Page 1: Site Validation Master Plan

SITE VALIDATION MASTER PLAN

RELEASING ITS FULL POTENTIAL

Page 2: Site Validation Master Plan

ASQ Definitions- Assurance: The act of giving confidence, the state of being certain or the act of making certain.

Quality assurance: The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.

FDA Definition-FDA Definition-

ValidationValidation: Establishing documented evidence, : Establishing documented evidence, which provides a high degree of assurance that a which provides a high degree of assurance that a specific process will consistently produce a product specific process will consistently produce a product meeting its predetermined specifications.meeting its predetermined specifications.

Page 3: Site Validation Master Plan

Validation Master Validation Master PlanPlan

The company’s overall policy, The company’s overall policy, intentions and approach to intentions and approach to validation, including the validation, including the validation of production validation of production processes, cleaning methods, processes, cleaning methods, analytical test methods and analytical test methods and computerized systems, computerized systems, should be established in the should be established in the Validation Master Plan.Validation Master Plan.

Page 4: Site Validation Master Plan

Site Validation Master Site Validation Master Plan versus:Plan versus:

Project Master PlanProject Master Plan Cleaning Validation Master Cleaning Validation Master

PlanPlan Process Validation Master Process Validation Master

PlanPlan Computer System Validation Computer System Validation

Master PlanMaster Plan

Page 5: Site Validation Master Plan

What PurposeWhat Purpose Where Scope Where Scope Why Policy & RationaleWhy Policy & Rationale Who ResponsibilitiesWho Responsibilities How Doc. Content & How Doc. Content &

FormatFormat When Prioritization & When Prioritization &

Sched.Sched.

Site Validation Master Site Validation Master PlanPlan

Page 6: Site Validation Master Plan

Site Validation Master Site Validation Master Plan- ScopePlan- Scope

FacilitiesFacilities Lab EquipmentLab Equipment Laboratory Laboratory

MethodsMethods Water & SteamWater & Steam HVACHVAC Gas SystemsGas Systems

Mfg. EquipmentMfg. Equipment ProcessProcess CleaningCleaning Computer Computer

SystemsSystems

Page 7: Site Validation Master Plan

Equipment Equipment QualificationQualification GeneralGeneral Pre-Qualification ActivitiesPre-Qualification Activities Qualification ActivitiesQualification Activities Protocol PreparationProtocol Preparation Installation, Operational & Installation, Operational &

Performance QualificationPerformance Qualification Acceptance CriteriaAcceptance Criteria Summary ReportSummary Report Re-qualificationRe-qualification

Page 8: Site Validation Master Plan

ExclusionsExclusions

Employs commonly used technology. Is easily installed. Is routinely (minimum daily) checked for

accuracy prior to use. Does not require specialized operating

skills and expertise.

Test instrumentation and simple equipment (pH meters, viscometers, scales) will be qualified via a procedure instead of a protocol. The procedure approach is applicable to equipment that:

Page 9: Site Validation Master Plan

Re-qualificationRe-qualification

The definition of what constitutes a change The definition of what constitutes a change to lab equipment that may require re-to lab equipment that may require re-qualification includes the following:qualification includes the following:

•Failure of test results •Relocation- equipment unplugged and moved within a room, between rooms, between buildings•Major component changes or modifications, including software changes

Page 10: Site Validation Master Plan

Planning Step # 1: Planning Step # 1: Inventory Existing WorkInventory Existing Work

ID Equipment Target Qualification

Completion Date

Qualification Status

1-01 Water HPLC 1Q-2008 --

1-02 Shimadzu Spectrophotometer

3Q-2008 --

L 19 Temp. Recorder N/A Calibrated

L 19 Viscosimeter Completed Qualified

Equipment List & Schedule:

Page 11: Site Validation Master Plan

Product Contact ListProduct Contact List

Product Description: Alpha A Suspension.doc

IDEquip.

