590
9475
92
9475
93
947596
947597
947657
947598
947599
947600
9476
01
947602
947603
947604
947605
9476
56
9476
55 947606
947607
947608
947610
947609
9476
11
947621
947654
947653
947652
947623
947618
947619
947620
947612
947613
947614
947617
947615
947616
947622
947591
B3
B4
B5
B6
C4
C5
C6
C7
C8
C9
D0
D1D2
D3
D4
D5
D9
E0
E1
E2
E3
E4
E5
E6
E7
E8
E9
F0
F1
F2
F3
F4F5
F6
F7
F8
G0
G1
G3
G4
G5
G6
G7
G9
H0
H1
H2
H3
H4
H6
H7
H8
H9
J0
J1
J2
J3
J5
J6
J7
J8
J9
K0
K1 K2
K3
K4
K5
K6
K7
K8
K9
L0
L1
L2
L3
L4
L5
L6
L7L8
L9
M0
M1
M2
M3
M4
M5
M6
M7
M8
M9
N0
N1
N2
N3
N4
N5
N6
N7 N8
N9
P1
P2
P3
P4P5
P6
P7
Q0
Q1
Q2
Q3
Q4
Q5
Q6
Q7
Q8
Q9
R0
R1
R2
R3R4
R5
R6R7
R8
R9
T0
T1
T2
T3
T4
B7
F9
//
//
//
/
947916
947917
947926
947918
9479
27
9479
19
947920
947921
947922
S153846
S153845
ELARA BOULEVARD
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
RIBBO
NWOOD C
RESCEN
T
Ra
P8947928
APPLEBERRY STREET
947916
947917
947918
9479
19
947920
947921
947922
947928
S153375
153377
153391A
S153415
S153390
153376
S1533
78
153373
S153
370
153371
153372
153374
153376A
153377A
153391
153392
S153388
153389
S153387
153392A
S153382
1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
S153393
153394
S153395
153398A
153398B
153398
153397
S153396
153400
153402
153401A
153401
153402A
S153430
153431S153403
153404
153405
153408
S153409
153407A
S153407
1534
16
S1534
17
1534
17A
153420
153419
S153418
S153423
153424
153425
153424A
153406
153425A
ELKHORN ST
FUTURELOT
No.6042
FUTURELOT
No.6041
TO BE CONSTRUCTEDUNDER URS20472
TO BE CONSTRUCTEDUNDER URS20472
D9a
1
2
3
4
5
6
7
8
13
14 15
161718
19
2021
22
23
24
25
26
27
32
33
34
35
36
37
3839
40
41
42
43
4445
46 47
48
49
50
5152
5354
5556
57
5859
60
61
62
63
646566
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B2 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Site PlanScale 1:1000
Establish Proposed PMS No. PMS 36555· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).
Establish Proposed PMS No. PMS 36556· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).
Establish Proposed PMS No. PMS 36558· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTRR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).
Establish Proposed PMS No. PMS 36554· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).
LEGEND
High Voltage Trenching/ / / / /
Low Voltage Trenching
Lay 40mm P.V.C. Service Conduits
New Pillar Excavation location
Existing Pillar
Existing Column
Establish New Padmount Substation
Install New Street Light Lantern
Existing Street Light Lantern
Padmount Substation - Existing
Existing Conduits (Ducts)
Install New Conduits (Ducts)
8.5m streeltight support column
5.5m streeltight support column
Uprate existing HVswitchgear in PMS36620 to RTRR.
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X
X
XX
XX
XX
XX
XX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
XX
XX
X
X
XX
X
XX
X
X
XX
X
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
X
TRF
F4255 F425
7
F4254
F425
9
F4256
SIE
PS
F425
8
TRF
F425
2
F4248
F425
1F4250
F425
3
SIE
PS
F4249
TRF
F4246
F4242
F4245
F4244
F4247
SIE
PS
F4243
ToSw C3475
(PMS 34599)To
Sw A5854(PMS 33408)
TRF
E8249
E8245E8244
E8248
E8246
E8250
8DJH
PS
E8247
E8251
PMSNo.36131
ToSw E8225
(PMS 36128)
ToSw C9507
(PMS 34945)
ToSw C9507
(PMS 34945)
XX
XX
XX
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
STJ #3 XX
XX
XX
XX
X
XX
X
XX
XXX
XX
XX
X
STJ #2
STJ #1
PADMOUNTSUBSTATION
No. 36556 PADMOUNTSUBSTATION
No.36620
PADMOUNTSUBSTATION
No. 36554
PADMOUNTSUBSTATION
No. 36555
PADMOUNTSUBSTATION
No.36558
ELARA BVD
MARSDENIA AVENUE
RIBBONW
OO
D CRESCENT
HOOKINS AVENUE
ELARA BOULEVARD
PEPP
ERBE
RRY
PARA
DE
MISTFLOWER STREET
APPLEBERRY STREET
ROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
TREET
RIBBO
NWOOD C
RESCEN
T
APPLEBERRY ST
ROSEPARK DRIVE
MISTFLOW
ER STREET
ELKHORN ST
240mm Al
240mm AlTR
F
F5266
F5269F9332
F9331
F5270
F5267
SIE
PS
F5271
F5268 TRF
F4268
F4271F4270
F4267
F4272
F4269
SIE
PSF9334
F9333
1
2
3
4
5
6
7
8
11
12
13
14 15
161718
19
2021
22
23
24
25
26
27
28
29
30
31
34
35
36
37
3839
40
41
42
43
4445
46 47
48
49
50
5152
5354
5556
57
5859
60
61
62
63
646566
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B3 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
LEGEND
Install 11kV 240mm² Al 3-Core XLPE/PVC/HDPE CableR.L.1082m, C.L.1100m.
Existing Underground Cable/s
Straight Through Joint (STJ)
Final HV CircuitNot to Scale11kV Area
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
Locate cable from sw.E8251 in PMS 36131 to sw.F5268 in PMS 36620 & disconnect from 36620.STJ (#3) and extend with new 240mm² Al cable tonew PMS 36554.Install new HV cable from sw. F5268, PMS 36620to new PMS 36556.
Locate cable from sw.C3475 in PMS34599 to sw. F5267 in PMS 36620.STJ (#1 & #2) and extend with 2 x new240mm² Al cables to new PMS 36558.
