EMP CLEARANCE [ J-11015/217/2007-IA.II(M) ]

for the period April-2014’ – September‘2014’

KHAS MAHAL OPENCAST PROJECT (AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT)

BOKARO & KARGALI AREA

CENTRAL COALFIELDS LIMITED ( A Miniratna Company )

Page 2: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Status of compliance of the terms and conditions given in the Environmental clearance letter No.J-11015/217/2007-IA.II (M) dt.02.08.2010 issued by MOEF, Govt. of India New Delhi for Khas Mahal Opencast Project (0.60 MTPA with a peak production of 1.5 MTPA in 318.71 ha project area) for the period from April’2014 to September’2014’ A.SPECIFIC CONDITONS:

Sl.No Condition Status

(i) Mining shall be carried out as per statute from the streams/nallahs flowing within the lease and along the diverted nallah along the lease boundary. No OB/topsoil shall be dumped along the side of the river/nallah. Approval of the flood and irrigation dept shall also be taken for continuation of mining operations

Mining is presently being carried out at about 1000 m from Godo nallah which is more than the statutory norms. There is no diversion of nallah along the lease boundary. No OB/topsoil is being dumped along the side of the river/nallah.

(ii) No washery shall be established within the ML without prior environmental clearance from the Ministry.

No washery is proposed in the ML area of project.

(iii) Top soil shall be stacked properly with proper slope at earmarked site(s) and shall not be kept active and shall be used for reclamation and development of green belt.

The present bench of OB contains highly degraded (morrum) material. However it is spread over backfilled area for biological reclamation.

(iv) OB shall be stacked at earmarked one external OB dump site of 99.16 ha in Konar OCP ML area shall be a max height of 75m. A slope stability study shall be undertaken to increase the dump height and the report furnished to the ministry for increasing dump height beyond 75m. The ultimate slope of the dump shall not exceed 280. Monitoring and management of reclaimed existing dump site shall continue until the vegetation becomes self-sustaining. Compliance status shall be submitted to the Ministry of Environment & Forest and its Regional Office located at Bhubaneshwar on yearly basis.

Presently no overburden is dumped externally. All overburden is used for backfilling in the mine. Till date the total area of backfilled dump is 60 Ha. Out of 60 Ha of backfilled area 30.94 Ha has been afforested by State Forest Department.

(v) Catch drains and siltation ponds of appropriate size shall be constructed to arrest silt and sediment flows from soil, OB and mineral dumps. The water so collected shall be utilized for watering the mine area, roads, green belt development etc. The drain shall be regularly desilted and maintained properly.

All mine water is collected to the mine sump acting as siltation pond. The present volume of mine sump is 40000 cubic metre. The water is used for sprinkling on roads & mining areas.

Page 3: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No Condition Status

(vi)

Garland drains (size, gradient and length) and sump capacity shall be designed keeping 50% safety margin over and above the peak sudden rain fall and maximum discharge in the area adjoining the mine site. Sump capacity shall also provide adequate retention period to allow proper settling of silt material.

All mine water is collected to the mine sump acting as siltation pond. The present volume of mine sump is 40000 cubic metre. The water is used for sprinkling on roads & mining areas.

The sump capacity is designed as per peak rainfall and is sufficient for safe operation of mine.

(vii) Dimension of the retaining wall at the toe of the dumps and OB benches within the mine to check run-off and siltation shall be based on the rainfall data.

Toe wall of dimension 1000m X 0.5 m X 1.0m constructed.

(viii) Mineral transportation from mine by road shall use trucks of a minimum capacity of 20 T. All internal roads shall be metal topped. A 3-tier Green belt shall be developed on both sides of the roads.

Internal coal transportation is by dumpers from face to coal stock yard. From coal stockyard, coal is being transported by covered trucks to different consumers like DVC BTPS and railway siding. The road to siding and BTPS is black topped. Plantation along road has been done.

(ix) High efficiency water sprinkling system provided to check fugitive emissions at the transfer points, haulage roads etc. shall be provided for crushing/loading operations for dust control at the CHP.

02 numbers of mobile water sprinklers of capacity 28 kl and 12 kl is deployed in the mine.

(x) Drill shall be wet operated only. There are 02 nos of drills and these are fitted with wet drilling arrangement.

(xi) Controlled blasting shall be practiced with use of delay detonators. The mitigative measures for control of ground vibrations and to arrest the fly rocks and boulders shall be implemented.

Nonels of different sizes and CED are used for controlled blasting. All steps suggested for mitigative measures for control of ground vibrations and to arrest the fly rocks and boulders are being implemented.

Page 4: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No Condition Status

(xii)

The total area that shall be brought out under a forestation at the time of mining closure shall include reclaimed external OB dump (99.16 ha), back filled area (145.36 ha) along ML boundary, embankment, safety zone (25.18ha) and undisturbed area, along roads and infrastructure, green belt (58.39 ha) and in township outside the lease by planting native species from the 70 species found in the original ecosystem during pre-mining phase in consultation with the DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha.

Plantation is being done on regular basis. Year wise plantation is given below; 1) Old plantation 3 Hac. 5300 nos. 2) 2006-07 – 27.24 Hac. (60500 nos.) 3) 2012-13- 3.7 Hac Out of 65 Ha of backfilled area 30.94 Ha has been afforested by State Forest Department. The density of the trees is 2500 plants per Ha. The major species are Chakundi, Bamboo, Siris, Aonla,Shisham, Kaju, Khair, Bakain, Ber, Bel, Karanj, Jamun, Neem, etc.

(xiii) A progressive mine closure plan shall be implemented by reclamation of quarry area of 145.36 ha which shall be backfield and brought to 20m above ground level and afforested by planting native plant species in consultation with the local DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha.

A mine closure plan has been prepared and approved at a cost of Rs 2269 lakh. Out of 65 Ha of backfilled area 30.94 Ha has been afforested by State Forest Department.

