site overview · 2019-11-25 · 088598 4162 4177 drainage residue lot 4271 residue lot 4272 residue...

14
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 088598 4162 4177 DRAINAGE RESIDUE LOT 4271 RESIDUE LOT 4272 RESIDUE LOT 4272 4001 4002 4003 4004 4005 4006 4007 4008 4009 4010 4011 4012 4013 4014 4015 4016 4017 4018 4019 4020 4021 4022 4023 4024 4025 4026 4027 4028 4029 4030 4031 4032 4033 4034 4035 4036 4037 4038 4039 4040 4041 4042 4043 4044 4045 4046 4047 4048 4049 4050 4051 4052 4053 4054 4055 4056 4057 4058 4059 4060 4061 4062 4063 4064 4065 4066 4067 4068 4069 4070 4071 4072 4073 4074 4075 4076 4077 4078 4079 4080 4081 4082 4083 4084 4085 4086 4087 4088 4089 4090 4091 4092 4093 4094 4095 4096 4097 4098 4099 4100 4101 4102 4103 4104 4105 4106 4107 4108 4109 4110 4111 4112 4113 4114 4115 4116 4117 4118 4119 4120 4121 4122 4123 4124 4125 4126 4127 4128 4129 4130 4131 4132 4133 4134 4135 4136 4137 4138 4139 4140 4141 4142 4143 4144 4145 4146 4147 4148 4149 4150 4151 4152 4153 4154 4155 4156 4157 4158 4159 4160 4161 4163 4164 4165 4166 4167 4168 4169 4170 4171 4172 4174 4173 4254 4253 4260 4255 4262 4264 4175 4176 4178 4268 4179 4180 4181 4182 4183 4184 4185 4186 4187 4188 4189 4190 4191 4192 4193 4194 4195 4196 4197 4198 4199 4200 4201 4202 4203 4204 4205 4206 4207 4208 4209 4210 4211 4212 4213 4214 4215 4216 4217 4218 4219 4220 4221 4222 4223 4224 4225 4226 4227 4228 4229 4230 4231 4232 4233 4234 4235 4236 4237 4238 4239 4240 4241 4242 4243 4244 4245 4246 4247 4248 4249 4250 4251 4252 4266 4256 4263 4257 4261 4259 4258 4265 4267 4269 4270 36554 36555 36556 36558 938714 938721 HOOKINS AVENUE ELARA BVD SUNDEW PARADE 938720 938719 ELARA BOULEVARD PEPPERBERRY PARADE PEPPERBERRY PARADE MISTFLOWER STREET ROSEPARK DRIVE SILKPOD STREET RIBBONWOOD CRESCENT MARSDENIA AVENUE MARSDENIA AVENUE SATINWOOD STREET RIBBONWOOD CRESCENT CONSTRUCTED UNDER URS19233 ELARA BVD ELARA BVD MARSDENIA AVENUE RIBBONWOOD CRESCENT HOOKINS AVENUE 36620 947576 947577 947578 947579 947580 947581 947582 947583 947584 947585 947586 947587 947588 947589 947590 947592 947593 947594 947595 947596 947597 947657 947598 947599 947600 947601 947602 947603 947604 947605 947656 947655 947606 947607 947608 947610 947609 947611 947621 947654 947653 947652 947623 947618 947619 947620 947612 947613 947614 947617 947615 947616 947622 947591 / / / 947914 947916 947917 947926 947915 947918 947927 947919 947920 947921 947922 947923 947924 947925 S153846 S153845 ELARA BOULEVARD PEPPERBERRY PARADE PEPPERBERRY PARADE MISTFLOWER STREET APPLEBERRY STREET ROSEPARK DRIVE SILKPOD STREET RIBBONWOOD CRESCENT MARSDENIA AVENUE MARSDENIA AVENUE SATINWOOD STREET CRABAPPLE ST RIBBONWOOD CRESCENT 947928 APPLEBERRY STREET 947914 947916 947917 947915 947918 947919 947920 947921 947922 947923 947924 947925 947928 S153375 153377 153391A S153415 S153422 149858 S149862 S153390 153376 S153378 153373 S153370 153371 153372 153374 153376A 153377A 153391 153392 S153388 153389 S153387 153392A S153382 153379 153380 153381 S153383 153384 153385 153386 153386A 153389A S153393 153394 S153395 153398A 153398B 153398 153397 S153396 153400 153402 153401A 153401 153402A S153430 153431 S153403 153404 153405 153408 S153409 153407A S153407 153411 153412 153413 153414 153416 S153417 153417A S153426 153420 153421 153419 S153418 S153423 153424 153425 153424A 153406 153427 153428 S153429 153425A ELKHORN ST FUTURE LOT No.6042 FUTURE LOT No.6041 TO BE CONSTRUCTED UNDER URS20472 TO BE CONSTRUCTED UNDER URS20472 TO BE CONSTRUCTED UNDER URS20472 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 Substations Underground Overhead General 5 6 Local Government Area 7 8 Checked HV OP Diagram UBD/Penguin Ref No. HV Switching AM Project. No. CAP / SAMP No. Work Orders GIS Map No. Drawn Date Design 9 10 DO NOT SCALE 11 Sheet No of Sheets 12 A1 H G F E D C 8 7 10 9 12 11 H A AMENDMENTS Original Issue G F E D C B A 6 5 2 4 3 1 2 4 3 1 B A C THIS DRAWING AND THE COPYRIGHT THEREIN IS THE PROPERTY OF ENDEAVOUR ENERGY AND MAY NOT BE COPIED, REPRODUCED, DISTRIBUTED, LOANED OR USED WITHOUT THE WRITTEN CONSENT OF ENDEAVOUR ENERGY TEMPLATE VERSION No. DIMENSIONS IN METRES ORIGINAL SCALE Reference Drawings NEWPARK PRECINCT 4 RICHMOND ROAD MARSDEN PARK URS20162 ELECTRICAL RETICULATION 507919 B 1 11 R. Walsh R. Walsh 16.07.2018 1:1000 URS20162 126 C:11 U82674 MARSDEN PARK BLACKTOWN CITY B505359 URS19233 - Newpark Precinct 2 A508329 PLT1059 - Elara Blvd Precinct 3 - Education B507917 URS20162 - DTE 0 3.11 Michael.J.B POWER LINE DESIGN PTY LTD PO BOX 338 Mittagong NSW 2575 Ph (02) 4872 1920 Fax (02) 4872 1240 Accredited Designer Number 2486 / ABN: 33107 591 846 THE PREPARATION OF THIS DESIGN HAS BEEN UNDERTAKEN GIVING DUE CONSIDERATION TO THE EXISTING SERVICES. THE PROJECT CONSTRUCTOR IS WHOLLY RESPONSIBLE FOR VERIFY THE EXACT LOCATION OF EXISTING SERVICES AND PERMANENT SURVEY MARKS PRIOR TO COMMENCING CONSTRUCTION. NO RESPONSIBILITY OR LIABILITY WILL BE ACCEPTED BY THE DESIGNER OF THIS PROJECT FOR DAMAGE TO EXISTING SERVICES AS A RESULT OF THIS DESIGN. N AUTHORISATION OF ESTIMATE VALUE OF ENDEAVOUR ENERGY FUNDED ASSETS Signed: Print Name: Service Number: Funding Amount: $ Date: Substation N/A N/A LV Mains N/A (km) N/A HV Mains N/A (km) N/A Asset Asset Cost Estimate ($) Unit Quantity Net Asset Capacity (kVA) Original Customer Utilization (kVA) Maximum Reimbursement Amount ($) Pro-Rata Reimbursement for Customer's Load Over 50kVA Pioneer Cost Share Reimbursement SCHEME - Expiry Date : N/A Signature: Date: Works Completed: Signature: Date: Inspected By: I: Contact No: of: Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004. Signature: Date: WORKS COMPLETED / FIELD BOOK ASSET RECORDING Constructed By: This design complies with Endeavour Energy's relevant standards as current at this time & as listed on the Endeavour Energy Accredited Service Provider's Internet site. These standards include, but are not limited to: CP: Connection Policy, EMS: Environmental Management Standard, MCI: Mains Construction Instruction, MDI: Mains Design Instruction, PDI: Protection Design Instruction, SDI: Substation Design Instruction, SAD: Design Drawing Standard, MMI: Mains Maintenance Instruction, SMI: Substation Maintenance Instruction, LDI: Public Lighting Electrical Design Element. Additionally, where relevant, the design complies with AS/NZS7000 "Overhead Line Design - Detailed Procedures" published by The Australian Standards. Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damage resulting from non-compliance of the design with the above standards. Service Provider Number: 2486 Name: Signed: Date: DESIGN COMPLIANCE AND INDEMNITY This Certification is issued subject to Endeavour Energy's Standard Certification Terms. Amendment: Date Approved: Examiner's Signature: Print Name: CERTIFIED BY ENDEAVOUR ENERGY APPROVAL TO CONNECT TO PUBLIC LIGHTING THIS APPROVAL IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S GENERAL TERMS & CONDITIONS FOR CONNECTION OF PUBLIC LIGHTING AND IS SPECIFICALLY FOR DRAWING NO. ____________ AMENDMENT _____ . REVIEWERS NAME: DATE APPROVED: REVIEWERS SIGNATURE: L McKinnon L McKinnon 16.07.2018 14. Existing Assets: Have all the existing assets been field checked and are accurate at the time of design? YES 13. Telecommunications: Telecommunications assets are NOT effected by the proposed works. 12. Pollution Controls: All the requirements of the Environmental Protection Authority pollution control legislation is to be strictly adhered to. 11. Environmental Management plan : EMP EMS0001 is part of this design (refer to EIA for details). 10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must be avoided. the following alternatives should be considered: mobile generators and substations, live line work, design alternatives, low voltage parallels, work practices/standards. the cost is to be funded by the customer/developer. 9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent after the works have been competed and the letter of acceptance has been issued. The reimbursed amount is shown in the "Funding Arrangements for Scope of Work table" . Any disagreement with the amount should be resolved with endeavour energy prior to the commencement of works. 8. WARNING: Live Endeavour Energy cables & other services in this area. Please contact "Dial Before You Dig" on telephone: 1100 for searches two days prior to excavation. 7. ATTENTION: The preparation of this design has been undertaken giving due consideration to the location of existing services. The Constructor is however responsible for the verification of services and permanent survey marks prior to the commencement of construction. No responsibility nor liability will be accepted by the designer for damage to existing services as a result of this design. 6. ATTENTION: All services searches must be checked before construction. 5. ATTENTION: Permanent survey marks may exist in this area, these are to be located by a surveyor prior to commencement of work. 4. Accredited Service Provider to notify Endeavour Energy asset data customer department daily when cable works is in progress. (ph. 131 081). 3. Design certification shall lapse where: (i) notice of intent has not been received within six (6) months of this certification, or (ii) construction has been interrupted for more than six (6) months. where design certification has lapsed the design must be resubmitted for certification by the accredited designer. 2. Endeavour Energy Contact Phone: 131081. 1. This drawing is to be read in conjunction with the relevant Endeavour Energy Network Standards and Connection Policy. NOTES MATERIAL QUANTITIES SPECIFIED ON THIS DESIGN: The quantities or dimensions specified on this design are based on information supplied by the developer, DBYD, the Endeavour GIS, field books and site conditions at the time of the design. As quantities and dimensions are subject to change, the Constructor must check all quantities and dimensions on site prior to tendering, ordering and construction. DBYD searches indicates the presence of services within the proposed work-site. The Level 1 ASP /Constructor is to confirm the location of "all" services prior to the commencement of works. Ref: 13261839 Date: 14 Nov 2017 DIAL BEFORE YOU DIG Design Safety Report (DSR) 29 Jan 2018 Summary Environmental Report (SER) part of EMS 0001 29 Jan 2018 Document Name Notation Date The Certification of this project is supported by the following key documents KEY DOCUMENTS TABLE (see breakdown to the left) Total EE Capital Contributions (excl PM & Design) $ 307,536 Total EE Capital Contribution (HV Reimbursed) $ 337,368 All other works and materials including but not limited to: Substation establishment & installation, Excavation & Trenching, Under-bores, Duct Installation, Cable Installation (Pulling & Laying), Cable Jointing, Installation of Earthing, Removal of Redundant Assets. NIL Assets to be Returned to the nearest Endeavour Energy Depot by Level 1 ASP. 24 July 2018 Endeavour Energy Funded & Level 1 ASP Constructed - Reimbursement (exc GST) Co-ordination Supply Required Date NIL NIL Nil Customer Funded Contestable Works Existing Duct Usage Charges (exc GST) Works Required Prior to Completion of Customer Contestable Project Works Required in Association of Customer Contestable Project All works associated with the inspection, testing, switching and the commissioning associated with this project. Including but not limited to: Pegging of easements, property boundaries and infrastructure locations, Registering of Easements, Provide Site Access, Own Service and Service connections, Confirm ground levels. Endeavour Energy Funded & Constructed NIL Endeavour Energy Supplied Materials Customer Funded Non-Contestable Works Customer Funded ASP Level 1 Electrical Works Customer FUNDING ARRANGEMENTS FOR SCOPE OF WORKS Modify/Uprate HV Switchgear $1630 4 x PM Substation Culvert $4892 4 x Plinth $4932 4 x Size 14 Fibreglass Cubicle $15712 4 x LV Switchgear CAT 1 FFIFF $27188 -1 x Siemens RTR HV Switchgear - $10745 2 x Siemens RTRR HV Switchgear $34308 3 x Siemens RTR HV Switchgear $32235 4 x Value of 500kVA 11kV Transformer only $54388 Install 4 x Sub Culvert $9280 Install 4 x New PM Substation $11440 Padmount Substation 9 x PM Sub Term (HV) $27459 3 x STJ in Trench (HV) $4431 Excavate 15m for 3 x STJ in Trench (HV) $1515 Joints (C) 11kV 240mmイ Al 3C XLPE $35937 (LC) Lay HV Cable Directly Buried in Trench $8790 (PC) Pull HV Cable Through Ducts $840 Lay Cable (D) Lay HV Ducts in SL/LV Trench $30107 (LD) Lay HV 125mm Ducts in Trench $1380 (T&R) HV Light Trenching & Reinstatement $11817 Trenching & Ducts Endeavour Energy Funded & Level 1 ASP Constructed - Reimbursement (exc GST) DEVELOPMENT CONSENT APPLICATION - BLACKTOWN COUNCIL URS20162 2017/04198/001 4001 - 4270 270 Winten Property Group Tana Sainsbury (J Wyndham Prince Pty Ltd) (02) 4720 - 3319 C.A.P. No. FILE No. LOT NUMBERS No. OF LOTS DEVELOPER DEVELOPERS REPRESENTATIVE CONTACT No. THIS DRAWING SUPPLIES 270 LOTS (SUBDIVISION OF LOT 3 & 7 DP1225885 & 1078187) TOTAL 3236 m Street Light Trenching 193 m Low Voltage Trenching 2365 m High Voltage Trenching 678 m TRENCH LENGTH NOTE THE CONSTRUCTION OF THIS DESIGN AND THE SUPPLY TO THIS SUBDIVISION IS DEPENDENT ON WORKS UNDER URS19233 BEING SUCCESSFULLY COMPLETED. High Voltage Trenching / / / / / Low Voltage Trenching Lay 40mm P.V.C. Service Conduits New Pillar Excavation location Existing Pillar Existing Column Establish New Padmount Substation Existing Street Light Lantern Padmount Substation - Existing Existing Conduits (Ducts) Install New Conduits (Ducts) LEGEND 8.5m streeltight support column 5.5m streeltight support column Install New Street Light Lantern Site Overview Property Boundary HV リ81 HV リ81 Spare リ125 Spare リ125 LV リ55 LV リ55 C SL G T リ100 725 880 1050 1100 350℄ 600 450 690 820 960 75 50 25 Minimum depth for HV electrical services (750) Minimum depth for gas & LV electrical services (600) Minimum depth for Telco services (450) Final Ground Level TYPICAL TRENCH CROSS SECTION (Refer to Technical Bulletin -0105c for further details) All dimensions in millimetres 50 50 G C SL Consumers Conduit (リ40mm) Streetlight Conduit (リ50mm) Gas Pipe (リ50mm) Telecommunications Duct T リ100 Column Centreline 100 150 1340 1640 300 Minimum Separation (Telco's) Minimum Separation (Gas) Minimum Separation (HV) Minimum Separation (LV) DUCT END LOCATION DETAIL GROUND LEVEL 300mm DEVELOPER TO ATTACH PVC MARKER TAPE TO DUCT END TYPICAL ROAD CROSSING CONFIGURATION Dimensions are in Millimetres 900mm ℄-600mm 900mm 900mm Kerb Line Property Line Boundary Roadcrossing Ducts 900mm 600mm 900mm Cable Trench ℄-600mm Boundary Property Line Road Roadcrossing Ducts PMS Road SCALE 1:2000 20m 0m 40m 60m 80m 100m 120m 140m 160m 180m 200m Padmount Substation Easement Requirements The easement shall be flat & level over the entire easement area, and be above the 1:100 year flood level. Services such as drains, piping or wiring are not permitted to pass through either the substation easement or the ground below it. If a retaining wall is to be installed, approval from council is required. Painting of Columns Local council requires a certificate from the manufacturer supplied confirming the power coated columns are in accordance with the requirements of AS/NZ 4506-2005. Streetlight Columns All streetlight columns are to be installed 350mm from the property boundaries unless otherwise indicated. SURVEY MARKS Permanent survey marks may exist in this area, these are to be located by survey prior to the commencement of works. WARNING A current services search of all utilities must be carried out prior to the commencement of works. FINAL GROUND LEVEL The constructor is to confirm finished ground level with the developer prior to the commencement of construction. ROUTE LENGTHS All route lengths are to be confirmed on site by the constructor prior to ordering materials. WARNING Telecommunications assets in this area. Constructor to contact relevant provider prior to the commencement of works. Streetlight LV Supply All active conductors extending from LV pillars to service streetlight columns to be fitted with a 16A in line fuse. WARNING Existing live electrical assets located in this vicinity, appropriate safety precautions must be utilised. SERVICE DUCTS The end of service ducts must not be placed under proposed driveways. (Refer to Developers Representative for details for details) Duct Requirements A continuous spare 125mm duct is to be installed in all trenches where HV and LV mains cables are installed. (maximum of 1x HV & 1x LV) Proposed Ducts/Conduits All Proposed 125mm ducts / conduits are to have a minimum 750mm cover. (in accordance with MDI0028) Existing Conduits All conduits are to be mandrelled, proven clear, free of foreign material, and deformation prior to the installation of cables. Service Ducts The end of service ducts must not be placed under proposed driveways. (Refer to Developers Representative for details for details) B Date: 16.07.2018 Change to easement location of substations 36554 & 36555 Drawn: Rich W Checked: Michael. B

