Page 1: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 1/373

FICCI CE

Six Sigma - A Breakthrough Strategy 

Competitive EdgeManagement Consultants 

Page 2: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 2/373

FICCI CE

• 400 State-of-the-art training slides on concepts of Six

Sigma, implementation methodologies, tools for

achieving Six Sigma and training of black belts.

• Self assessment utility package.

• Quality promotional posters.

Contents 

Jointly developed by FICCI Quality Forum and Competitive Edge, Management consultants 

Page 3: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 3/373

FICCI CE

1. Basic concepts of Six Sigma

4. Measurement phase

3. Define phase

2. Fundamentals of the breakthrough strategy

5. Analysis phase

6. Improvement phase

8. Implementation and deployment

7. Control phase

9. Measurement of business excellence

CLICK on the boxes below to navigate 

End slide show

Index 

Page 4: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 4/373

FICCI CE

1. Basic concepts of Six Sigma 

Most effective strategy

Limitation of other tools

What is Sigma

Six Sigma and defect rate

Old and new concept of quality

Six Sigma and cost of quality

Reasons to adopt Six Sigma

Global acceptability and success stories

How Six Sigma works

Page 5: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 5/373

FICCI CE

Most effective strategy 

Six Sigma is the most effective breakthrough strategy ever

devised. It enables companies to make substantialimprovements in their bottom-line by designing and

monitoring every day business activities in ways which

minimizes all types of waste and non-value adding

activities and maximizes customer satisfaction. 

Page 6: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 6/373

FICCI CE

Limitations of other tools 

Many organizations have earlier tried Downsizing, Outsourcing,

Activity based costing, Business process reengineering, Just in time,

Kaizen & TQM for improving quality and business results. While all

these tools are useful in their own ways, they often fail to make

 breakthrough improvements in bottom line and quality.

Page 7: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 7/373

FICCI CE

Limitations of other tools 

Kaizen, for example, means doing little things better and continuously

reaching for better standards, work well till 3 or 4 sigma in specific processes. These small improvements may not necessarily translate

into overall business improvement. This is because Kaizen only uses

 basic tools. For reaching 5 or 6 sigma standards, the organization will

have to use sophisticated tools like Quality Function Deployment

(QFD), Failure Mode and Effect Analysis (FMEA) and Design of

Experiments (DOE) to achieve optimum throughput at minimum cost.

Page 8: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 8/373

FICCI CE

What is Sigma 

The term „Sigma‟  taken from the Greek alphabet, is used

to designate the distribution or spread about the mean

(average) of any parameter of product, process or procedure. In the context of business or manufacturing

 process, Sigma capability is a metric which indicates how

the process is behaving. Higher the Sigma value, better the

capability of the process to produce defect free work and

vice versa.

Page 9: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 9/373

FICCI CE

Six Sigma and error or defect rate 

At present most companies, when their processes are under

control, are able to achieve 3 sigma capability which represents99.7% performance i.e 3 defects per 1000. With rapid

technological advances and development of complex products,

this level of quality is no longer acceptable. 

Page 10: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 10/373

FICCI CE

As manufacturing of most of the products involves large number of processes and if each process has a maximum quality capability of 99.7%,

the quality of finished product would be considerably less. Therefore, if the

companies have to compete in the global markets, they have to achieve a

much higher level of quality capability.

Six Sigma and error or defect rate 

Page 11: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 11/373

FICCI CE

Levels of Sigma and defect rate 

Quality level % Quality Defective PPM*

 

3 Sigma 99.73 66807

4 Sigma 99.9937 6210

5 Sigma 99.999943 233

6 Sigma 99.9999998 3.4

 

*Parts Per Million

Page 12: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 12/373

FICCI CE

Old concept

of quality 

Past concepts of quality focused on “conformance to standards” .  This

definition assumed that as long as the company produced quality productsand services, their performance standard was correct regardless of how

those standards were met. Moreover, setting of standards and

measurement of performance was mainly confined to the production areas

and the commercial and other service functions were managed through

command and control.

Page 13: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 13/373

FICCI CE

New concept of quality 

In Six Sigma, the concept of quality encompasses manufacturing,

commercial and other service functions of an organization because all

these functions directly or indirectly affect products/service quality &

customer satisfaction. It also embodies a structured system of capturing

all types of errors and their quantified measurement for subsequent

analysis and improvement.

Under the new approach, quality is a state in which Value enr ichment  

is realized for the customer and provider in every aspect of business

relationship.

Page 14: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 14/373

FICCI CE

Value enrichment 

The term „Value enrichment‟  for the company means that they must

strive to produce highest quality products at the lowest possible costs to be competitive in the global markets.

For customers, the term „Value enrichment‟ means that they have the

right to purchase high quality products/services at the lowest cost.

Page 15: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 15/373

FICCI CE

Knowing characteristics critical to customer 

Value enrichment for the company and the customer is done by

measurement based approach of Six Sigma, which enables us to find :-• Vast areas of business about which we do not know enough.

• When we do not know about a parameter or a characteristic which are

important to customers, we do not value it. 

• If we do not value a parameter or a characteristic, we do not measure it. 

• If we do not measure, we can not improve. 

Page 16: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 16/373

FICCI CE

Six Sigma and cost of quality 

Six Sigma has a very significant impact on the cost of quality. Asthe Sigma level moves up, the cost of quality comes down and vice

versa. Traditionally recorded quality cost generally account for

only 4 to 5 percent of sales which mainly comprise of cost of scrap,

re-work and warranty.

Page 17: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 17/373

FICCI CE

Hidden costs of quality 

There are additional costs of quality which are hidden and do not

appear in the account books of the company, as they are intangible anddifficult to measure. These additional costs could be as high as 20-25%

of sales and comprise of low conversion efficiency of materials, cost of

resolving customer problems, inadequate resource utilization, high

inventory, long cycle times, more set-up times, penalties due to late

delivery and lost customer loyalty and goodwill.

CC C

Page 18: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 18/373

FICCI CE

•Scrap

•Rework•Warranty costs

Hidden Costs 

Visible costs

• Excessive use of material

• High inventory

• Inadequate resource utilization

• Cost of redesign and re-inspection

• Cost of resolving customer problems

•  Lost customers / Goodwill

Visible and hidden costs 

• Conversion efficiency of materials

FICCI CE

Page 19: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 19/373

FICCI CE

Cost of quality at various levels of Sigma 

Sigma Defect rate(PPM) Cost of quality Competitive level

3.4 <10%

233 10-15%

6210 15-20%

66807 20-30%

308537 30-40%

6,90000 >40%

World

Class

Industry

Average

Non

Competitive

6

5

4

3

2

1

FICCI CE

Page 20: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 20/373

FICCI CE

Six Sigma is a high performance data driven approach

focused on analyzing the root causes of business

 problems and solving them. It ties the outputs of a

 business directly to market place.

How Six Sigma works 

FICCI CE

Page 21: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 21/373

FICCI CE

Clear focus on the bottom line 

Six Sigma places a clear focus on getting the bottom lineresults along with the time frame. No Six Sigma project is

approved until the bottom line or the success factors are

clearly spelt out. Each project must be completed within a

given time frame which is usually 3-6 months.

FICCI CE

Page 22: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 22/373

FICCI CE

Objectives of Six Sigma 

At the strategic level, the goal of Six Sigma is to align an

organization to its marketplace and deliver real improvements (in

terms of rupees/dollars) to the bottom line.

At the operational level, the Six Sigma goal is to move the

 business product or service attributes within the zone of customer

specifications and to significantly shrink process variation.

FICCI CE

Page 23: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 23/373

FICCI CE

The Six Sigma strategy affects five fundamental areas

of business :-

1. Process improvement

2. Product & service improvement

3. Customer satisfaction

4. Design methodology

5. Supplier improvement

The business improvement mechanism is shown in the

next slide.

Impact of Six Sigma 

FICCI CE

Page 24: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 24/373

FICCI CE

Suppliers InputsProcess

Outputs

Business

Process

CriticalCustomer

Requirements

Defects

Variation in output of processes

causes defects 

Six Sigma business improvement mechanism 

FICCI CE

Page 25: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 25/373

FICCI CE

Aspects of Six Sigma 

Six Sigma approach integrates the human and process

elements of improvement to produce breakthrough

results.

FICCI CE

Page 26: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 26/373

FICCI CE

Human elements 

• Strong leadership

• Training

• Customer focus

• Project teams

• Culture change

FICCI CE

Page 27: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 27/373

FICCI CE

Process elements 

• Analysis of variation

• Disciplined approach

• Quantitative measures

• Statistical methods

• Process improvement 

FICCI CE

Page 28: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 28/373

Reasons to adopt Six Sigma 

In the past, quality programs adopted by organizations focused on meeting

customer‟s needs without due consideration of visible and invisible costs.

Thus, many organizations managed to produce high quality goods, but at a

comparatively high cost.

However, today in the fiercely competitive market, the organizations haveno choice but to offer the best quality products and services at the

minimum cost - which is the purpose and objective of Six Sigma.

FICCI CE

Page 29: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 29/373

Reasons to adopt Six Sigma

• Organizations which achieve significant quality

improvement earn 8 - 10 % better prices.

• Organizations which achieve a superior quality position are

3 times more profitable than those with inferior levels of

quality.

• Organizations which improve their quality, gain 4-5 % in

market share each year.

• Each significant positive shift in process capability equates

to 10 times improvement in profitability.

FICCI CE

Page 30: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 30/373

Global acceptability 

Six Sigma approach was initially developed in Motorola

and greatly refined during its application in General

Electric. This is what CEO, GE Power systems has to

say about Six Sigma.

“Quality (Six Sigma)…  The Pride and Commitment is the most

 pervasive and all encompassing initiative we (GE) have ever

launched. Quality is the fabric by which all of us will be bound

together, and how our daily activities and contributions can be

measured both internally and externally by our customers when

they vote with their next order”.

Mr. Robert.L.Nardelli 

FICCI CE

Page 31: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 31/373

Global acceptability 

The world over, organizations seeking better ways of

improving their profitability have adopted Six Sigma because of its ability in giving quick tangible results.

These organizations include General Electric, Allied

signal, Honda, Sony, Canon, Polaroid, Texas instruments

and many more fortune 500 companies across the globe.

FICCI CE

Page 32: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 32/373

Success stories - General Electric 

General Electric‟s, Jack Welch describes Six Sigma as

the most important initiative GE has ever undertaken. GEhad an operative income of 10% for decades and they were

not able to improve this despite various efforts. After

implementation of Six Sigma GE was able to improve its

operative income from 10% in 1995 to 16.7% in 1998.

Page 33: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 33/373

FICCI CE

Page 34: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 34/373

Asea Brown Boveri 

ABB, after application of Six Sigma has reduced

measurement equipment error by 83%. The company also

made drastic improvements in material handling resulting in

an annual estimated cost savings of US $775000.

FICCI CE

Page 35: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 35/373

Challenge for the Indian companies 

It is high time, that Indian companies also start

implementing Six Sigma for making breakthroughimprovements and to remain globally competitive.

FICCI CE

Page 36: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 36/373

2. Fundamentals of the breakthrough strategy 

Fundamental steps

Operations perspective of strategy

Process perspective of strategy

Business perspective of strategy

Strategies at various levels

Six sigma roadmap

Players and their responsibilities

Black Belt training program

FICCI CE

Page 37: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 37/373

Fundamental steps 

There are 6 fundamental steps involved in applying the

 breakthrough strategy for achieving Six Sigma. These 6

steps are :-

• Define• Measure

• Analyze

• Improve

• Control

• Standardize 

FICCI CE

Page 38: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 38/373

   B   R   E   A   K

   T   H   R   O   U   G   H   S

   T   R   A   T   E   G   Y

Identification

Characterization

Optimization

Institutionalization

Define

MeasureAnalyze

Improve

Control

Standardize

Identify key business

issues

Understand current

performance levels

Achieve breakthrough

improvement

Integrate Six Sigma in

day to day functioning.

Stage Phase Objective

The Six Sigma roadmap- Breakthrough strategy 

FICCI CE

Page 39: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 39/373

Define phase 

This phase defines the project. It identifies critical

customer requirements and links them to business needs.

It also defines a project charter and the business processesto be undertaken for Six Sigma.

Note: This phase is extensively covered in a separate chapter “Define phase”. 

FICCI CE

Page 40: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 40/373

Measurement phase 

This phase involves selecting product characteristic, mapping

respective process, making necessary measurements and

recording the results of the process. This is essentially a data

collection phase.

Note: This phase is extensively covered in a separate chapter “Measurement phase”. 

FICCI CE

Page 41: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 41/373

Analysis phase 

In this phase an action plan is created to close the “gap” 

 between how things currently work and how the organization

would like them to work in order to meet the goals for a

 particular product or service. This phase also requires

organizations to estimate their short term and long term process

capabilities.

Note: This phase is extensively covered in a separate chapter “Analysis phase”. 

FICCI CE

Page 42: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 42/373

Improvement phase 

This phase involves improving processes/product performance

characteristics for achieving desired results and goals. This phase

involves application of scientific tools and techniques for making

tangible improvements in profitability and customer satisfaction.

Note: This phase is extensively covered in a separate chapter “Improvement phase”. 

FICCI CE

Page 43: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 43/373

Control phase 

This phase requires the process conditions to be properly

documented and monitored through statistical process control

methods. After a “settling  in”  period, the process capability

should be reassessed. Depending upon the results of such afollow-up analysis, it may be sometimes necessary to revisit

one or more of the preceding phases.

Note: This phase is extensively covered in a separate chapter “Control phase”. 

FICCI CE

Page 44: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 44/373

Standardization phase 

This phase requires institutionalizing Six Sigma into day to

day working of the organization. In this phase the Six Sigma

gains derived by certain specific projects are applied to the

other projects as well for optimum business results.

FICCI CE

Page 45: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 45/373

The breakthrough strategy 

Each phase is designed to ensure that :-

• Companies apply the breakthrough strategy in a systematic

way.

• Six Sigma projects are systematically designed and

executed and

• The results of these projects are incorporated into running

the day-today business.

FICCI CE

Page 46: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 46/373

Strategy at various levels 

Almost every organization can be divided into 3 basic

levels :-

1. Business level

2. Operations level

3. Process level.

It is extremely important that Six Sigma is understood andintegrated at every level.

