Page 2: Site Safety Forum 2017 for Works Contracts and Property

Precast Top slab and manhole shaft

Precast Top Slab of Water Tank Cast in-situ VS Precast Top Slab

Typ./F

4 days

4 days

Original

2 days R.C .

Supporting Key

Lifting Point

+ 2 days

Cast in-situ Top slab and manhole shaft

Enhanced Proposal

R.C . Supporting

Key

. . . .

. . . . . . . . . .

. . . . . .

2 days

Cast in-situ Top slab

Page 3: Site Safety Forum 2017 for Works Contracts and Property

3

Comparison of Traditional Cast in-situ top slab and Precast Top Slab

Cast In-situ Top Slab Precast Top Slab

Safety • Activity in Confined Spaces Dismantle Formwork Transportation of scaffolds • Higher temperature in water tank

• Reduction construction activity in Confined Spaces • Prevention of Heat Stroke

Quality Control Moderate Easier

Environmental Formwork & Falsework Construction Waste

Noise

Formwork & Falsework Construction Waste

Noise

Time Moderate A bit Faster (Parallel Construction)

Cost Moderate More and less the same

Water Tank Wall Stem Precast top slab

Precast Top Slab of Water Tank

Page 4: Site Safety Forum 2017 for Works Contracts and Property

Original Fixed temporary protective canopy as stated in contract

- Enhancement - Foldable temporary protective canopy

clamping on parapet wall at 1/F was proposed and adopted

``

Enhancement of Temporary Protective Canopy

Advantages: • Foldable protective canopy facilitate lifting works adjoining

to building • Reduce construction works at height • Save time for installation works • Reusable at other projects

Page 5: Site Safety Forum 2017 for Works Contracts and Property

• Insert methods for Protective Canopy

5

Enhancement of Temporary Protective Canopy

Page 6: Site Safety Forum 2017 for Works Contracts and Property

6

Provision of Steel mesh for Slab Opening

Install of steel mesh at Slab Opening before Concreting

Page 7: Site Safety Forum 2017 for Works Contracts and Property

7

Provision of Steel mesh for Slab Opening

Placed Plywood over openings Placed Steel covers at slab openings

Page 8: Site Safety Forum 2017 for Works Contracts and Property

8

Innovative Safety Wailing

Typical Safety Wailings at Wall Openings

Page 9: Site Safety Forum 2017 for Works Contracts and Property

9

Safety measure for window opening

800mm – 1400 mm at Wall openings

Innovative Safety Wailing

Advantages: ???

• For openings with difference sizes

• The concrete defects at openings can be repaired without removing the wailings

• No anchor bolts required and subsequence repairing works

• Observable if missing

Page 10: Site Safety Forum 2017 for Works Contracts and Property

10

Anti Slip Measure for Ramp (Material Hoist)

Two wheel hand trolley with hand break

Page 11: Site Safety Forum 2017 for Works Contracts and Property

11

Safety Facilities at Fork Lift

Page 12: Site Safety Forum 2017 for Works Contracts and Property

12

Safety Innovative ( RFID) • RFID application on plant speed monitoring

• Instant push message

• Information of plant, operator, location,

time, etc.

Page 13: Site Safety Forum 2017 for Works Contracts and Property