(xiv) No ground water (bore well) shall be used for mining operations and any additional water requirement during mining operations shall be met from mine sump water. Rain water harvesting structures shall be erected within and around the ML including check dams for recharge of ground water in case the water table shows the declining trend.

No ground water (bore well) is used for mining operations. At present mine sump of 40000 cubic metre capacity is used for sprinkling on roads & mining areas.

(xv) Regular monitoring of ground water level and quality shall be carried out by establishing a network of existing wells and construction of new peizometers. The monitoring for quality shall be done four times in a year in pre-monsoon (May), monsoon (August), post-monsoon (November) and winter (January) seasons and for quality in May. Data thus collected shall be submitted to the Ministry of Environement & Forest and to the Central Pollution Control Board quarterly within one month of monitoring.

Regular monitoring of ground water quality will be started soon.

Page 5: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No Condition Status

(xvi) The Project authority shall meet water requirement of nearby village(s) in case in the village wells go dry due to dewatering mine.

The mine water will be discharged to nearby villages if needed.

(xvii) Sewage treatment plant of adequate capacity shall be installed in the colony. ETP shall also be provided for workshop and CHP wastewater. Treated wastewater meeting prescribed norms only shall be permitted to be discharged into the natural water course.

New workshop is under construction in which ETP is proposed. Washing platform has been constructed in the new workshop. Sump / lagoon discharge quality report for quarter ending September 2014 attached.

(xviii) Besides carrying out regular periodical health checkup of their workers, 10% of the workers identified from workforce engaged in active mining operations shall be subjected to health check-up for occupational diseases and hearing impairment, if any, through an agency such as NIOH, Ahmedabad within a period of one year and the result reported to this Ministry and to DGMS.

Periodical Medical Examination is being done regularly at area regional hospital as per requirement of Mines Rules 1955. Year Target Achievement 2012: 148 152 2013 110 110 2014 123 144 No occupational diseases reported.

(xix) A detailed CSR plan shall also be prepared for and in consultation with local communities; CSR should be for a minimal Rs. 5/tone of coal produced annually which is to be adjusted for the depreciation in the value of rupee over the life of the project. The activities under taken for the specific villages adopted under CSR should be displayed on the company website and updated at least once a year.

CSR details uploaded in company’s website. Budget for CSR activities has been allocated for B&K Area (administrative area) is approximately Rs. 2.00 Crore for financial year 2014-15. About Rs. 3.00 Crore expenditure has been incurred on CSR activities by B&K area during last three financial years

(xx) For monitoring land use pattern and for post mining land use, a time series of land use maps based on satellite imagery (on a scale of 1:5000) of the core zone and buffer zone from the start be prepared once in 3 years (for any one particulars season which is consistent on the time series) and the report submitted to MOEF and its Regional Office at Bhubaneswar.

The remote sensing study was carried out in the year 2011.

(xxi) A final mine closure plan along with details of Corpus Fund shall be submitted to the Ministry of Environment & Forest 5 years in advance of final mine closure for approval.

Agreed. A mine closure plan has been prepared and approved at a cost of Rs 2269 lakh.

(xxii) A minimum Rs.206.38 lakhs earmarked for capital costs shall be utilized for environmental pollution control measures and an annual recurring budget for environmental measures shall be provided till end of mine life and the details of expenditure thereon shall be furnished as part of the monitoring report submitted to MOEF RO, Bhubaneswar. The details shall also be uploaded on the company website.

The revenue expenditure for 2013-14 1. Rs.75000.00 (statutory fee) 2. Rs. 5.07 Lacs (approx) for water sprinkling / dust control. 3. Rs 2.17 lakh for Environmental monitoring.

Page 6: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

B.GENERAL CONDTIONS:

Sl.No. Condition Status

(i) No change in technology and scope of working shall be made without prior approval of the Ministry of Environment & Forests.

No change is being done in mining technology and scope of working. Mining being carried out by shovel – dumper.

(ii) No change in the calendar plan including quantum of mineral coal and waste being produced shall be made.

No change is done in the calendar plan. The coal and OB production during last 03 years is given below; Year Coal (MT) OBR (Mcu M) 2011-12 : 1.20 0.99 2012-13: 1.20 1.19 2013-14: 1.00 0.64

(iii) Four ambient air quality monitoring station shall be established in the core zone as well as in the buffer zone for monitoring PM10, PM 2.5, SO2, NOx. Location of the stations shall be decided based on the meteorological date, topographical features and environmentally and ecologically sensitive targets in consultation with the State Pollution Control Board. Monitoring of heavy metal such as Hg, As, Ni,

Cd, Cr, in particulates shall be carried out at-least once in six months.

Air quality monitoring station has been established at Rest House, PO office, Barwabera Village and Lodhar Bera village for monitoring SPM, RPM, SO2, NOx. The results of monitoring report are given below;

Figures in ug/m3 Figure of quarter ending June 2014

Figure of quarter ending Sept 2014

SPM

Rest house 178 111 PO office 125 106 Lodherbera Village 139 117

Barwabera Village 130 127

RPM

Rest house 103 83 PO office 73 65 Lodherbera Village 87 63

Barwabera Village 67 79

NOx

Rest house 18 18 PO Office 21 20 Lodherbera Village 20 19

Barwabera Village 19 19

SO2

Rest house < 25 < 25 PO Office < 25 < 25

Lodherbera Village

< 25 < 25

Barwabera Village < 25 < 25

Page 7: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No Condition Status

(iv) Data on ambient air quality (PM10, PM 2.5, SO2 and NOx and heavy metal such as Hg, As, Ni, Cr, etc.) and other monitoring data shall be regularly submitted to the Ministry including its Regional Office at Bhubaneswar and to the State Pollution Control Board and the Central Pollution Control Board once in six months. Random verification of samples through analysis from independent laboratories recognized under the EP Rules, 1986 shall be furnished as part of the compliance report.