FICCI CE

Page 47: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 47/373

Strategies at various levels 

• Executives at the business level  can use Six Sigma for

improving market share, increasing profitability and

organizations long term viability.• Managers at operations level  can use Six Sigma to improve

yield and reduce the labor and material cost.

• At the process level  engineers can use Six Sigma to reduce

defects and variation and improve process capability leading to better customer satisfaction. 

FICCI CE

Page 48: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 48/373

Business perspective of the breakthrough strategy 

• Define what plans must be in place to realize improvement of

each state.

• Measure the business systems that support the plans.

• Analyze the gaps in system performance benchmarks.

• Improve system elements to achieve performance goals.

• Control system-level characteristics that are critical to value.

• Standardize the systems that prove to be best-in-class.

FICCI CE

Page 49: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 49/373

Operations perspective of the breakthrough strategy 

• Define Six Sigma projects to resolve operational issues.

• Measure performance of the Six Sigma projects.

• Analyze project performance in relation to operational goals.

• Improve Six Sigma project management system.

• Control inputs of project management system.

• Standardize best-in-class management system practices.

FICCI CE

Page 50: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 50/373

Process perspective of the breakthrough strategy 

• Define the processes that contribute to the functional problems.

• Measure  the capability of each process that offers operational

leverage.

• Analyze the data to assess prevalent patterns and trends.

• Improve  the key product/service characteristics created by the

key processes.

• Control the process variables that exert undue influence.• Standardize the methods and processes that produce best-in-

class performance. 

FICCI CE

Page 51: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 51/373

Six Sigma players and their responsibilities 

FICCI CE

Page 52: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 52/373

Champions - Qualification 

The CEO  should be the main driver of the Six Sigma

 program. Under him departmental / functional heads such

as vice president or director manufacturing or marketing

have to take charge in implementing the program. The

champions must have complete hands-on experience withsound knowledge of advanced statistical tools.

FICCI CE

Page 53: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 53/373

Champions - Responsibilities 

• Create the vision  of Six Sigma for the organization.

• Define the road map   to implement Six Sigma across theorganization.

• Select the r ight people . 

• Develop a training plan   for implementing breakthrough

strategy.

• Carefully select high impact projects . 

FICCI CE

Page 54: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 54/373

Champions - Responsibilities 

• Support development of statistical thinking .

• Realize the gains by supporting Six Sigma projects

through allocation of resources   and removal of

roadblocks.

• Recognize and reward people .

FICCI CE

Page 55: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 55/373

Selecting the right people 

The success of Six Sigma to a very large extent depends

upon selection of right people. The CEO must therefore

ensure that the selected experts have suitable qualification,

mental attitude to challenge the status-quo and a missionary

zeal to implement change. These experts are also known as

“black   belts”. The qualification, responsibilities andtraining program of black belts is discussed on the

following slides.

FICCI CE

Wh the name “Black Belts”?

Page 56: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 56/373

Why the name “Black Belts”? 

The name black belts comes from the sport of Karate .Both Karate and Six Sigma depend on mental discipline

and systematic, intensive training. Just as black belts in

Karate depend on power, speed and decisiveness, Six

Sigma black belts should also depend on the same

qualities. Just as the black belts continuously reposition

their bodies, Six Sigma black belts also must be able to

reposition themselves as they move from one project to

another.

FICCI CE

Characteristics of Six Sigma Black Belt

Page 57: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 57/373

Characteristics of Six Sigma Black Belt 

• Understands the “big  picture” of the business.

• Focuses on results and understands the importance of the bottom line.

• Speaks the language of money, time, organizational objectives.

• An expert in SPC and continuous improvement tools.

• Capable of consulting, mentoring and coaching.

• Drives change by challenging conventional wisdom.

• Anticipates and confronts problems proactively and solves them.

FICCI CE

Master Black Belts Qualification

Page 58: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 58/373

Master Black Belts - Qualification 

They are usually Chief Engineers or Head of departments /functional heads.They must posses a technical degree and

have sound knowledge of statistical tools.

FICCI CE

M t Bl k B lt R ibiliti

Page 59: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 59/373

Master Black Belts - Responsibilities 

The master Black Belts should take the main responsibility

of implementing Six Sigma program. They must assist theorganization in identifying Six Sigma projects and also

develop and train Black Belts under them.

FICCI CE

M t Bl k B lt R ibiliti

Page 60: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 60/373

Master Black Belts - Responsibilities 

• Take on leadership of major programs.

• Participate in project reviews to offer technical expertise.

• Organize training and development programs for Six Sigma

team members/black belts.

• Facilitate sharing of best practices across the organization.• Ensure successful implementation of Six Sigma projects from

start to end.

FICCI CE

Black Belts Qualification

Page 61: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 61/373

Black Belts - Qualification 

They must posses a technical degree or must have minimum 5years of relevant experience. They must have good knowledge

of statistical tools.

FICCI CE

Black Belts Responsibilities

Page 62: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 62/373

Black Belts - Responsibilities 

• Act as a breakthrough strategy expert.

• Identify barriers or roadblocks.

• Lead and direct teams in project execution.• Report progress to management.

• Determine the most effective tools to apply.

FICCI CE

Black Belts Responsibilities

Page 63: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 63/373

Black Belts - Responsibilities 

• Prepare detailed project report in all the phases.

• Get inputs from operators, first line supervisors and

team leaders.

• Train others.

• Ensure that the results are sustained.

FICCI CE

Page 64: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 64/373

Black Belt training program 

FICCI CE

Black Belt training

Page 65: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 65/373

While the Six Sigma methodology needs the involvement of

all people across the organization, the bulk of implementing 

the breakthrough strategy rests on black belts. Black Belts

 possess the Six Sigma knowledge and skills necessary toimplement, sustain and lead a highly focussed Six Sigma

initiative within the organization.

Black Belt training 

FICCI CE

Black Belt training

Page 66: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 66/373

Black Belt training 

Black Belt training is divided into four sessions. Each sessionis organized around the four core phases of break through

strategy i.e. Measurement, Analysis, Improvement & Control.

Usually the black belt training is completed in four months

with one week devoted to class room instructions for each

 phase followed by three weeks in application of knowledge tothe assigned project. The training program for each phase is

depicted on the following slides.

FICCI CE

Black Belt training Measurement phase

Page 67: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 67/373

Black Belt training - Measurement phase Training period 4 weeks ( 1 Week classroom instructions, 3 weeks on projects ) 

• Select CTQ characteristic

• Define performance standards

• Establish data collection plan,

validate measurement system &

collect data.

Customer surveys, QFD, FMEA

Blue prints, customer surveys

Histograms, control charts

Components of training Tools used*

*These tools have been covered in the relevant chapters. 

FICCI CE

Black Belt training - Analysis phase

Page 68: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 68/373

Black Belt training - Analysis phase

Training period 4 weeks ( 1 Week classroom instructions, 3 weeks on projects )

• Establish process capability

• Define performance objective

• Identify variation sources

Process capability indices (Cp, Cpk),

Benchmarking

Control charts, FMEA, Cause &

effect diagram, Histograms.

Components of training Tools used*

*These tools have been covered in the relevant chapters

FICCI CE

Black Belt training - Improvement phase

Page 69: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 69/373

Black Belt training - Improvement phase 

Training period 4 weeks ( 1 Week classroom instructions, 3 weeks on projects )

• Screen potential causes

• Discover variable relationships

• Establish operating tolerances

& pilot solution

Pareto Analysis, FMEA, Cause

& Effect.

FMEA, Process flowcharting,

Cause & Effect.

Design of Experiments, Process

capability study.

Components of training Tools used*

*These tools have been covered in the relevant chapters

FICCI CE

Black Belt training - Control phase

Page 70: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 70/373

Black Belt training Control phase

Training period 4 weeks ( 1 Week classroom instructions, 3 weeks on projects )

• Validate measurement system

• Determine process capability

• Implement process control

system & project closure

Process flowcharting

Capability indices

Mistake proofing, SPC,

Risk management.

Components of training Tools used

*These tools have been covered in the relevant chapters

FICCI CE

Page 71: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 71/373

3. Define phase 

Key steps of define phase

Projects critical to customers

Develop team charter

Define process map

Objectives of define phase

FICCI CE

Objectives of define phase

Page 72: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 72/373

Objectives of define phase 

• To identify the process or product for improvement.

• To develop an action plan.

• To obtain formal project approval. 

FICCI CE

Key steps of the define phase

Page 73: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 73/373

Key steps of the define phase 

A. Identify project which are critical to customers.

B. Develop team charter / action plan.

C. Define process map.

Each step is discussed in detail in the following slide.

FICCI CE

A Identify projects critical to customers

Page 74: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 74/373

A. Identify projects critical to customers 

The following steps are required for this purpose :-

I. Identify present & future customers.

II. Analyze voice of the customer.

III Translate customer needs into Critical to Quality (CTQ)

requirements.

IV. Integrate CTQs with business strategies.

V. Identify projects for breakthrough improvements.

FICCI CE

A Identify projects critical to customers

Page 75: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 75/373

A. Identify projects critical to customers 

The following sources of input can be used to build thedatabase on the customers and for identification of CTQs.

• Customer surveys

• Customer complaints

• Internal problems

• Benchmarking data with key competitors and

• Brainstorming

FICCI CE

B Develop a team charter

Page 76: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 76/373

B. Develop a team charter 

The following steps are required for developing a team

charter / action plan:-

I. Develop a business case  - Relevance of the project,

consequences of not undertaking the project and how doesit fit with the business goals.

II. Define problem / goal statement  - Why are we not

meeting our customer requirements, how significant is the

 problem, when & where do the problems occur and what isthe impact of the problem.

FICCI CE

Develop a team charter

Page 77: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 77/373

Develop a team charter 

III. Assess project scope - Which processes will the team

focus on, resources available to the team, the start & the

end point.

IV. Define timeframe - This should contain complete list

of activities to be undertaken alongwith realistic time

frames.

V. Define roles and responsibilities - Define the roles andresponsibilities of various team members.

FICCI CE

C Define process map

Page 78: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 78/373

C. Define process map 

The following steps are required for process mapping :-

I.  Define process

II.  Connect the customer to your process

III. Map business process - The process map for the project

includes customer and their key requirements, inputs,

suppliers, process steps and outputs.

FICCI CE

4 Measurement phase

Page 79: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 79/373

4. Measurement phase 

Understanding and controlling variation

Accuracy and precision

Measurement of accuracy

Measurement of precision

Understanding normal distribution

Meaning of a sigma process

Various levels of sigma process

Picturisation of accuracy and precision

Calculating non-conformities

Objectives of Measurement phase

FICCI CE

Objectives of Measurement phase

Page 80: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 80/373

Objectives of Measurement phase 

• Collect data for identified projects.

• Characterize data by using mean, standard deviationand z value.

• Understand various levels of sigma process.

• Measure non-conformances.

FICCI CE

Understanding & controlling variation 

Page 81: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 81/373

g g

Variation is a basic phenomenon of nature. This effects all

entities including products and processes. Variation is found

in all stages of product life cycle including design &

development, manufacturing, service and supplier processes.

Controlling process variation is a key to achieving Six Sigmaquality .

FICCI CE

Understanding & controlling variation

Page 82: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 82/373

Understanding & controlling variation 

Variation is responsible for the difference between one unit of

 product and another. It can also be defined as the difference

between specif ications and customer requi rements . Variation

is present in all processes. When it is present in one or morecharacteristics of a product or process, it causes poor quality

and customer dissatisfaction.

FICCI CE

Understanding & controlling variation

Page 83: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 83/373

Understanding & controlling variation 

Products and processes are expected to vary because no two

things are exactly alike. Differences result from materialcharacteristics, methods, people, machine and

environmental factors as depicted on the next slide.

FICCI CE

Sources of variation 

Page 84: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 84/373

Variation

Methods

•Procedures•Policies

•Accounting

Material

•Assemblies•Components

•Suppliers

•Consumables

Environment 

• Noise level•Humidity

•Temperature

•Lighting

People•Training

•Experience

•Skill

•Attitude

Machine•Technology

•Variability

•Tooling

•Fixtures

Measurement•Counting

•Instruments

•Gauging

•Tests

FICCI CE

Causes of variation 

Page 85: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 85/373

Chance / Inherent Causes

They have the influence on

the output all the time. 

Causes

Special / Assignable Causes

They influence the output

only once in a while. 

FICCI CE

Chance / inherent causes of variation 

Page 86: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 86/373

Chance or inherent causes are sources of variation which are

always present because of small day-to-day variables. Thesecauses are inherently part of the process (or system) and

affect everyone working in the process. They are typically

due to a large number of small random sources of variation.

Chance causes also contribute to the output variability

 because they themselves vary.

FICCI CE

Chance / inherent causes of variation

Page 87: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 87/373

Chance / inherent causes of variation 

Each chance/inherent cause typically contributes a small

 portion to the total variation in process outputs. Inherent

causes usually have a nonsystematic, random appearance.Process or system variability is defined in terms inherent causes

 because they are regular contributors. The variables involved in

inherent causes may change slightly from day to day, but this is

natural. They will always be present, and the best way to stayahead of this situation is to plan for it.

FICCI CE

Special / assignable causes 

Page 88: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 88/373

p g

These are causes that do not occur naturally and are unusual.

These types of causes are not inherent part of the process (orsystem) all the time or do not affect everyone but arise because

of specific circumstances. Special causes are sporadic

contributors and are due to some specific circumstances.

Process or system variability is defined without them. Special

causes can be identified and efforts can be made to minimize

their influence on the process.

FICCI CE

A & P i i

Page 89: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 89/373

Accuracy & Precision 

FICCI CE

Visually summarising data - Histograms 

Page 90: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 90/373

Histograms are one of the simplest ways to summarize the

data in the visual form. Histograms give us the graphical

 picture of the data . It graphically depicts the frequency of

occurrence of an event. On the X axis, the measured valuesor scale is plotted, and on the Y axis the frequency is

 plotted. Histograms are extremely important in analyzing

variation in the processes.The example of an histogram is

shown on the following slide.

Page 91: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 91/373

FICCI CE

Measurement of central tendency -Accuracy 

Page 92: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 92/373

y y

Accuracy is defined as closeness of agreement between

observed values and known reference standard.

Accuracy can be measured by measuring central tendency   of

the process.