DescriptionCapacity Location

MIXING TANKS

MT-1 Lee Tank 100 L Rm. 21

MT-2 Lee Tank 400 L Rm. 21

PORTABLE MIXERS

PM-1 Hobart NA Portable

Page 12: Site Validation Master Plan

FDA 483 ObservationsFDA 483 Observations

Not all manufacturing ISO Class Not all manufacturing ISO Class [removed] rooms, Biological [removed] rooms, Biological Safety Cabinets and Safety Cabinets and manufacturing equipment have manufacturing equipment have documentation of cleaning documentation of cleaning validations.validations.

No validation studies were No validation studies were conducted to support cleaning of conducted to support cleaning of the [removed].the [removed].

Page 13: Site Validation Master Plan

Product/Equipment Product/Equipment MatrixMatrixEquip. ID

3001 3002 3003 3004 3005

Name Tank-1 Tank-2 Pump-1 Pump-2 Mixer-1

Prod. Name

Prod. Code

Batch Size

Apha 1 DMEO 290L X X

Apha 2 DFEE 400L X X X X

Beta R YHHJ 350L X X

Beta S YHKP 700L X X X

Page 14: Site Validation Master Plan

Planning Step # 2: Planning Step # 2: PrioritizationPrioritization

Product Name

CodeMfg.

on Site

Pkg. on

Site

Lab. Tests

Targeted Completion

Date

Apha 1 DDGH X 1,2 R/S 2Q 2008

Apha 2 GANN X 1,2 R/S 3Q 2008

Beta R KKLV X 1,2 R/S 1Q 2009

Beta S KKLC X 1,2 R/S 4Q 2009

Priority 1 Products:

Page 15: Site Validation Master Plan

Planning Steps 3 & 4:Planning Steps 3 & 4:Establish a Timeline & Establish a Timeline & Estimate ResourcesEstimate Resources

Category Totals No. Req. Val.

(A)Pers. Req.

(B)Time Req. (Yrs.)

(A) X (B) =Total Time Required

(Man-years)

Lab Equip. 111 89 2 2.5 5

Methods 124 60 1 9.0 9.0

Mfg. & Pkg. Equip.

195 178 4 3.5 14.0

Process 65 65 2.25 8.0 18.0

Cleaning 65 65 1 7.25 7.25

Sub-Totals: 836 630 -- 9 77.5

Page 16: Site Validation Master Plan

SITE VALIDATION MASTER PLANSITE VALIDATION MASTER PLAN

2009

.

Gas6 mo.

MENSZAK

2Q 2008

2010 201520122011

HVAC & LFUs

2.0 yrs.

Lab Equip. Qual.

1.5 yrs.

All Other Process Validation 5.0 yrs.

Cleaning Methods yr.

All Other Equipment 2.0 yrs.

20172013 2014 2016

LOC Transfer Project

All Other Validation

All Other Cleaning Validation4.25 yrs.

LOC Equipment 1.5 yrs.

LOC Process Validation

3.0 yrs.

Total Process Validation

8.0 yrs.

LOC Cleaning Validation3.75 yrs.

Total Cleaning Validation

8.0 yrs.

LOC Methods Validation3.0 yrs.

Total Methods Validation

9.0 yrs.

All Other Methods6.0 yrs.

Total Equipment Qualification

3.5 yrs.

Page 17: Site Validation Master Plan

Site Validation Master Site Validation Master Plan ValuePlan Value

The Site Validation Master The Site Validation Master Plan provides clarity, and it Plan provides clarity, and it enables the validation enables the validation manager to communicate the manager to communicate the workload, capacity constraints workload, capacity constraints and justify the need for and justify the need for resources. It facilitates resources. It facilitates effective management and the effective management and the best performance.best performance.

Page 18: Site Validation Master Plan

Planning Step # 6: Planning Step # 6: Repeat Steps 1-5 Repeat Steps 1-5

The firm has a protocol for the qualification of solutions used in Manufacturing. This protocol has been effective since 21 Dec 2004. To date only 2 of the approximately 50 materials used in either the manufacture of products or for cleaning/disinfection have been qualified.