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:
X X X
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
// //
//
////
////
//
//
//
//
//
//
//
//
//
//
//
//
//
////
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
XX
XX
XX
XX
XX
XX
OO
OO
O
O
O
O
O
O
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XX
XX
X
XX X
XX X
XX
XX
X
XX
XX
XX
XXX
X
X
X
X
X
XX
XX
X
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
XXX
X
XX
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
X
XX
XX
XX
X
XX
X
X
XX
XX
XX
XXX
XX
XX
X
X
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX X
X
X
XX
X
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
X
XX
XX
MARSDENIA
X
X
XX X
X
X
X
X
X
X
X X X
XX
X
RS
TU
V
TRF
PADMOUNTSUBSTATION
No. 36556
PADMOUNTSUBSTATION
No.36620
PADMOUNTSUBSTATION
No. 36555
RS
TU
V
TRF
XX
XX
XX
XX
XX
XX
X
X
XX
XX
X
XX
XX
XX
XX
RS
TU
V
TRF
PE
L277800C947576
PE
L277801C947577
PE
L277802C947578
PE
L277803C947579
PE
L277804C947580
PE
L277805C947581
PE
L277806C947582
PE
L277807C947583
PE
L277808C947584
PE
L277809C947585
PE
L277810C947586
PE
L277811C947587
PE
L277812C947588
PE
L277813C947589
PE
L277814C947590
PE
L277815C947591
PE
L277816C947592
PE
L277817C947593
PE
L277818C947594
PE
L277819C947595
PE
L277820C947596
PE
L277821C947597
PE
L277844C947620
PE
L277845C947621
PE
L277830C947606
PE
L277831C947607
PE
L277841C947617
PE
L277842C947618
PE
L277846C947622
PE
L277851C947652
PE
L277853C947654
PE
L277852C947653
PE
L277854C947655
PE
L277855C947656
PE
L277847C947623
PE
X
X
X
X
PE
L277843C947619
OO
OO
OO
O
O
O
O
OO
OO
OO
OO
O
O
O O
O
O
O
OO
O
OO
O
OO
O
OO O
OO
O
OO
OO
O
O
O
OO
O
OO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
O
OO
OO
O
OO
OO
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
O
O
O
O
O
OO
OO
O
PE
L277978C947915
PE
277989947926
PE
L277977C947914
PE
277990947927
S153846
S153845
ELARA BVD
MARSDENIA AVENUEELARA BLVD
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
CRABAPPLE S
T
APPLEBERRY STREET
ROSEPARK DRIVE
CRABAPPLE S
T
PE
L277979C947916
PE
L277980C947917
PE
L277981C947918
PE
L277982C947919
PE
L277983C947920
PE
L277991C947928
S1533
78
153377A
153392
S153388
153389
S153387
153392A1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
S153393
153400
153402
153401A
153401
153402A
153431S153403
153404
153405
153408
S153409
153407A
S153407
153411
153412
153413153414
S153415
1534
16S153422
S1534
17
1534
17A
S1534
26
153420
1534
21
153419
S153418
S153423
153424
153425 153425A
153424A
153406
153427
1534
28
S153429
1
3
4
5
6
7
8
9
10
11
12
13
14 15
161718
19
2021
22
23
24
25
26
27
28
29
30
31
40
41
42
43
4445
46 47
48
49
50
5354
5556
57
5859
// //
//
////
////
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
// //
//
////
//
////
//
//
//
//
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
OO
O
OO
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XX
XX
X
XX X
XX X
XX
XXX
X
X
X
X
X
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
XX
X
X
X
X
X
XX
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
XX
XX
X
X
X
X
X
XX
XX
X
XX
XX
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
XX
X
X
XX
X
X
XX
XX
XX
X
XX
X
X
XX
XX
XX
XXX
XX
XX
X
X
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX X
X
X
XX
X
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
X
XX
XX
XXX
XX
X
XX
XX
XX
XX
XX
XX
X
XX
XX
X
XX
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X X
XX
X
XX
XX
XXX
XX
XX
XX
X
XX
X
XX
XX
XX
X
XX
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
MARSDENIA
X
X
XX X
X
X
X
X
X
X
X X X
XX
X
RS
TU
V
TRF
RS
TU
V
TRF
PADMOUNTSUBSTATION
No. 36556
PADMOUNTSUBSTATION
No.36620
PADMOUNTSUBSTATION
No. 36555
RS
TU
V
TRF
RS
TU
V
TRF
XX
XX
XX
XX
XX
XX
X
X
XX
XX
X
XX
XX
XX
XX
RS
TU
V
TRF
PE
L277809C947585
PE
L277810C947586
PE
L277812C947588
PE
L277813C947589
PE
L277814C947590
PE
L277815C947591
PE
L277816C947592
PE
L277817C947593
PE
L277821C947597
PE
L277822C947598
PE
L277844C947620
PE
L277845C947621
PE
L277823C947599
PE
L277824C947600
PE
L277825C947601
PE
L277826C947602
PE
L277827C947603
PE
L277828C947604
PE
L277829C947605
PE
L277830C947606
PE
L277831C947607
PE
L277832C947608
PE
L277833C947609
PE
L277835C947611
PE
L277836C947612
PE
L277839C947615
PE
L277837C947613
PE
L277840C947616
PE
L277838C947614
PE
L277841C947617
PE
L277842C947618
PE
L277846C947622
PE
L277851C947652
PE
L277853C947654
PE
L277852C947653
PE
L277854C947655
PE
L277855C947656
PE
L277847C947623
PE
L277856C947657
X
X
X
X
PE
L277843C947619
PE
L277834C947610
OO
OO
O
OO
OO
O
O
O
OO
OO
OO
O
O
O
O
OO
OO
OO
OO
O
O
O O
O
O
O
OO
O
O
OO O
O
OO
OO
OO
OO
OO
OO
OO
O
O
OO
O
OO
O
O
OO O
OO
O
OO
OO
O
O
OO
OO
O
O
O
O
O
O
O
O
OO
O
OO
OO
OO
OO
OO
O
O
O
O
PE
277986947923
PE
277989947926
S153846
S153845
ELARA BVD
MARSDENIA AVENUE
RIBBONW
OO
D CRESCENT
ELARA BLVD
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
RIBBO
NWOOD C
RESCEN
T
APPLEBERRY STREET
ROSEPARK DRIVE
CRABAPPLE S
T
PADMOUNTSUBSTATION
No.36558
PE
L277980C947917
PE
L277981C947918
PE
L277982C947919
PE
L277983C947920 PE
L277984C947921
PE
L277985C947922
PE
L277991C947928
PADMOUNTSUBSTATION
No. 36554
S153390
S153375
153376
S1533
78
153373
S153
370
153371
153372
153374
153376A
153377
153377A
153391
153392
S153388
153389
S153387
153392A
153391A
S153382
1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
S153393
153394
S153395
153398A
153398B
153398
153397
S153396
153400
153402
153401A
153401
153402A
S153430
153431S153403
153404
153405
S153409
153407A
S153407
S153415
1534
16
S1534
17
1534
17A
153420
153419
S153418
S153423
153424
153425 153425A
153424A
153406
ELKHORN ST
1
2
3
5
6
7
8
14 15
161718
19
2021
22
23
24
25
26
27
32
33
34
35
36
37
3839
40
41
42
43
4445
46 47
48
49
50
5152
5354
5556
57
5859
60
61
62
63
646566
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B4 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
NFinal LV Circuit
Not to Scale
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
LEGEND
Existing Underground Cable/s
X X X X XInstall 240mm² Al 4-Core XLPE/PVC Cable (T84)R.L. 3790m, C.L. 4290m.