FICCI CE

Accuracy 

Page 93: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 93/373

y

There are three popular measures of accuracy:-

• Mean

• Mode

• Median

The most commonly used measure of accuracy is mean ( simplearithmetic mean). Hence for the purpose of Six Sigma we

confine our study on Mean only.

FICCI CE

Measurement of accuracy 

Page 94: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 94/373

Mean - it is the arithmetic average of the measurements.

To find the mean, all the measurements  X 1 , X 2 , X 3 , …… , X n 

are added and their sum is divided by the number of

measurements, n. Mathematically it is represented as:-

Mean X =( X1 + X2 + X3 +……+ Xn)

n

FICCI CE

Measurement of dispersion - Precision

Page 95: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 95/373

Measurement of dispersion Precision 

Precision is the measure of dispersion between several individual

observations of relevant quality characteristics. Precision describes

consistency of the process. Precision can be measured through :-

1. Range:  Range is the difference between the largest and smallestmeasurement in a given set of observations.

2. Standard Deviation: Standard deviation in general terms is a measure of

mean variation of values from the central tendency.

Standard deviation is more reliable method of measuring precision, hencefor the purpose of Six Sigma, we will confine our study on Standard

deviation.

FICCI CE

Measurement of precision 

Page 96: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 96/373

Mean Deviation of values from central tendency can also be

used to measure dispersion. However, there is one difficulty

in the use of this measure, that the algebraic sum of all

deviations is zero.

Standard deviation is calculated as root mean square of the

deviations of observations from the mean which henceforth

will be represented by abbreviation SD.

FICCI CE

Calculation of standard deviation 

Page 97: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 97/373

Variance, V =

(X1

2 + X2

2 +….+Xn

2) - n ( X ) 2

(n - 1)

Standard Deviation, SD =V

Standard deviation can be calculated by the following formula :-

If X1, X2 ,X3…………Xn are individual observations

And X is the arithmetic mean 

FICCI CE

Example to calculate standard deviation 

Page 98: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 98/373

Sl. X X (Square)

1 10 100

2 11 121

3 12 144

4 13 169

5 14 196

Total 60 730

Calculate standard deviation of 10, 11, 12, 13 , 14

FICCI CE

Calculation of Standard Deviation 

Page 99: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 99/373

Variance, V =

(X12 + X2

2 +….+Xn2) - n ( X )2 

(n - 1)

X =60

5= 12

=730 - 5 x (12)

(5 - 1)

= 2.5

SD = =1.58112.5

FICCI CE

Sigma 

Page 100: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 100/373

Standard deviation is also referred to as the Greek letter

sigma in quality management literature. Consequently

 process variation can be described by how many sigmas ( i.e

how many multiples of standard deviation or SD ) fit within

the specification limits.The higher this number, the better is

the quality and vice versa.

Sigma is a statistical measure of the qual i ty consistency for

a particular process / product.

FICCI CE

Page 101: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 101/373

Understanding normal distribution 

FICCI CE

Normal Distribution 

Page 102: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 102/373

In practice generally we come across data which is of

variable type and is measured on continuous scale. If there

are no extraneous factors it follows a systematic patternknown as “Normal  Distribution”. It can be derived after

 plotting histogram as explained in the next slide.

FICCI CE

Histogram 

Page 103: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 103/373

CTQ

   F  r  e  q  u  e  n  c  y

10

20

30

40

50

60

0

Thickness of output in mm

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 

Page 104: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 104/373

FICCI CE

Most commonly used intervals 

Page 105: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 105/373

In normal distribution, the most common intervals are :

1. Process mean - SD and process mean + SD i.e 1 Sigma

2. Process mean - 2 SD and process mean + 2 SD i.e 2 Sigma

3. Process mean - 3 SD and process mean + 3 SD i.e 3 Sigma 

FICCI CE

% Population between Mean - SD & Mean + SD (1Sigma) 

Page 106: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 106/373

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mean = 10, SD = 2

- SD + SD

Mean+SD =12Mean-SD =8

% Population

% population between Mean - SD and Mean + SD or 1 Sigma = 68.3,

This implies that 68.3% population lies between dimensions of 8 and 12

FICCI CE

% Population between Mean - 2 SD & Mean + 2 SD (2Sigma) 

Page 107: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 107/373

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mean = 10, SD = 2

% Population

Mean-2 SD=6Mean+2 SD=14

-2 SD +2 SD

% population between Mean - 2 SD and Mean +2 SD or 2 Sigma = 95.5

This implies that 95.5% population lies between dimensions 6 &14

FICCI CE

% Population between Mean - 3 SD & Mean + 3 SD (3 Sigma) 

Page 108: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 108/373

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mean = 10, SD = 2 

Mean + 3SD =16Mean - 3SD =4

% Population

- 3 SD + 3 SD

% population between Mean - 3 SD and Mean +3 SD or 3 Sigma = 99.73

This implies that 99.73 % population lies between 4 & 16

FICCI CE

Range of observations for nearly 100% population 

Page 109: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 109/373

Range of observations for nearly 100% population (to be

 precise 99.73%) depends upon, mean of the process and

standard deviation of the process. If it follows normaldistribution the population lies between -

Mean - 3 SD & Mean + 3 SD i.e ( 3Sigma )

FICCI CE

Page 110: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 110/373

What is a Sigma process 

FICCI CE

Meaning of a Sigma process 

Page 111: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 111/373

From a sigma process we come to know that at what

distance, in terms of the standard deviation, thespecification limits are placed from the target value.

FICCI CE

Move beyond 3 sigma 

Page 112: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 112/373

Until a few years back all statistical process controls

were designed on the basis of 3 sigma limits. It is only inthe recent years that this concept has been challenged and

the organizations have started looking for quality levels

 beyond 3 Sigma.

FICCI CE

3 Sigma process 

Page 113: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 113/373

LSLUSL

Mean=8

SD = 2

- 3 SD + 3 SD

2 3 4 5 6 7 8 9 1210 16151413111

Note : LSL is Lower specification limit and USL is Upper specification limit.

FICCI CE

4 Sigma process 

Page 114: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 114/373

2 3 4 5 6 7 8 9 1210 16151413111

LSL USLMean=8

SD = 1.33

- 4 SD + 4 SD

FICCI CE

5 Sigma process 

Page 115: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 115/373

2 3 4 5 6 7 8 9 1210 16151413111

LSLUSL

Mean=8

SD = 1.07

- 5 SD + 5 SD

FICCI CE

6 Sigma process 

Page 116: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 116/373

LSL USL

Mean=8

SD = 1

- 6 SD + 6 SD

2 3 4 5 6 7 8 9 1210 16151413111

FICCI CE

Precision 

Page 117: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 117/373

Lesser the standard deviation of the process, more precise or

consistent is the process

FICCI CE

3 Sigma Vs 6 Sigma 

Page 118: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 118/373

The goal of Six Sigma program is to reduce the variation in

every process to such an extent that the spread of 12 sigmas i.e.6 Sigmas on either side of the mean fits within the process

specifications. The figure on next slide shows what this looks

like.

FICCI CE

3 Sigma Vs 6 Sigma 

Page 119: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 119/373

2 3 4 5 6 7 8 9 1210 16151413111

LSL USL

6 Sigma curve 

3 Sigma curve 

In a 3 sigma process the values are widely spread along the center line,

showing the higher variation of the process. Whereas in a 6 Sigma

 process, the values are closer to the center line showing

less variation in the process.

FICCI CE

3 Sigma Vs 6 Sigma 

Page 120: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 120/373

The comparison on the previous slide also shows a process in

which the process spread of Six Sigmas (ie. 3 Sigmas on either

side just fits within the specifications). In this case one must be

extremely careful to ensure that the process average never slips

off the target, otherwise the curve will shift and non-

conforming items will increase. With Six Sigma requirement

the process mean can shift by as much as 1.5 sigma before the

likelihood of non-conforming items is increased. Even if the

 process mean does shift off center by as much as 1.5 sigma,only 3.4 non-conforming items per million parts should result.

FICCI CE

Amount of process shift allowed 

Page 121: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 121/373

2 3 4 5 6 7 8 9 1210 16151413111

LSL USL

SD = 1

1.5 SD 1.5 SD

FICCI CE

Accurate and PrecisionPicturization of accuracy & precision 

Page 122: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 122/373

Accuracy & precision of a process can

 be best explained by using the analogyof a rifle firing at a target.

FICCI CE

Accuracy and precision 

Page 123: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 123/373

With the center of the target taken to be the true value of the

characteristic being measured and by the rifle shotsrepresenting the measured values, there are four combinations

of accuracy and precision as depicted in the following slides.

FICCI CE

Inaccurate and imprecise 

Page 124: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 124/373

+

FICCI CE

Accurate and imprecise 

Page 125: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 125/373

+

FICCI CE

Precise but inaccurate 

Page 126: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 126/373

+

FICCI CE

Accurate and precise 

Page 127: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 127/373

+

FICCI CE

Six Sigma objective 

Page 128: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 128/373

As observed from the Picturization in the preceding slides, the

objective of moving towards Six Sigma quality is to

continuously achieve greater consistency of the processes by

reducing the variation.

FICCI CE

C l l ti f iti

Page 129: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 129/373

Calculating non conformities 

FICCI CE

Calculating non conformities 

Page 130: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 130/373

The number of observations falling within the distribution

frequency curve can be co-related with the area under the

curve.

Finding area ( percentage of non conformities  ) under anormal curve requires the use of standard normal distribution

table. It is conventional to use the letter z  to denote the

standard normal variate. The table for areas under normal

curve are given at the end of this section.

FICCI CE

Sigma ratings in terms of Z 

Page 131: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 131/373

The z value corresponding to USL or LSL* tells us how manysigma the USL or LSL is from the process setting. Thus the z

value corresponding to the specification limit gives the sigma

rating of the process.

Note 1:  As we know that most of the variable data that we come across in the

industry follows normal distribution with certain mean and standard deviation. Wedefine a variate „Z‟(  standardized normal variate ) which has a mean value 0 and

standard deviation 1. This is done in order to make use of Standard Normal Tables.

* LSL is the lower specification limit & USL is the upper specification limit 

FICCI CE

Calculating non conformities 

Page 132: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 132/373

LSL USL

Non

conformitiesNonconformities

FICCI CE

Formula for calculating % non conformities 

Page 133: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 133/373

With respect to LSL,

With respect to USL

ZL = ( LSL - X )/SD

ZU = ( USL-X )/SD

Where X= Process meanSD = Process Standard deviation

USL = Upper specification limit

LSL = Lower specification limit respectively.

FICCI CE

Page 134: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 134/373

Illustration for calculating

% non conformities 

FICCI CE

Histogram for rolling thickness 

Page 135: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 135/373

Spec: 1.6+/- 0.1 mm

50

40

30

20

10

0

1.465 1.505 1.545 1.585 1.625 1.665 1.705 

LSL USL

Thickness

Mean=1.58

SD=0.042

FICCI CE

Normal curve for the population 

Page 136: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 136/373

Spec: 1.6+/- 0.1 mm

50

40

30

20

10

0

1.465 1.505 1.545 1.585 1.625 1.665 1.705 

LSL USL

Thickness

Proportion

of defects

Proportionof defects

Mean=1.58

SD=0.042

FICCI CE

Calculating non conformities 

Page 137: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 137/373

With respect to LSL, 

With respect to USL,

= ( 1.50-1.58 )/0.042 = -1.90

ZU = ( USL-X )/SD = ( 1.70-1.58 )/0.042 = 2.86

ZL = ( LSL - X )/SD

The Percentage of values falling beyond specification limits, corresponding

to the z value can be read from the standard normal table as 0.0287 and

0.0021 for ZU and ZL respectively. Total percentage of non conformities=2.87+0.21=3.08. (While referring to Normal distribution table, only

absolute value of z should be taken.)

Page 138: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 138/373

FICCI CE

Areas under normal curve - Normal distribution table 

Area 

Page 139: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 139/373

z Area z Area z Area z Area0.80 0.211855 1.00 0.158655 1.20 0.115070 1.40 0.080757

0.81 0.208970 1.01 0.156248 1.21 0.113140 1.41 0.079270

0.82 0.206108 1.02 0.153864 1.22 0.111233 1.42 0.077804

0.83 0.203269 1.03 0.151451 1.23 0.109349 1.43 0.076459

0.84 0.200454 1.04 0.149170 1.24 0.107488 1.44 0.074934

0.85 0.197662 1.05 0.146859 1.25 0.105650 1.45 0.073529

0.86 0.194894 1.06 0.144572 1.26 0.103835 1.46 0.072145

0.87 0.192150 1.07 0.142310 1.27 0.102042 1.47 0.070781

0.88 0.189430 1.08 0.140071 1.28 0.100273 1.48 0.069437

0.89 0.186733 1.09 0.137875 1.29 0.098525 1.49 0.068112

0.90 0.184060 1.10 0.135666 1.30 0.096801 1.50 0.0668072

0.91 0.181411 1.11 0.133500 1.31 0.095098 1.51 0.0655217

0.92 0.178786 1.12 0.131357 1.32 0.093418 1.52 0.0642555

0.93 0.176185 1.13 0.129238 1.33 0.091759 1.53 0.0630084

0.94 0.173609 1.14 0.127143 1.34 0.090123 1.54 0.0617802

0.95 0.171056 1.15 0.125072 1.35 0.088508 1.55 0.0605708

0.96 0.168528 1.16 0.123024 1.36 0.086915 1.56 0.0593799

0.97 0.166023 1.17 0.121001 1.37 0.085343 1.57 0.0582076

0.98 0.163543 1.18 0.119000 1.38 0.083793 1.58 0.0570534

0.99 0.161087 1.19 0.117023 1.39 0.082264 1.59 0.0559174

e

FICCI CE

Areas under normal curve - Normal distribution table 

Area 

Page 140: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 140/373

z Area z Area z Area z Area1.60 0.0547993 1.80 0.0359303 2.00 0.0227501 2.20 0.0139034

1.61 0.0536989 1.81 0.0351478 2.01 0.0222155 2.21 0.0135525

1.62 0.0526161 1.82 0.0343794 2.02 0.0216916 2.22 0.0132093

1.63 0.0515507 1.83 0.0336249 2.03 0.0211782 2.23 0.01287361.64 0.0505026 1.84 0.0328841 2.04 0.0206751 2.24 0.0125454