Quarterly monitoring reports are regularly submitted on annual basis at JSPCB, Ranchi along with Environment Statement. These reports are also submitted along with half yearly compliance report.

(v) Adequate measures shall be taken for control of noise levels below 85 dBA in the work environment. Workers engaged in blasting and drilling operation, operation of HEMM etc. shall be provided with the plugs/muffs.

Adequate measures are being taken. Noise levels are regularly monitored and kept below 85 dBA . The results are appended below.

NOISE in dB(A) Figure of quarter ending June 2014

Figure of quarter ending Sept 2014

Rest house 49.50 47.6 48.90

49.3 48.7 47.20

PO Office

Lodherbera Village

(vi) Industrial waste water (workshop and wastewater from the mine) shall be properly collected, and treated so as to confirm to the standards including for heavy metals before discharge prescribed under GSR 422(E) dated 19th May 1993 and 31st December 1993 or as amended from time to time. Oil and grease trap shall be installed before discharge of workshop effluents.

Workshop is under construction. Washing ramp constructed. Oil and grease trap shall be installed shortly. Mine water is collected in sump of 40000 cubic metre capacity and treated water is used by nearby village and industrial use. The water quality monitoring report for the period from Sept 2014 is attached , main parameters are summarized below,

All Parameters are in mg/1 unless specified

Figure of quarter ending June 2014

Figure of quarter ending Sept 2014

Parameter Lagoon Discharge Godo Nallah Lagoon Discharge

Godo Nallah

1.. Total suspended Solids

40.0

<2.0 2.0

28.0

- 2.40

34 <2.0 2.00

24

-- 2.00

2. Oil & grease 3. B.O.D (3 day 27oC)

Page 8: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No. Condition Status

(vii) Vehicular emissions shall be kept under control and regularly monitored. Vehicles used for transportation of mineral shall be covered with tarpaulins and optimally loaded.

Vehicular emission is kept under control and regularly monitored. Vehicles used for transporting the coal is being covered with tarpaulins and optimally loaded. Vehicles are having PUC certificate.

(viii) Monitoring of Environmental quality parameters shall be carried out through establishment of adequate number and type of pollution monitoring and analysis equipment in consultation with the State Pollution Control Board and data got analyzed through a laboratory recognized under EP rules, 1986.

Monitoring of Environmental quality is done by CMPDI having recognized laboratory.

(ix) Personnel working in dusty areas shall wear protective respiratory devices and they shall also be provided with adequate training and information on safety and health aspects. Occupational health surveillance programme of the workers shall be undertaken periodically to observe any contractors due to exposure of dust and to take corrective measures, if needed.

Personnel working in dusty areas like drill operators have been provided with protective respiratory devices (dust masks) and provided with adequate training and information on safety and health aspects. PME is done regularly. Year Target Achievement 2012: 148 152 2013 110 110 2014 123 144 No occupational diseases reported.

(x) A separate environmental management cell with suitable qualified personnel shall be set up under the control of a senior Executive, who will report directly to the Head of the Company.

An Environment Management cell has been established in this project, headed by Project Officer, KMP OCP who is assisted by a team of following personnel. 1. Colliery Manager, KMP. 2. Project Engr(Excv),KMP. 3. Sr.Manager(M),KMP. 4. Area Env.Engr.(B&K).

(xi) The funds earmarked for environmental protection measures shall be kept in separate account and shall not be diverted for other purpose. Year-wise expenditure shall be reported to this Ministry and its Regional Office at Bhubaneswar.

The funds earmarked for environment protection measures are not being diverted for other purpose. Year wise expenditure will be reported to ministry and it’s Regional Office at Bhubaneswar. The revenue expenditure for 2013-14 is 1. Rs.75000.00 (statutory fee) 2. Rs. 5.07 Lacs (approx) for water sprinkling / dust control. 3. Rs 2.17 lakh for Environmental monitoring.

Page 9: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No. Condition Status

(xii) The Project authority shall advertise at least in two local newspapers widely circulated around the project, one of which shall be in the vernacular language of the locally concerned within seven days of the clearance letter informing that the project has been accorded environment clearance and a copy of the clearance letter is available with the State Pollution Control Board and may also be seen at the website of the Ministry of Environment & Forests at http://envfor.nic.in.

Advertisement has been made in following newspapers. 1. Hindustan , dated 09/10/2010 (Dhanbad Edition).. 2. Prabhat Khabar, dated 09/10/2010. (Dhanbad Edition). A copy of EC has been sent to member Secretary, JSPCB . It is posted on company website.

(xiii) A copy of the Environmental clearance letter shall be marked to concerned Panchayat/Zila Parishad, Municipal corporation or Urban Local Body and Local NGO, if any, from whom any suggestion/representation has been received while processing the proposal. A copy of the clearance letter shall also be displayed at company’s website.

The copy of the clearance letter is displayed at company’s website.

(xiv) A copy of clearance letter shall be displayed on the website of the concerned state pollution control board. The EC letter shall also be displayed at the Regional Office, District Industry centre and collector’s office/Tehsildar’s office for 30 days.

Copy of EC has been sent to JSPCB for further needful at their end.

(xv) The clearance letter shall be uploaded on the company’s website. The compliance status of the stipulated EC conditions shall also be uploaded by the project authorities in their website and updated at least once every six months so as to

The copy of the clearance letter along with compliance status is displayed at company’s website.

(xvi) The project proponent shall submit six monthly reports on the status of compliance of the stipulated environmental clearance conditions (both in hard copy and in e mail) to the respective Regional Office of the MOEF, the respective Zonal offices of CPCB and the SPCB.

Agreed and is being implemented.

(xvii) The Regional office of this Ministry located at Bhubaneswar shall monitor compliance of the stipulated conditions. The project authorities shall extend full cooperation to the respective Regional Office by furnishing the requisite data/information/monitoring reports.

The Project authorities will extend full cooperation to Regional Office, MoEF.