Install 50mm² Cu 4-Core XLPE/PVC Cable (T94)R.L. 376m, C.L. 435m.// // // //
O O O O O OInstall 1x 16mm² Cu 2-Core XLPE/PVC CableR.L. 1003m, C.L. 1223m.
LV Isolation Switch/Links (N/O)
LV Isolation Switch/Links (N/C)
Pillar Earth
PE
XXXXXXXX
Lantern Number - New AssetColumn Number - New Asset(PE Controlled)
PE
XXXXXXXX
Lantern Number - Existing AssetColumn Number - Existing Asset(PE Controlled)
Install New Street Light Lantern
Existing Street Light Lantern
5.5m streeltight support column
8.5m streeltight support column
Proposed 277800 - 277847 947576 - 947623 17W Street LED JLB99G05L17 889 48 5.5m EnlargedBase Column IE/5.5.EB Type 2 / Type 2 995 48 3.0m Curved Pipe Outreach IE3.0CPS/25 991 5° Powder coated
black Blacktown Council
Proposed 277851- 277856 947652 - 947657 80W Street LED PL99G01L90 950 6 8.5m EnlargedBase Column IE/8.5.EB Type 2 / Universal 995 6 4.5m Curved Pipe Outreach IE4.5CPS/25 991 5° Powder coated
black Blacktown Council
State LuminaireNumber
SupportNumber Description Part No. Rate
Code QTY Description Part NO. FootingBolt / Foundation
RateCode QTY Description Part No. Rate
Code
UpcastAngle
ColumnColour
Charge ToLuminaire Column / Pole Outreach / Bracket
Lighting Equipment & Billing Schedule
A
A
B
C
B
C
D
D
VdE16 36555 [U] 36554 [S]VdE15 36557 [S] 36555 [V]VdE14 36555 [V] 36557[S]VdE13 36554 [S] 36555 [U]VdE12 36555 [R] 36554 [U]VdE11 36554 [U] 36555 [R]VdE10 36558 [V] 36554 [V]VdE9 36558 [V] 36557 [R]VdE8 36554 [V] 36558 [V]VdE7 36556 [U] 36557 [S]VdE6 36557 [S] 36556 [U]VdE5 36555 [S] 36556 [R]VdE4 36556 [V] 36555 [S]VdE3 36555 [S] 36556 [V]VdE2 36556 [S] 36557 [U]VdE1 36557 [U] 36556 [S]
Supply Sub Off line Sub
Emergency Voltage Drop (VdE) Calculations Based on 60% of ADMD = 3.9kVA
(Of the 270 lots, 90<350m², 180 >350m²)Normal Voltage Drop (Vd) Calculations Based on 100% of ADMD = 6.5kVA
LEGEND FOR LV VOLTAGE DROP
V - SpareU - Pillar S153845
T - TRANSFORMER
S - Pillar S153403
R - Pillar S153846PMS 36620New Labels
V - Pillar S153396
U - spareT - TRANSFORMER
S - spareR - Pillar S153430
PMS 36558New Labels
V - Pillar S153423
U - Pillar S153407
T - TRANSFORMER
S - Pillar S153426
R - Pillar S153418PMS 36556New Labels
V - Pillar S153383
U - Pillar S153378
T - TRANSFORMER
S - Pillar S153415
R - Pillar S153387PMS 36555New Labels
V - Pillar S153393
U - Pillar S153390
T - TRANSFORMER
S - Pillar S153375
R - Pillar S153370PMS 36554New Labels
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
To LV Neutral
/ Earth Bar
To HV Earth Bar0.5m
LV. End
HV. End
PMS Plinth
PMS Easement
To HV Earth Bar
(LV Switchgear Frame)
14.0m
(Ins
ulated
)
Property Boundary
Prop
erty
Boun
dary
SATI
NWOOD S
T
2.5m
3.0m
PMS
LOT No.4056
LOT No.4057
4.8m
(Min
imum
)
4.8m Electrode
Kerb
4.8m Electrode
(Supplementary Electrode)
To LV
Neu
tral
/ Ear
th Bar
To H
V Ear
th B
ar
0.5m
LV. End
HV. End
PMS Plin
th
PMS Eas
emen
t
To H
V Ear
th Bar
(LV S
witchg
ear F
rame)
14.0m (Insulated)
Prope
rty B
ound
ary
Property Boundary
ROSEPARK DR
2.5m
3.0m
PMS
LOT No.4200
LOT No.4199
4.8m(Minimum) 4.8
m Elec
trode
Kerb
4.8m E
lectro
de
(Sup
plemen
tary E
lectro
de)
To LV Neutral
/ Earth Bar
To
HV Earth
Bar
0.5m
LV. End
HV. End
PMS Plinth
PMS Easement
To HV Earth Bar
(LV Switchgear Frame)
14.0m (Insulated)
Property Boundary
Property Boundary
MISTFLO
WER ST
2.5m
3.0m
PMS
LOT No.4270
LOT No.4246 4.8m(Minimum)
4.8m Electrode
Kerb
4.8m Electrode
(Supplementary Electrode)
To LV Neutral
/ Earth Bar
To HV Earth
Bar
0.5m
LV. End
HV. End
PMS Plinth
PMS Easement
To HV Earth Bar
(LV Switchgear Frame)
14.0m (Insulated)
Property Boundary
Property Boundary
ELKHORN ST
2.5m
3.0m
PMS
FUTURE LOT
No.6042
4.8m(Minimum)
4.8m Electrode
Kerb
4.8m Electrode
(Supplementary Electrode) FUTURE LOT
No.6041
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B5 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Padmount Substation 36554Common Earth Configuration
Not to ScaleEarthing Construction to EDI-0006
Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.