Upload: others

Post on 10-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

//

//

//

/ //

//

//

//

//

//

//

//

//

//

// /

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

/

//

/

//

/

//

088598

4162

4177

DRAINAGERESIDUE LOT 4271

RESIDUELOT 4272

RESIDUELOT 4272

4001

4002

4003

4004

4005

4006

4007

4008

4009

4010

4011

4012

4013

4014

4015

4016

4017

4018

4019

4020

4021

4022

4023

4024

4025

4026

4027

4028

4029

4030

4031

4032

4033

4034

4035

4036

4037

4038

4039

4040

4041

4042

4043

4044

4045

4046

4047

4048

4049

4050

4051

4052

4053

4054

4055

4056

4057

4058

4059

4060

4061

4062

40634064

4065

4066

40674068

4069

4070

4071

4072

4073

4074

4075

4076

4077

4078

4079

4080

4081

4082

4083

4084

4085

40864087

4088

4089

4090

4091

4092

4093

4094

4095

4096

4097

4098

4099

4100

4101

4102

4103

4104

4105

4106

4107

4108

4109

4110

4111

4112

4113

4114

41154116

41174118

4119

4120

4121

4122

4123

4124

4125

4126

4127

4128

4129

4130

4131

4132

41334134

4135

4136

4137

4138

4139

4140

4141

4142

4143

4144

4145

4146

4147

4148

41494150

4151

4152

4153

4154

4155

4156

4157

4158

4159

4160

4161

4163

4164

4165

4166

4167

4168

4169

41704171

4172

4174

4173

4254

4253

4260

4255

4262

42644175

4176

4178

4268

4179

4180

4181

4182

4183

4184

4185

4186

4187

4188

4189

4190

4191

4192

4193

4194

4195

4196

4197

4198

4199

4200

4201

4202

4203

4204

4205

4206

4207

4208

4209

4210

4211

4212

4213

4214

4215

4216

4217

4218

4219

4220

4221

4222

4223

4224

4225

4226

4227

4228

4229

4230

4231

4232

4233

4234

4235

4236

4237

4238

4239

4240

4241

4242

4243

4244

4245

4246

4247

4248

4249

4250

4251

4252

4266

4256

4263

4257

4261

4259

4258

4265

4267

4269

4270

36554

36555

36556

36558

938714

938721

HOOKINS AVENUE

ELARA BVD

SUN

DEW

PARAD

E

938720

938719

ELARA BOULEVARD

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

ROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

RIBBO

NWOOD C

RESCEN

T

CONSTRUCTEDUNDER URS19233

ELARA BVD

ELARA BVD

MARSDENIA AVENUE

RIBBONW

OO

D CRESCENT

HOOKINS AVENUE

36620

947576

947577

947578

9475

79

9475

80

9475

81

947582

9475

83

947584

947585

947586

947587

947588

947589

947590

9475

92

9475

93947594

9475

95

947596

947597

947657

947598

947599

947600

9476

01

947602

947603

947604

947605

9476

56

9476

55 947606

947607

947608

947610

947609

9476

11

947621

947654

947653

947652

947623

947618

947619

947620

947612

947613

947614

947617

947615

947616

947622

947591

//

/

947914

947916

947917

947926

947915

947918

9479

27

9479

19

947920

947921

947922

947923

947924

947925

S153846

S153845

ELARA BOULEVARD

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

RIBBO

NWOOD C

RESCEN

T

947928

APPLEBERRY STREET

947914

947916

947917

947915

947918

9479

19

947920

947921

947922

947923

947924

947925

947928

S153375

153377

153391A

S153415

S153422

149858 S149862

S153390

153376

S1533

78

153373

S153

370

153371

153372

153374

153376A

153377A

153391

153392

S153388

153389

S153387

153392A

S153382

1533

79

153380

1533

81S15

3383

153384

153385

153386

153386A

153389A

S153393

153394

S153395

153398A

153398B

153398

153397

S153396

153400

153402

153401A

153401

153402A

S153430

153431S153403

153404

153405

153408

S153409

153407A

S153407

153411

153412

153413153414

1534

16

S1534

17

1534

17A

S1534

26

153420

1534

21

153419

S153418

S153423

153424

153425

153424A

153406

153427

1534

28

S153429

153425A

ELKHORN ST

FUTURELOT

No.6042

FUTURELOT

No.6041

TO BE CONSTRUCTEDUNDER URS20472

TO BE CONSTRUCTEDUNDER URS20472

TO BE CONSTRUCTEDUNDER URS20472

1

2

3

4

5

6

7

8

9

10

11

12

13

14 15

161718

19

2021

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

3839

40

41

42

43

4445

46 47

48

49

50

5152

5354

5556

57

5859

60

61

62

63

646566

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B1 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

N

AUTHORISATION OF ESTIMATE VALUEOF ENDEAVOUR ENERGY FUNDED ASSETS

Signed:

Print Name:

Service Number:

Funding Amount: $

Date:

Substation N/A N/A

LV Mains N/A (km) N/A

HV Mains N/A (km) N/A

AssetAsset Cost

Estimate ($)Unit

QuantityNet Asset

Capacity (kVA)Original CustomerUtilization (kVA)

MaximumReimbursement

Amount ($)

Pro-Rata Reimbursement for Customer's Load Over 50kVA

Pioneer Cost Share Reimbursement SCHEME - Expiry Date : N/ASignature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This design complies with Endeavour Energy's relevant standards as current at thistime & as listed on the Endeavour Energy Accredited Service Provider's Internetsite. These standards include, but are not limited to:

· CP: Connection Policy,· EMS: Environmental Management Standard,· MCI: Mains Construction Instruction,· MDI: Mains Design Instruction,· PDI: Protection Design Instruction,· SDI: Substation Design Instruction,· SAD: Design Drawing Standard,· MMI: Mains Maintenance Instruction,· SMI: Substation Maintenance Instruction,· LDI: Public Lighting Electrical Design Element.·Additionally, where relevant, the design complies with AS/NZS7000 "Overhead LineDesign - Detailed Procedures" published by The Australian Standards.

Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damageresulting from non-compliance of the design with the above standards.

Service Provider Number: 2486Name:

Signed:

Date:

DESIGN COMPLIANCE AND INDEMNITY

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

APPROVAL TO CONNECT TO PUBLIC LIGHTING

THIS APPROVAL IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S GENERAL TERMS &CONDITIONS FOR CONNECTION OF PUBLIC LIGHTING AND IS SPECIFICALLY FOR

DRAWING NO. ____________ AMENDMENT _____ .

REVIEWERS NAME:

DATE APPROVED:REVIEWERSSIGNATURE:

L McKinnon L McKinnon

16.07.2018

14. Existing Assets:Have all the existing assets been field checked and are accurate at the time ofdesign? YES

13. Telecommunications:Telecommunications assets are NOT effected by the proposed works.

12. Pollution Controls:All the requirements of the Environmental Protection Authority pollutioncontrol legislation is to be strictly adhered to.

11. Environmental Management plan:EMP EMS0001 is part of this design (refer to EIA for details).

10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must beavoided. the following alternatives should be considered: · mobile generators and substations,· live line work,· design alternatives,· low voltage parallels,· work practices/standards.the cost is to be funded by the customer/developer.

9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent afterthe works have been competed and the letter of acceptance has been issued.The reimbursed amount is shown in the "Funding Arrangements for Scope ofWork table" . Any disagreement with the amount should be resolved withendeavour energy prior to the commencement of works.

8. WARNING: Live Endeavour Energy cables & other services in this area.Please contact "Dial Before You Dig" on telephone: 1100 for searches two daysprior to excavation.

7. ATTENTION:The preparation of this design has been undertaken giving due consideration tothe location of existing services. The Constructor is however responsible for theverification of services and permanent survey marks prior to the commencementof construction. No responsibility nor liability will be accepted by the designer fordamage to existing services as a result of this design.

6. ATTENTION:All services searches must be checked before construction.

5. ATTENTION:Permanent survey marks may exist in this area, these are to be located by asurveyor prior to commencement of work.

4. Accredited Service Provider to notify Endeavour Energy asset data customerdepartment daily when cable works is in progress. (ph. 131 081).

3. Design certification shall lapse where:

(i) notice of intent has not been received within six (6) months of this certification,or

(ii) construction has been interrupted for more than six (6) months.

where design certification has lapsed the design must be resubmitted forcertification by the accredited designer.

2. Endeavour Energy Contact Phone: 131081.

1. This drawing is to be read in conjunction with the relevant Endeavour EnergyNetwork Standards and Connection Policy.

NOTES

MATERIAL QUANTITIES SPECIFIED ON THIS DESIGN: The quantities or dimensions specified on this design are based oninformation supplied by the developer, DBYD, the Endeavour GIS, fieldbooks and site conditions at the time of the design. As quantities anddimensions are subject to change, the Constructor must check all quantitiesand dimensions on site prior to tendering, ordering and construction.

DBYD searches indicates the presence of serviceswithin the proposed work-site. The Level 1 ASP

/Constructor is to confirm the location of "all" servicesprior to the commencement of works.

Ref: 13261839 Date: 14 Nov 2017

DIAL BEFORE YOU DIG

Design Safety Report (DSR) 29 Jan 2018

Summary Environmental Report (SER) part of EMS 0001 29 Jan 2018

Document Name Notation Date

The Certification of this project is supported by the following key documentsKEY DOCUMENTS TABLE

(see breakdown to the left) Total EE Capital Contributions (excl PM & Design)

$ 307,536Total EE Capital Contribution (HV Reimbursed)

$ 337,368

All other works and materials including but notlimited to:· Substation establishment & installation,· Excavation & Trenching,· Under-bores,· Duct Installation,· Cable Installation (Pulling & Laying),· Cable Jointing,· Installation of Earthing,· Removal of Redundant Assets.

NIL

Assets to be Returned to the nearest EndeavourEnergy Depot by Level 1 ASP.

24 July 2018

Endeavour Energy Funded & Level 1 ASPConstructed - Reimbursement (exc GST) Co-ordination Supply Required Date

NIL NILNil

Customer Funded Contestable Works Existing Duct Usage Charges (exc GST)

Works Required Prior toCompletion of Customer

Contestable Project

Works Required inAssociation of Customer

Contestable Project

· All works associated with the inspection, testing,switching and the commissioning associated withthis project.

Including but not limited to:· Pegging of easements, property boundaries andinfrastructure locations,· Registering of Easements,· Provide Site Access,· Own Service and Service connections,· Confirm ground levels.

Endeavour Energy Funded & Constructed

NIL

Endeavour Energy Supplied Materials Customer FundedNon-Contestable Works Customer Funded

ASP Level 1 Electrical Works Customer

FUNDING ARRANGEMENTS FOR SCOPE OF WORKS

Modify/Uprate HV Switchgear $1630

4 x PM Substation Culvert $4892

4 x Plinth $4932

4 x Size 14 Fibreglass Cubicle $15712

4 x LV Switchgear CAT 1 FFIFF $27188

-1 x Siemens RTR HV Switchgear - $10745

2 x Siemens RTRR HV Switchgear $34308

3 x Siemens RTR HV Switchgear $32235

4 x Value of 500kVA 11kV Transformer only $54388

Install 4 x Sub Culvert $9280

Install 4 x New PM Substation $11440

Padmount Substation

9 x PM Sub Term (HV) $27459

3 x STJ in Trench (HV) $4431

Excavate 15m for 3 x STJ in Trench (HV) $1515

Joints

(C) 11kV 240mm² Al 3C XLPE $35937

(LC) Lay HV Cable Directly Buried in Trench $8790

(PC) Pull HV Cable Through Ducts $840

Lay Cable

(D) Lay HV Ducts in SL/LV Trench $30107

(LD) Lay HV 125mm Ducts in Trench $1380

(T&R) HV Light Trenching & Reinstatement $11817

Trenching & Ducts

Endeavour Energy Funded & Level 1 ASP Constructed - Reimbursement(exc GST)

DEVELOPMENT CONSENT APPLICATION - BLACKTOWN COUNCIL

URS20162 2017/04198/001 4001 - 4270 270 Winten Property Group Tana Sainsbury (J Wyndham Prince Pty Ltd) (02) 4720 - 3319

C.A.P. No. FILE No. LOTNUMBERS

No. OFLOTS DEVELOPER DEVELOPERS REPRESENTATIVE CONTACT No.

THIS DRAWING SUPPLIES 270 LOTS (SUBDIVISION OF LOT 3 & 7 DP1225885 & 1078187)

TOTAL 3236 m

Street Light Trenching 193 m

Low Voltage Trenching 2365 m

High Voltage Trenching 678 mTRENCH LENGTH

NOTETHE CONSTRUCTION OF THIS DESIGN AND

THE SUPPLY TO THIS SUBDIVISION ISDEPENDENT ON WORKS UNDER URS19233

BEING SUCCESSFULLY COMPLETED.

High Voltage Trenching/ / / / /

Low Voltage Trenching

Lay 40mm P.V.C. Service Conduits

New Pillar Excavation location

Existing Pillar

Existing Column

Establish New Padmount Substation

Existing Street Light Lantern

Padmount Substation - Existing

Existing Conduits (Ducts)

Install New Conduits (Ducts)

LEGEND

8.5m streeltight support column

5.5m streeltight support column

Install New Street Light Lantern

Site Overview

Prop

erty

Bou

ndar

y

HVØ81

HVØ81

SpareØ125

SpareØ125LV

Ø55LV

Ø55

C SLG

TØ100

725

880

1050

1100

350

600 450

690 820 960

75

50

25Minimum depth for HV

electrical services (750)

Minimum depth for gas &LV electrical services (600)

Minimum depth forTelco services (450)

Final Ground Level

TYPICAL TRENCH CROSS SECTION(Refer to Technical Bulletin -0105c for further details)

All dimensions in millimetres

5050

G

C

SL

Consumers Conduit (Ø40mm)

Streetlight Conduit (Ø50mm)

Gas Pipe (Ø50mm)

Telecommunications Duct

TØ100

Col

umn

Cen

trelin

e

100

150

1340 1640

300

MinimumSeparation (Telco's)

MinimumSeparation (Gas)

MinimumSeparation (HV)

MinimumSeparation (LV)

DUCT END LOCATION DETAIL

GROUND LEVEL

300m

m

DEVELOPER TO ATTACHPVC MARKER TAPE

TO DUCT ENDTYPICAL ROAD CROSSING CONFIGURATION

Dimensions are in Millimetres

900m

m

-6

00m

m

900mm

900mm

Kerb Line

Property Line

Boundary

RoadcrossingDucts

900mm

600m

m

900m

m

Cable Trench

-600mmBoundary

Property Line

Road

Roadcrossing

Ducts

PMS

Roa

d

SCALE 1:200020m0m 40m 60m 80m 100m 120m 140m 160m 180m 200m

Padmount SubstationEasement Requirements

The easement shall be flat & level over theentire easement area, and be above the

1:100 year flood level.Services such as drains, piping or wiring are

not permitted to pass through either thesubstation easement or the ground below it.If a retaining wall is to be installed, approval

from council is required.

Painting of ColumnsLocal council requires a certificate

from the manufacturer suppliedconfirming the power coated columns

are in accordance with therequirements of AS/NZ 4506-2005.

Streetlight ColumnsAll streetlight columns are to be

installed 350mm from the propertyboundaries unless otherwise

indicated.

SURVEY MARKSPermanent survey marks may existin this area, these are to be located

by survey prior to thecommencement of works.

WARNING A current services search of all

utilities must be carried out prior tothe commencement of works.

FINAL GROUND LEVELThe constructor is to confirm finished

ground level with the developer prior tothe commencement of construction.

ROUTE LENGTHSAll route lengths are to be confirmed

on site by the constructor prior toordering materials.

WARNINGTelecommunications assets in this

area. Constructor to contact relevantprovider prior to the commencement

of works.

Streetlight LV SupplyAll active conductors extending from

LV pillars to service streetlightcolumns to be fitted with a 16A in

line fuse.

WARNINGExisting live electrical assets located

in this vicinity, appropriate safetyprecautions must be utilised.

SERVICE DUCTSThe end of service ducts must not be

placed under proposed driveways.(Refer to Developers Representative

for details for details)

Duct RequirementsA continuous spare 125mm duct is tobe installed in all trenches where HVand LV mains cables are installed.

(maximum of 1x HV & 1x LV)

Proposed Ducts/ConduitsAll Proposed 125mm ducts / conduitsare to have a minimum 750mm cover.

(in accordance with MDI0028)

Existing ConduitsAll conduits are to be mandrelled,

proven clear, free of foreign material,and deformation prior to the

installation of cables.