(xviii) The environmental statement for each financial year ending 31st March in Form-V is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be uploaded on the company’s website along with the status of compliance of EC conditions and shall be sent to the respective Regional Offices of the MOEF by e-mail.

The Environmental Statement for the Financial year 2013-2014 is submitted to Regional office of JSPCB. It is uploaded on company’s website.

Page 10: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

Sl.No. Condition Status

3. The ministry or any other competent authority may stipulate any further condition for Environmental protection.

Agreed.

4. Failure to comply any of the conditions above may result win withdrawal of the clearance and attract the provisions of the Environment (protection) Act, 1986.

Agreed.

5.

The above conditions will be enforced inter-alia, under the provisions of the water (prevention & control of pollution) Act, 1974, the Air (Prevention & control of pollution) Act, 1981, the Environment (protection) Act, 1986 and the public liability Insurance Act, 1991 along with their amendments and Rules. The proponent shall ensure to provide for the costs incurred for taking up remedial measures in cased of soil contamination, contamination of ground water and surface water, and occupational and other diseases due to the mining operations.

Accepted.

*************

Page 11: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali OC

Stations: Date of Sampling: 1. P.O. Office 18-19/06/2014

2. Rest House 18-19/06/2014

3. I W S P Kargali 18-19/06/2014

4. Phusro Workshop 19-20/06/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

181 197 162 376

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

116 143 94 279

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

22 17 22 19

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 1 (Authorized Signatory)

Page 12: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali OC

Stations:

1. P.O. Office

2. Rest House

3.

4.

Station Name Date of Sampling Noise Level

P.O.Office 18/06/2014 50.2

Rest House 18/06/2014 51.1

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 2 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 13: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali OCP

Stations: Date of Sampling: 1. Lagoon Discharge 28/06/2014

2. Phusro OC Lagoon Discharge 28/06/2014

3.

Sl.No. Parameter Sampling Stations Detection Limit MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.12 0.18 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 <0.001 0.001 2.0 APHA, 22nd Edition, AAS-GTA

5 COD, mg/l, Max 44 52 4.00 250.0 APHA, 22nd Edition, Closed Reflux,

Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.58 0.62 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 0.1 APHA, 22nd Edition, AAS-GTA

13 Manganese(as Mn), mg/l, Max <0.02 <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.7 2.1 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.0 <2.0 2.00 10.0 IS 3025/39:1991, R : 2003, Partition

Gravimetric

17 pH value 8.10 8.06 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 <0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 0.05 APHA, 22nd Edition, AAS-GTA

20 Sulphide (as SO3), mg/l, Max <0.005 <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.8 24.7 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984, Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.10 1.20 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 38 42 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 3 (Authorized Signatory)

Page 14: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: - Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali OCP

Stations: Date of Sampling: 1. Baid Karo Nala before Damodar 28/06/2014

2. Damodar after conf. Of BK Nala 28/06/2014

3. Raw water Damodar River, Kargali End 28/06/2014

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 2.80 2.40 2.40 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.001 <0.001 <0.001 0.001 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 32 28 16 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 4.90 4.60 7.20 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.48 0.52 0.55 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max <0.06 <0.06 0.67 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 7.08 7.53 5.75 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 7.88 7.70 7.88 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 34 28 14 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 264 226 132 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 46 54 32 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ)

B&K – 4 (Authorized Signatory)

Page 15: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Drinking Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: IS:10500 Drinking Water Standards Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali OCP

Stations: Date of Sampling: 1. Treated Water from IWSP 28/06/2014

2.

3.

Sl.N

o

Parameter Sampling Stations Detection Limit

IS:10500

Drinking Water

Standards

Standard / Test

Method 1 2 3

1 Boron (as B), mg/l, Max <0.20 0.20 0.5 APHA, 22nd Edition ,Carmine

2 Cadmium (as Cd), mg/l, Max <0.001 0.001 0.003 APHA, 22nd Edition,

AAS-GTA

3 Calcium (as Ca), mg/l, Max 20.8 1.60 75 IS-3025/40:1991,

EDTA

4 Chloride (as Cl), mg/l, Max 20 2.00 250 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 0.03 0.05 IS 3025/42 : 1992

R : 2009, AAS-Flame

6 Fluoride (as F) mg/l, Max 0.44 0.02 1.0 APHA, 22nd Edition ,

SPADNS

7 Free Residual Chlorine, mg/l, Min 0.06 0.02 0.2 APHA, 22nd Edition, DPD

8 Iron (as Fe), mg/l, Max <0.06 0.06 0.3 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

9 Lead (as Pb), mg/l, Max <0.005 0.005 0.01 APHA, 22nd Edition,

AAS-GTA

10 Manganese (as Mn), mg/l, Max <0.02 0.02 0.1 IS-3025/59:2006,AAS-Flame

11 Nitrate (as NO3), mg/l, Max 3.10 0.5 45 APHA, 22nd Edition,

UV-Spectrphotometric

12 Odour Agreeable Qualitative Agreeable IS 3025 /05:1983,

R-2012, Qualitative

13 pH value 7.75 2.5 6.5 to 8.5 IS-3025/11:1983,

R-1996, Electrometric

14 Phenolic compounds (as C6H5OH), mg/l, Max

<0.001 0.001 0.001 APHA, 22nd Edition,

4-Amino Autipyrine

15 Selenium (as Se), mg/l, Max <0.002 0.002 0.01 APHA, 22nd Edition,

AAS-GTA

16 Sulphate (as SO4) mg/l, Max

18 2.00 200 APHA, 22nd Edition. Turbidity

17 Total Alkalinity (caco3),, mg/l, Max 64 4.00 200 IS-3025/23:1986,Titration

18 Total Arsenic (as As), mg/l, Max <0.002 0.002 0.01 IS 3025/ 37:1988

R : 2003, AAS-VGA

19 Total Chromium (as Cr), mg/l, Max <0.01 0.01 - IS-3025/52:2003, AAS-Flame

20 Total Dissolved Solids, mg/l, Max 164 25.00 500 IS 3025 /16:1984

R : 2006, Gravimetric

21 Total Hardness (caco3), mg/l, Max 84 4.00 200 IS-3025/21:1983,

R-2002, EDTA

22 Turbidity, NTU, Max 2 1.0 1 IS-3025/10:1984 R-1996,

Nephelometric

23 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025/ 49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ)

B&K – 5 (Authorized Signatory)

Page 16: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali UG

Stations: Date of Sampling: 1. Bermo Seam Incline Pit Office 19-20/06/2014

2. Jawahar Nagar Colony 20-21/06/2014

3.