Any modifications to this earthing design must be approved in writing by the designer.
Padmount Substation 36555Common Earth Configuration
Not to ScaleEarthing Construction to EDI-0006
Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.
Any modifications to this earthing design must be approved in writing by the designer.
Padmount Substation 36556Common Earth Configuration
Not to ScaleEarthing Construction to EDI-0006
Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.
Any modifications to this earthing design must be approved in writing by the designer.
Padmount Substation 36558Common Earth Configuration
Not to ScaleEarthing Construction to EDI-0006
Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.
Any modifications to this earthing design must be approved in writing by the designer.
HV EARTHING DETAILS
Soil Resistivity(Ω .m)
Layer 1 23.37Depth
(m)
2.49
Layer 2 9.7 -
Design earth resistance limit in Ohms 1 - 10
Measured earth resistance limit in Ohms
Number of Electrodes 1
Insulated Depth (m) 0
Length of bare electrode (m) 4.8
Connector Type (CAD or CRIMP) Crimp
HV EARTHING DETAILS
Soil Resistivity(Ω .m)
Layer 1 23.37Depth
(m)
2.49
Layer 2 9.7 -
Design earth resistance limit in Ohms 1 - 10
Measured earth resistance limit in Ohms
Number of Electrodes 1
Insulated Depth (m) 0
Length of bare electrode (m) 4.8
Connector Type (CAD or CRIMP) Crimp
HV EARTHING DETAILS
Soil Resistivity(Ω .m)
Layer 1 23.37Depth
(m)
2.49
Layer 2 9.7 -
Design earth resistance limit in Ohms 1 - 10
Measured earth resistance limit in Ohms
Number of Electrodes 1
Insulated Depth (m) 0
Length of bare electrode (m) 4.8
Connector Type (CAD or CRIMP) Crimp
HV EARTHING DETAILS
Soil Resistivity(Ω .m)
Layer 1 23.37Depth
(m)
2.49
Layer 2 9.7 -
Design earth resistance limit in Ohms 1 - 10
Measured earth resistance limit in Ohms
Number of Electrodes 1
Insulated Depth (m) 0
Length of bare electrode (m) 4.8
Connector Type (CAD or CRIMP) Crimp
LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable
Earth Electrode Location & Length(Length of bare electrode shown in metres)
LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable
Earth Electrode Location & Length(Length of bare electrode shown in metres)
LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable
Earth Electrode Location & Length(Length of bare electrode shown in metres)
LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable
Earth Electrode Location & Length(Length of bare electrode shown in metres)
Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR
mounted on the LV frame & the LVNeutral / Earth bar.
Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR
mounted on the LV frame & the LVNeutral / Earth bar.
Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR
mounted on the LV frame & the LVNeutral / Earth bar.
Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR
mounted on the LV frame & the LVNeutral / Earth bar.
Earthing Warning LabelsEarth warning labels and tags are to be
installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).
Insulated earth electrodesystem layed in cable trench.
Insulated earth electrodesystem layed in cable trench.
Insulated earth electrodesystem layed in cable trench.
Insulated earth electrodesystem layed in cable trench.
N
N
N
N
Earthing Warning LabelsEarth warning labels and tags are to be
installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).
Earthing Warning LabelsEarth warning labels and tags are to be
installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).
Earthing Warning LabelsEarth warning labels and tags are to be
installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B6 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
A0-A2
New Footpath Ducts
44 - - - - - - - -
A2-A3
New Road Crossing
26 - - - - - - - -
A3-A4
New Footpath Ducts
25 - - - - - - - -
A4-A5
New Footpath Ducts
21 - - - - - - - -
A5-A6
New Footpath Ducts
37 - - - - - - - -
A6-A7
New Footpath Ducts
13 - - - - - - - -
A7-A8
New Footpath Ducts
38 - - - - - - - -
A8-B1
New Footpath Ducts
63 - - - - - - - -
B1-B2
New Footpath Ducts
33 - - - - - - - -
B2-B3
New Footpath Ducts
48 - - - - - - - -
B3-B4
New Footpath Ducts
30 - - - - - - - -
B4-B5
New Footpath Ducts
12 - - 12 - 12 12 - -
B4-B7
New Road Crossing
18 - - - 18 18 36 - -
B6-B7
New Footpath Ducts
10 - - - - - - - -
LVLV
SL
LV
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
HVHV
LVLVLV
SL
HV
LV
LVLVLV
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
B7-C0
New Footpath Ducts
130 - - - - - - - -
C0-C1
New Footpath Ducts
10 - - 10 - 10 10 - -
C1-C2
New Footpath Ducts
25 - - 25 - 25 25 - -
C2-C3
New Footpath Ducts
6 - - - - - - - -
C4-C5
New Footpath Ducts
13 - - - - - - - -
C5-C6