1.65 0.0494714 1.85 0.0321567 2.05 0.0201821 2.25 0.0122244

1.66 0.0484572 1.86 0.0314427 2.06 0.0196992 2.26 0.0119106

1.67 0.0474597 1.87 0.0307419 2.07 0.0192261 2.27 0.0116038

1.68 0.0464786 1.88 0.0300540 2.08 0.0187627 2.28 0.0113038

1.69 0.0455139 1.89 0.0293789 2.09 0.0183088 2.29 0.0110106

1.70 0.0445654 1.90 0.0287165 2.10 0.0178643 2.30 0.0107241

1.71 0.0436329 1.91 0.0280665 2.11 0.0174291 2.31 0.0104440

1.72 0.0427162 1.92 0.0274289 2.12 0.0170029 2.32 0.0101704

1.73 0.0418151 1.93 0.0268034 2.13 0.0165858 2.33 0.0099031

1.74 0.0409295 1.94 0.0261898 2.14 0.0161773 2.34 0.0096418

1.75 0.0400591 1.95 0.0255880 2.15 0.0157775 2.35 0.0093867

1.76 0.0392039 1.96 0.0249978 2.16 0.0153863 2.36 0.0091375

1.77 0.0383635 1.97 0.0244191 2.17 0.0150034 2.37 0.0088940

1.78 0.0375379 1.98 0.0238517 2.18 0.0146286 2.38 0.0086563

1.79 0.0367269 1.99 0.0232954 2.19 0.0142621 2.39 0.0084242

FICCI CE

Areas under normal curve - Normal distribution table 

Area 

Page 141: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 141/373

z Area z Area z Area z Area2.40 0.00819755 2.60 0.00466120 2.80 0.00255519 3.00 0.00134999

2.41 0.00797623 2.61 0.00452715 2.81 0.00247711 3.10 0.00096660

2.42 0.00776023 2.62 0.00439650 2.82 0.00240123 3.20 0.00068714

2.43 0.00754941 2.63 0.00426930 2.83 0.00232744 3.30 0.00048342

2.44 0.00734365 2.64 0.00414532 2.84 0.00225574 3.40 0.00033693

2.45 0.00714284 2.65 0.00402462 2.85 0.00218600 3.50 0.00023263

2.46 0.00694686 2.66 0.00390708 2.86 0.00211829 3.60 0.00015911

2.47 0.00675565 2.67 0.00379258 2.87 0.00205243 3.70 0.00010780

2.48 0.00656915 2.68 0.00368118 2.88 0.00198847 3.80 0.00007235

2.49 0.00638717 2.69 0.00357264 2.89 0.00192630 3.90 0.00004810

2.50 0.00620967 2.70 0.00346702 2.90 0.00186586 4.00 0.00003167

2.51 0.00603658 2.71 0.00336421 2.91 0.00180721 4.10 0.00002066

2.52 0.00586778 2.72 0.00326413 2.92 0.00175023 4.20 0.000013552.53 0.00570315 2.73 0.00316679 2.93 0.00169486 4.30 0.00000854

2.54 0.00554264 2.74 0.00307202 2.94 0.00164115 4.40 0.00000541

2.55 0.00538617 2.75 0.00297282 2.95 0.00158894 4.50 0.00000340

2.56 0.00523365 2.76 0.00289011 2.96 0.00153828 4.60 0.00000211

2.57 0.00508493 2.77 0.00280285 2.97 0.00148904 4.70 0.00000130

2.58 0.00494003 2.78 0.00271803 2.98 0.00144130 4.80 0.00000079

2.59 0.00479883 2.79 0.00263548 2.99 0.00139493 4.90 0.00000048

5.00 0.00000029

FICCI CE

Areas under normal curve - Normal distribution table 

Area 

Page 142: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 142/373

z Area5.10 0.00000180

5.20 0.00000107

5.30 0.00000063

5.40 0.00000037

5.50 0.00000021

5.60 0.00000012

5.70 0.000000070

5.80 0.000000040

5.90 0.000000022

6.00 0.000000012

Note: Only absolute values of z should be taken while referring to this table.

FICCI CE

5. Analysis phase 

Page 143: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 143/373

Definition of process capability

Empirical rule

Need for process capability

Factors influencing process capability

Estimating process capability

Process capability indices - Cp index

Process capability indices - Cpk index

Objectives of Analysis phase

Benchmarking

FICCI CE

Objective of Analysis phase 

Page 144: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 144/373

• The objective of this phase is to study the stability, shape,center and spread of the process.

• To establish an improvement goal or the performance

objective through benchmarking.

Page 145: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 145/373

FICCI CE

Process capability 

Page 146: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 146/373

Process capability

The inherent variability of a quality characteristic that the

 process is capable of maintaining, when in a state of statisticalcontrol under a given set of conditions.

Assuming normal distribution of the quality characteristic

Process Capability = +/- 3 SD = Total spread of 6 SD. 

FICCI CE

Process capability 

Page 147: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 147/373

Process capability is judged by comparing process performance with process requirements. Since meeting

specification limits is one of the most basic requirements of

a process capability study, it is extremely important to

accurately verify and define the specification limits.

FICCI CE

Need for process capability 

Page 148: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 148/373

  For meeting customer requirements/ specifications.

  To compare actual performance of equipment with

manufacturer‟s claim. 

  To compare the performance of two processes.

  To provide more realistic tolerances for component

dimensions.

  Provide a basis for process control. 

FICCI CE

Factors influencing process capability 

Page 149: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 149/373

1. Condition of machine/ equipment.

2. Type of operation and operational conditions.

3. Raw materials.

4. Skill of operators.

5. Measurement method / instruments.

6. Inspector‟s skill.

FICCI CE

Estimation of process capability 

Page 150: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 150/373

• Visual from run chart.

• Frequency distribution and histogram.

• Control charts.

• Analysis of variances.

• Probability papers. 

Note : Reduction of variability can be achieved through use of SPC

tools and Design of Experiments.

FICCI CE

The empirical rule 

Page 151: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 151/373

We have seen in the earlier chapter that almost all (to be

accurate 99.73%) the process output from a normally

distributed process lies between (process mean - 3 SD)

and (process mean+ 3 SD).

The total spread of the process can thus be described as 6 SD 

FICCI CE

99.73% population between process mean +/- 3 SD 

Page 152: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 152/373

LSL USL

- 3 SD + 3 SD

2 3 4 5 6 7 8 9 1210 16151413111

FICCI CE

Process capability indices : The Cp index 

Page 153: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 153/373

A  major reason for quantifying process capability is tocompute the ability of a process to hold product tolerances.

A measure of this relationship is process capability ratio or

Cp. Process capability is also known as potential capability.

The Cp index is given by:-

Cp = Tolerance

6 SD

Where Tolerance = USL - LSLSD = Standard Deviation

Page 154: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 154/373

FICCI CE

Calculating defective PPM at various levels of sigma. 

Page 155: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 155/373

Refer normal distribution table for finding defective parts per

million ( PPM ) for corresponding z values. 

Quality level Cp z Defective PPM 

2 Sigma 0.67 2 22750

3 Sigma 1.00 3 1350

4 Sigma 1.33 4 32

5 Sigma 1.67 5 0.3

6 Sigma 2.00 6 0.001

FICCI CE

Impact of process capability 

Page 156: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 156/373

For individual parts, the ideal design is Cp = 2; in other words,

the design specification is twice as “wide” as the true capability

of the process. This is where the phrase “Six Sigma Quality” 

originated. Since the process capability is +/- 3SD, a design

specification twice as wide would be +/- 6 SD.

FICCI CE

Impact of process capability 

Page 157: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 157/373

However, it is learnt from the industry experience across theworld, that the processes rarely stay centered on their targeted

nominals, shifts of 1.5 SD to either side of the mean are

common, even in well controlled processes.

Therefore in practice, an ultimate z-value of 4.5  is considered

Six Sigma Quality. Consulting the z-table, we find that the

 probability of producing non conformities associated with a z-

value of 4.5 is 0.0000034. If this value is obtained, then only3.4 out of every million parts manufactured will be defective.

FICCI CE

Calculating defective PPM with permissible shift of 1.5 SD

at various levels of sigma. ( practical situation ) 

Page 158: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 158/373

Refer normal distribution table for finding defective PPM for

corresponding z values. 

Quality level Cp z Defective PPM 

2 Sigma 0.17 0.5 308538

3 Sigma 0.50 1.5 66807

4 Sigma 0.83 2.5 6210

5 Sigma 1.17 3.5 233

6 Sigma 1.50 4.5 3.4

FICCI CE

Drawbacks of Cp 

Page 159: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 159/373

Cp however is not a very reliable measure as it does not tell us

all.

Consider the following four processes producing the sameoutput X with specification 20+/- 4. Each of these processes

have the Standard deviation of 1.

FICCI CE

Process 1

Page 160: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 160/373

LSL USL

X=20

SD=1

Cp=1.33

FICCI CE

X 22

Process 2

Page 161: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 161/373

LSL USL

X=22

SD=1

Cp=1.33

FICCI CE

X 15

Process 3

Page 162: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 162/373

LSL USL

X=15

SD=1

Cp=1.33

FICCI CE

Process 4

Page 163: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 163/373

LSL USL

X=25

SD=1

Cp=1.33

FICCI CE

Calculation of Cpk index 

Page 164: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 164/373

Cpk = Min [ USL - x , x - LSL ]

3SD 3SD

Cpk is a measure of process performance capability

The process performance index Cpk is given by:-

Example :

Specification : 20 +/- 4, SD = 1

Cp = Tolerance/6SD = 8/6 = 1.33

FICCI CE

Calculation of Cpk index - Example 

Page 165: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 165/373

x = 20, Cpk = Cp = 1.33

x = 22, Cpk = 0.67

x = 15, Cpk = -0.33

x = 25, Cpk = -0.33

Example :

Specification : 20 +/- 4, SD = 1

Cp = Tol/6 SD = 8/6 = 1.33

FICCI CE

Calculation of Cpk index 

Page 166: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 166/373

In the previous slide we observe that, although the Cp

value = 1.33 in all the four cases, but because of the shift

in the process setting level we are getting Cpk values as0.67 in 2nd case and hence the non conformities. Similar

observations are noticed in 3rd and 4th case where we get

the Cpk as -0.33.

FICCI CE

The Cpk index 

Page 167: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 167/373

Thus Cpk = Cp means the process is centered.

Cpk < 1 means non- conformances are being produced.

Cpk < 0 indicates that the process has been set beyond either of

the two specification limits.

Note : Cpk is always less than or equal to Cp. 

FICCI CE

Cp and Cpk indices 

Page 168: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 168/373

Therefore, the first step is to bring Cpk=Cp by proper

centering of the process. The second step should be to

improve the Cp value by decreasing the variation.

FICCI CE

Process capability indexes for one sided tolerances 

Page 169: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 169/373

One-sided Tolerances - The Cp and Cpk indexes are used

for characteristics with two-sided tolerances - that is,

 processes with both upper and lower specification limits.

Since many characteristics have only one-sided

specifications, it is also convenient to have one-sided

capability indexes.

FICCI CE

Process capability indexes for one sided tolerances 

Page 170: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 170/373

For processes that have only a Lower specification limit, LSL,the lower capability index Cpl is defined by:-

Correspondingly, when only an Upper specification exists,

we define an upper capability index by:-

Cpl = x - LSL

3 SD

Cpu = USL - x3 SD 

FICCI CE

Establish a goal for improvement 

Page 171: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 171/373

Once the organization has completed the process

capability study, the next step is to benchmark the

 processes with the best in class or world class parameters.

Benchmarking is discussed on the following slides.

FICCI CE

Benchmarking 

Page 172: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 172/373

FICCI CE

Benchmarking 

Page 173: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 173/373

Benchmarking is quality by comparison  for achieving

 better standards. In the global movement today, thecompetition is improving at a faster rate, and the only way

to improve your relative quality and move upwards is to

find out and implement the best industry practices.

FICCI CE

Benchmarking :-

Stages of improvement 

World Class Recognized as the best

Benchmarked by others

i C

Page 174: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 174/373

Best in Class 

Exceeds customer expectations, outperformsall competitors and has clear competitive edge

Efficient 

Meets all internal requirements for cost margins,

asset utilization, cycle-time and measures of excellence

Incapable 

Is ineffective, inefficient and at the risk of failing.

 Needs major redesign

Effective

Satisfies all customer requirements

FICCI CE

Benchmarking methodology 

Page 175: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 175/373

Benchmarking can be of various types - competitive

 benchmarking, product benchmarking, process

 benchmarking and best practices benchmarking. Whatever

 be the category chosen by the organization, the

 benchmarking methodology remains the same in each case.

Benchmarking methodology is explained through 5 simple

steps in the following slide :-

FICCI CE

A. Identify processes to Benchmark  

Page 176: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 176/373

• Select processes to benchmark.

• Measure current process capability and define goal.

• Understand detailed process which needs improvement.

FICCI CE

B. Select organization to Benchmark  

Page 177: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 177/373

• Select organizations which perform your process.

• Compile a list of world class process parameters.

FICCI CE

C. Compile the required information 

Page 178: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 178/373

• Develop a detailed questionnaire to obtain desired

information.

• Obtain the desired information. The information can be

obtained from various sources viz: internet, trade journals,

 professional associations, industry publications, industry

experts, libraries etc.

FICCI CE

D. Analyze gaps 

Page 179: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 179/373

Too much information is as bad as too little. Gather and

analyze only the information you need to make a direct

comparison of performance. Compare like with like.

Identify the performance gaps and develop an action plan

to close the gaps. Also highlight and quantify the

consequences of not closing the gap.

FICCI CE

E. Develop an action plan 

Page 180: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 180/373

• Review observations of the gap analysis.

• Set new performance standards.

• Develop an action plan for meeting the new performance

standards, identify process owners with their

responsibilities and move to improvement phase.

FICCI CE

6. Improvement phase 

Page 181: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 181/373

Objectives of Improvement phase

Histograms

Pareto analysis

Control charts

Root Cause Analysis

Process flowcharting

Failure Mode & Effect Analysis

Quality Function Deployment

Design of Experiments ( DOE )

FICCI CE

Objectives of Improvement phase 

Page 182: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 182/373

• To develop a proposed solution to the existing problems.

• To confirm that the proposed solution will meet the desired

quality improvement goals. 

• To identify resources required  for successfulimplementation of the solution.

• To plan and execute actual improvements.