4.

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

269 244

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

186 153

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

19 23

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 6 (Authorized Signatory)

Page 17: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali UG

Stations:

1. Bermo Seam Incline pit Office

2. Jawahar Nagar Colony

3.

4.

Station Name Date of Sampling Noise Level

Bermo Seam Incline Pit

Office

19/06/2014 52.7

Jawahar Nagar Colony 20/06/2014 50.5

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 7 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 18: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali UG

Stations: Date of Sampling: 1. Bermo Seam Incline Pit Office 28/06/2014

2.

3.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.20 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 0.001 2.0 APHA, 22nd Edition, AAS-GTA

5 COD, mg/l, Max 56 4.00 250.0 APHA, 22nd Edition, Closed Reflux,

Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.64 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 2.4 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 2.00 10.0 IS 3025/39:1991, R : 2003, Partition

Gravimetric

17 pH value 8.12 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996, Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.7 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984, Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.25 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 44 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 8 (Authorized Signatory)

Page 19: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Bokaro OCP

Stations: Date of Sampling: 1. Hind Strip Colony 20-21/06/2014

2. Rest House 23-24/06/2014 3. Gandhinagar Colony 23-24/06/2014 4.

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

643 406 151

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

508 288 119

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

23 18 21

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 9 (Authorized Signatory)

Page 20: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Bokaro OCP

Stations:

1. Hindstrip Colony

2. Rest House

3.

4.

Station Name Date of Sampling Noise Level

Hindstrip Colony 20/06/2014 48.4

Rest House 23/06/2014 48.2

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 10 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 21: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Bokaro OCP

Stations: Date of Sampling: 1. Lagoon Discharge 30/06/2014

2.

3.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.10 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 0.001 2.0 APHA, 22nd Edition, AAS-

GTA

5 COD, mg/l, Max 56 4.00 250.0 APHA, 22nd Edition, Closed

Reflux, Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.65 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-

GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.3 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max 2.00 2.00 10.0 IS 3025/39:1991, R : 2003,

Partition Gravimetric

17 pH value 8.02 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-

GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.8 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984,

Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.10 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 48 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 11 (Authorized Signatory

Page 22: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: - Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Bokaro OCP

Stations: Date of Sampling: 1. Goda Nala before Damodar 30/06/2014

2. Damodar before Goda Nala 30/06/2014

3. Damodar after Goda Nala 30/06/2014

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 3.00 2.40 3.00 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.001 <0.001 <0.001 0.001 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 14 30 18 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 4.70 7.20 6.80 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.57 0.38 0.44 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max 0.68 <0.06 0.45 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 7.97 6.20 6.64 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 7.92 7.97 8.04 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 12 32 16 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 110 248 128 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 58 34 46 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 12 (Authorized Signatory)

Page 23: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo - I

Stations: Date of Sampling: 1. Karo Seam Incline 24-25/06/2014 2. Workshop 24-25/06/2014 3. New Karo Colony 24-25/06/2014 4. Karo Village 25-26/06/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

222 271 150 204

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

81 45 70 97

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

19 22 19 22

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k - 13 (Authorized Signatory)

Page 24: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo - I

Stations:

1. New Karo Colony

2. Karo Village

3.

4.

Station Name Date of Sampling Noise Level

New Karo Colony 24/06/2014 49.2

Karo Village 25/06/2014 46.2

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k - 14 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 25: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo - I

Stations: Date of Sampling: 1. Lagoon Discharge 30/06/2014

2. Karo Seam Incline Mine Water 30/06/2014

3.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.09 0.22 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 <0.001 0.001 2.0 APHA, 22nd Edition, AAS-GTA

5 COD, mg/l, Max 60 64 4.00 250.0 APHA, 22nd Edition, Closed Reflux,

Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.34 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.50 0.48 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 0.1 APHA, 22nd Edition, AAS-GTA

13 Manganese(as Mn), mg/l, Max <0.02 <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.4 1.6 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 <2.00 2.00 10.0 IS 3025/39:1991, R : 2003, Partition

Gravimetric

17 pH value 7.94 7.85 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 <0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 0.05 APHA, 22nd Edition, AAS-GTA

20 Sulphide (as SO3), mg/l, Max 0.005 <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.8 24.8 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984, Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max <1.00 1.20 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 54 58 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k - 15 (Authorized Signatory)

Page 26: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt.

29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Rest House 19-20/06/2014

2. P.O. Office 20-21/06/2014

3. Lodherbera Village 23-24/06/2014 4. Barwabera Village 27-28/06/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

178 125 139 130

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

103

73 87 67

3 Particulate

Matter (PM2.5)

µg/m3 - 76 53 24 -

4 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

5 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

18 21 20 19

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 16 (Authorized Signatory)

Page 27: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations:

1. Rest House

2. P.O. Office

3. Lodherbera Village

4.

Station Name Date of Sampling Noise Level

Rest House 19/06/2014 49.5

P.O.Office 20/06/2014 47.6

Lodherbera Village

23/06/2014 48.9

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 17 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 28: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Lagoon Discharge 30/06/2014

2.