New Footpath Ducts
14 - - - - - - - -
C6-C7
New Footpath Ducts
22 - - - - - - - -
C7-C8
New Footpath Ducts
12 - - - - - - - -
C8-C9
New Footpath Ducts
13 - - - - - - - -
C9-D0
New Footpath Ducts
22 - - - - - - - -
D0-D1
New Footpath Ducts
16 - - - - - - - -
D1-D2
New Road Crossing
16 - - - - - - - -
D2-D3
New Footpath Ducts
10 - - - - - - - -
C9-D4
New Road Crossing
16 - - - - - - - -
LVLV
HVHV
LVLV
SL
HVHV
LVLV
SL
SL
SL
LVLV
LVLV
LVLV
SL
LVLVLV
LVLV
LVLV
SL
LV
LVLV
LV
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B7 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
C6-D5
New Road Crossing
16 - - - - - - - -
D5-D7
New Footpath Ducts
92 - - - - - - - -
D7-D8
New Footpath Ducts
26 - - 26 - 26 26 - -
D8-D9
New Footpath Ducts
25 - - 25 - 25 25 - -
C2-D7
New Road Crossing
27 - - - 27 27 54 - -
D9-E0
New Footpath Ducts
49 - - 49 - 49 49 - -
E0-E1
New Footpath Ducts
13 - - 13 - 13 13 - -
E1-E2
New Footpath Ducts
10 - - 10 - 10 10 - -
E2-E3
New Footpath Ducts
36 - - - - - - - -
E3-E4
New Footpath Ducts
42 - - - - - - - -
E4-E5
New Footpath Ducts
10 - - - - - - - -
E5-E6
New Footpath Ducts
47 - - - - - - - -
E6-E7
New Road Crossing
21 - - - - - - - -
E7-E8
New Footpath Ducts
13 - - 13 - 13 26 - -
LV
LVLV
HVHV
LVLVLV
SL
HVHV
LVLV
SL
HV
LV
HVHV
LVLV
HVHV
LVLVLVLV
HVHV
LVLVLV
LVLVLV
LVLVLV
LVLV
LVLV
LV
HVHV
LVLV
SL
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
E8-E9
New Footpath Ducts
15 - - 15 - 15 30 - -
E9-F0
New Footpath Ducts
36 - - 36 - 36 72 - -
E4-F0
New Road Crossing
20 - - - - - - - -
F0-K2
New Footpath Ducts
42 - - - - - - - -
F0-F1
New Road Crossing
26 - - - 26 26 78 - -
F1-F2
New Footpath Ducts
24 - - 24 - 24 48 - -
F2-F3
New Footpath Ducts
1 - - 1 - 1 2 - -
F3-F4
New Footpath Ducts
27 - - 27 - 27 54 - -
E2-F4
New Road Crossing
26 26 52 - 26 26 - - -
F4-F5
New Road Crossing
16 - - - - - 32 - -
F5-F6
New Footpath Ducts
7 - - - - - 14 - -
F6-F7
New Footpath Ducts
20 - - - - - 40 - -
F7-F8
New Footpath Ducts
33 - - - - - 66 - -
F8-F9
New Road Crossing
22 - - - - - 44 - -
HVHV
LVLV
HVHV
LV
SL
LV
LVLV
HV
LV
HVHV
LV
HVHV
LVLV
SL
HVHV
LVLV
HV
HV
LV
HV
LVLVLV
HV
LVLVLVLV
SL
HV
LV
SL
HV
LV
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B8 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
G0-G1
New Footpath Ducts
1 - - - - - - - -
G1-G3
New Footpath Ducts
62 - - - - - - - -
G3-G4
New Footpath Ducts
10 - - - - - - - -
G4-G5
New Footpath Ducts
48 - - - - - - - -
G5-G6
New Footpath Ducts
10 - - - - - - - -
G6-G7
New Footpath Ducts
39 - - - - - - - -
G7-G9
New Footpath Ducts
51 - - - - - - - -
G9-H0
New Footpath Ducts
8 - - - - - - - -
H0-J2
New Road Crossing
17 - - - - - - - -
H1-H2
New Footpath Ducts
13 - - - - - - - -
H2-H3
New Footpath Ducts
35 - - - - - - - -
H3-H4
New Footpath Ducts
10 - - - - - - - -
H4-H6
New Footpath Ducts
62 - - - - - - - -
H6-H7
New Footpath Ducts
13 - - - - - - - -
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
H7-F5
New Footpath Ducts
28 - - - - - - - -
F4-H8
New Footpath Ducts
48 48 48 96 - 96 - - -
H8-H9
New Footpath Ducts
35 - - 70 - 70 35 - -
H9-J0
New Footpath Ducts
35 - - 70 - 70 35 - -
J0-J1
New Footpath Ducts
14 - - 28 - 28 14 - -
J1-J2
New Footpath Ducts
50 - - - - - - - -
J2-J3
New Footpath Ducts
25 - - - - - - - -
J3-J5
New Footpath Ducts
46 - - - - - - - -
J5-J6
New Footpath Ducts
34 - - - - - - - -
J6-J7
New Footpath Ducts
10 - - - - - - - -
J7-J8
New Footpath Ducts
30 - - - - - - - -
J8-J9
New Footpath Ducts
13 - - - - - - - -
J7-K6
New Road Crossing
17 - - - - - - - -
J8-K5
New Road Crossing
17 - - - - - - - -
LVLV
HVHVHV
HVHVHV
LVLV
HVHVHV
LVLV
HVHVHV
LVLV
LVLVLVLV
LVLVLV
LVLVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LV
LV
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B9 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
J9-K0
New Footpath Ducts
35 - - - - - - - -
K0-K1
New Footpath Ducts
28 - - - - - - - -
K0-K3
New Road Crossing
16 - - - - - - - -
K2-K3
New Footpath Ducts
23 - - - - - - - -
K4-K5
New Footpath Ducts
30 - - - - - - - -
J5-K7
New Road Crossing
26 - - - - - - - -
K7-K8
New Footpath Ducts
28 - - - - - - - -
K8-K9
New Footpath Ducts
31 - - - - - - - -
K9-L0
New Footpath Ducts
35 - - - - - - - -
L0-L1
New Footpath Ducts
1 - - - - - - - -
L1-L2
New Footpath Ducts
35 - - - - - - - -
L2-L3
New Footpath Ducts
20 - - - - - - - -
L3-L4
New Footpath Ducts
32 - - - - - - - -
L5-L6
New Footpath Ducts
30 - - - - - - - -
LVLV
SL
LV
LVLVLV
SL
LV
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
SL
LVLV
LVLV
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
L6-L7
New Footpath Ducts
10 - - - - - - - -
L7-L8
New Footpath Ducts
16 - - - - - - - -
L9-M0
New Footpath Ducts
10 - - - - - - - -
L9-M5
New Road Crossing
