Page | 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB 60103- SITE SURVEYING Fieldwork 1 Report Levelling Name Student ID Marks LEE KIM THIAM 0310710 LEE CHUN YEE 0321748 LEE PEI GIE 0315653 LEE KIT HUNG 0315722

Upload: darren-lee

Post on 17-Aug-2015

54 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Site Surveying Levelling

Page | 1

SCHOOL OF ARCHITECTURE, BUILDING AND

DESIGN

BACHELOR OF QUANTITY SURVEYING (HONOURS)

QSB 60103- SITE SURVEYING

Fieldwork 1 Report

Levelling

Name Student ID Marks

LEE KIM THIAM

0310710

LEE CHUN YEE

0321748

LEE PEI GIE

0315653

LEE KIT HUNG

0315722

Page 2: Site Surveying Levelling

Page | 2

Table of Content

Content Page

Cover Page 1

Table of Content 2

A. Introduction to Levelling 3-4

B. Outline of Apparatus 5

i) Automatic Level 5

ii) Adjustable Leg-Tripod 5

iii) Optical Plummet 5

iv) Horizontal Bubble Level 6

v) Bar- Coded Level Rod 6

C. Objectives 6

D. Field Data 7 – 10

i) Rise and Fall Method 8 – 10

ii) Height of Collimation Method 9 – 10

E. Conclusion 11

Page 3: Site Surveying Levelling

Page | 3

A. Introduction to Leveling

Leveling is the process of measuring heights. It is possible when leveling to measure

heights with an accuracy of millimeters. Heights can also be measured using total

stations, handheld lasers and GPS devices. However, leveling offers an inexpensive,

simple and accurate method for measuring heights, and it is widely used in construction

sites. Any method of measuring the heights of points above or below the ground is done

by using an agreed datum. These datums or reference points are present in all

construction sites and has an arbitrary height assigned to the point. Most construction

sites will have several of these benchmarks, and if they have heights based on an

arbitrary datum, they are known as Temporary Bench Marks.

A horizontal line (or plane) of sight (line or plane of collimation) is established with a

telescope (fitted with cross-hairs) which can be turned about a vertical axis. The

difference in consecutive readings taken on a vertical staff gives the level difference

between two points as shown in Figure 1.

Figure 1: Leveling

(Source : http://www.colorado.edu/geography/courses/geog_2043_f01/lab4/diff.jpg)

Page 4: Site Surveying Levelling

Page | 4

There are 2 main methods of booking levels:

A) Rise and Fall Method B) Height of Collimation Method

Source :

(http://admin.i4learnprod.co.uk/repository/resource/view_resour

ce.php?id=122)

Source :

(http://gmba-learning-gateway.co.uk/images/Height_of_Col.jpg?713)

Definitions

Leveling : A surveying operation carried out to determine the elevation of points or to

find the difference in elevation of points.

Spirit level/Engineer’s Level : A surveying instrument used to carry out leveling.

Backsight (BS) : A sighting with a level back to a point of known elevation.

Foresight (FS) : A sighting with a level to determine the elevation of a point.

Intermediate Sight (IS) : A fore shot to a point at which you want to know the

elevation but which will not be used as a turning point.

Turning Point : A point at which you have established an elevation with FS and on

which you will subsequently take a BS.

Peg test : Surveying operation carried out to determine id the leveling bubble and

telescope line-of-sight are parallel.

Elevation of Instrument (EI) : Elevation of the telescope cross-hairs.

Balancing shots : attempt when doing a leveling survey to keep the lengths of FS

and BS at any given instrument setup as close as possible.

Closure Error : Difference in elevation determined from the leveling survey and the

known elevation of a benchmark.

Page 5: Site Surveying Levelling

Page | 5

B. Outline of Apparatus

1. Automatic Level

2. Adjustable Leg Tripod

3. Optical Plummet

Source :

(http://img.diytrade.com/cdimg/636179/4720826/0/1195520062/32

X_automatic_level.jpg )

A Professional Leveling Tool used by Contractors, Buildersm Land

Surveying Professionals, or the Engineer who demands accurate

leveling every time ( Tngineering Supply, 2014).

Source :

(http://www.vsaservicesindia.com/images/products/accessories/larg

e/1.jpg )

Adjustable-leg tripods is easy to set up on ground because each leg

can be adjusted to exactly the height needed to find level, even on a

steep slope (Johnson Level,2010).

Source :

(http://www.hayesinstrument.com/accs_TopconTribrachOP.jpg )

A device on some transits and theodolites; used to center the

instrument over a point, in place of a plumb bob, which moves in a

strong wind. (McGraw-Hill,2003).

Page 6: Site Surveying Levelling

Page | 6

4. Horizontal Bubble Level

5. Bar-Coded level Rod

C. Objectives

1. To enable students to get hands-on experience in setting up the working with the

auto-level.

2. To determine the error of disclosure in order to determine whether the leveling is

acceptable.

3. To allow students to apply theories learnt in classes in a hands-on situation such

as making adjustments for each reduced level of every single staff station in

order to obtain the most accurate reduced levels.

4. To identify the reduced level of each station.

5. To enhance students’ knowledge on leveling procedure.

Source : (http://cms.leica-

geosystems.us/wp/ape/files/2013/10/tribrach-components-3.jpg )

A tool to determine whether the surface is horizontal.

Source : (http://www.a1-

equipment.co.uk/uploaded/public/504a08e7b04253.41472947.jpg )

To determine the relative heights of the different points in the area

under survey (Clancy,1991).