3.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.12 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 0.001 2.0 APHA, 22nd Edition, AAS-

GTA

5 COD, mg/l, Max 48 4.00 250.0 APHA, 22nd Edition, Closed

Reflux, Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.60 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-

GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.2 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 2.00 10.0 IS 3025/39:1991, R : 2003,

Partition Gravimetric

17 pH value 7.88 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-

GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.8 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984,

Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.15 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 40 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k – 18 (Authorized Signatory)

Page 29: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: - Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Goda nala D/S of Mine 30/06/2014

2. Konar River in Confluence with Bokaro River 30/06/2014

3.

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 2.40 2.60 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.001 <0.001 0.001 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 14 18 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 4.80 4.70 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.47 0.43 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max 0.45 0.68 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 5.75 5.31 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 7.70 7.82 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 14 12 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 112 150 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 28 30 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k – 19 (Authorized Signatory)

Page 30: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo Special

Stations: Date of Sampling: 1. Rest House 25-26/06/2014 2. P.O. Office 25-26/06/2014 3. Central School 26-27/06/2014 4.

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

70 351 297

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

37 98 88

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

22 18 22

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 20 (Authorized Signatory)

Page 31: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo Special

Stations:

1. Rest House

2. P.O. Office

3.

4.

Station Name Date of Sampling Noise Level

Rest House 25/06/2014 48.7

P.O.Office 25/06/2014 48.5

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 21 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 32: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo Special

Stations: Date of Sampling: 1. U/G Mine Water 30/06/2014

2.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.14 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 0.001 2.0 APHA, 22nd Edition, AAS-

GTA

5 COD, mg/l, Max 64 4.00 250.0 APHA, 22nd Edition, Closed

Reflux, Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.62 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max 0.51 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-

GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.50 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 2.00 10.0 IS 3025/39:1991, R : 2003,

Partition Gravimetric

17 pH value 7.90 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-

GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.7 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984,

Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.20 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 56 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ)

B&K – 22 (Authorized Signator)

Page 33: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: - Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Karo Special

Stations: Date of Sampling: 1. Bokaro River before Nala 30/06/2014

2. Bokaro River after Nala 30/06/2014

3.

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 2.40 2.80 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.001 <0.001 0.001 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 32 74 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 6.80 5.40 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.58 0.62 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max 0.28 0.24 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 5.75 7.08 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 7.70 7.78 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 24 48 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 254 610 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 28 44 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 23 (Authorized Signatory)

Page 34: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt.

29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali Washery

Stations: Date of Sampling: 1. Rest House 18-19/06/2014

2. Phusro W/S 19-20/03/2014

3. Subhas Nagar Colony 26-27/06/2014

4. Dhori GM Office 26-27/06/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

197 376 104 109

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

143 279 56 71

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

17 19 19 21

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 24 (Authorized Signatory)

Page 35: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Kargali Washery

Stations:

1. Subash Nagar Colony

2. Dhori G.M.Office

3.

4.

Station Name Date of Sampling Noise Level

Subhas Nagar Colony 26/06/2014 49.6

Dhori G.M.Office 26/06/2014 49.7

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 25 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 36: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt.

29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 03.07.14-16.07.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 16.07.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Konar OCP

Stations: Date of Sampling: 1. Rest House 27-28/06/2014

2. P.O.Office 27-28/06/2014 3. Barwabera Village 27-28/06/2014 4. Lodherbera Village 23-24/06/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

199 153 130 139

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

104 80 67 87

3 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

4 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

23 22 19 20

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 26 (Authorized Signatory)

Page 37: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending June ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

03.07.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Konar OCP

Stations:

1. P.O.Office

2. Barwabera Village

3.

4.

Station Name Date of Sampling Noise Level

P.O.Office 27/06/2014 47.2

Barwabera Village 27/06/2014 47.6

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 27 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 38: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Konar OCP

Stations: Date of Sampling: 1. Lagoon Konar OCP 30/06/2014

2.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard &

Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.17 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.001 0.001 2.0 APHA, 22nd Edition, AAS-

GTA

5 COD, mg/l, Max 44 4.00 250.0 APHA, 22nd Edition, Closed

Reflux, Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.38 0.02 2.0 APHA, 22nd Edition,

SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max 0.57 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-

GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-

Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-

Flame

15 Nitrate Nitrogen, mg/l, Max 2.4 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 2.00 10.0 IS 3025/39:1991, R : 2003,

Partition Gravimetric

17 pH value 7.96 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-

GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 24.8 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984,

Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-

Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.10 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 38 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max 0.02 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ)

B&K – 28 (Authorized Signator)

Page 39: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: - Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Konar OCP

Stations: Date of Sampling: 1. Upstream of Konar River 30/06/2014

2. Downstream of Konar River 30/06/2014

3.

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 2.80 3.00 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.001 <0.001 0.001 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 18 20 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 7.20 6.70 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.55 0.58 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max 0.45 0.63 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 6.20 6.64 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 8.10 8.15 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 18 16 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 148 154 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 32 44 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K – 29 (Authorized Signatory)

Page 40: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Drinking Water Quarter Ending June ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 03.07.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 03.07.14-12.07.14

Testing Protocol: IS:10500 Drinking Water Standards Date of Reporting: 12.07.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Konar OCP

Stations: Date of Sampling: 1. Well at Barwabera Village 30/06/2014

2.

3.