16 - - - - - - - -
M1-M2
New Footpath Ducts
13 - - - - - - - -
M2-M3
New Footpath Ducts
1 - - - - - - - -
M4-K3
New Footpath Ducts
51 - - - - - - - -
M5-M6
New Footpath Ducts
42 - - - - - - - -
M6-M7
New Footpath Ducts
10 - - - - - - - -
M6-Q2
New Road Crossing
16 - - - - - - - -
M7-M8
New Footpath Ducts
20 - - - - - - - -
M8-M9
New Footpath Ducts
13 - - - - - - - -
M9-Q1
New Footpath Ducts
16 - - - - - - - -
Q0-Q1
New Road Crossing
26 - - - 26 26 52 - -
SL
SL
SL
LV
LVLV
SL
LVLV
LVLV
LVLVLV
LV
LVLV
LVLV
SL
SL
HV
LV
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B10 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
HVHV
HVHV
HVHV
HVHV
HVHV
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
Q0-Q2
New Footpath Ducts
56 - - - - - - - -
Q2-Q3
New Footpath Ducts
44 - - - - - - - -
Q3-Q4
New Footpath Ducts
52 - - - - - - - -
Q4-L4
New Road Crossing
16 - - - - - - - -
Q4-Q5
New Footpath Ducts
15 - - - - - - - -
Q5-Q6
New Footpath Ducts
10 - - - - - - - -
Q6-Q7
New Footpath Ducts
20 - - - - - - - -
Q7-Q8
New Footpath Ducts
12 - - - - - - - -
Q8-Q9
New Footpath Ducts
13 - - - - - - - -
Q9-R0
Existing Ducts
7 - - - - - - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
R0-R1
Existing Ducts
51 - - - - - - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
R1-R2
Existing Ducts
1 - - - - - - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
R2-T2
Existing Ducts
19 - - - - - - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
T2-R3
Existing Ducts
23 - - - - - - - -
LVLV
LVLV
LVLV
SLLV
LVLVLV
SL
LVLVLV
SL
LVLV
LVLV
SL
LVLV
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
T2-T1
Existing Ducts
25 - - - 50 50 - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
T0-T1
New Footpath Ducts
24 - - 48 - 48 24 - -
S1-A0
New Footpath Ducts
15 - - - - - - - -
B5-N0
New Footpath Ducts
16 - - 16 - 16 16 - -
N0-N1
New Footpath Ducts
25 - - 25 - 25 25 - -
N1-N2
New Footpath Ducts
16 - - - - - - - -
N2-N3
New Footpath Ducts
23 - - - - - - - -
N2-N5
New Road Crossing
17 - - - - - - - -
N5-N4
New Footpath Ducts
16 - - - - - - - -
N5-N6
New Footpath Ducts
33 - - - - - - - -
N6-N7
New Road Crossing
21 21 42 - 21 21 - - -
N1-N7
New Road Crossing
16 - - - 16 16 32 - -
N6-N8
New Footpath Ducts
10 - - 10 - 10 10 - -
N7-N9
New Footpath Ducts
30 - - - - - - - -
HVHVHV
LVLVLV
LVLV
HVHV
LVLVLV
HVHV
LVLVLV
LVLV
SL
LVLV
LV
SL
LVLV
HV
HV
LV
HVHV
LVLV
SL
LVLV
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162ELECTRICAL RETICULATION
507919 B11 11R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507917 URS20162 - DTE
0
3.11
Michael.J.B
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE
CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.
ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.
WORKS COMPLETED / FIELD BOOK
CONSTRUCTED BY:
SIGNATURE: DATE:
WORKS COMPLETED:
SIGNATURE: DATE:
INSPECTED BY:
ASSET RECORDING
I:
CONTACT NO:
OF:
HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004
SIGNATURE: DATE:
TRENCH LEGEND
LV Cable (Direct Buried)
HV Cable (Direct Buried)
50mm Duct - Spare
50mm Duct - with Existing Cable
50mm Duct - with New SL Cable
125mm Duct - Spare
125mm Duct - with Existing Cable
125mm Duct - with New Cable
LV
HV
SL
Existing Cable Abandoned
Direct Buried Cable
125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Duct and Cable Schedule codes:
T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench
*All length entered in meters (m)
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
N9-P1
New Footpath Ducts
38 - - - - - - - -
P1-D1
New Footpath Ducts
41 - - - - - - - -
N8-P2
New Footpath Ducts
70 - - 70 - 70 70 - -
P2-P3
New Footpath Ducts
10 - - 10 - 10 10 - -
P3-P4
New Footpath Ducts
23 - - 23 - 23 23 - -
P4-P5
New Road Crossing
16 - - - - - - - -
P5-E6
New Footpath Ducts
81 - - - - - - - -
P4-P6
New Footpath Ducts
25 - - 25 - 25 25 - -
P6-P7
New Footpath Ducts
17 - - 17 - 17 17 - -
P7-R7
New Footpath Ducts
15 - - 15 - 15 15 - -
E1-F6
New Road Crossing
20 - - - - - - - -
H3-J0
New Road Crossing
16 - - - - - - - -
M4-M1
New Road Crossing
17 - - - - - - - -
L6-Q3
New Road Crossing
17 - - - - - - - -
LVLV
SL
LVLV
HVHV
LVLV
HVHV
LVLV
SL
HVHV
LVLVLV
LV
LVLV
HVHV
LVLV
HVHV
LVLV
SL
HVHV
LVLV
LV
LV
LV
LV
Urban Subdivision Related Reimbursement - Duct and Cable Schedule
Nodes Configuration Route Length(m)
HV Trench&
Reinstate(T&R)
Lay Duct(LD)
Lay Cable(LC)
Pull Cable(PC)
Cable (C)(Al) Duct (D) Other Duct
Reimbursement (m) x ($)Existing Duct Usage (m) x
($)
Q1-E7
New Footpath Ducts
45 - - 45 - 45 90 - -
P8-Q0
New Footpath Ducts
23 - - 23 - 23 46 - -
R6-P8
New Footpath Ducts
2 - - 2 - 2 4 - -
R6-R7
Existing Ducts
21 - - - - - - -
NilDucts installed by thesame developer in an
earlier stage - URS20472.