The tools and techniques for making improvement are

discussed on the following slides :-

FICCI CE

Histogram 

Page 183: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 183/373

The frequency histogram can be described as a bar graph

displaying the frequency distribution of specific processes,

items and devices. This tool provides a valuable means for

tracking variation. For instance, it can categorize product defectlevels or distribution. The primary difference between the

histogram and any other bar diagram is that the horizontal scale

of the histogram represents a numerical scale.

FICCI CE

Histogram 

Page 184: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 184/373

A frequency histogram provides the basis for understanding the

variation of both production and service scenarios with the

visualization to identify opportunity easily with each area

(histogram bars) while keeping track of variation. It must be pointed out that frequency histograms do not tell the total

sources of variation and do not present a specific pattern over

time.

FICCI CE

Constructing a Histogram 

Page 185: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 185/373

Constructing a histogram is quite simple. Microsoft bar chartcan be used to draw a histogram. The following simple steps

should be followed :-

1. Select insert Microsoft bar graph.

2. Feed in scale and their respective frequencies.

3.Since there is no gap between the bars in a histogram, select

“format data series”. Click on “options”  field and make the gap

width between the bars=0.

Please see the example of a histogram generated by Microsoftgraph on the next slide.

FICCI CE

Constructing a Histogram 

35

Page 186: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 186/373

0

5

10

15

20

25

30

35

5 6 7 8 9 10

Machine set up time in minutes

FICCI CE

Pareto analysis 

Page 187: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 187/373

The Pareto principle is to concentrate on “vital  few”  rather

than “trivial many”  in tackling quality problems. The Pareto

diagram is a tool for identifying few actually important causesfor defectives which result in large proportion of defectives,

instead of concentrating on large number of causes which

contributes to a small proportion of the total defectives.

FICCI CE

Constructing a Pareto chart 

Page 188: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 188/373

A Pareto diagram is a bar chart of number of defectives with

 bars representing the number of defectives due to different

sources arranged in descending order of their importance. A

line graph of cumulative number of defectives (Ogive) is alsodrawn in the same chart. The causes are given along the x axis,

the number of defectives are given on the left y axis and the

cumulative %defectives is given along the right y axis.

FICCI CE

Constructing a Pareto chart 

Data on defective cords

Page 189: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 189/373

Data on defective cords

S No. Source of defectives No. of Percentage

defectives defectives

1 Wrong Ply TPM 75 25

2 Plyless Feeding 150 503 Single end 30 10

4 Wrong Cable TPM 45 15

Total 300 100

FICCI CE

Arranging data in descending order 

D t d f ti d

Page 190: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 190/373

Data on defective cords

S No. Source of defectives No. of Percentage Cumulative

defectives defectives % defectives

1 Plyless Feeding 150 50 50

2 Wrong Ply TPM 75 25 75

3 Wrong Cable TPM 45 15 90

4 Single end 30 10 100

Total 300 100

FICCI CE

Pareto analysis of defective cords 

300100%

Page 191: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 191/373

0

50

100

150

200

25080%

60%

40%

20%

0%Plyless

feeding 

Wrong ply

TPM

Wrong

cable TPM 

Single

end

Page 192: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 192/373

FICCI CE

Example -construction of P charts 

Day Rejects Tested Proportion1 14 286 0.049

2 22 281 0 078

Page 193: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 193/373

2 22 281 0.078

3 9 310 0.029

4 19 313 0.0615 21 293 0.072

6 18 305 0.059

7 16 322 0.050

8 16 316 0.051

9 21 293 0.072

10 14 287 0.049

11 15 307 0.049

12 16 328 0.049

13 21 296 0.071

14 9 296 0.03015 25 317 0.079

16 15 297 0.051

17 14 283 0.049

18 13 321 0.040

19 10 317 0.032

20 21 307 0.068

21 19 317 0.060

22 23 323 0.071

23 15 304 0.049

24 12 304 0.039

25 19 324 0.059

26 17 289 0.059

27 15 299 0.050

28 13 318 0.041

29 19 313 0.061

30 12 289 0.042

Total 493 9155

 

FICCI CE

Construction of P charts 

Data points Number of defective units

P =

Page 194: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 194/373

 Number of units in the sample

Process Average P =Total defective units

Total units observed

Upper control Limit ( UCL ) = P+3 P ( 1-P )

n

Lower control Limit = P-3 P ( 1-P )

n

n=Average sample size= 305* 

=

= 0.0926

=0.1508

0.053

* Since the data size do not vary much around the mean value, P chart is simplified

by taking the average sample size to calculate he control limits 

FICCI CE

Construction of P charts 

Page 195: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 195/373

The construction of control charts is very simple. Simply

select the range of data points ( “proportion”  column in the

excel sheet ) and click the graph button. Select “Line graph” 

and the p chart is automatically calculated. The average, UCLand LCL can be manually displayed by drawing three

additional lines on the graph. Please refer the next slide for the

graph.

FICCI CE

P chart 

0.1

Page 196: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 196/373

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.080.09

5 15 25

LCL0.015

UCL

0.0926

CL

0.053

Days

FICCI CE

NP charts 

Page 197: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 197/373

The NP chart is used for plotting number of defectives instead

of proportion defectives. This is another version of P chart and

its applicability depends upon the interest of the end user.

FICCI CE

Example -construction of np charts 

Day Rejects Sample size1 10 100

2 12 100

Page 198: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 198/373

2 12 100

3 10 100

4 11 100

5 6 100

6 7 100

7 12 100

8 10 100

9 6 100

10 11 100

11 9 100

12 14 100

13 16 100

14 21 100

15 20 100

16 12 100

17 11 100

18 6 100

19 10 100

20 10 10021 11 100

22 11 100

23 11 100

24 6 100

25 9 100

Total 272 2500

FICCI CE

Example -construction of np charts 

Page 199: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 199/373

 p = X1 + X2 + X3 +…..Xk

kn

n = subgroup sample size = 100 

UCL = np + 3 np ( 1-p )

LCL = np - 3 np ( 1-p )

27525*100

= = 0.1088

np = 0.1088*100 =10.88

=20.22

=1.54

FICCI CE

25

Example -construction of np charts 

Page 200: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 200/373

0

5

10

15

20

5 15 25

LCL1.54

UCL

20.22

Np

10.88   R  e   j  e  c

   t  s

Days

FICCI CE

Root cause analysis 

Page 201: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 201/373

In any organization numerous problems exist in all facets of its

activities. The efficiency and survival of the organization

depends on how promptly these problems are recognized and

their root causes are isolated and eliminated.

A systematic analysis of each potential problem area should be

carried out to recognize the root causes which are responsible

for creating the problem. This analysis is called Root Cause 

Analysis. This is more of a philosophy or a discipline rather

than any isolated technique for continuous improvement.

FICCI CE

Tools & techniques for root cause analysis 

Page 202: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 202/373

Ishikawa or cause and effect diagram

Histogram

Pareto Analysis

Control charts

Brain Storming

Flow Charting

Process Capability Analysis

Scatter diagram and regression analysis

Statistically Design Experiment ( Design of Experiments ) 

FICCI CE

Cause & Effect diagram - Major and subsidiary causes 

Material  Methods Environment 

Assemblies Procedures Noise level

Page 203: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 203/373

Men MeasurementMachine

Effect

Assemblies

Components

Suppliers

Consumables

Procedures

Policies

Accounting

Humidity

Temperature

Lighting

Training

Experience

Skill

Attitude

Variability

Tooling

Fixtures

Technology

Instruments

Gauging

Counting

Tests

FICCI CE

Example of Cause & Effect diagram 

Material  Methods Environment 

High lead time

Inadequate

process controlHigh Noise level

Page 204: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 204/373

Men MeasurementMachine

Low

operatingprofit

High lead time

High inventory

Poor quality

of vendors

poor review

system

process control

Poor MIS

Poor QC

Heat

Poor Lighting

Inadequate

TrainingLack

of Experience

Low

motivation

High

variation

PoorMaintenance

Frequent

breakdowns

Old machines

Inadequate

Instruments

Inadequate

measurement

No SPC

Page 205: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 205/373

FICCI CE

Typical causes for non conformance/ defects Material factors 

Page 206: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 206/373

• Use of untested materials

• Mix-up of materials

• Substandard material accepted on concession because ofnon-availability of correct material

• Inconsistency in specifications on the part of vendors

FICCI CE

Typical causes for non conformance/ defects Men factors 

Page 207: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 207/373

• Incorrect knowledge of setting up machines

• Careless operator and inadequate supervision

• Undue rush by the operator to achieve quality targets

• Lack of understanding of drawing instructions relating to a

 process

• Operator does not possess requisite skill for operating

machines

FICCI CE

Typical causes for non conformance/ defects Method factors 

Page 208: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 208/373

• Inadequate process controls

•  Non availability of proper test equipments

• Test equipment out of calibration• Vague inspection/ testing instructions

• Inspectors do not possess the necessary skill

FICCI CE

Click on the boxes to enter your Cause & Effect 

Material  Methods Environment 

Click to enter

Page 209: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 209/373

Men MeasurementMachine

click

FICCI CE

Process flow Charting 

Page 210: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 210/373

Flow charting provides the basis for understanding the standard

 process procedures, the relationship between people and work

to be done. Flowcharting is a very good tool for understanding

and identifying process bottlenecks such as delays, excessive

transportation, waiting time and queuing time. It also identifieskey customers, suppliers and process owners by operational

work unit, performance level, quality level and productivity at

each process point. Flow charts can also identify source of

errors, decision points and non-value adding operations.

FICCI CE

Receive PCB

Parts from vendorsReturn part to

vendors

Assemble parts in PCB

Test assembled PCB Rework & Analyze

Flow chart of Printed circuit board 

Page 211: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 211/373

Inspect parts

Inspect parts

Wait for Mfg.

Inspect PCB

Pack & Ship

Bad

Bad

Parts

good

or

bad Parts

good

orbad

Good

Good

FICCI CE

Customer

satisfaction

dept.Issue

owners

Sample : Seeking customer feedback and taking corrective action flow diagram. 

Page 212: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 212/373

Customer

Surveys

Complaints

Critical

Situations

Other

Customer

satisfaction

dept

Internationalmarketing

Administration

Domestic

Marketing

Technical

Delivery

Service

•Develop action plans

•Resolve issues

•Improve

•Issue

identification•Prioritization

•Ownership

•Review actions

•Emerging issues

•Action plan

FICCI CE

Failure Mode and Effects Analysis (FMEA) 

Page 213: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 213/373

FMEA is a structured analysis for identifying ways &

methods in which the product or processes can fail and

then plan to prevent those failures. FMEA is a proactivetool for reducing defects and non-conformities.

Page 214: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 214/373

FICCI CE

Advantages of FMEA 

Page 215: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 215/373

• For improving the reliability and safety of the

products.

• For improving customer satisfaction.

• Tracking actions to reduce non-conformities.

• New product development.

FICCI CE

Definition of terms 

Page 216: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 216/373

Failure Mode : It is a manner in which a part or a process

can fail to meet specifications. It is usually associated with

defect or non-conformities.

Examples : Missing part, Oversized, Undersized, Incorrect

 price, Offspec parts.

FICCI CE

Definition of terms 

Page 217: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 217/373

Cause :  Causes are sources of variation which are

associated with key process inputs. Cause can be best

defined as a deficiency which results in a failure mode.

Examples : Instructions not followed, Lack of experience,

Incorrect documentation, Poor handling etc.

Page 218: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 218/373

FICCI CE

Relationship of cause, failure mode & effect 

Page 219: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 219/373

Cause FailureMode

Effect

FICCI CE

Causes  Causes Causes 

FMEA through Cause & Effect Diagram

Page 220: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 220/373

FailureMode

Causes CausesCauses

Effect

Prevent

or Detect

FICCI CE

Steps in FMEA process 

Page 221: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 221/373

1. Develop a process map and identify process steps.

2. List key process outputs for satisfying internal and

external customer requirements.

3. List key process inputs for each process steps.4. List ways the process inputs can vary (causes) and

identify associated failure modes and effects.

5. Assign severity occurrence and detection rating for each

cause.

FICCI CE

Steps in FMEA process 

Page 222: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 222/373

6. Calculate risk priority number ( RPN) for each potential

failure mode.

7. Determine recommended actions to reduce RPN‟s.

8. Establish time frame for corrective actions.9. Take corrective actions.

10. Put all controls in place.

FICCI CE

Ranking terms used in FMEA calculationsScale:1(Best) to 10 ( Worst) 

Page 223: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 223/373

• Severity (SEV) : Severity indicates how severe is the impact of the effect on the customer.

• Occurrence (OCC) :  This indicates the likelihood of the cause of the

failure mode to occur.

• Detection (DET) :  This indicates the likelihood of the current system todetect the cause or failure mode if it occurs.

• Risk priority number : This number is used to place priority to items for

 better quality planning.

RPN = SEV X OCC X DET

See next slides for specimen best to worst ratings on a 10 point scale.

FICCI CE

Best to Worst ratings for FMEA calculations 

Rating Degree of Severity Likelihood of Occurrence Ability to detect

1 Customer will not at all observe Very remote possibility Sure that the potential failure

Page 224: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 224/373

 the adverse effect will be detected & preventedbefore reaching the next

customer 

2 Customer will experience Low failure with supporting Almost sure that the potential

slight discomfort documents failure will be detected before

reachig the next customer 

3 Customer will experience Low failure without supporting Less chances that the

annoyance because of slight documents potential failure will reach the

degradation of performance next customer undetected

4 Customer dissatisf ied due to Occasional failures Some controls may detect

reduced performance the potential from reaching the

next customer 

5 Customer is uncomfortable Moderate failure rate with Moderate chances that the

supporting documents potential failure will reach the

next customer 

FICCI CE

Rating Degree of Severity Likelihood of Occurrence Ability to detect

6 Warranty repairs Modearate failure rate without Controls are not likely to detect

Best to Worst ratings for FMEA calculations 

Page 225: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 225/373

supporting documents or prevent the potential failurefrom reaching the next

customer 

7 High degree of customer High failure rate with supporting Less chances that the potential

dissatisfaction documents failure will be detected or

 prevented before reaching

the next customer 

8 Vey high degree of customer High failure rate with supporting Very less chances that the

dissatisfaction documents potential failure will be detected

or prevented before reaching

the next customer 

9 Negative impact on the Failure is almost certain Existing controls will not detectcustomer the potential failure

10 Negative impact on the Assured failure Existing controls will not detect

customer, people & society the potential failure

FICCI CE

Rank severity

on 1 to 10

scale

Rank occurrence

on a 1 to 10

scale

List how the cause

is presently

being controlled

Rank how well

cause/failure

can be detected

on 1 to 10 scale

FMEA Form: ( Column 1 to 9 ) 

Page 226: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 226/373

1 2 3 4 5 6 7 8 9

Process Potential failure mode Potential failure effect SEV Potential causes OCC Current Controls DET RPN

Part No.