Page 7: Site Surveying Levelling

Page | 7

D. Field Data

Rise and Fall Method

BS IS FS Rise Fall R.L. Remarks

1.180 100.000 BM1

1.300 3.475 2.295 97.705 TP A

1.270 1.237 0.063 97.768 TP B

1.210 1.385 0.115 97.653 TP C

1.547 1.309 0.099 97.554 TP D

1.235 1.255 0.292 97.846 TP E

1.215 1.275 0.040 97.806 TP F

1.220 1.405 0.190 97.616 TP F

1.367 1.229 0.009 97.607 TP G

3.950 1.370 0.003 97.604 TP H

1.390 1.601 2.349 99.953 TP I

1.365 0.025 99.978 BM 1

∑BS = 16.884

∑FS = 16.906

∑Rise = 2.729

∑Fall = 2.751

Arithmetical Check:

∑BS - ∑FS = ∑Rise - ∑Fall = Last Reduced Level Reading – First Reduced Level

Reading

16.884 – 16.906 = 2.729 – 2.751 = 99.978 – 100.000

-0.022 = -0.022 = -0.022

Acceptable Disclosure:

Formulae: 12 +/- √k

K= the number of set-ups

12 +/- √11 = +/-39.799mm or 0.0398m

Page 8: Site Surveying Levelling

Page | 8

Height of Collimation Method

BS IS FS Height of Collimation

R.L. Remarks

1.180 101.180 100.000 BM1

1.300 3.475 99.005 97.705 TP A

1.270 1.237 99.038 97.768 TP B

1.210 1.385 98.862 97.653 TP C

1.547 1.309 99.101 97.554 TP D

1.235 1.255 99.081 97.846 TP E

1.215 1.275 99.021 97.806 TP F

1.220 1.405 98.836 97.616 TP F

1.367 1.229 98.974 97.607 TP G

3.950 1.370 101.554 97.604 TP H

1.390 1.601 101.343 99.953 TP I

1.365 99.978 BM 1

∑BS = 16.884

∑FS = 16.906

Arithmetical Check:

∑BS - ∑FS = Last Reduced Level Reading – First Reduced Level Reading

16.884 – 16.906 = 99.978 – 100.000

-0.022 = -0.022

Acceptable Disclosure:

Formulae: 12 +/- √k

K= the number of set-ups

12 +/- √11 = +/-39.799mm or 0.0398m

Page 9: Site Surveying Levelling

Page | 9

Rise and Fall Method

BS IS FS Rise Fall R.L. Adjustment

Final R.L.

Remarks

1.180 100.000

100.000 BM1

1.300 3.475 2.295 97.705 +0.002 97.707 TP A

1.270 1.237 0.063 97.768 +0.004 97.772 TP B

1.210 1.385 0.115 97.653 +0.006 97.659 TP C

1.547 1.309 0.099 97.554 +0.008 97.562 TP D

1.235 1.255 0.292 97.846 +0.010 97.856 TP E

1.215 1.275 0.040 97.806 +0.012 97.818 TP F

1.220 1.405 0.190 97.616 +0.014 97.634 TP F

1.367 1.229 0.009 97.607 +0.016 97.623 TP G

3.950 1.370 0.003 97.604 +0.018 97.622 TP H

1.390 1.601 2.349 99.953 +0.020 99.973 TP I

1.365 0.025 99.978 +0.022 100.000 BM 1

∑BS = 16.884

∑FS = 16.906

∑Rise =

2.729

∑Fall =

2.751

Correction per set-up

= Error of misclosure ÷ Number of set up

= (100.000 – 99.978) ÷ 11

= +0.002 m

Page 10: Site Surveying Levelling

Page | 10

Height of Collimation Method

BS IS FS Height of Collimati

on

R.L. Adjustment Final R.L.

Remarks

1.180 101.180 100.000

100.000 BM1

1.300 3.475 99.005 97.705 +0.002 97.707 TP A

1.270 1.237 99.038 97.768 +0.004 97.772 TP B

1.210 1.385 98.862 97.653 +0.006 97.659 TP C

1.547 1.309 99.101 97.554 +0.008 97.562 TP D

1.235 1.255 99.081 97.846 +0.010 97.856 TP E

1.215 1.275 99.021 97.806 +0.012 97.818 TP F

1.220 1.405 98.836 97.616 +0.014 97.634 TP F

1.367 1.229 98.974 97.607 +0.016 97.623 TP G

3.950 1.370 101.554 97.604 +0.018 97.622 TP H

1.390 1.601 101.343 99.953 +0.020 99.973 TP I

1.365 99.978 +0.022 100.000 BM 1

∑BS = 16.884

∑FS = 16.906

Correction per set-up

= Error of misclosure ÷ Number of set up

= (100.000 – 99.978) ÷ 11

= +0.002 m

Page 11: Site Surveying Levelling

Page | 11

E. Conclusion

In this fieldwork, the reduced level of Bench Mark (BM) 1 is given which is 100.00m. The

leveling process begins with obtaining the backsight (BS) of BM1 and the foresight (FS) of

turning point (TP) A. Then the auto level is shifted to obtain the BS of TP A and the FS of TP B.

This process is repeated by shifting the auto level to obtain the BS and FS of the following staff

stations and lastly go back to BM1 to obtain its FS in order to calculate the error of misclosure.

We used both the rise and fall method and the height of collimation method to calculate the

reduced level of each staff station. The error of misclosure was -0.022mm and the acceptable

range of error of misclosure was calculated using the 12+/- √k formulae where k represents the

number of set-ups, and the acceptable range of error of

misclosure is +/- 39.799mm or +/- 0.0398m. Thus, our leveling is acceptable.

To distribute the error, the correction per set-up is calculated using the following formulae:

Correction per set-up:

= Error of misclosure ÷ Number of set up

The correction per-set up is +0.002m and is cumulative as shown in the table provided in

the adjusted data section.