D9-D9a
New Road Crossing
22 22 88 - - - - - -
Total: 4041m 117m 230m 879m 210m 1089m 1309m
Total: $11,817 $1,380 $8,790 $840 $35,937 $30,107 $0 $0
HVHV
LV
HVHV
LVLV
HVHV
LVLV
SL
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
//
//
/
//
//
/
//
//
/ / //
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/ / /
//
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
4162
4177
DRAINAGERESIDUE LOT 4271
RESIDUELOT 4272
4012
4013
4014
4015
4016
4017
4018
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4074
4075
4076
4077
4078
4079
4080
4081
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
4124
4125
4126
4140
4141
4142
4143
4144
4145
4146
4147
4148
41494150
4151
4152
4153
4154
4155
4156
4157
4158
4159
4160
4161
4163
4164
4165
4166
4167
4168
4169
41704171
4172
4174
4173
4254
4253
4260
4255
4262
42644175
4176
4178
4268
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4229
4230
4231
4232
4233
4234
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4250
4251
4252
4266
4256
4263
4257
4261
4259
4258
4265
4267
4269
4270
36555
36556
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
ROSEPARK DRIVE
SILKPOD STREET
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
ELARA BVD
MARSDENIA AVENUE 36620
947576
947577
947578
9475
79
9475
80
9475
81
947582
9475
83
947584
947585
947586
947587
947588
947589
947590
9475
92
9475
93947594
9475
95
947596
947597
947657
947605
9476
5694
7655 947606
947607
947621
947654
947653
947652
947623
947620
947622
947591
02
02
02
02
02
02
04
02
//
//
//
/
04
04
04
04
947914
947916
947917
947915
947918
9479
27
9479
19
S153846
S153845
PEPPERBERRY PARADE
PEPPERBERRY PARADE
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
947928
APPLEBERRY STREET
02
02
02
02
02
03
02
04
04
02
14
02
947914
947916
947917
947915
947918
9479
19
947928
153391A
S153415
S153422
S1533
78
153377A
153391
153392
S153388
153389
S153387
153392A1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
153402
153401A
153401
S153403
153404
153405
153408
S153409
153407A
S153407
153411
153412
153413153414
1534
16
S1534
17
1534
17A
S1534
26
153420
1534
21
153419
S153418
S153423
153424
153425
153424A
153406
153427
1534
28
S153429
153425A
04 1
2
3
4
5
6
7
8
9
10
11
12
13
14 15
161718
19
2021
22
23
24
25
26
27
28
29
30
31
3839
40
41
42
43
4445
46 47
48
49
50
53
5556
//
//
/
//
//
/ / //
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/ / /
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
/
//
//
//
//
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
/
//
//
//
/
4177
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4054
4055
4056
4057
4058
4059
4060
4061
4062
40634064
4065
4066
40674068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
40864087
4088
4089
4090
4091
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
41154116
41174118
4119
4120
4121
4122
4123
4124
4125
4126
4127
4128
4129
4130
4131
4132
41334134
4135
4136
4137
4138
4139
4140
4141
4142
4143
41444163
4164
4165
4166
4167
4168
4169
41704171
4172
4174
4173
4175
4176
4178
4268
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4269
4270
36554
36555
36556
36558
ELARA BOULEVARD
MISTFLOWER STREET
ROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
RIBBO
NWOOD C
RESCEN
T
MARSDENIA AVENUE
RIBBONW
OO
D CRESCENT
36620
947584
947585
947586
947588
947589
947590
9475
92
9475
93
947596
947597
947657
947598
947599
947600
9476
01
947602
947603
947604
947605
9476
56
9476
55 947606
947607
947608
947610
947609
9476
11
947621
947654
947653
947652
947623
947618
947619
947620
947612
947613
947614
947617
947615
947616
947622
947591
03
02
02
02
02
02
12
02
04
02
//
//
//
/
04
04
04
04
947917
947926
947918
9479
19
947920
947921
947922
S153846
S153845
ELARA BOULEVARD
MISTFLOWER STREET
APPLEBERRY STREETROSEPARK DRIVE
SILKPOD STREET
RIBBONWOOD CRESCENT
MARSDENIA AVENUE
MARSDENIA AVENUE
SATI
NWOOD S
TREE
T
CRABAPPLE S
T
RIBBO
NWOOD C
RESCEN
T
947928
APPLEBERRY STREET
02
02
02
02
02
03
04
02
02
02
02
02
02
947917
947918
9479
19
947920
947921
947922
947928
S153375
153377
153391A
S153415
S153390
153376
S1533
78
153373
S153
370
153371
153372
153374
153376A
153377A
153391
153392
S153388
153389
S153387
153392A
S153382
1533
79
153380
1533
81
S1533
83
153384
153385
153386
153386A
153389A
S153393
153394
S153395
153398A
153398B
153398
153397
S153396
153400
153402
153401A
153401153402A
S153430
153431S153403
153404
153405
S153409
153407A
S153407
1534
16
S1534
17
1534
17A
153420
153419
S153418
S153423
153424
153425
153424A
153406
153425A
ELKHORN ST
FUTURELOT
No.6042
FUTURELOT
No.6041
TO BE CONSTRUCTEDUNDER URS20472
TO BE CONSTRUCTEDUNDER URS20472
04 1
2
3
4
5
6
7
8
14 15
161718
19
2021
22
23
24
25
26
27
32
33
34
35
36
37
3839
40
41
42
43
4445
46 47
48
49
50
5152
5354
5556
57
5859
60
61
62
63
646566
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162DUCT TRENCH & EASEMENT
507917 B1 3R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507919 URS20162 - RETIC
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
LEGEND
High Voltage Trenching/ / / / /
Low Voltage Trenching
Lay 40mm P.V.C. Service Conduits
New Pillar Excavation location
Existing Pillar
New Column Excavation location
Existing Column
Establish New Padmount Substation
Install New Street Light Lantern
Existing Street Light Lantern
XYRoad Crossing Duct ConfigurationX =Number of 50mm Ducts,Y= Number of 125mm Ducts.
Padmount Substation - Existing
Existing Conduits (Ducts)
Install New Conduits (Ducts)
COMMENCED ON
& COMPLETED ON
SIGNATURE
I
OF
CONTACT NUMBER
HEREBY CERTIFY THAT THE DUCTS SHOWN ON THISDRAWING HAVE BEEN INSTALLED IN ACCORDANCE WITH THISDRAWING & ENDEAVOR ENERGY STANDARDS MDI0028 &MCI0006. THE DUCT DEPTHS AND LOCATIONS AT EACH ENDHAVE BEEN CORRECTLY MARKED ON THIS DRAWING AS PERENDEAVOR ENERGY STANDARD SAD0004.
LAND SURVEYOR REGISTERED UNDERSURVEYING AND SPATIAL INFORMATION ACT 2002
SIGNATURE
THE INSTALLATION OF THE DUCTS WAS
15C. Restriction Zone - Swimming Pools:A restriction zone on the use of land in relation to pools measured 5.0m from thepadmount substation easement and earth grid is to be created over Lots 4057,4056, 4200, 4199, 4246, 4270 & future lots 6041 & 6042 in favour of endeavourenergy within proposed lot 18.
15B. Restriction Zone - Fire Ratings of Buildings:A restriction zone on the use of land in relation to fire ratings of buildingsmeasured 3.0m from the padmount substation plinth is to be created over Lots4057, 4056, 4200, 4199, 4246, 4270 & future lots 6041 & 6042 in favour ofEndeavour Energy.