1

23

4

5

List failure

modes for each

step

List effects

of each

failure mode

List causes

for each failure

mode

RPN=

SEV*OCC*DET

FICCI CE

Designates people

responsible for

corrective action

FMEA Form contd: ( column 10 to 15 )

RPN is recalculated

on completion of

corrective action

Page 227: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 227/373

10 11 12 13 14 15

 Actions Recommended Responsibility SEV OCC DET RPN

List actions

recommended

on RPN pareto

FICCI CE

Quality Function Deployment ( QFD ) 

Page 228: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 228/373

 No matter how effectively a company meets the initial

needs of the customers, it must remain constantly alertand responsive to the changing and increasing needs of

the customers. Because if the company is not

responsive to these changing needs, the passage of time

will erode the early competitive advantages.

FICCI CE

QFD 

Page 229: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 229/373

QFD is a scientific technique for translating the voice of

the customer into development of products and

services. It is a complete product planning process asopposed to problem solving and analysis. The technique

was invented by Akashi Fukuhara of Japan and first

applied with very good results at Toyota.

FICCI CE

Page 230: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 230/373

Putting QFD into practice 

FICCI CE

Importance

Step 1 : List customer requirements and rank  

Page 231: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 231/373

Customer Requirements  on 10 pointscale 

Very Important

Moderately Important

Slightly important

FICCI CE

Step 2 : List technical requirements to meet customer requirements 

Page 232: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 232/373

   T  e  c

   h  n   i  c

  a   l   R  e  q  u

   i  r  e  m

  e  n

   t  s

FICCI CE

Customer competitive

evaluation on 5 point scale( 5 high , 1 low )

a  n   k

Step 3 : Comparing product with the nearest competitor

Page 233: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 233/373

1 2 3 4 5 Action   R  a

Competitor product  Our product 

Customer Requirements 

FICCI CE

Step 4 : Establish relationship between customer requirementand technical requirements 

Page 234: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 234/373

Customer RequirementsRank

Strong relation

Moderate relation

Weak relation

Page 235: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 235/373

FICCI CE

Step 5 : Do competitive technical Assessment 

Page 236: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 236/373

Customer Requirements  Rank  

Competitive evaluation

Competitive

Technical

Assessment 

5

4

3

2

1

Competitor assessment

Our assessment

Page 237: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 237/373

FICCI CE

QFD - customer‟s voice 

Page 238: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 238/373

The whole process of the QFD can be linked to GIGO (

Garbage in garbage out ). This is because, if the voice of the

customer has not been captured properly, the final product

will also not be the one actually desired by the market place.

It is therefore extremely important to capture the correctvoice of the customer before taking any other step in the

QFD planning process. We will explain this by the

forthcoming example of new car development.

FICCI CE

Example : new car development 

Page 239: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 239/373

FICCI CE

Page 240: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 240/373

A product development team wants to determine what the

customers want in a new car. After interviewing about 120 cardrivers, the team came out with the following chart of the

customer requirements : 

FICCI CE

Desired product attributes in a new car 

• Easy to drive

• Quiet riding , no squeaks or rattles

5

4.8

Requirement Rank

Page 241: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 241/373

• Excellently finished

• Smooth riding even on rough road

• Excellent gas mileage

• Aerodynamic design

• Hugs the road

• Free from breakdowns

• Fast acceleration

• Virtually maintenance free

• Durable - will last 150000 miles

• Protects the driver and passenger in case of accident

• Classic styling

• Has instruments to read critical functions

• Has many electronic devises

• Has convertible roof

4.64.5

3.9

3.8

3.7

3.63.5

3.4

3.3

3.2

3

2.2

2

1.4

FICCI CE

Translating into technical requirements 

Page 242: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 242/373

The product development team is all set to translate the requirementsof the customer into technical requirements as per the QFD matrix.

Fallacy : The survey is based on aggregate data management and its

 basic assumption is that there is one best answer for every one. 

FICCI CE

Classification of needs 

Page 243: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 243/373

The product development team is asked by the CEO to

classify the needs of various drivers and then give it a rating

instead of proceeding simply with the aggregate data

management. After the market survey the product

development team divided the customer into two broadcategories :-

1. The performance driver and

2. The practical driver

The team then came with the following findings -

FICCI CE

Two different profiles of desired product attributes 

•Fast acceleration

•Aerodynamic design

•Hugs the road 

Performance driver Practical driver

•Excellent gas mileage

•Virtually maintenance free

•Free from breakdowns

5

Page 244: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 244/373

•Easy to drive

•Excellently finished

•Quiet riding

•Classic styling

•Smooth riding

•Free from breakdowns

•Excellent gas mileage

•Protects drivers

•Durable

•Many electronic devices

•Convertible roof

•Virtually maintenance free

•Easy to drive

•Durable

•Quiet riding

•Smooth ride

•Protects driver

•Excellently finished

•Many electronic devises

•Aerodynamic design•Hugs the road

•Instruments to read functions

•Classic styling

•Convertible roof

•Fast acceleration

4

3

2

1

FICCI CE

New Car 

Page 245: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 245/373

The classification of the customer requirements clearly reveals

that the attribute which is most important  for theperformance driver, is  least important for the practical

driver  and vice versa. A simple listing of the customer

requirements would have definitely ended up in the

development of incorrect product for the market. Reading the

voice of the customer is therefore the most critical and

challenging aspect of the whole QFD process.

FICCI CE

QFD - Conclusion 

Page 246: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 246/373

It is therefore very important that your organization is

constantly looking for the living customers  instead of

mythological ones created by aggregate data management.

Once the voice of the customer has been properly captured,translating them into technical requirements should not be

much of a difficulty.

Page 247: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 247/373

FICCI CE

Design of experiments 

Page 248: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 248/373

Design of experiments (DOE) is a valuable tool to optimize

 product and process designs, to accelerate the development

cycle, to reduce development costs, to improve the transition of

 products from research and development to manufacturing andto effectively trouble shoot manufacturing problems. Today,

Design of Experiments is viewed as a quality technology to

achieve product excellence at lowest possible overall cost.

FICCI CE

Objectives of Experimentation 

Th f ll i f h bj i f

Page 249: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 249/373

The following are some of the objectives of

experimentation in an industry :

• Improving efficiency or yield

• Finding optimum process settings

• Locating sources of variability

• Correlating process variables with product characteristics

• Comparing different processes, machines, materials etc

• Designing new processes and products.

FICCI CE

Various terms used in Experimentation 

I th t t f di i i t l d i th

Page 250: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 250/373

In the context of discussion on experimental designs, the

common frequently used terms are :

• factor

• Level

• Treatment combination

• Response

• Effect

• Interaction

FICCI CE

Traditional approach 

The traditional approach to product and process

ti i ti i t d t i bl t ti

Page 251: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 251/373

optimization is to conduct one variable at-a-timeexperiments. This approach though simple to plan and

execute, suffers from several drawbacks. For instance,

varying factor „A‟  from its nominal value „A1‟  to some

other value „A2‟ may produce a given change in the qualityof the product, when other factor „B‟  is at a value „B1‟.

However a different change in the quality of the product

will result, when factor „B‟ is at a value „B2‟. This effect

known as interaction effect, can not be detected under

traditional approach..

FICCI CE

Statistically designed experiments 

Page 252: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 252/373

A statistically designed experiment permits simultaneous

consideration of all the possible factors that are suspected

to have bearing on the quality problem under investigation

and as such even if interactions effect exist, a validevaluation of the main effect can be made. Scanning a

large number of variables is one of the ready and simpler

objectives that a statistically designed experiment would

fulfill in many problem situations.

FICCI CE

Statistically designed experiments 

Page 253: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 253/373

Even a limited number of experiments would enable the

experimenter to uncover the vital factors as which further

trials would yield useful results. The approach has numberof merits, it is quick, reliable and efficient.

FICCI CE

Basic principles of experimentation 

Page 254: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 254/373

Basic principles of Experimentation are :

• Randomization

• Replication• Local Control

FICCI CE

Basic principles of experimentation 

Page 255: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 255/373

• Randomization :  is described as an insurance against

extraneous factors.

• Replication : increases the sensitivity of the experiment i.e

 power of detecting differences between treatments.

• Local Control : reduces the effect of natural variability of

materials, environmental conditions etc.

FICCI CE

Planning for experimentation 

Page 256: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 256/373

It is known widely that a properly well planned experiment

helps to achieve better efficiency and hence certain amount

of thinking must be done before deciding to carry out theexperiment and actually conducting the experiment.

FICCI CE

The various steps to be followed in this direction are listed

below :

Planning for experimentation 

Page 257: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 257/373

 below : Selection of area of study : Pareto analysis

Proof of the need for experimentation

Brain storming and Cause & Effect diagram : To list all the

 possible factors Classification of factors

Interactions to be studied

Response and type of model for analysis

Note : Pareto Analysis, Brain storming and Cause & Effect diagrams have

already been covered in the previous slides.

FICCI CE

Proof of the need for experimentation 

Page 258: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 258/373

After having selected the area for experimentation we have

to ensure that the problem is of „Break   through‟  or

„Improvement‟  nature  and not a problem of „control‟ 

nature. For this purpose past data should be suitably

analyzed and plotted on some process control chart tocheck whether the process is within statistical control or

not. If the analysis shows lack of control or statistical

instability, then it is a problem of „control‟  nature and

experimentation may not be needed.

FICCI CE

Proof of the need for experimentation 

Page 259: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 259/373

However if the problem is of chronic nature and there is

stability in the process, then it establishes the need for

experimentation. Before deciding to carry outexperimentation the need for experimentation must be

established.

FICCI CE

Classification of factors 

Tools like brainstorming and cause & effect diagrams

Page 260: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 260/373

Tools like brainstorming and cause & effect diagramshelps in identification of factors and preparing a complete

list of the factors involved in any experiment. Factors

listed can be classified into three categories :

1. Experimental Factors2. Control Factors

3. Error or Noise Factors

FICCI CE

Classification of factors 

Page 261: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 261/373

1.  Experimental factors  are those which we really

experiment with by varying them at various levels.

2. Control Factors are those which are kept at a constant(controlled) level throughout experimentation.

FICCI CE

3 Error or Noise factors are those which can neither be

Classification of factors 

Page 262: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 262/373

3. Error or Noise factors are those which can neither bechanged at our will nor can be fixed at one particular level.

Effect of these factors causes the error component in the

experiment and as such these factors are termed as error or

noise factors.

Note : At the planning stage itself all the factors viz. Experimental,

Control and error should be recognized. This will help to tackle them

appropriately during experimentation.

FICCI CE

Response and type of model for analysis 

The ultimate observations or data generated by the

Page 263: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 263/373

The ultimate observations or data generated by theexperiment is known as the response. The response may be :

• Continuous or measurement type and follows a normal

distribution

• Continuous or measurement type but does not follow normaldistribution

FICCI CE

7. Control phase 

Objectives of control phase

Page 264: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 264/373

Objectives of control phase

Tools for effective control system

Risk management

Mistake proofing techniques

Product design controls

FICCI CE

Objectives of control phase 

Page 265: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 265/373

• To ensure that our processes stay in control after the

improvement solution has been implemented and

• To quickly detect the out of control state and determine theassociated causes so that actions can be taken to control the

 problem before non-conformances are produced.

FICCI CE

Control phase 

Page 266: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 266/373

Having achieved the improvement, it needs to be sustained. There is ageneral tendency for all processes to degrade unless there is an

effective control mechanism which is able to detect incipient deviation

in the process, which are then analyzed and necessary corrective action

is taken to bring the process back to the state which was attained after

 planned improvement was effected. These control mechanisms must beintegrated in the form of a quality management system document

which should be made mandatory.

FICCI CE

Control phase 

Page 267: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 267/373

Unless we control the business processes in the form of

documentation and ongoing process controls, processes

will tend to degrade overtime and shall loose the gains

achieved in the improvement activities.

FICCI CE

Tools for effective control system 

Page 268: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 268/373

I. SPC - This has already been covered in “Measurement and

Analysis section”.

II. Risk management

III. Mistake proofingIV. Product design controls

FICCI CE

Risk management 

Page 269: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 269/373

FICCI CE

Risk management 

Page 270: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 270/373

Risk can be defined as the  probability  of an undesirable

event occurring and the impact/consequence of that event.

Risk management is a process of managing risk using riskabatement plans.

FICCI CE

Objectives of risk management plan 

Page 271: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 271/373

• To identify and quantify risk elements viz. Technical, cost, marketing

risk.

• To reduce risk by means of risk abatement plans integrated into

 processes• To Monitor progress of abatement plan

• To Highlight and manage risk as early as possible. 

FICCI CE

Key steps of a risk management process 

Page 272: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 272/373

• Identify risk elements and risk types

• Assign risk ratings i.e. probability and consequence of risk

• Prioritize risk as high medium and low

• Identify risk abatement plans for high and medium risks• Incorporate the risk abatement plans into work plans.

FICCI CE

Ways to identify risk  

Page 273: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 273/373

1. FMEA (This has been already discussed in the chapter on

“Measurement” 

2. Past experience

3. Brainstorming

Whatever be the method it is important to analyze risk in terms of

complex design issues, cutting edge technology issues, untested

techniques, new manufacturing processes and high cost uncertainties.

FICCI CE

Methods of risk abatement 

I l / li / f i /fi ld l i

Page 274: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 274/373

• Involve customers/suppliers/manufacturing/field early in

the process

• Model or simulate the process

• Use robust design• Test

• Conduct periodic project reviews

• Complete analysis earlier

• Assure proper resourcing

FICCI CE

Mistake Proofing 

Page 275: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 275/373

FICCI CE

Mistake proofing 

Page 276: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 276/373

Mistake proofing is a scientific technique for improvement

of operating systems including materials, machines and

methods with an aim of preventing problems due to human

error. The term “error”  means a sporadic deviation fromstandard procedures resulting from loss of memory,

 perception or motion.