Service DuctsThe end of service ducts must not be

placed under proposed driveways.(Refer to Developers Representative

for details for details)

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

//

//

/

//

//

/

//

//

/ / //

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/ / /

//

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

4162

4177

DRAINAGERESIDUE LOT 4271

RESIDUELOT 4272

4012

4013

4014

4015

4016

4017

4018

4036

4037

4038

4039

4040

4041

4042

4043

4044

4045

4046

4047

4048

4049

4050

4051

4052

4053

4068

4069

4070

4071

4072

4073

4074

4075

4076

4077

4078

4079

4080

4081

4082

4083

4084

4085

4087

4094

4095

4096

4097

4098

4099

4100

4101

4102

4103

4104

4105

4106

4107

4108

4109

4110

4111

4112

4113

4114

4122

4123

4124

4125

4126

4127

4128

4129

4140

4141

4142

4143

4144

4145

4146

4147

4148

41494150

4151

4152

4153

4154

4155

4156

4157

4158

4159

4160

4161

4163

4164

4165

4166

4167

4168

4169

41704171

4172

4174

4173

4254

4253

4260

4255

4262

42644175

4176

4178

4268

4179

4180

4181

4182

4183

4184

4185

4186

4187

4188

4189

4190

4191

4192

4193

4194

4195

4196

4197

4198

4199

4200

4201

4202

4203

4204

4205

4206

4207

4208

4209

4210

4211

4212

4213

4214

4215

4216

4217

4218

4219

4220

4221

4222

4223

4224

4225

4226

4227

4228

4229

4230

4231

4232

4233

4234

4235

4236

4237

4238

4239

4240

4241

4242

4243

4244

4245

4246

4247

4248

4249

4250

4251

4252

4266

4256

4263

4257

4261

4259

4258

4265

4267

4269

4270

36555

36556

ELARA BOULEVARD

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

ROSEPARK DRIVE

SILKPOD STREET

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

ELARA BVD

MARSDENIA AVENUE 36620

947576

947577

947578

9475

79

9475

80

9475

81

947582

9475

83

947584

947585

947586

947587

947588

947589

947590

9475

92

9475

93947594

9475

95

947596

947597

947657

947605

9476

56

9476

55 947606

947607

9476

11

947621

947654

947653

947652

947623

947618

947619

947620

947622

947591

A0

A2

A3

A4

A5

A6

A7

A8

B1

B2

B3

B4

B5

B6

C0

C1

C2 C3

C4

C5

C6

C7

C8

C9

D0

D1D2

D3

D4

D5

D7

D8

D9

E0

E1

E2

E3

E4

E5

E6

E7

E8

E9

F0

F1

F2

F3

F4F5

F6

F7

F8

H6

H7

H8

J7

J8

J9

K0

K1 K2

K3

K4

K5

K6 K8

L8

L9

M0

M1

M2

M3

M4

M5

M6

M7

M8

M9

N0

N1

N2

N3

N4

N5

N6

N7 N8

N9

P1

P2

P3

P4P5

P6

P7

Q0

Q1

Q2

R5

R6R7

R8

R9

S1

B7

F9

//

//

//

/

947914

947916

947917

947926

947915

947918

9479

27

9479

19

947920

S153846

S153845

ELARA BOULEVARD

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

Ra

P8947928

APPLEBERRY STREET

947914

947916

947917

947915

947918

9479

19

947920

947928

153391A

S153415

S153422

S1533

78

153377A

153391

153392

S153388

153389

S153387

153392A1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

153400

153402

153401A

153401

153402A

S153403

153404

153405

153408

S153409

153407A

S153407

153411

153412

153413153414

1534

16

S1534

17

1534

17A

S1534

26

153420

1534

21

153419

S153418

S153423

153424

153425

153424A

153406

153427

1534

28

S153429

153425A

TO BE CONSTRUCTEDUNDER URS20472

D9a

1

2

3

4

5

6

7

8

9

10

11

12

13

14 15

161718

19

2021

22

23

24

25

26

27

28

29

30

31

3839

40

41

42

43

4445

46 47

48

49

50

5354

5556

57

5859

//

//

/

//

//

/ / //

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/ / /

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

/

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

//

/

4162

4177

4001

4002

4003

4004

4005

4006

4007

4008

4009

4010

4011

4012

4013

4014

4015

4016

4017

4018

4019

4020

4021

4022

4023

4024

4025

4026

4027

4028

4029

4030

4031

4032

4033

4034

4035

4036

4037

4038

4039

4040

4041

4042

4043

4044

4045

4046

4047

4048

4049

4050

4051

4052

4053

4054

4055

4056

4057

4058

4059

4060

4061

4062

40634064

4065

4066

40674068

4069

4070

4071

4072

4073

4074

4075

4076

4077

4078

4079

4080

4081

4082

4083

4084

4085

40864087

4088

4089

4090

4091

4092

4093

4094

4095

4096

4097

4098

4099

4100

4101

4102

4103

4104

4105

4106

4107

4108

4109

4110

4111

4112

4113

4114

41154116

41174118

4119

4120

4121

4122

4123

4124

4125

4126

4127

4128

4129

4130

4131

4132

41334134

4135

4136

4137

4138

4139

4140

4141

4142

4143

4144

4145

4146

41474160

4161

4163

4164

4165

4166

4167

4168

4169

41704171

4172

4174

4173

4175

4176

4178

4268

4179

4180

4181

4182

4183

4184

4185

4186

4187

4188

4189

4190

4191

4192

4193

4194

4195

4196

4197

4198

4199

4200

4201

4202

4203

4204

4205

4206

4207

4208

4209

4210

4211

4212

4213

4214

4215

4216

4217

4218

4219

4220

4221

4222

4223

4224

4225

4226

4227

4228

4235

4236

4237

4238

4239

4240

4241

4242

4243

4244

4245

4246

4247

4248

4249

4269

4270

36554

36555

36556

36558

ELARA BOULEVARD

MISTFLOWER STREET

ROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

RIBBO

NWOOD C

RESCEN

T

ELARA BVD

MARSDENIA AVENUE

RIBBONW

OO

D CRESCENT

36620

947584

947585

947586

947587

947588

947589

947590

9475

92

9475

93

947596

947597

947657

947598

947599

947600

9476

01

947602

947603

947604

947605

9476

56

9476

55 947606

947607

947608

947610

947609

9476

11

947621

947654

947653

947652

947623

947618

947619

947620

947612

947613

947614

947617

947615

947616

947622

947591

B3

B4

B5

B6

C4

C5

C6

C7

C8

C9

D0

D1D2

D3

D4

D5

D9

E0

E1

E2

E3

E4

E5

E6

E7

E8

E9

F0

F1

F2

F3

F4F5

F6

F7

F8

G0

G1

G3

G4

G5

G6

G7

G9

H0

H1

H2

H3

H4

H6

H7

H8

H9

J0

J1

J2

J3

J5

J6

J7

J8

J9

K0

K1 K2

K3

K4

K5

K6

K7

K8

K9

L0

L1

L2

L3

L4

L5

L6

L7L8

L9

M0

M1

M2

M3

M4

M5

M6

M7

M8

M9

N0

N1

N2

N3

N4

N5

N6

N7 N8

N9

P1

P2

P3

P4P5

P6

P7

Q0

Q1

Q2

Q3

Q4

Q5

Q6

Q7

Q8

Q9

R0

R1

R2

R3R4

R5

R6R7

R8

R9

T0

T1

T2

T3

T4

B7

F9

//

//

//

/

947916

947917

947926

947918

9479

27

9479

19

947920

947921

947922

S153846

S153845

ELARA BOULEVARD

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

RIBBO

NWOOD C

RESCEN

T

Ra

P8947928

APPLEBERRY STREET

947916

947917

947918

9479

19

947920

947921

947922

947928

S153375

153377

153391A

S153415

S153390

153376

S1533

78

153373

S153

370

153371

153372

153374

153376A

153377A

153391

153392

S153388

153389

S153387

153392A

S153382

1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

S153393

153394

S153395

153398A

153398B

153398

153397

S153396

153400

153402

153401A

153401

153402A

S153430

153431S153403

153404

153405

153408

S153409

153407A

S153407

1534

16

S1534

17

1534

17A

153420

153419

S153418

S153423

153424

153425

153424A

153406

153425A

ELKHORN ST

FUTURELOT

No.6042

FUTURELOT

No.6041

TO BE CONSTRUCTEDUNDER URS20472

TO BE CONSTRUCTEDUNDER URS20472

D9a

1

2

3

4

5

6

7

8

13

14 15

161718

19

2021

22

23

24

25

26

27

32

33

34

35

36

37

3839

40

41

42

43

4445

46 47

48

49

50

5152

5354

5556

57

5859

60

61

62

63

646566

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B2 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

N

SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

Site PlanScale 1:1000

Establish Proposed PMS No. PMS 36555· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).

Establish Proposed PMS No. PMS 36556· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).

Establish Proposed PMS No. PMS 36558· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTRR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).

Establish Proposed PMS No. PMS 36554· Transformer: 500kVA (11000:433V),· HV Switchgear: Siemens 8DJH, Type: "RTR",· HV Fuses: 12kV, 63A HRC (I-type),· LV Switchgear: Weber CAT 1, Config: "FFIFF",· LV Fuses: LV 250A (DIN, size 2)· Cubicle: Size 14,· Earthing: Common (refer Earth Design).

LEGEND

High Voltage Trenching/ / / / /

Low Voltage Trenching

Lay 40mm P.V.C. Service Conduits

New Pillar Excavation location

Existing Pillar

Existing Column

Establish New Padmount Substation

Install New Street Light Lantern

Existing Street Light Lantern

Padmount Substation - Existing

Existing Conduits (Ducts)

Install New Conduits (Ducts)

8.5m streeltight support column

5.5m streeltight support column

Uprate existing HVswitchgear in PMS36620 to RTRR.

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X

X

XX

XX

XX

XX

XX

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

XX

X

XX

X

X

XX

X

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

X

TRF

F4255 F425

7

F4254

F425

9

F4256

SIE

PS

F425

8

TRF

F425

2

F4248

F425

1F4250

F425

3

SIE

PS

F4249

TRF

F4246

F4242

F4245

F4244

F4247

SIE

PS

F4243

ToSw C3475

(PMS 34599)To

Sw A5854(PMS 33408)

TRF

E8249

E8245E8244

E8248

E8246

E8250

8DJH

PS

E8247

E8251

PMSNo.36131

ToSw E8225

(PMS 36128)

ToSw C9507

(PMS 34945)

ToSw C9507

(PMS 34945)

XX

XX

XX

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

STJ #3 XX

XX

XX

XX

X

XX

X

XX

XXX

XX

XX

X

STJ #2

STJ #1

PADMOUNTSUBSTATION

No. 36556 PADMOUNTSUBSTATION

No.36620

PADMOUNTSUBSTATION

No. 36554

PADMOUNTSUBSTATION

No. 36555

PADMOUNTSUBSTATION

No.36558

ELARA BVD

MARSDENIA AVENUE

RIBBONW

OO

D CRESCENT

HOOKINS AVENUE

ELARA BOULEVARD

PEPP

ERBE

RRY

PARA

DE

MISTFLOWER STREET

APPLEBERRY STREET

ROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

TREET

RIBBO

NWOOD C

RESCEN

T

APPLEBERRY ST

ROSEPARK DRIVE

MISTFLOW

ER STREET

ELKHORN ST

240mm Al

240mm AlTR

F

F5266

F5269F9332

F9331

F5270

F5267

SIE

PS

F5271

F5268 TRF

F4268

F4271F4270

F4267

F4272

F4269

SIE

PSF9334

F9333

1

2

3

4

5

6

7

8

11

12

13

14 15

161718

19

2021

22

23

24

25

26

27

28

29

30

31

34

35

36

37

3839

40

41

42

43

4445

46 47

48

49

50

5152

5354

5556

57

5859

60

61

62

63

646566

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B3 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

N

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

LEGEND

Install 11kV 240mm² Al 3-Core XLPE/PVC/HDPE CableR.L.1082m, C.L.1100m.

Existing Underground Cable/s

Straight Through Joint (STJ)

Final HV CircuitNot to Scale11kV Area

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

Locate cable from sw.E8251 in PMS 36131 to sw.F5268 in PMS 36620 & disconnect from 36620.STJ (#3) and extend with new 240mm² Al cable tonew PMS 36554.Install new HV cable from sw. F5268, PMS 36620to new PMS 36556.

Locate cable from sw.C3475 in PMS34599 to sw. F5267 in PMS 36620.STJ (#1 & #2) and extend with 2 x new240mm² Al cables to new PMS 36558.