Sl.N

o

Parameter Sampling Stations Detection Limit

IS:10500

Drinking Water

Standards

Standard / Test

Method 1 2 3

1 Boron (as B), mg/l, Max <0.20 0.20 0.5 APHA, 22nd Edition ,Carmine

2 Cadmium (as Cd), mg/l, Max <0.001 0.001 0.003 APHA, 22nd Edition,

AAS-GTA

3 Calcium (as Ca), mg/l, Max 44.8 1.60 75 IS-3025/40:1991,

EDTA

4 Chloride (as Cl), mg/l, Max 46 2.00 250 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 0.03 0.05 IS 3025/42 : 1992

R : 2009, AAS-Flame

6 Fluoride (as F) mg/l, Max

0.48 0.02 1.0 APHA, 22nd Edition ,

SPADNS

7 Free Residual Chlorine, mg/l, Min 0.12 0.02 0.2 APHA, 22nd Edition, DPD

8 Iron (as Fe), mg/l, Max 0.35 0.06 0.3 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

9 Lead (as Pb), mg/l, Max <0.005 0.005 0.01 APHA, 22nd Edition, AAS-

GTA

10 Manganese (as Mn), mg/l, Max <0.02 0.02 0.1 IS-3025/59:2006,AAS-Flame

11 Nitrate (as NO3), mg/l, Max 5.31 0.5 45 APHA, 22nd Edition,

UV-Spectrphotometric

12 Odour Agreeable Qualitative Agreeable IS 3025 /05:1983, R-2012,

Qualitative

13 pH value 7.85 2.5 6.5 to 8.5 IS-3025/11:1983, R-1996,

Electrometric

14 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 0.002 0.001 APHA, 22nd Edition,4-Amino

Autipyrine

15 Selenium (as Se), mg/l, Max <0.002 0.002 0.01 APHA, 22nd Edition, AAS-

GTA

16 Sulphate (as SO4) mg/l, Max

24 2.00 200 APHA, 22nd Edition.

Turbidity

17 Total Alkalinity (caco3),, mg/l, Max 112 4.00 200 IS-3025/23:1986,Titration

18 Total Arsenic (as As), mg/l, Max <0.002 0.002 0.01 IS 3025/ 37:1988

R : 2003, AAS-VGA

19 Total Chromium (as Cr), mg/l, Max <0.01 0.01 - IS-3025/52:2003, AAS-

Flame

20 Total Dissolved Solids, mg/l, Max 380 25.00 500 IS 3025 /16:1984

R : 2006, Gravimetric

21 Total Hardness (caco3), mg/l, Max 192 4.00 200 IS-3025/21:1983,

R-2002, EDTA

22 Turbidity, NTU, Max 4 1.0 1 IS-3025/10:1984 R-1996,

Nephelometric

23 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025/ 49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K –30 (Authorized Signatory)

Page 41: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Ambient Air Quarter Ending Sept. ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt.

29/04/14 Date of Receipt of

Sample:

22.09.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: 22.09.14-10.10.14

Sampling Protocol: IS 5182 (part 14): 2000 ,R -2010,

Methods for Measurement of Air Pollution

Date of Reporting: 10.10.14

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000

Remarks & Observation: All samplers placed 1.5 m above ground level

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Rest House 08-09/09/2014

2. P.O. Office 08-09/09/2014 3. Lodherbera Village 08-09/09/2014 4. Barwabera Village 09-10/09/2014

S.No Test Parameters Units Test Method TEST RESULT

Stations: 1 2 3 4

1 Total Particulate

Matter (PM10+

>PM10)

µg/m3 Lab.SOP 4

based on – IS:

5182/23, 2006

111 106 117 127

2 Particulate

Matter (PM10)

µg/m3 IS: 5182/23

2006

83 65 63 79

3 Particulate

Matter (PM2.5)

µg/m3 - - - 41 -

4 Sulphur Dioxide

(SO2)

µg/m3 IS: 5182 /02

2001 R-2006

<25 <25 <25 <25

5 Nitrogen Oxides

(as NOx)

µg/m3 IS: 5182 /02

1975 R-1998

18 20 19 19

Note: Gazette Notification no. G.S.R 742(E) dt.25th Sept.’2000 is enclosed along for reference

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 16 (Authorized Signatory)

Page 42: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Noise Quarter Ending Sept. ‘14

Customer / W. O. no. &

Date:

CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of

Sample:

22.09.14

Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: -

Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25th

Sept.’2000

Date of Reporting: -

Remarks:

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations:

1. Rest House

2. P.O. Office

3. Lodherbera Village

4.

Station Name Date of Sampling Noise Level

Rest House 08/09/2014 49.3

P.O.Office 08/09/2014 48.7

Lodherbera Village

08/09/2014 47.2

Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K

Noise Level

Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&K - 17 (Authorized Signatory)

6.00 AM to 10.00 PM

10.00 PM to 6.00 AM

Leq 75 dB(A)

Leq 70 dB(A)

Page 43: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Effluent Water Quarter Ending Sept. ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 22.09.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 22.09.14-01.10.14

Testing Protocol: MOEF -SCH-VI STANDARDS, Class ‘a’ Date of Reporting: 01.10.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Lagoon Discharge 19/09/2014

2.

3.

Sl.No. Parameter Sampling Stations Detection

Limit

MOEF -SCH-VI

STANDARDS

Class ‘A’