FICCI CE

Defect Vs errors 

It is important to understand that defects and errors are not

the same thing. A defect is the result of an error, or an

Page 277: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 277/373

the same thing. A defect is the result of an error, or an

error is the cause of defects as explained below.

Error Defect

Cause Result

FICCI CE

Prevention of defects 

Page 278: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 278/373

Machine

orhuman error

Detect error

Take action

feedback

zero

defect

Stop errors fromturning into defects

Cause Intermediate result End result

FICCI CE

Types of error 

• Error in memory of PLAN : Error of forgetting the

Page 279: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 279/373

• Error in memory of PLAN  :  Error of forgetting the

sequence/ contents operations required or restricted in

standard procedures.

• Error in memory of EXECUTION  :  Errors of forgettingthe sequence/contents of operations having been finished.

• Error in PERCEPTION  of type  : Error of selecting the

wrong object in type or quantity. 

FICCI CE

Types of error 

• Error in perception of MOVEMENT  : Error of

Page 280: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 280/373

p pmisunderstanding/misjudging the shape, position, direction

or other characteristics of the objects.

• Error in motion of HOLDING : Error in failing to hold

objects.

• Error in motion of CHANGING :  Errors of failing to

change the shape, position, direction, or other

characteristics of object according to the standard. 

FICCI CE

Human error provoking situations 

• Inadequate written standards

Page 281: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 281/373

• Too many parts

• Mix up

• Too many steps

• Specifications or critical conditions• Too many adjustments

• Tooling change

• Frequent repetition

• Environmental factors

FICCI CE

Principles of mistake proofing

Page 282: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 282/373

The principles of mistake proofing can be categorized into groups:

A. Prevention of occurrence

B. Minimization of effects 

FICCI CE

A. Prevention of occurrence 

Methods under this principle aim to prevent the occurrence

Page 283: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 283/373

Methods under this principle aim to prevent the occurrence

of human errors from all stages of operations and make

corrections unnecessary.This can be done through the

following 3 methods :-

• Elimination

• Replacement

• Facilitation

FICCI CE

Elimination 

Elimination method aims to remove the system properties 

Page 284: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 284/373

y p p

which generate operations/restrictions susceptible to human

errors so as to make them unnecessary. Consider the error of

an operator touching a high temperature pipe and getting

 burnt. One method of preventing this error is to make the pipesafe by covering it with insulating material. This improvement

removes the property of the pipe which generates the

restriction.

FICCI CE

Replacement 

The replacement method aims to use more reliable methods

Page 285: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 285/373

The replacement method aims to use more reliable methods 

than operators and make it unnecessary for operators to

 perform such functions as memory, perception or motion.

The use of specially partitioned parts boxes holding specified

number of parts to prevent the error of supplying incorrectnumber of parts is an example of foolproof method based on

replacement.

FICCI CE

Facilitation 

The principles of elimination and replacement described

Page 286: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 286/373

The principles of elimination and replacement described

above make it unnecessary for operators to perform

operations or note restrictions. In contrast to these, the

 purpose of facilitation is to make such functions as

memory, perception and motion required in operations

easy for the operators, and thus reduce the occurrence

rate of human errors.

FICCI CE

B. Minimization of effects* 

M th d d thi i i l i t i i i th ff t f

Page 287: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 287/373

Methods under this principle aim to minimize the effects of

human error and focus on processes where the errors

develop into serious problems of quality,safety or

efficiency. This can be divided into two categories :-1. Detection and

2. Mitigation

*This principle is also known as Stop-in-time. 

FICCI CE

Detection 

The concept of detection is that even if a human error occurs,the deviations from standard states caused by it can be

Page 288: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 288/373

the deviations from standard states caused by it can be

detected and corrected in the succeeding operation  steps.

The methods of correcting the detected deviations are

classified into two types :-

1. Operators are informed  or find by themselves the

deviations and take necessary corrective action.

2. The deviations are automatically corrected  without

operators.

FICCI CE

Detection 

Page 289: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 289/373

There are two methods of informing the operator. The first

method is to bring to the operator‟s  notice by alarms  or

the remained parts and the second method is by making the

successive operations impossible.

FICCI CE

Mitigation 

The mitigation method aims to make operations redundant or incorporate shock absorbing/protecting materials so as to

Page 290: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 290/373

or incorporate shock absorbing/protecting materials so as to

mitigate the effects of human errors in their development

 process.

Example :  Consider the error of burning out the motor of a production machine by forgetting to switch off the power

supply. The mitigation countermeasure is to install a fuse

which cuts off the power supply when the temperature reaches

certain point.

FICCI CE

Product Design Controls 

Page 291: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 291/373

Product design controls can be categorized in 3 parts

• Means of knowing the product

• Means of testing designs

• Means of regulating designs

FICCI CE

Means of knowing the product 

Page 292: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 292/373

Do the designers know the variety of application  of the

 product.

Do they have complete information on the operatingenvironments. 

Do they have access to the user to discuss applications.

Do they know the potential field misuses of the product.

FICCI CE

Means of knowing the product 

Do they have clear understanding of product requirementon :-

Page 293: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 293/373

on :

Performance

Life

Warranty period

Reliability

Maintainability

Accessibility

Safety

Operating costs

FICCI CE

Means of knowing the product 

Have the non quantitative features of the product beendefined in some manner?

Page 294: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 294/373

defined in some manner?

Do the designers know the level of product

sophistication suitable for the user involved?

Are adequate design guidelines, standards, handbooks

and catalogues available?

Do the designers understand the interaction of their

 part of design with remainder of the design?

FICCI CE

Means of knowing the product 

Do the designers understand the consequences of a failure 

or other inadequacies of their designs on:-

Page 295: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 295/373

1. The functioning of the total system

2. Warranty costs and

3. User costs ?

Do they know the relative importance  of various

components & characteristics within components?

Do the designers know what are the manufacturing

capabilities relative to the design of tolerances?

FICCI CE

Means of knowing the product 

Page 296: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 296/373

Do the designers derive tolerances  based on

customer/functional needs or just use standard tolerances?

Do the designers know the shop and field costs  incurred because of incomplete design specifications or designs

required in change?

FICCI CE

Means of testing designs 

Page 297: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 297/373

Do the designers have the means of testing  their design

with regard to the following :- a. Performance & reliability tests

 b. Tests for unknown design interaction or effects

c. Pilot run

Is their an independent review of design?

Have the detailed drawings been checked?

FICCI CE

Means of testing designs 

Page 298: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 298/373

Do the designers record analysis for the design?

Do the designers receive adequate feedback   fromdevelopment tests, manufacturing tests, acceptance tests and

user experience?

Are the results quantified  where possible including

frequency of problems and costs to the manufacturer anduser?

FICCI CE

Means of testing designs 

Page 299: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 299/373

Does failure information contain sufficient technical detailson causes?

 Are the designers aware of material substitutions or

 process changes?

Do the designers receive notice when their designs

specifications are not followed in practice?

FICCI CE

Means of regulating Design 

Have the designers been provided with the means of

Page 300: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 300/373

g p

regulating the design process?

Are they provided with information on new alternative

materials or design approaches? Have they been given performance information on previous

designs?

Are the results of research efforts on new products transmitted

to the designers?

FICCI CE

Means of regulating Design 

Page 301: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 301/373

Are the approvals  required from the designers to use

 products from the new suppliers?

Do the designers participate in defining the criteria forshipment of the product?

Can the designers propose changes  involving trade-offs

 between functional performance, reliability and

maintainability?

FICCI CE

Means of regulating Design 

Are designers told of  changes to their designs before they are

Page 302: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 302/373

released?

Have causes of design failures been determined by thorough

analysis? Do designers have the authority  to follow their designs

through the prototype stage and make design changes where

needed?

Can the designers initiate design changes?

FICCI CE

Means of regulating Design 

Page 303: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 303/373

Are field reports reviewed with designers before making

decisions on design changes?

Do designers understand the procedures  and chain of

command for changing a design?

Page 304: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 304/373

Awareness of the present status

Page 305: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 305/373

  It is extremely important for an organization to carry out an

overall assessment of the present status to know their strengths

and weaknesses. The following steps are important in

conducting the assessment :-

FICCI CE

Steps in conducting assessment 

Page 306: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 306/373

Agree on the assessment parameters  and criteria. Whatever be the criteria, it is important to cover all the major aspects

like leadership, information and analysis, strategic planning,

human resource utilization, quality assurance, business

results and customer satisfaction.

FICCI CE

Steps in conducting assessment 

• Educate the management in the criteria and adapt the

Page 307: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 307/373

• Educate the management in the criteria and adapt the

criteria.

• Form the internal information gathering team.

• Train the team in the criteria and in the information

gathering process.

• Plan and conduct the information gathering process.

FICCI CE

Steps in conducting assessment 

Page 308: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 308/373

• Collate the information and write the factual report.

• Have objective external experts validate and assess the

facts and provide feedback to senior management.• Use this feedback as input to the strategic planning

 process, and plan the actions required to cause

improvement.

FICCI CE

Organizational assessment On the basis of business excellence model 

Please answer the following questions about your organization

Page 309: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 309/373

Please answer the following questions about your organization.

Each question must be rated on a scale of 1-5, 1 being lowest and

5 being highest.

Note: To enable the users to enter their score and arrive at overall ratings, a

separate utility package is also provided in MS Excel file “Scoresheet”  in this CD. 

FICCI CE

Leadership 

1. Is the top management having personal visible involvement in all aspects

of quality management?

2.  Do they actively participate  in creating and reinforcing customer focus

Page 310: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 310/373

throughout the organization?

3.  Do they provide active support  to the change program by providing

appropriate resources?

4. Do they actively involve themselves in  recognizing  the employee/ team

contributions?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Strategic planning 

5. Does the company have a common vision which is shared by all theemployees in its true sense?

Page 311: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 311/373

p y

6. Does the company‟s  strategic planning address realignment of work

processes to improve customer focus and operational performance?

7.  Are the company‟s  strategies targeted for quantified measurableimprovement in important areas and Is building for future seen as more

important than short term benefits?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Strategic planning 

Page 312: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 312/373

8. Is commitment to resources for new facilities, process improvements and

training done considering long term objectives?

9.  Does the company‟s  long term projections of operational performanceeffectively incorporate comparisons with competitors?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Information management 

10 Does the company‟s orking s stem and proced res promote easy

Page 313: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 313/373

10.  Does the company‟s  working system and procedures promote easy

upward flow of information?

11. Do the employees feel free to share the information?

12. Is the company‟s  information management system accessible to every

one without any difficulty?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Information management 

Page 314: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 314/373

13.  Does the company periodically update  its information

management system?

14.  Is the information system reliable and accurate  for people tomake decisions in time?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Human resource focus 

15. Does the company‟s business plan consider human resource capabilities

for addressing quality leadership opportunities?

16 I h i i d ti d t i i d id d id i

Page 315: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 315/373

16.  Is the investment in education and training  decided considering

employee needs and future business needs?

17. Does the company evaluate its human resource planning using employee

feedback ? 

18. Does the company have an effective system for setting both quantitative

and qualitative targets? 

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Human resource focus 

19.  Are the employees generally aware and meet the expectedperformance standards?

Page 316: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 316/373

20. Does the company make effort to integrate employees job performance

with key quality improvement targets and business results?

21. Does the company have an effective appraisal system which takes careof the career progression of all the employees?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Human resource focus 

22. Is the company concerned about employee well being?

Page 317: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 317/373

23. Is the good performance suitably rewarded?

24.  Is the employee motivation level  high and good performance

suitably rewarded ?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Human resource satisfaction 

25. Is the company able to realize the full potential of its people and

 people‟s commitment to job is visible? 

Page 318: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 318/373

p p j

26.  Are the existing system of incentive and reward  adequate for  

maximum employee contribution?

27. Is the company‟s image as an employer good and the company is

able to attract the best talent? 

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Customer and market focus 

28.  Does the company address future needs taking into accountcompetitors and changing customer expectations?

Page 319: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 319/373

29. Does the company regularly evaluate and improve its processes

 based in changing customer expectations?

30.  Does the company set performance standards  and reviewsthem for further improvement?

31. Does the company trace system performance, with reference to

set expectation level, using quality measures?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Customer and market focus 

32.  Does the company regularly evaluate  and improve their

commitments for service performance to match customerexpectations?

Page 320: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 320/373

33. Does the company promptly resolve all formal and informal

customer complaints?

34.  Does the company regularly determine  customer‟s  currentand expected requirements?

35. Does the company determine specific product feature and their

relative importance using customer listening techniques like

QFD?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Customer and market focus 

36. Does the company analyze and use information on customerloss/gain and product performance to develop future strategies?

Page 321: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 321/373

37. Does the company effectively determine customer satisfaction

and make effective efforts to improve it further?

38. Does the company‟s customer satisfaction measure capture keyinformation that reflects their likely future behavior? 

39.  Is the customer satisfaction level effectively compared with

that of your key competitors by studies and independent surveys?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Customer satisfaction 

40 Does the company improve its system of determining

Page 322: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 322/373

40.  Does the company improve its system of determining

customer satisfaction on a regular basis?

41. Does the company effectively use customer dissatisfaction 

indicators for making improvements?

42. Has the company achieved better customer satisfaction for

its products and services in relation to its key competitors? 

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Supplier focus 

43.  Does the company evaluate supplier performance  with specifiedrequirements/parameters through mutually agreed plans?

Page 323: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 323/373

44. Does the company effectively communicate its quality requirements to

the suppliers?

45. Does the company effectively evaluate if suppliers are meeting itsquality requirements?

46. Does the company organize training programs for the suppliers to

improve their ability to meet key requirements and response times? 

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Supplier focus 

47.  Does the company have a system to generate healthy competition

among suppliers of similar items to improve performance?

Page 324: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 324/373

48. What is the level of your supplier satisfaction?

49. Are the suppliers paid in time ?

50. Does the company constantly endeavor for development of capabilities

of its suppliers?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Processes 

51. Does the company‟s product design consider customer‟s implied andfuture needs?

Page 325: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 325/373

52.  Does the company validate  its product designs taking into account

 performance, process and supplier capabilities?

53. Does the company evaluate and improve design and design processesso as to improve product quality and cycle/response time?