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

JOINT/TERMINATION TYPE:NETWORK ACCESS AUTHORISATION:JOIN/TERMINATION KIT#:JOIN/TERMINATION BATCH #:DATE OF MANUFACTURE:

X X X

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

// //

//

////

////

//

//

//

//

//

//

//

//

//

//

//

//

//

////

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

XX

XX

XX

XX

XX

XX

OO

OO

O

O

O

O

O

O

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X XX

XX

X

XX X

XX X

XX

XX

X

XX

XX

XX

XXX

X

X

X

X

X

XX

XX

X

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

X

X

XXX

X

XX

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

X

XX

XX

XX

X

XX

X

X

XX

XX

XX

XXX

XX

XX

X

X

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX X

X

X

XX

X

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

X

XX

XX

MARSDENIA

X

X

XX X

X

X

X

X

X

X

X X X

XX

X

RS

TU

V

TRF

PADMOUNTSUBSTATION

No. 36556

PADMOUNTSUBSTATION

No.36620

PADMOUNTSUBSTATION

No. 36555

RS

TU

V

TRF

XX

XX

XX

XX

XX

XX

X

X

XX

XX

X

XX

XX

XX

XX

RS

TU

V

TRF

PE

L277800C947576

PE

L277801C947577

PE

L277802C947578

PE

L277803C947579

PE

L277804C947580

PE

L277805C947581

PE

L277806C947582

PE

L277807C947583

PE

L277808C947584

PE

L277809C947585

PE

L277810C947586

PE

L277811C947587

PE

L277812C947588

PE

L277813C947589

PE

L277814C947590

PE

L277815C947591

PE

L277816C947592

PE

L277817C947593

PE

L277818C947594

PE

L277819C947595

PE

L277820C947596

PE

L277821C947597

PE

L277844C947620

PE

L277845C947621

PE

L277830C947606

PE

L277831C947607

PE

L277841C947617

PE

L277842C947618

PE

L277846C947622

PE

L277851C947652

PE

L277853C947654

PE

L277852C947653

PE

L277854C947655

PE

L277855C947656

PE

L277847C947623

PE

X

X

X

X

PE

L277843C947619

OO

OO

OO

O

O

O

O

OO

OO

OO

OO

O

O

O O

O

O

O

OO

O

OO

O

OO

O

OO O

OO

O

OO

OO

O

O

O

OO

O

OO

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

OO

OO

OO

OO

OO

OO

O

OO

OO

O

OO

OO

O

O

O

O

O

O

OO

OO

OO

OO

OO

OO

O

O

O

O

O

OO

OO

O

PE

L277978C947915

PE

277989947926

PE

L277977C947914

PE

277990947927

S153846

S153845

ELARA BVD

MARSDENIA AVENUEELARA BLVD

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

CRABAPPLE S

T

APPLEBERRY STREET

ROSEPARK DRIVE

CRABAPPLE S

T

PE

L277979C947916

PE

L277980C947917

PE

L277981C947918

PE

L277982C947919

PE

L277983C947920

PE

L277991C947928

S1533

78

153377A

153392

S153388

153389

S153387

153392A1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

S153393

153400

153402

153401A

153401

153402A

153431S153403

153404

153405

153408

S153409

153407A

S153407

153411

153412

153413153414

S153415

1534

16S153422

S1534

17

1534

17A

S1534

26

153420

1534

21

153419

S153418

S153423

153424

153425 153425A

153424A

153406

153427

1534

28

S153429

1

3

4

5

6

7

8

9

10

11

12

13

14 15

161718

19

2021

22

23

24

25

26

27

28

29

30

31

40

41

42

43

4445

46 47

48

49

50

5354

5556

57

5859

// //

//

////

////

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

// //

//

////

//

////

//

//

//

//

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

OO

O

OO

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X XX

XX

X

XX X

XX X

XX

XXX

X

X

X

X

X

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

X

X

X

XX

XXX

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

X

X

X

XX

XX

X

XX

XX

XXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

X

XX

X

X

XX

X

X

XX

XX

XX

X

XX

X

X

XX

XX

XX

XXX

XX

XX

X

X

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX X

X

X

XX

X

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

X

XX

XX

XXX

XX

X

XX

XX

XX

XX

XX

XX

X

XX

XX

X

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X X

XX

X

XX

XX

XXX

XX

XX

XX

X

XX

X

XX

XX

XX

X

XX

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

MARSDENIA

X

X

XX X

X

X

X

X

X

X

X X X

XX

X

RS

TU

V

TRF

RS

TU

V

TRF

PADMOUNTSUBSTATION

No. 36556

PADMOUNTSUBSTATION

No.36620

PADMOUNTSUBSTATION

No. 36555

RS

TU

V

TRF

RS

TU

V

TRF

XX

XX

XX

XX

XX

XX

X

X

XX

XX

X

XX

XX

XX

XX

RS

TU

V

TRF

PE

L277809C947585

PE

L277810C947586

PE

L277812C947588

PE

L277813C947589

PE

L277814C947590

PE

L277815C947591

PE

L277816C947592

PE

L277817C947593

PE

L277821C947597

PE

L277822C947598

PE

L277844C947620

PE

L277845C947621

PE

L277823C947599

PE

L277824C947600

PE

L277825C947601

PE

L277826C947602

PE

L277827C947603

PE

L277828C947604

PE

L277829C947605

PE

L277830C947606

PE

L277831C947607

PE

L277832C947608

PE

L277833C947609

PE

L277835C947611

PE

L277836C947612

PE

L277839C947615

PE

L277837C947613

PE

L277840C947616

PE

L277838C947614

PE

L277841C947617

PE

L277842C947618

PE

L277846C947622

PE

L277851C947652

PE

L277853C947654

PE

L277852C947653

PE

L277854C947655

PE

L277855C947656

PE

L277847C947623

PE

L277856C947657

X

X

X

X

PE

L277843C947619

PE

L277834C947610

OO

OO

O

OO

OO

O

O

O

OO

OO

OO

O

O

O

O

OO

OO

OO

OO

O

O

O O

O

O

O

OO

O

O

OO O

O

OO

OO

OO

OO

OO

OO

OO

O

O

OO

O

OO

O

O

OO O

OO

O

OO

OO

O

O

OO

OO

O

O

O

O

O

O

O

O

OO

O

OO

OO

OO

OO

OO

O

O

O

O

PE

277986947923

PE

277989947926

S153846

S153845

ELARA BVD

MARSDENIA AVENUE

RIBBONW

OO

D CRESCENT

ELARA BLVD

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

RIBBO

NWOOD C

RESCEN

T

APPLEBERRY STREET

ROSEPARK DRIVE

CRABAPPLE S

T

PADMOUNTSUBSTATION

No.36558

PE

L277980C947917

PE

L277981C947918

PE

L277982C947919

PE

L277983C947920 PE

L277984C947921

PE

L277985C947922

PE

L277991C947928

PADMOUNTSUBSTATION

No. 36554

S153390

S153375

153376

S1533

78

153373

S153

370

153371

153372

153374

153376A

153377

153377A

153391

153392

S153388

153389

S153387

153392A

153391A

S153382

1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

S153393

153394

S153395

153398A

153398B

153398

153397

S153396

153400

153402

153401A

153401

153402A

S153430

153431S153403

153404

153405

S153409

153407A

S153407

S153415

1534

16

S1534

17

1534

17A

153420

153419

S153418

S153423

153424

153425 153425A

153424A

153406

ELKHORN ST

1

2

3

5

6

7

8

14 15

161718

19

2021

22

23

24

25

26

27

32

33

34

35

36

37

3839

40

41

42

43

4445

46 47

48

49

50

5152

5354

5556

57

5859

60

61

62

63

646566

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B4 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

NFinal LV Circuit

Not to Scale

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

LEGEND

Existing Underground Cable/s

X X X X XInstall 240mm² Al 4-Core XLPE/PVC Cable (T84)R.L. 3790m, C.L. 4290m.

Install 50mm² Cu 4-Core XLPE/PVC Cable (T94)R.L. 376m, C.L. 435m.// // // //

O O O O O OInstall 1x 16mm² Cu 2-Core XLPE/PVC CableR.L. 1003m, C.L. 1223m.

LV Isolation Switch/Links (N/O)

LV Isolation Switch/Links (N/C)

Pillar Earth

PE

XXXXXXXX

Lantern Number - New AssetColumn Number - New Asset(PE Controlled)

PE

XXXXXXXX

Lantern Number - Existing AssetColumn Number - Existing Asset(PE Controlled)

Install New Street Light Lantern

Existing Street Light Lantern

5.5m streeltight support column

8.5m streeltight support column

Proposed 277800 - 277847 947576 - 947623 17W Street LED JLB99G05L17 889 48 5.5m EnlargedBase Column IE/5.5.EB Type 2 / Type 2 995 48 3.0m Curved Pipe Outreach IE3.0CPS/25 991 5° Powder coated

black Blacktown Council

Proposed 277851- 277856 947652 - 947657 80W Street LED PL99G01L90 950 6 8.5m EnlargedBase Column IE/8.5.EB Type 2 / Universal 995 6 4.5m Curved Pipe Outreach IE4.5CPS/25 991 5° Powder coated

black Blacktown Council

State LuminaireNumber

SupportNumber Description Part No. Rate

Code QTY Description Part NO. FootingBolt / Foundation

RateCode QTY Description Part No. Rate

Code

UpcastAngle

ColumnColour

Charge ToLuminaire Column / Pole Outreach / Bracket

Lighting Equipment & Billing Schedule

A

A

B

C

B

C

D

D

VdE16 36555 [U] 36554 [S]VdE15 36557 [S] 36555 [V]VdE14 36555 [V] 36557[S]VdE13 36554 [S] 36555 [U]VdE12 36555 [R] 36554 [U]VdE11 36554 [U] 36555 [R]VdE10 36558 [V] 36554 [V]VdE9 36558 [V] 36557 [R]VdE8 36554 [V] 36558 [V]VdE7 36556 [U] 36557 [S]VdE6 36557 [S] 36556 [U]VdE5 36555 [S] 36556 [R]VdE4 36556 [V] 36555 [S]VdE3 36555 [S] 36556 [V]VdE2 36556 [S] 36557 [U]VdE1 36557 [U] 36556 [S]

Supply Sub Off line Sub

Emergency Voltage Drop (VdE) Calculations Based on 60% of ADMD = 3.9kVA

(Of the 270 lots, 90<350m², 180 >350m²)Normal Voltage Drop (Vd) Calculations Based on 100% of ADMD = 6.5kVA

LEGEND FOR LV VOLTAGE DROP

V - SpareU - Pillar S153845

T - TRANSFORMER

S - Pillar S153403

R - Pillar S153846PMS 36620New Labels

V - Pillar S153396

U - spareT - TRANSFORMER

S - spareR - Pillar S153430

PMS 36558New Labels

V - Pillar S153423

U - Pillar S153407

T - TRANSFORMER

S - Pillar S153426

R - Pillar S153418PMS 36556New Labels

V - Pillar S153383

U - Pillar S153378

T - TRANSFORMER

S - Pillar S153415

R - Pillar S153387PMS 36555New Labels

V - Pillar S153393

U - Pillar S153390

T - TRANSFORMER

S - Pillar S153375

R - Pillar S153370PMS 36554New Labels

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

To LV Neutral

/ Earth Bar

To HV Earth Bar0.5m

LV. End

HV. End

PMS Plinth

PMS Easement

To HV Earth Bar

(LV Switchgear Frame)

14.0m

(Ins

ulated

)

Property Boundary

Prop

erty

Boun

dary

SATI

NWOOD S

T

2.5m

3.0m

PMS

LOT No.4056

LOT No.4057

4.8m

(Min

imum

)

4.8m Electrode

Kerb

4.8m Electrode

(Supplementary Electrode)

To LV

Neu

tral

/ Ear

th Bar

To H

V Ear

th B

ar

0.5m

LV. End

HV. End

PMS Plin

th

PMS Eas

emen

t

To H

V Ear

th Bar

(LV S

witchg

ear F

rame)

14.0m (Insulated)

Prope

rty B

ound

ary

Property Boundary

ROSEPARK DR

2.5m

3.0m

PMS

LOT No.4200

LOT No.4199

4.8m(Minimum) 4.8

m Elec

trode

Kerb

4.8m E

lectro

de

(Sup

plemen

tary E

lectro

de)

To LV Neutral

/ Earth Bar

To

HV Earth

Bar

0.5m

LV. End

HV. End

PMS Plinth

PMS Easement

To HV Earth Bar

(LV Switchgear Frame)

14.0m (Insulated)

Property Boundary

Property Boundary

MISTFLO

WER ST

2.5m

3.0m

PMS

LOT No.4270

LOT No.4246 4.8m(Minimum)

4.8m Electrode

Kerb

4.8m Electrode

(Supplementary Electrode)

To LV Neutral

/ Earth Bar

To HV Earth

Bar

0.5m

LV. End

HV. End

PMS Plinth

PMS Easement

To HV Earth Bar

(LV Switchgear Frame)

14.0m (Insulated)

Property Boundary

Property Boundary

ELKHORN ST

2.5m

3.0m

PMS

FUTURE LOT

No.6042

4.8m(Minimum)

4.8m Electrode

Kerb

4.8m Electrode

(Supplementary Electrode) FUTURE LOT

No.6041

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B5 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

Padmount Substation 36554Common Earth Configuration

Not to ScaleEarthing Construction to EDI-0006

Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.

