SITE REPORT
Wong Yun Shi ( 0315225 )
Measurement 1 - Sr. Ang Fuey Lin
Construction Technology – Mr. Leong Boon Tik
Building Materials – Puan Hasmanira Mokhtar
1
Content Pages Introduction 3Objective 4Photos and Descriptions 5 - 19Conclusion 20
2
Introduction
On 20 June 2014, we have a site visit which organized by our measurement 1 lecturer, Sr. Ang where located at Jalan Klang Lama, Mukim Petaling. It was somewhere nearby The Pearl International Hotel Kuala Lumpur. The employer of the project was Aikbee Timbers Sdn. Bhd. While the main contractor was Encorp Construction Sdn Bhd and the quantity surveyor was PCM Kos Perunding Sdn Bhd.
It was a construction of a 25 storey multipurpose building. Two Basement which are B1 and B2 are car park for shopping mall while first floor and second floor was shopping mall. 3rd floor until 7th floor are car park for residence while 7th floor onward was residential area. It had 403 units for residence
The size of the land was roughly around 1 acre. It is a two years contract, estimate to complete on November 2014 including all the construction, engineering and commissioning works. The total amount for the project was roughly around RM 106.1 millions.
3
Objective
Observe the usage of machinery at the construction site. For example, bar bending machine, concrete mixer, mechanical plants, cutting machine, tower crane.
Aware the importance of personal safety on the construction site. Require to wear safety helmet and safety shoes when going in to avoid accident.
Experience the working place of quantity surveyor which is dealing with weather and the risks may occur on the site.
Gain more basics of the construction process through a site visit.
Increase personal knowledge of the construction process by listening the professional’s briefing and gathering all the information carry on site.
Explore the type of building materials and technology use to construct a building.
Recognize the measurable items for substructure and reinforced concrete frameworks.
4
Photos & Descriptions
View of the site
Bore Piling
5
Independent Scaffolding
Mobile access tower
6
Safety net
Making of concrete spacers
7
Making of concrete spacers
Making of concrete spacers
8
Staircase
Concrete pipe
9
Description board
Precaution on the site
10
Precaution on the site
bents
11
12
Main bars and stirrups in the beam
13
Car park sloping slab
14
Starter bars
pipes
15
Various type of sample
16
17
Plans of the building
Lifting tower tower crane
18
Links & Bents
Mesh Fabric Reinforcement (BRC)
19
Column
Concrete Staircase
20
Forklift
Hold Trailer Concrete Pump
Conclusion
Throughout the site visit, I had learnt the real feeling compared with study at the university lifestyle. It was more tough than I was thought. It really a fresh experience for me that I ever had. I learnt to be more patient and careful because of the weather condition and the risk will be happen everywhere on the site. Teamwork also an important element in constructing a building.
In the university, I will only learnt about the knowledge based on the slide or book that given by lecturers to improve ourselves. But we can’t feel the real life working on outside.
21
As conclusion, I had gained a lots knowledge about the basic of the construction process, experience of actual working space, the usage of machinery, the usage of technology and different of building materials and others. The most memorable moment was the contractor let us to walk down scaffolding from 5th floor to experience the reality of the professionals .
The site visit was useful and bring me to overcome the problem which could happen in my future. I wish I could have more practical knowledge to prepare a better me in my working future.
22