BIS Standard & Method

1 2 3 1 Ammonical Nitrogen, mg/l, Max 0.18 0.02 50.0 IS 3025/34:1988,

R : 2009, Nessler’s

2 Arsenic (as As), mg/l, Max <0.002 0.002 0.2 IS 3025/37:1988

R : 2003, AAS-VGA

3 B.O.D (3 days 27oC), mg/l, Max 2.00 2.00 30.0 IS 3025 /44:1993,R:2003

3 day incubation at 27°C

4 Cadmium(as Cd), mg/l, Max <0.0005 0.0005 2.0 APHA, 22nd Edition, AAS-

GTA

5 COD, mg/l, Max 40 4.00 250.0 APHA, 22nd Edition, Closed

Reflux, Titrimetric

6 Copper (as Cu), mg/l, Max <0.03 0.03 3.0 IS 3025/42: 1992

R : 2009, AAS-Flame

7 Dissolved Phosphate, mg/l, Max <0.30 0.30 5.0 APHA, 22nd Edition

Molybdovanadate

8 Fluoride (as F) mg/l, Max 0.66 0.02 2.0 APHA, 22nd Edition, SPADNS

9 Free Ammonia, mg/l, Max <0.01 0.01 5.0 IS:3025/34:1988, Nesseler’s

10 Hexavalent Chromium, mg/l, Max <0.01 0.01 0.1 APHA, 22nd Edition,

Diphenylcarbohydrazide

11 Iron (as Fe), mg/l, Max <0.06 0.06 3.0 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

12 Lead (as Pb), mg/l, Max <0.005 0.005 0.1 APHA, 22nd Edition, AAS-

GTA

13 Manganese(as Mn), mg/l, Max <0.02 0.02 2.0 IS-3025/59:2006, AAS-Flame

14 Nickel (as Ni), mg/l, Max <0.10 0.10 3.0 IS-3025/54:2003, AAS-Flame

15 Nitrate Nitrogen, mg/l, Max 1.8 0.50 10.0 APHA, 22nd Edition,

UV-Spectrphotometric

16 Oil & Grease, mg/l, Max <2.00 2.00 10.0 IS 3025/39:1991, R : 2003,

Partition Gravimetric

17 pH value 6.88 2.5 5.5 to 9.0 IS-3025/11:1983, R-1996,

Electrometric

18 Phenolic compounds (as C6H5OH),mg/l, Max

<0.002 0.002 1.0 APHA, 22nd Edition

4-Amino Antipyrine

19 Selenium (as Se), mg/l, Max <0.002 0.002 0.05 APHA, 22nd Edition, AAS-

GTA

20 Sulphide (as SO3), mg/l, Max <0.005 0.005 2.0 APHA, 22nd Edition

Methylene Blue

21 Temperature (o C ) 27.3 Shall not exceed

50 C above the receiving temp.

IS-3025/09:1984,

Thermometeric

22 Total Chromium (as Cr), mg/l, Max <0.06 0.06 2.0 IS-3025/52:2003, AAS-Flame

23 Total Kjeldahl Nitrogen, mg/l, Max 1.00 1.00 100.0 IS:3025/34:1988, Nesseler’s

24 Total Residual Chlorine, mg/l, Max <0.02 0.02 1.0 APHA, 22nd Edition, DPD

25 Total Suspended Solids, mg/l, Max 34 10.00 100.0 IS 3025/17:1984,

R :1996, Gravimetric

26 Zinc (as Zn), mg/l, Max <0.01 0.01 5.0 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k – 18 (Authorized Signatory)

Page 44: SIX MONTHLY REPORT OF EMP CLEARANCE [ J …...(AN ISO 9001-2008 14001-2004 & OHSAS 18001:2007 CERTIFIED PROJECT) BOKARO & KARGALI AREA CENTRAL COALFIELDS LIMITED ( A Miniratna Company

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD.

Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested

2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

TEST REPORT

Lab No. T-2187 Job No. 094314026 Year 2014-15

Type of Sample: Surface Water Quarter Ending Sept. ‘14

Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: 22.09.14

Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: 22.09.14-01.10.14

Testing Protocol: - Date of Reporting: 01.10.14

Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent

TEST RESULT

The sample has been tested with the following results:-

Area : B&K Project: Khasmahal

Stations: Date of Sampling: 1. Goda nala D/S of Mine 19/09/2014 2. Konar River in Confluence with Bokaro River 19/09/2014 3.

4.

Sl.

No

Parameter Sampling Stations Detection

Limit

BIS Standard &

Method 1 2 3 4

1 Arsenic (as As), mg/l, Max <0.002 <0.002 0.002 IS 3025/37:1988

R : 2003, AAS-VGA

2 BOD (3 days 27oC), mg/l, Max 2.00 2.60 2.00 IS 3025 /44: 1993, R : 2003

3 day incubation at 27°C

3 Cadmium(as Cd), mg/l, Max <0.0005 <0.0005 0.0005 APHA, 22nd Edition

AAS-GTA

4 Chlorides (as Cl), mg/l, Max 16 18 2.00 IS-3025/32:1988, R-2007,

Argentometric

5 Copper (as Cu), mg/l, Max <0.03 <0.03 0.03 IS 3025 /42 : 1992

R : 2009, AAS-Flame

6 Disolved Oxygen, min. 4.80 5.20 0.10 IS 3025/381989,

R : 2003, Winkler Azide

7 Fluoride (as F) mg/l, Max 0.42 0.43 0.02 APHA, 22nd Edition

SPADNS

8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 0.01 APHA, 22nd Edition, 1,5 -

Diphenylcarbohydrazide

9 Iron (as Fe), mg/l, Max <0.06 <0.06 0.06 IS 3025 /53 : 2003,

R : 2009 , AAS-Flame

10 Lead (as Pb), mg/l, Max <0.005 <0.005 0.005 APHA, 22nd Edition

AAS-GTA

11 Nitrate (as NO3), mg/l, Max 5.75 4.87 0.50 APHA, 22nd Edition,

UV-Spectrphotometric

12 pH value 6.80 7.14 2.5 IS-3025/11:1983, R-1996,

Electrometric

13 Phenolic compounds (as C6H5OH), mg/l, Max

<0.002 <0.002 0.002 APHA, 22nd Edition

4-Amino Antipyrine

14 Selenium (as Se), mg/l, Max <0.002 <0.002 0.002 APHA, 22nd Edition

AAS-GTA

15 Sulphate (as SO4) mg/l, Max 20 18 2.00 APHA, 22nd Edition

Turbidity

16 Total Dissolved Solids, mg/l, Max 130 154 25.00 IS 3025 /16:1984

R : 2006, Gravimetric

17 Total Suspended Solids, mg/l, Max 20 24 10.00 IS 3025 /17:1984,

R :1996, Gravimetric

18 Zinc (as Zn), mg/l, Max <0.01 <0.01 0.01 IS 3025 /49 : 1994,

R : 2009, AAS-Flame

Analysed By Checked By G.M (Chemist) Env. Lab, CMPDI(HQ) B&k – 19 (Authorized Signatory)