Any modifications to this earthing design must be approved in writing by the designer.

Padmount Substation 36555Common Earth Configuration

Not to ScaleEarthing Construction to EDI-0006

Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.

Any modifications to this earthing design must be approved in writing by the designer.

Padmount Substation 36556Common Earth Configuration

Not to ScaleEarthing Construction to EDI-0006

Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.

Any modifications to this earthing design must be approved in writing by the designer.

Padmount Substation 36558Common Earth Configuration

Not to ScaleEarthing Construction to EDI-0006

Information Updated After Commissioning on _________________Earthing design is based on the requirements of Endeavour Energy's EDI100 & EDI001.

Any modifications to this earthing design must be approved in writing by the designer.

HV EARTHING DETAILS

Soil Resistivity(Ω .m)

Layer 1 23.37Depth

(m)

2.49

Layer 2 9.7 -

Design earth resistance limit in Ohms 1 - 10

Measured earth resistance limit in Ohms

Number of Electrodes 1

Insulated Depth (m) 0

Length of bare electrode (m) 4.8

Connector Type (CAD or CRIMP) Crimp

HV EARTHING DETAILS

Soil Resistivity(Ω .m)

Layer 1 23.37Depth

(m)

2.49

Layer 2 9.7 -

Design earth resistance limit in Ohms 1 - 10

Measured earth resistance limit in Ohms

Number of Electrodes 1

Insulated Depth (m) 0

Length of bare electrode (m) 4.8

Connector Type (CAD or CRIMP) Crimp

HV EARTHING DETAILS

Soil Resistivity(Ω .m)

Layer 1 23.37Depth

(m)

2.49

Layer 2 9.7 -

Design earth resistance limit in Ohms 1 - 10

Measured earth resistance limit in Ohms

Number of Electrodes 1

Insulated Depth (m) 0

Length of bare electrode (m) 4.8

Connector Type (CAD or CRIMP) Crimp

HV EARTHING DETAILS

Soil Resistivity(Ω .m)

Layer 1 23.37Depth

(m)

2.49

Layer 2 9.7 -

Design earth resistance limit in Ohms 1 - 10

Measured earth resistance limit in Ohms

Number of Electrodes 1

Insulated Depth (m) 0

Length of bare electrode (m) 4.8

Connector Type (CAD or CRIMP) Crimp

LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable

Earth Electrode Location & Length(Length of bare electrode shown in metres)

LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable

Earth Electrode Location & Length(Length of bare electrode shown in metres)

LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable

Earth Electrode Location & Length(Length of bare electrode shown in metres)

LEGEND19/2.14 (70mm²) Insulated PVC/PVC Annealed Cu Cable

Earth Electrode Location & Length(Length of bare electrode shown in metres)

Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR

mounted on the LV frame & the LVNeutral / Earth bar.

Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR

mounted on the LV frame & the LVNeutral / Earth bar.

Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR

mounted on the LV frame & the LVNeutral / Earth bar.

Common Earthed PMS2x Insulated copper links to beinstalled between the HV BAR

mounted on the LV frame & the LVNeutral / Earth bar.

Earthing Warning LabelsEarth warning labels and tags are to be

installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).

Insulated earth electrodesystem layed in cable trench.

Insulated earth electrodesystem layed in cable trench.

Insulated earth electrodesystem layed in cable trench.

Insulated earth electrodesystem layed in cable trench.

N

N

N

N

Earthing Warning LabelsEarth warning labels and tags are to be

installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).

Earthing Warning LabelsEarth warning labels and tags are to be

installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).

Earthing Warning LabelsEarth warning labels and tags are to be

installed in accordance with clause5.3.6.4 & Drawing 348245 (EDI 100).

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B6 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

A0-A2

New Footpath Ducts

44 - - - - - - - -

A2-A3

New Road Crossing

26 - - - - - - - -

A3-A4

New Footpath Ducts

25 - - - - - - - -

A4-A5

New Footpath Ducts

21 - - - - - - - -

A5-A6

New Footpath Ducts

37 - - - - - - - -

A6-A7

New Footpath Ducts

13 - - - - - - - -

A7-A8

New Footpath Ducts

38 - - - - - - - -

A8-B1

New Footpath Ducts

63 - - - - - - - -

B1-B2

New Footpath Ducts

33 - - - - - - - -

B2-B3

New Footpath Ducts

48 - - - - - - - -

B3-B4

New Footpath Ducts

30 - - - - - - - -

B4-B5

New Footpath Ducts

12 - - 12 - 12 12 - -

B4-B7

New Road Crossing

18 - - - 18 18 36 - -

B6-B7

New Footpath Ducts

10 - - - - - - - -

LVLV

SL

LV

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

HVHV

LVLVLV

SL

HV

LV

LVLVLV

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

B7-C0

New Footpath Ducts

130 - - - - - - - -

C0-C1

New Footpath Ducts

10 - - 10 - 10 10 - -

C1-C2

New Footpath Ducts

25 - - 25 - 25 25 - -

C2-C3

New Footpath Ducts

6 - - - - - - - -

C4-C5

New Footpath Ducts

13 - - - - - - - -

C5-C6

New Footpath Ducts

14 - - - - - - - -

C6-C7

New Footpath Ducts

22 - - - - - - - -

C7-C8

New Footpath Ducts

12 - - - - - - - -

C8-C9

New Footpath Ducts

13 - - - - - - - -

C9-D0

New Footpath Ducts

22 - - - - - - - -

D0-D1

New Footpath Ducts

16 - - - - - - - -

D1-D2

New Road Crossing

16 - - - - - - - -

D2-D3

New Footpath Ducts

10 - - - - - - - -

C9-D4

New Road Crossing

16 - - - - - - - -

LVLV

HVHV

LVLV

SL

HVHV

LVLV

SL

SL

SL

LVLV

LVLV

LVLV

SL

LVLVLV

LVLV

LVLV

SL

LV

LVLV

LV

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B7 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

C6-D5

New Road Crossing

16 - - - - - - - -

D5-D7

New Footpath Ducts

92 - - - - - - - -

D7-D8

New Footpath Ducts

26 - - 26 - 26 26 - -

D8-D9

New Footpath Ducts

25 - - 25 - 25 25 - -

C2-D7

New Road Crossing

27 - - - 27 27 54 - -

D9-E0

New Footpath Ducts

49 - - 49 - 49 49 - -

E0-E1

New Footpath Ducts

13 - - 13 - 13 13 - -

E1-E2

New Footpath Ducts

10 - - 10 - 10 10 - -

E2-E3

New Footpath Ducts

36 - - - - - - - -

E3-E4

New Footpath Ducts

42 - - - - - - - -

E4-E5

New Footpath Ducts

10 - - - - - - - -

E5-E6

New Footpath Ducts

47 - - - - - - - -

E6-E7

New Road Crossing

21 - - - - - - - -

E7-E8

New Footpath Ducts

13 - - 13 - 13 26 - -

LV

LVLV

HVHV

LVLVLV

SL

HVHV

LVLV

SL

HV

LV

HVHV

LVLV

HVHV

LVLVLVLV

HVHV

LVLVLV

LVLVLV

LVLVLV

LVLV

LVLV

LV

HVHV

LVLV

SL

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

E8-E9

New Footpath Ducts

15 - - 15 - 15 30 - -

E9-F0

New Footpath Ducts

36 - - 36 - 36 72 - -

E4-F0

New Road Crossing

20 - - - - - - - -

F0-K2

New Footpath Ducts

42 - - - - - - - -

F0-F1

New Road Crossing

26 - - - 26 26 78 - -

F1-F2

New Footpath Ducts

24 - - 24 - 24 48 - -

F2-F3

New Footpath Ducts

1 - - 1 - 1 2 - -

F3-F4

New Footpath Ducts

27 - - 27 - 27 54 - -

E2-F4

New Road Crossing

26 26 52 - 26 26 - - -

F4-F5

New Road Crossing

16 - - - - - 32 - -

F5-F6

New Footpath Ducts

7 - - - - - 14 - -

F6-F7

New Footpath Ducts

20 - - - - - 40 - -

F7-F8

New Footpath Ducts

33 - - - - - 66 - -

F8-F9

New Road Crossing

22 - - - - - 44 - -

HVHV

LVLV

HVHV

LV

SL

LV

LVLV

HV

LV

HVHV

LV

HVHV

LVLV

SL

HVHV

LVLV

HV

HV

LV

HV

LVLVLV

HV

LVLVLVLV

SL

HV

LV

SL

HV

LV

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B8 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

G0-G1

New Footpath Ducts

1 - - - - - - - -

G1-G3

New Footpath Ducts

62 - - - - - - - -

G3-G4

New Footpath Ducts

10 - - - - - - - -

G4-G5

New Footpath Ducts

48 - - - - - - - -

G5-G6

New Footpath Ducts

10 - - - - - - - -

G6-G7

New Footpath Ducts

39 - - - - - - - -

G7-G9

New Footpath Ducts

51 - - - - - - - -

G9-H0

New Footpath Ducts

8 - - - - - - - -

H0-J2

New Road Crossing

17 - - - - - - - -

H1-H2

New Footpath Ducts

13 - - - - - - - -

H2-H3

New Footpath Ducts

35 - - - - - - - -

H3-H4

New Footpath Ducts

10 - - - - - - - -

H4-H6

New Footpath Ducts

62 - - - - - - - -

H6-H7

New Footpath Ducts

13 - - - - - - - -

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

H7-F5

New Footpath Ducts

28 - - - - - - - -

F4-H8

New Footpath Ducts

48 48 48 96 - 96 - - -

H8-H9

New Footpath Ducts

35 - - 70 - 70 35 - -

H9-J0

New Footpath Ducts

35 - - 70 - 70 35 - -

J0-J1

New Footpath Ducts

14 - - 28 - 28 14 - -

J1-J2

New Footpath Ducts

50 - - - - - - - -

J2-J3

New Footpath Ducts

25 - - - - - - - -

J3-J5

New Footpath Ducts

46 - - - - - - - -

J5-J6

New Footpath Ducts

34 - - - - - - - -

J6-J7

New Footpath Ducts

10 - - - - - - - -

J7-J8

New Footpath Ducts

30 - - - - - - - -

J8-J9

New Footpath Ducts

13 - - - - - - - -

J7-K6

New Road Crossing

17 - - - - - - - -

J8-K5

New Road Crossing

17 - - - - - - - -

LVLV

HVHVHV

HVHVHV

LVLV

HVHVHV

LVLV

HVHVHV

LVLV

LVLVLVLV

LVLVLV

LVLVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LV

LV

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B9 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

J9-K0

New Footpath Ducts

35 - - - - - - - -

K0-K1

New Footpath Ducts

28 - - - - - - - -

K0-K3

New Road Crossing

16 - - - - - - - -

K2-K3

New Footpath Ducts

23 - - - - - - - -

K4-K5

New Footpath Ducts

30 - - - - - - - -

J5-K7

New Road Crossing

26 - - - - - - - -

K7-K8

New Footpath Ducts

28 - - - - - - - -

K8-K9

New Footpath Ducts

31 - - - - - - - -

K9-L0

New Footpath Ducts

35 - - - - - - - -

L0-L1

New Footpath Ducts

1 - - - - - - - -

L1-L2

New Footpath Ducts

35 - - - - - - - -

L2-L3

New Footpath Ducts

20 - - - - - - - -

L3-L4

New Footpath Ducts

32 - - - - - - - -

L5-L6

New Footpath Ducts

30 - - - - - - - -

LVLV

SL

LV

LVLVLV

SL

LV

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

SL

LVLV

LVLV

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

L6-L7

New Footpath Ducts

10 - - - - - - - -

L7-L8

New Footpath Ducts

16 - - - - - - - -

L9-M0

New Footpath Ducts

10 - - - - - - - -

L9-M5

New Road Crossing

16 - - - - - - - -

M1-M2

New Footpath Ducts

13 - - - - - - - -

M2-M3

New Footpath Ducts

1 - - - - - - - -

M4-K3

New Footpath Ducts

51 - - - - - - - -

M5-M6

New Footpath Ducts

42 - - - - - - - -

M6-M7

New Footpath Ducts

10 - - - - - - - -

M6-Q2

New Road Crossing

16 - - - - - - - -

M7-M8

New Footpath Ducts

20 - - - - - - - -

M8-M9

New Footpath Ducts

13 - - - - - - - -

M9-Q1

New Footpath Ducts

16 - - - - - - - -

Q0-Q1

New Road Crossing

26 - - - 26 26 52 - -

SL

SL

SL

LV

LVLV

SL

LVLV

LVLV

LVLVLV

LV

LVLV

LVLV

SL

SL

HV

LV

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B10 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