15A. Padmount Substation Easement - (Common Earthing):Easement for padmount substation minimum 5.5m x 2.75m + Variable is to becreated over Lots 4057, 4199, 4246 & future lot 6042 in favour of EndeavourEnergy. This easement is a minimum size and in addition to the substationeasement the following restriction zone requirements should be documented onthe linen plan & 88b instrument. (Refer to Endeavour Energy Standard MDI0044,Annexure 1 for Standard Easement Terms)
Duct, Trench & EasementSite Plan
Scale 1:1000
14. Existing Assets:Have all the existing assets been field checked and are accurate at the time ofdesign? YES
13. Telecommunications:Telecommunications assets are NOT effected by the proposed works.
12. Pollution Controls:All the requirements of the Environmental Protection Authority pollutioncontrol legislation is to be strictly adhered to.
11. Environmental Management plan:EMP EMS0001 is part of this design (refer to EIA for details).
10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must beavoided. the following alternatives should be considered: · mobile generators and substations,· live line work,· design alternatives,· low voltage parallels,· work practices/standards.the cost is to be funded by the customer/developer.
9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent afterthe works have been competed and the letter of acceptance has been issued.The reimbursed amount is shown in the "Funding Arrangements for Scope ofWork table" . Any disagreement with the amount should be resolved withendeavour energy prior to the commencement of works.
8. WARNING: Live Endeavour Energy cables & other services in this area.Please contact "Dial Before You Dig" on telephone: 1100 for searches two daysprior to excavation.
7. ATTENTION:The preparation of this design has been undertaken giving due consideration tothe location of existing services. The Constructor is however responsible for theverification of services and permanent survey marks prior to the commencementof construction. No responsibility nor liability will be accepted by the designer fordamage to existing services as a result of this design.
6. ATTENTION:All services searches must be checked before construction.
5. ATTENTION:Permanent survey marks may exist in this area, these are to be located by asurveyor prior to commencement of work.
4. Accredited Service Provider to notify Endeavour Energy asset data customerdepartment daily when cable works is in progress. (ph. 131 081).
3. Design certification shall lapse where:
(i) notice of intent has not been received within six (6) months of this certification,or
(ii) construction has been interrupted for more than six (6) months.
where design certification has lapsed the design must be resubmitted forcertification by the accredited designer.
2. Endeavour Energy Contact Phone: 131081.
1. This drawing is to be read in conjunction with the relevant Endeavour EnergyNetwork Standards and Connection Policy.
NOTES
NOTETHE CONSTRUCTION OF THIS DESIGN AND
THE SUPPLY TO THIS SUBDIVISION ISDEPENDENT ON WORKS UNDER URS19233
BEING SUCCESSFULLY COMPLETED.
Padmount SubstationEasement Requirements
The easement shall be flat & level over theentire easement area, and be above the
1:100 year flood level.Services such as drains, piping or wiring are
not permitted to pass through either thesubstation easement or the ground below it.If a retaining wall is to be installed, approval
from council is required.
This design complies with Endeavour Energy's relevant standards as current at thistime & as listed on the Endeavour Energy Accredited Service Provider's Internetsite. These standards include, but are not limited to:
· CP: Connection Policy,· EMS: Environmental Management Standard,· MCI: Mains Construction Instruction,· MDI: Mains Design Instruction,· PDI: Protection Design Instruction,· SDI: Substation Design Instruction,· SAD: Design Drawing Standard,· MMI: Mains Maintenance Instruction,· SMI: Substation Maintenance Instruction,· LDI: Public Lighting Electrical Design Element.·Additionally, where relevant, the design complies with AS/NZS7000 "Overhead LineDesign - Detailed Procedures" published by The Australian Standards.
Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damageresulting from non-compliance of the design with the above standards.
Service Provider Number: 2486Name:
Signed:
Date:
DESIGN COMPLIANCE AND INDEMNITY
L McKinnon L McKinnon
16.07.2018
8.5m streeltight support column
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
S153375
S153375
HV
LV
3.0m
5.0m
"B"
"C"
"A"
*
PMS PLINTH
PMS EASEMENT
LOT
No.405
7
LOT
No.405
6
Property Boundary
Prop
erty
Boun
dary
SATI
NWOOD S
T
0.915m
1.415m
0.7m
0.7m
0.9m
HV
LV
3.0m
5.0m
"B"
"C"
"A"
*
PMS PLIN
TH
PMS EASEMENT
PROPERTY B
OUNDARYLOT No.4199
LOT No.4200
Property Boundary
ROSEPARK DR
0.915
m
1.415
m
0.7m
0.7m
0.9m
LOT No.4246
LOT No.4270
Property Boundary
Property Boundary
HV
LV
3.0m
5.0m
"B"
"C"
"A"
*PMS PLINTH
PMS EASEMENT
MISTFLO
WER ST
0.915m
1.415m0.7m
0.7m
1.415m
FUTURE LOT
No.6042
FUTURE LOT
No.6041
ELKHORN ST
Property Boundary
Property Boundary
HV
LV
3.0m
5.0m
"B"
"C"
"A"
*
PMS PLINTH
PMS EASEMENT
0.915m
1.415m
0.7m
0.7m
1.415m
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162DUCT TRENCH & EASEMENT
507917 B2 3R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507919 URS20162 - RETIC
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36554 - COMMON EARTHING
REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS
EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36555- COMMON EARTHING
REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS
EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36558 - COMMON EARTHING
REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS
EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36556 - COMMON EARTHING
REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS
Standard easement
Extended easement
Standard easement
Extended easement
A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR 0.25m OFFSETTOWARD THE HV END.
B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.
C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)
A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR 0.25m OFFSETTOWARD THE HV END.
B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.
C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)
A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m + VARIABLE, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR0.25m OFFSET TOWARD THE HV END.
B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.
C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)
A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m + VARIABLE, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR0.25m OFFSET TOWARD THE HV END.
B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.
C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)
N N
N
NSCALE 1:100
1m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m
SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m
SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m
SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings NEWPARKPRECINCT 4
RICHMOND ROADMARSDEN PARK
URS20162DUCT TRENCH & EASEMENT
507917 B3 3R. Walsh
R. Walsh
16.07.2018
1:1000
URS20162
126 C:11
U82674
MARSDEN PARK
BLACKTOWN CITY
B505359 URS19233 - Newpark Precinct 2
A508329 PLT1059 - Elara Blvd Precinct 3 - Education
B507919 URS20162 - RETIC
0
3.11
Michael.J.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
BD
ate:
16.
07.2
018
Cha
nge
to e
asem
ent
loca
tion
of s
ubst
atio
ns36
554
& 36
555
Dra
wn:
Ric
h W
Che
cked
: Mic
hael
. B