FDA 483 Observation:

Page 19: Site Validation Master Plan

Six Steps to Planning:Six Steps to Planning:

1. Inventory all existing and upcoming work.

2. Prioritize.3. Establish a timeline.4. Estimate the resources needed.5. Communicate to upper management

for involvement, commitment and resources.

6. Repeat Steps 1-5 on a routine basis.

Page 20: Site Validation Master Plan

Process OptimizationProcess Optimization

How?How?

KIWI2.mpeg

Page 21: Site Validation Master Plan

1. Identify the Task1. Identify the Task

Document ChangesDocument Changes

Protocol Approval(Signed)

Protocol Execution(Signed)

Summary Report Approval

(Signed)

Draft Revision Amendment Addendum

Page 22: Site Validation Master Plan

2. Concentrate the 2. Concentrate the WorkWork

Page 23: Site Validation Master Plan

3. Form Partnerships3. Form Partnerships

Page 24: Site Validation Master Plan

4. Define Performance4. Define Performance

Activity Val. User / Owner

QA

Planning

Define Priorities:

1) Analytical Methods

2) Laboratory Equipment

3) Facilities / Utilities

4) Production Equipment

5) Process

Responsibilities Matrix:

Page 25: Site Validation Master Plan

5. Training5. Training

The greatest benefit of The greatest benefit of training comes not from training comes not from learning something new, learning something new, but from doing better but from doing better what we what we alreadyalready know. know.

Page 26: Site Validation Master Plan

Five Steps to Five Steps to OptimizationOptimization

1.1. Identify the tasks.Identify the tasks.

2.2. Concentrate the work.Concentrate the work.

3.3. Define performance.Define performance.

4.4. Form partnerships. Form partnerships.

5.5. Build continuous learning Build continuous learning and teaching. and teaching.

Page 27: Site Validation Master Plan

Constraints vs. Constraints vs. PerformancePerformance

Quality

Cost Time

Scope

Page 28: Site Validation Master Plan

Look at the Big PictureLook at the Big Picture

Periodic review applying an Periodic review applying an holistic approach to quality holistic approach to quality systems.systems.

Page 29: Site Validation Master Plan

Process OptimizationProcess Optimization

Incorporate steps to optimize Incorporate steps to optimize individual processes (quality individual processes (quality system).system).

Look at the constraints.Look at the constraints. Periodically review applying Periodically review applying

an holistic approach to quality an holistic approach to quality systems.systems.

Page 30: Site Validation Master Plan

Why?Why?

Regulatory Regulatory RequirementRequirement

Assures QualityAssures Quality Good EconomicsGood Economics

Page 31: Site Validation Master Plan

ReferencesReferences

1.1. ASTM E 2500-07 Standard Guide for Specification, ASTM E 2500-07 Standard Guide for Specification, Design, and Verification of Pharmaceutical and Design, and Verification of Pharmaceutical and Biopharmaceutical Manufacturing Systems and Biopharmaceutical Manufacturing Systems and EquipmentEquipment

2.2. ICH Q9 Quality Risk HandbookICH Q9 Quality Risk Handbook

3.3. Pharmaceutical cGMPs for the 21Pharmaceutical cGMPs for the 21stst Century—A Risk- Century—A Risk-Based ApproachBased Approach

4.4. FDA Guide to Inspections of Quality Systems- August FDA Guide to Inspections of Quality Systems- August 19991999

5.5. The Gold Sheet- January 2008: “Quality Systems No The Gold Sheet- January 2008: “Quality Systems No Longer Theoretical as Industry Begins Implementing Longer Theoretical as Industry Begins Implementing Concepts”Concepts”

Page 32: Site Validation Master Plan

Lee Menszak Lee Menszak Consulting, Inc.Consulting, Inc.

[email protected]@earthlink.net

845-300-1730845-300-1730