HVHV

HVHV

HVHV

HVHV

HVHV

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

Q0-Q2

New Footpath Ducts

56 - - - - - - - -

Q2-Q3

New Footpath Ducts

44 - - - - - - - -

Q3-Q4

New Footpath Ducts

52 - - - - - - - -

Q4-L4

New Road Crossing

16 - - - - - - - -

Q4-Q5

New Footpath Ducts

15 - - - - - - - -

Q5-Q6

New Footpath Ducts

10 - - - - - - - -

Q6-Q7

New Footpath Ducts

20 - - - - - - - -

Q7-Q8

New Footpath Ducts

12 - - - - - - - -

Q8-Q9

New Footpath Ducts

13 - - - - - - - -

Q9-R0

Existing Ducts

7 - - - - - - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

R0-R1

Existing Ducts

51 - - - - - - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

R1-R2

Existing Ducts

1 - - - - - - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

R2-T2

Existing Ducts

19 - - - - - - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

T2-R3

Existing Ducts

23 - - - - - - - -

LVLV

LVLV

LVLV

SLLV

LVLVLV

SL

LVLVLV

SL

LVLV

LVLV

SL

LVLV

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

T2-T1

Existing Ducts

25 - - - 50 50 - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

T0-T1

New Footpath Ducts

24 - - 48 - 48 24 - -

S1-A0

New Footpath Ducts

15 - - - - - - - -

B5-N0

New Footpath Ducts

16 - - 16 - 16 16 - -

N0-N1

New Footpath Ducts

25 - - 25 - 25 25 - -

N1-N2

New Footpath Ducts

16 - - - - - - - -

N2-N3

New Footpath Ducts

23 - - - - - - - -

N2-N5

New Road Crossing

17 - - - - - - - -

N5-N4

New Footpath Ducts

16 - - - - - - - -

N5-N6

New Footpath Ducts

33 - - - - - - - -

N6-N7

New Road Crossing

21 21 42 - 21 21 - - -

N1-N7

New Road Crossing

16 - - - 16 16 32 - -

N6-N8

New Footpath Ducts

10 - - 10 - 10 10 - -

N7-N9

New Footpath Ducts

30 - - - - - - - -

HVHVHV

LVLVLV

LVLV

HVHV

LVLVLV

HVHV

LVLVLV

LVLV

SL

LVLV

LV

SL

LVLV

HV

HV

LV

HVHV

LVLV

SL

LVLV

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162ELECTRICAL RETICULATION

507919 B11 11R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507917 URS20162 - DTE

0

3.11

Michael.J.B

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

ALL ROUTE LENGTHS ARE TO BECONFIRMED ON SITE BY THE

CONSTRUCTOR PRIOR TO ORDERINGMATERIALS.

ALL NEW SPARE 125mm DUCTS INSTALLEDARE TO HAVE A MINIMUM 750mm COVER.

WORKS COMPLETED / FIELD BOOK

CONSTRUCTED BY:

SIGNATURE: DATE:

WORKS COMPLETED:

SIGNATURE: DATE:

INSPECTED BY:

ASSET RECORDING

I:

CONTACT NO:

OF:

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWINGHAVE BEEN RECORDED IN ACCORDANCE WITH ENDEAVOUR ENERGY'SSTANDARD SAD 004

SIGNATURE: DATE:

TRENCH LEGEND

LV Cable (Direct Buried)

HV Cable (Direct Buried)

50mm Duct - Spare

50mm Duct - with Existing Cable

50mm Duct - with New SL Cable

125mm Duct - Spare

125mm Duct - with Existing Cable

125mm Duct - with New Cable

LV

HV

SL

Existing Cable Abandoned

Direct Buried Cable

125mm Duct - Spare(Endeavour Energy Requested)E125mm Duct - Spare(Developer funded)D

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Duct and Cable Schedule codes:

T&R: HV Light trenching & reinstatementPC: Lay Cable - Pull Conductor through DuctsLD: Lay HV 125mm Ducts in TrenchC: Cable - MaterialsLC: Lay HV Cable - Directly Buried in TrenchD: Lay HV duct in SL/LV Trench

*All length entered in meters (m)

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

N9-P1

New Footpath Ducts

38 - - - - - - - -

P1-D1

New Footpath Ducts

41 - - - - - - - -

N8-P2

New Footpath Ducts

70 - - 70 - 70 70 - -

P2-P3

New Footpath Ducts

10 - - 10 - 10 10 - -

P3-P4

New Footpath Ducts

23 - - 23 - 23 23 - -

P4-P5

New Road Crossing

16 - - - - - - - -

P5-E6

New Footpath Ducts

81 - - - - - - - -

P4-P6

New Footpath Ducts

25 - - 25 - 25 25 - -

P6-P7

New Footpath Ducts

17 - - 17 - 17 17 - -

P7-R7

New Footpath Ducts

15 - - 15 - 15 15 - -

E1-F6

New Road Crossing

20 - - - - - - - -

H3-J0

New Road Crossing

16 - - - - - - - -

M4-M1

New Road Crossing

17 - - - - - - - -

L6-Q3

New Road Crossing

17 - - - - - - - -

LVLV

SL

LVLV

HVHV

LVLV

HVHV

LVLV

SL

HVHV

LVLVLV

LV

LVLV

HVHV

LVLV

HVHV

LVLV

SL

HVHV

LVLV

LV

LV

LV

LV

Urban Subdivision Related Reimbursement - Duct and Cable Schedule

Nodes Configuration Route Length(m)

HV Trench&

Reinstate(T&R)

Lay Duct(LD)

Lay Cable(LC)

Pull Cable(PC)

Cable (C)(Al) Duct (D) Other Duct

Reimbursement (m) x ($)Existing Duct Usage (m) x

($)

Q1-E7

New Footpath Ducts

45 - - 45 - 45 90 - -

P8-Q0

New Footpath Ducts

23 - - 23 - 23 46 - -

R6-P8

New Footpath Ducts

2 - - 2 - 2 4 - -

R6-R7

Existing Ducts

21 - - - - - - -

NilDucts installed by thesame developer in an

earlier stage - URS20472.

D9-D9a

New Road Crossing

22 22 88 - - - - - -

Total: 4041m 117m 230m 879m 210m 1089m 1309m

Total: $11,817 $1,380 $8,790 $840 $35,937 $30,107 $0 $0

HVHV

LV

HVHV

LVLV

HVHV

LVLV

SL

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

//

//

/

//

//

/

//

//

/ / //

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/ / /

//

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

4162

4177

DRAINAGERESIDUE LOT 4271

RESIDUELOT 4272

4012

4013

4014

4015

4016

4017

4018

4036

4037

4038

4039

4040

4041

4042

4043

4044

4045

4046

4047

4048

4049

4050

4051

4052

4053

4074

4075

4076

4077

4078

4079

4080

4081

4094

4095

4096

4097

4098

4099

4100

4101

4102

4103

4104

4105

4106

4107

4108

4109

4110

4111

4112

4113

4114

4124

4125

4126

4140

4141

4142

4143

4144

4145

4146

4147

4148

41494150

4151

4152

4153

4154

4155

4156

4157

4158

4159

4160

4161

4163

4164

4165

4166

4167

4168

4169

41704171

4172

4174

4173

4254

4253

4260

4255

4262

42644175

4176

4178

4268

4179

4180

4181

4182

4183

4184

4185

4186

4187

4188

4189

4190

4191

4192

4193

4194

4195

4196

4197

4198

4199

4200

4201

4202

4203

4204

4205

4206

4207

4208

4209

4210

4211

4212

4213

4214

4215

4216

4217

4218

4219

4220

4221

4222

4223

4224

4225

4226

4227

4228

4229

4230

4231

4232

4233

4234

4235

4236

4237

4238

4239

4240

4241

4242

4243

4244

4245

4246

4247

4248

4249

4250

4251

4252

4266

4256

4263

4257

4261

4259

4258

4265

4267

4269

4270

36555

36556

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

ROSEPARK DRIVE

SILKPOD STREET

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

ELARA BVD

MARSDENIA AVENUE 36620

947576

947577

947578

9475

79

9475

80

9475

81

947582

9475

83

947584

947585

947586

947587

947588

947589

947590

9475

92

9475

93947594

9475

95

947596

947597

947657

947605

9476

5694

7655 947606

947607

947621

947654

947653

947652

947623

947620

947622

947591

02

02

02

02

02

02

04

02

//

//

//

/

04

04

04

04

947914

947916

947917

947915

947918

9479

27

9479

19

S153846

S153845

PEPPERBERRY PARADE

PEPPERBERRY PARADE

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

947928

APPLEBERRY STREET

02

02

02

02

02

03

02

04

04

02

14

02

947914

947916

947917

947915

947918

9479

19

947928

153391A

S153415

S153422

S1533

78

153377A

153391

153392

S153388

153389

S153387

153392A1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

153402

153401A

153401

S153403

153404

153405

153408

S153409

153407A

S153407

153411

153412

153413153414

1534

16

S1534

17

1534

17A

S1534

26

153420

1534

21

153419

S153418

S153423

153424

153425

153424A

153406

153427

1534

28

S153429

153425A

04 1

2

3

4

5

6

7

8

9

10

11

12

13

14 15

161718

19

2021

22

23

24

25

26

27

28

29

30

31

3839

40

41

42

43

4445

46 47

48

49

50

53

5556

//

//

/

//

//

/ / //

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/ / /

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

/

//

//

//

//

//

//

//

//

/

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

//

/

//

//

//

/

4177

4001

4002

4003

4004

4005

4006

4007

4008

4009

4010

4011

4012

4013

4014

4015

4016

4017

4018

4019

4020

4021

4022

4023

4024

4025

4026

4027

4028

4029

4030

4031

4032

4033

4034

4035

4036

4037

4038

4039

4040

4041

4042

4043

4044

4045

4046

4047

4048

4049

4050

4051

4052

4053

4054

4055

4056

4057

4058

4059

4060

4061

4062

40634064

4065

4066

40674068

4069

4070

4071

4072

4073

4074

4075

4076

4077

4078

4079

4080

4081

4082

4083

4084

4085

40864087

4088

4089

4090

4091

4092

4093

4094

4095

4096

4097

4098

4099

4100

4101

4102

4103

4104

4105

4106

4107

4108

4109

4110

4111

4112

4113

4114

41154116

41174118

4119

4120

4121

4122

4123

4124

4125

4126

4127

4128

4129

4130

4131

4132

41334134

4135

4136

4137

4138

4139

4140

4141

4142

4143

41444163

4164

4165

4166

4167

4168

4169

41704171

4172

4174

4173

4175

4176

4178

4268

4179

4180

4181

4182

4183

4184

4185

4186

4187

4188

4189

4190

4191

4192

4193

4194

4195

4196

4197

4198

4199

4200

4201

4202

4203

4204

4205

4206

4207

4208

4209

4210

4211

4212

4213

4214

4215

4216

4217

4218

4219

4220

4221

4222

4223

4224

4225

4226

4227

4228

4235

4236

4237

4238

4239

4240

4241

4242

4243

4244

4245

4246

4247

4248

4249

4269

4270

36554

36555

36556

36558

ELARA BOULEVARD

MISTFLOWER STREET

ROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

RIBBO

NWOOD C

RESCEN

T

MARSDENIA AVENUE

RIBBONW

OO

D CRESCENT

36620

947584

947585

947586

947588

947589

947590

9475

92

9475

93

947596

947597

947657

947598

947599

947600

9476

01

947602

947603

947604

947605

9476

56

9476

55 947606

947607

947608

947610

947609

9476

11

947621

947654

947653

947652

947623

947618

947619

947620

947612

947613

947614

947617

947615

947616

947622

947591

03

02

02

02

02

02

12

02

04

02

//

//

//

/

04

04

04

04

947917

947926

947918

9479

19

947920

947921

947922

S153846

S153845

ELARA BOULEVARD

MISTFLOWER STREET

APPLEBERRY STREETROSEPARK DRIVE

SILKPOD STREET

RIBBONWOOD CRESCENT

MARSDENIA AVENUE

MARSDENIA AVENUE

SATI

NWOOD S

TREE

T

CRABAPPLE S

T

RIBBO

NWOOD C

RESCEN

T

947928

APPLEBERRY STREET

02

02

02

02

02

03

04

02

02

02

02

02

02

947917

947918

9479

19

947920

947921

947922

947928

S153375

153377

153391A

S153415

S153390

153376

S1533

78

153373

S153

370

153371

153372

153374

153376A

153377A

153391

153392

S153388

153389

S153387

153392A

S153382

1533

79

153380

1533

81

S1533

83

153384

153385

153386

153386A

153389A

S153393

153394

S153395

153398A

153398B

153398

153397

S153396

153400

153402

153401A

153401153402A

S153430

153431S153403

153404

153405

S153409

153407A

S153407

1534

16

S1534

17

1534

17A

153420

153419

S153418

S153423

153424

153425

153424A

153406

153425A

ELKHORN ST

FUTURELOT

No.6042

FUTURELOT

No.6041

TO BE CONSTRUCTEDUNDER URS20472

TO BE CONSTRUCTEDUNDER URS20472

04 1

2

3

4

5

6

7

8

14 15

161718

19

2021

22

23

24

25

26

27

32

33

34

35

36

37

3839

40

41

42

43

4445

46 47

48

49

50

5152

5354

5556

57

5859

60

61

62

63

646566

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162DUCT TRENCH & EASEMENT

507917 B1 3R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507919 URS20162 - RETIC

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

N

SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

LEGEND

High Voltage Trenching/ / / / /

Low Voltage Trenching

Lay 40mm P.V.C. Service Conduits

New Pillar Excavation location

Existing Pillar

New Column Excavation location

Existing Column

Establish New Padmount Substation

Install New Street Light Lantern

Existing Street Light Lantern

XYRoad Crossing Duct ConfigurationX =Number of 50mm Ducts,Y= Number of 125mm Ducts.

Padmount Substation - Existing

Existing Conduits (Ducts)

Install New Conduits (Ducts)

COMMENCED ON

& COMPLETED ON

SIGNATURE

I

OF

CONTACT NUMBER

HEREBY CERTIFY THAT THE DUCTS SHOWN ON THISDRAWING HAVE BEEN INSTALLED IN ACCORDANCE WITH THISDRAWING & ENDEAVOR ENERGY STANDARDS MDI0028 &MCI0006. THE DUCT DEPTHS AND LOCATIONS AT EACH ENDHAVE BEEN CORRECTLY MARKED ON THIS DRAWING AS PERENDEAVOR ENERGY STANDARD SAD0004.

LAND SURVEYOR REGISTERED UNDERSURVEYING AND SPATIAL INFORMATION ACT 2002

SIGNATURE

THE INSTALLATION OF THE DUCTS WAS

15C. Restriction Zone - Swimming Pools:A restriction zone on the use of land in relation to pools measured 5.0m from thepadmount substation easement and earth grid is to be created over Lots 4057,4056, 4200, 4199, 4246, 4270 & future lots 6041 & 6042 in favour of endeavourenergy within proposed lot 18.

15B. Restriction Zone - Fire Ratings of Buildings:A restriction zone on the use of land in relation to fire ratings of buildingsmeasured 3.0m from the padmount substation plinth is to be created over Lots4057, 4056, 4200, 4199, 4246, 4270 & future lots 6041 & 6042 in favour ofEndeavour Energy.

15A. Padmount Substation Easement - (Common Earthing):Easement for padmount substation minimum 5.5m x 2.75m + Variable is to becreated over Lots 4057, 4199, 4246 & future lot 6042 in favour of EndeavourEnergy. This easement is a minimum size and in addition to the substationeasement the following restriction zone requirements should be documented onthe linen plan & 88b instrument. (Refer to Endeavour Energy Standard MDI0044,Annexure 1 for Standard Easement Terms)

Duct, Trench & EasementSite Plan

Scale 1:1000

14. Existing Assets:Have all the existing assets been field checked and are accurate at the time ofdesign? YES

13. Telecommunications:Telecommunications assets are NOT effected by the proposed works.

12. Pollution Controls:All the requirements of the Environmental Protection Authority pollutioncontrol legislation is to be strictly adhered to.

11. Environmental Management plan:EMP EMS0001 is part of this design (refer to EIA for details).

10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must beavoided. the following alternatives should be considered: · mobile generators and substations,· live line work,· design alternatives,· low voltage parallels,· work practices/standards.the cost is to be funded by the customer/developer.

9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent afterthe works have been competed and the letter of acceptance has been issued.The reimbursed amount is shown in the "Funding Arrangements for Scope ofWork table" . Any disagreement with the amount should be resolved withendeavour energy prior to the commencement of works.

8. WARNING: Live Endeavour Energy cables & other services in this area.Please contact "Dial Before You Dig" on telephone: 1100 for searches two daysprior to excavation.

7. ATTENTION:The preparation of this design has been undertaken giving due consideration tothe location of existing services. The Constructor is however responsible for theverification of services and permanent survey marks prior to the commencementof construction. No responsibility nor liability will be accepted by the designer fordamage to existing services as a result of this design.

6. ATTENTION:All services searches must be checked before construction.

5. ATTENTION:Permanent survey marks may exist in this area, these are to be located by asurveyor prior to commencement of work.

4. Accredited Service Provider to notify Endeavour Energy asset data customerdepartment daily when cable works is in progress. (ph. 131 081).

3. Design certification shall lapse where:

(i) notice of intent has not been received within six (6) months of this certification,or

(ii) construction has been interrupted for more than six (6) months.

where design certification has lapsed the design must be resubmitted forcertification by the accredited designer.

2. Endeavour Energy Contact Phone: 131081.

1. This drawing is to be read in conjunction with the relevant Endeavour EnergyNetwork Standards and Connection Policy.

NOTES

NOTETHE CONSTRUCTION OF THIS DESIGN AND

THE SUPPLY TO THIS SUBDIVISION ISDEPENDENT ON WORKS UNDER URS19233

BEING SUCCESSFULLY COMPLETED.

Padmount SubstationEasement Requirements

The easement shall be flat & level over theentire easement area, and be above the

1:100 year flood level.Services such as drains, piping or wiring are

not permitted to pass through either thesubstation easement or the ground below it.If a retaining wall is to be installed, approval

from council is required.

This design complies with Endeavour Energy's relevant standards as current at thistime & as listed on the Endeavour Energy Accredited Service Provider's Internetsite. These standards include, but are not limited to:

· CP: Connection Policy,· EMS: Environmental Management Standard,· MCI: Mains Construction Instruction,· MDI: Mains Design Instruction,· PDI: Protection Design Instruction,· SDI: Substation Design Instruction,· SAD: Design Drawing Standard,· MMI: Mains Maintenance Instruction,· SMI: Substation Maintenance Instruction,· LDI: Public Lighting Electrical Design Element.·Additionally, where relevant, the design complies with AS/NZS7000 "Overhead LineDesign - Detailed Procedures" published by The Australian Standards.

Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damageresulting from non-compliance of the design with the above standards.

Service Provider Number: 2486Name:

Signed:

Date:

DESIGN COMPLIANCE AND INDEMNITY

L McKinnon L McKinnon

16.07.2018

8.5m streeltight support column

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

S153375

S153375

HV

LV

3.0m

5.0m

"B"

"C"

"A"

*

PMS PLINTH

PMS EASEMENT

LOT

No.405

7

LOT

No.405

6

Property Boundary

Prop

erty

Boun

dary

SATI

NWOOD S

T

0.915m

1.415m

0.7m

0.7m

0.9m

HV

LV

3.0m

5.0m

"B"

"C"

"A"

*

PMS PLIN

TH

PMS EASEMENT

PROPERTY B

OUNDARYLOT No.4199

LOT No.4200

Property Boundary

ROSEPARK DR

0.915

m

1.415

m

0.7m

0.7m

0.9m

LOT No.4246

LOT No.4270

Property Boundary

Property Boundary

HV

LV

3.0m

5.0m

"B"

"C"

"A"

*PMS PLINTH

PMS EASEMENT

MISTFLO

WER ST

0.915m

1.415m0.7m

0.7m

1.415m

FUTURE LOT

No.6042

FUTURE LOT

No.6041

ELKHORN ST

Property Boundary

Property Boundary

HV

LV

3.0m

5.0m

"B"

"C"

"A"

*

PMS PLINTH

PMS EASEMENT

0.915m

1.415m

0.7m

0.7m

1.415m

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162DUCT TRENCH & EASEMENT

507917 B2 3R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507919 URS20162 - RETIC

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

Signature: Date:

Works Completed:

Signature: Date:

Inspected By:

I:

Contact No:

of:

Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.

Signature: Date:

WORKS COMPLETED / FIELD BOOK

ASSET RECORDING

Constructed By:

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36554 - COMMON EARTHING

REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS

EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36555- COMMON EARTHING

REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS

EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36558 - COMMON EARTHING

REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS

EASEMENT AND RESTRICTION ZONES FOR PADMOUNTSUBSTATION 36556 - COMMON EARTHING

REFER TO PROJECT NOTES 15 A, B, C FOR DETAILS

Standard easement

Extended easement

Standard easement

Extended easement

A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR 0.25m OFFSETTOWARD THE HV END.

B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.

C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)

A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR 0.25m OFFSETTOWARD THE HV END.

B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.

C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)

A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m + VARIABLE, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR0.25m OFFSET TOWARD THE HV END.

B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.

C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)

A. PADMOUNT SUBSTATION EASEMENT 2.75m x 5.5m + VARIABLE, CENTRED AROUND THE SUBSTATION PLINTH EXCEPT FOR0.25m OFFSET TOWARD THE HV END.

B. RESTRICTION ON THE USE OF LAND IN RELATION TO THE FIRE RATING OF BUILDINGS MEASURED 3.0m FROM SUBSTATIONPLINTH.

C. RESTRICTION ON THE USE OF LAND IN RELATION TO THE SWIMMING POOLS MEASURED 5.0m FROM SUBSTATION EASEMENT* SUBSTATION PLINTH 1.35m x 3.17m AT TOP OF CONCRETE. (ALL OFFSETS TO PLINTH SHOWN FROM TOP OF CONCRETE)

N N

N

NSCALE 1:100

1m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m

SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m

SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m

SCALE 1:1001m0m 2m 3m 4m 5m 6m 7m 8m 9m 10m

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B

Substations

Underground

Overhead

General

5 6

Local Government Area

7 8

CheckedHV OP Diagram

UBD/Penguin Ref No.

HV Switching

AM Project. No.

CAP / SAMP No.Work Orders

GIS Map No.Drawn

Date

Design

9 10

DO NOTSCALE

11

Sheet No of Sheets

12

A1

H

G

F

E

D

C

87 109 1211

H

AAM

END

MEN

TS

Orig

inal

Issu

e

G

F

E

D

C

B

A

652 431

2 431

B

A

C THIS DRAWING AND THE

COPYRIGHTTHEREIN IS THEPROPERTY OF

ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY

TEM

PLAT

E VE

RSI

ON

No.

DIMENSIONSIN

METRES

ORIGINALSCALE

Reference Drawings NEWPARKPRECINCT 4

RICHMOND ROADMARSDEN PARK

URS20162DUCT TRENCH & EASEMENT

507917 B3 3R. Walsh

R. Walsh

16.07.2018

1:1000

URS20162

126 C:11

U82674

MARSDEN PARK

BLACKTOWN CITY

B505359 URS19233 - Newpark Precinct 2

A508329 PLT1059 - Elara Blvd Precinct 3 - Education

B507919 URS20162 - RETIC

0

3.11

Michael.J.B

POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575

Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846

THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE

EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFY THE EXACT

LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING

CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS

PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.

This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.

Amendment:

Date Approved:

Examiner's Signature:

Print Name:

CERTIFIED BY ENDEAVOUR ENERGY

BD

ate:

16.

07.2

018

Cha

nge

to e

asem

ent

loca

tion

of s

ubst

atio

ns36

554

& 36

555

Dra

wn:

Ric

h W

Che

cked

: Mic

hael

. B