54. Does the company determine the cause of variation, make corrections

and integrate them into the process?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Processes 

55. Does the company analyze processes to achieve better quality, reduced

cycle/response time and better operational performance? 

Page 326: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 326/373

56. Does the company regularly evaluate and the key business processes,

their requirements, quality and operational performance?

57.  Does the company regularly analyze and simplify  the processes toachieve better quality, cycle-time and operational performance?

58.  Does the company effectively use alternative technology  for

improvement?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Processes 

59.  Does the company effectively use information  from customers for

b i d t i i t?

Page 327: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 327/373

 business and support service process improvement?

60. Does the company make efforts to find out information from best in the

class and make use of this information for process improvement?

61. Is the criterion of benchmarking well defined and documented?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Processes 

62. Does the company‟s work culture ensure precedence to quality overcost and response time considerations?

Page 328: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 328/373

63. Is there a  judicious planning for balancing cost, quality and time in

every decision taken in the organization?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Impact on society 

64. Is the company effectively satisfying  the needs and expectations of

the society at large?

65 Does the company effectively evaluate possible impacts of its

Page 329: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 329/373

65.  Does the company effectively evaluate possible impacts  of its

 products and operations on society?

66.  Does the company promote ethical conduct  in all activities hat it

does and are the company‟s ad-campaigns truthful and reflect facts?

67. Does the company effectively consider energy conservation and

preservation of global resources?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

FICCI CE

Company specific business results 

68. Does your company enjoy product quality leadership for the range of products it deals with?

Page 330: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 330/373

69. Is the company‟s growth over the last financial year comparable with

the industry growth?

70. Are the overall financial results better that the last financial year and

have the shareholder expectations been met?

Note: Please enter your score in MS Excel file “Scoresheet” given in this CD. 

Analyze your score 

• 281 - 350 : Excellent. You are doing very well, but there is

Page 331: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 331/373

no room for complacency.

• 211 - 280 : Good. With a little effort you can do better.

• 141 - 210 : Average. Your direction is clear, but you need

to intensify your efforts to move up.

• Less than 140 : Serious situation. You may not survive

for a long time. Immediate action is required to change the

 present situation.

FICCI CE

Assessment report 

At the end of the assessment, management should have a

report that includes :

Page 332: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 332/373

report that includes :

• Factual account that sets out how the organization operates

today.

• A list of existing strengths and weaknesses  to build

upon.

• A list of present and future opportunities. 

• A list of six Sigma projects to be undertaken. 

FICCI CE

Critical issues & superior choices

in Six Sigma implementation. 

Page 333: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 333/373

FICCI CE

A. Method focus versus problem focus. 

Page 334: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 334/373

It is a general tendency amongst organizations to latch on the

ideas like SPC, JIT, QFD & DOE as if they were the panacea to

all the problems. As soon as the new quality tool is introduced it becomes the focus of the company. Nobody is willing to pose a

question of the real problem faced by the company. With the

 problem solving focus the question is “what is the problem?”.

A problem focus enables us to select the appropriate solutions.

FICCI CE

B. Focus on productivity versus focus on quality

improvement. 

Even with a lot of talk on quality management focus is

Page 335: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 335/373

Even with a lot of talk on quality, management focus is

generally directed towards productivity improvement with

quality improvement as a by product. Management by & large

has not understood that the focus on quality results inimproved productivity as a by product. For Six Sigma to be

really effective, organizations must focus on quality  with

 productivity as a by product & not vice-versa.

FICCI CE

C. Soft progress versus hard progress. 

Many organizations have a tendency to describe quality

Page 336: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 336/373

Many organizations have a tendency to describe quality

 progress in soft terms (intermediate results) instead of hard

terms(end results).  Once such a practice is considered

acceptable it almost becomes a norm. Some companies willdescribe how many black belts have been trained rather than

how many have actually resolved problems that has resulted

in breakthrough improvements. The top management must

require progress reports in hard terms  rather than softterms.

FICCI CED. Improvement of manufacturing systems versus

all other systems . 

Si Si ff ll lk d b i h

Page 337: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 337/373

Six Sigma efforts are usually talked about in the

manufacturing sense. Other areas of business, which are

equally important somehow receive scant attention. Many

times organizations fail to define measurement metrics for

marketing, Purchase, Quality assurance, Product engineering,

Suppliers, Employees & Customers. Please see chapter on

“Measurement of business excellence” for more details.

FICCI CE

Prerequisites of successful implementation 

Highly visible top down management commitment  to

the initiatives

Page 338: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 338/373

the initiatives.

A proper measurement system  to track the progress.

This weaves accountability into six sigma initiatives and

 provides tangible picture of the organization‟s efforts.

Internal and external  benchmarking  of the

organization's products, services and processes.

FICCI CE

Prerequisites of successful implementation 

Stretch goals to focus on changing the processes.

Page 339: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 339/373

Appointment and training of champions and black belts 

to promote initiatives . The champions must be able to

 provide necessary planning, teaching, coaching andconsulting at all levels in the organization.

Training and development at all levels.

FICCI CE

Creating Six sigma Focus 

Si Si j t b l t d th b i f

Page 340: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 340/373

Six Sigma projects can be selected on the basis of

any of the following criteria :- 

• Focus on project cost savings• Focus on Deliverables

• Focus on the processes

• Focus on the problems 

FICCI CE

Focus on project cost savings 

Page 341: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 341/373

Under this criteria the Six Sigma projects are selected for

 potential reductions in the fixed or var iable costs . The

organization should however be aware about the limitation

of this approach, particularly when they are trying to

 propagate quality.

FICCI CE

Focus on deliverables 

Under this approach the organization identifies the areas that

Page 342: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 342/373

Under this approach the organization identifies the areas that

are the greatest cause of customer dissatisfaction.  High

warranty costs is one area that the organization may want to

look into. However this approach is also short sighted as itfocuses on defects rather than the processes that create the

defects.

FICCI CE

Focus on the processes 

To select the Six Sigma projects by focussing on the processes

Page 343: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 343/373

g p j y g p

is the best way to attack the root causes of defects and

customer satisfaction concerns . It is important for the

organization to identify critical processes which are operatingat low sigma levels.

FICCI CE

Focus on the problems 

Another way to select the Six Sigma project is to straightaway

Page 344: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 344/373

Another way to select the Six Sigma project is to straightaway

focus on the problem . Many a times there may be nothing

wrong with the process, but the products may still not be

doing very well. One example could be weak design of the product. The organization can straightaway focus on redesign

of the products.

FICCI CE

Six Sigma deployment schedule 

Week Activities

1 Champions create the vision of Six sigma in the organization

2-5 Define the road map with comprehensive training plan

6 Identify high impact Six sigma projects

Page 345: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 345/373

7 Class room training of Black belts on MEASURE phase

8-10 Black belts work on projects & apply knowledge gained in the MEASURE phase

11 Class room training of Black belts on ANALYZE phase

12-14 Black belts work on projects & apply knowledge gained in the ANALYZE phase

15 Class room training of Black belts on IMPROVE phase

16-18 Black belts work on projects & apply knowledge gained in the IMPROVE phase

19 Class room training of Black belts on CONTROL phase

20-22 Black belts work on projects & apply knowledge gained in the CONTROL phase

23-24 The Black belts review the results and select other areas of high impact

FICCI CE

9. Measuring business excellence 

Measures of business excellence

Non financial measures

Employee related

Page 346: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 346/373

Operations related

Customers related

Financial measures

FICCI CE

Measures of business excellence 

Page 347: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 347/373

After implementing Six Sigma, the organization must assess the

impact of the program on overall business results. Since six sigma has

an impact on all the business functions, the organization must measure

all the functions through quantifiable measures of excellence. Tofacilitate this assessment, sample measures of excellence for various

functions are given on the following slides. 

FICCI CE

Measures of business excellence 

Page 348: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 348/373

The measures of business excellence can be broadly

classified into following two categories :-

A. Non financial measures

B. Financial measures 

FICCI CE

A. Non financial measures 

Page 349: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 349/373

 Non financial measures can be further classified into threecategories :-

I. Employee related

II. Operations relatedIII. Customers related 

FICCI CE

I. Employee related 

Page 350: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 350/373

• Employee satisfaction

• Awards presented

• Internal promotions

• Employee turnover

• Safety and health

• Suggestions received and implemented

FICCI CE

II. Operations related 

Page 351: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 351/373

Operations related measures can be classified further into following categories:

• Marketing

• Purchase

• Manufacturing

• Product Engineering

• Quality Assurance• Product reliability

• Accounting

FICCI CE

Operations related :- Marketing 

1. Accuracy of forecast assumptions.

2. Number of incorrect order entries.

3 O t k d fi ld li

Page 352: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 352/373

3. Overstocked field supplies.

4. Contract errors.

5. Late deliveries.

6. Customer complaints.

7. Warranty cost as a percentage of sales.

FICCI CE

Operations related :- Purchase 

1. Premium freight cost/ demurrage charges.

2. Down - time because of parts shortages.

Page 353: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 353/373

3. Number of Off specification parts used to keep line going.

4. Cycle time from start of purchase request until items in house.

5. Excess inventory.

6. Percentage of purchased material rejected on receipt.

FICCI CE

Operations related :- Manufacturing 

1. Yield per ton of raw materials.

2. Percentage of parts scrapped.

Page 354: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 354/373

3. Percentage of parts reworked.

4. Percentage of parts accepted on concession.

5. Percentage of final product graded as seconds.

6. Production per man / machine.

FICCI CE

Operations related :- Product engineering 

1. Number of engineering changes per document.

2. Number of errors found during design review.

Page 355: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 355/373

3. Number of errors found in design evaluation test.

4. Percentage of time over- run compared to planned time for

development.

5. Percentage of cost over - run over estimated cost of development.

6. Number of tooling redesign after trial production. 

FICCI CE

Operations related :- Quality Assurance 

1. Percentage of lots rejected due to errors.

2. Percentage of products having defects detected by customers.

Page 356: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 356/373

3. Number of engineering changes that should have been detected in

design review.

4. Errors in inspection / test reports.

5. Cycle time to get corrective actions.

6. Percentage of appraisal cost compared to production cost.

FICCI CE

Operations related :- Product reliability 

• Mean time to failure.

• Failure rate.

Page 357: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 357/373

• Probability of failure occurrence during given time interval.

• Probability of failure non-occurrence during given time interval.

• Mean life time.

• Mean time to first generate overhaul.

• Mean time to repair.

FICCI CE

Operations related :- Accounting 

1. Percentage of late payments.

2. Time to respond to customer request for information.

Page 358: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 358/373

3. Billing errors.

4. Incorrect accounting entries.

5. Payroll errors.

6. Errors in cost estimates.

FICCI CE

III. Customer related 

• Market share

• Market penetration

• New markets identified

O ll t ti f ti

Page 359: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 359/373

• Overall customer satisfaction

• Customer complaints

• Customer retention

• R&D expenditure as a percentage of sales

• New products and services introduced

• Sales per employee

FICCI CE

B. Financial measures 

The normal business pressures in today‟s  world tend to

cause more time to be spent on financial measures than any

Page 360: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 360/373

p y

other element of business. We need to be sure that the

strong signals sent by this attention in no way

underestimates the importance of the non financial

measures as discussed in the previous slides to improve the

overall business performance.

FICCI CE

Financial measures 

In addition, to the standards set of revenue and costaccountancy measures, the organizations must reduce their

quality costs and eliminate all the non value adding

Page 361: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 361/373

q y g

activities from their system.

Various categories of quality cost are given on the

following slides :-

FICCI CE

Quality costs - Prevention costs 

• Market research

• Quality training programs.

• Contract review

• Design review

Page 362: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 362/373

• Field trials

• Supplier evaluation

• Process plan review

• Process capability review

• Design and manufacture of jigs and fixtures

• Preventive maintenance

FICCI CE

Quality costs - Appraisal costs 

Proto type testing

Vendor surveillance

Incoming material inspection

Page 363: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 363/373

co g ate a spect o

Process inspection/control

Final inspection

Laboratory testing / measurement

Quality audits

FICCI CE

Quality costs - Internal failure 

Design changes/ corrective action

Scrap due to design changes

Excess inventory

Page 364: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 364/373

Rectification / reject disposition of purchased material

Rework/rejection in manufacturing

Downgrading of end product

Downtime of plant & machinery

Trouble-shooting & investigation of defects

FICCI CE

Quality costs - External failure 

Processing / investigation of customer complaint

Repair/replacement of sold goods

Warranty claims

Page 365: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 365/373

y

Product liability & litigation costs

Interest charges on delayed payment due to quality problems Loss of customer goodwill & sales 

FICCI CE

Size of categories of quality costs 

In most of the organizations working at 2 or 3 sigma there

is less emphasis on prevention, and their main quality

Page 366: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 366/373

p p , q y

efforts are on appraisal with very little control on internal

and external failure costs. Organizations must intensify

their efforts on the preventive costs to reduce their overall

cost of quality.

FICCI CE

1-10-100 Rule 

1

10

Rs

Rs

Prevention

Correction

S   t  a  g  e  s

Page 367: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 367/373

100

Rs

Rs

Rs

Failure

   S

FICCI CE

Amount Percentage

Prevention Costs

Quality Administration

QualityEngineering

Reliability Engineering

T i i

Computing cost of poor quality 

Page 368: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 368/373

Training

Total Prevention

Appraisal Costs

Inspection

Test

Vendor Control

Measurement Control

Materials ConsumedQulaity Audits

Total Appraisal

FICCI CE

Amount Percentage

Internal Failure Costs

Scrap

Repair & rework

Vendor Losses

Computing cost of poor quality 

Page 369: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 369/373

Failure Analysis

Total internal

External Failure Costs

Failures-manufacturing

Failures-Engineering

Failure-Sales

Warranty charges

Failure Analysis

Total External

Total Quality Costs

FICCI CE

Financial measures 

• Cost of quality as a percentage of sales

• Profit before interest and financial charges

Page 370: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 370/373

• Profit before and after tax

• Growth in profits over last year

• Return on assets

• Return on capital employed

• Return on sales

FICCI CE

General H.LAL 

General H.Lal is a mechanical engineer. In 1971 he joined the Defence

Quality Organization and held important appointments till in 1987 he

was appointed Director General, Defence Quality AssuranceOrganization. After retirement he was appointed Director General,

Bureau of Indian Standards. In addition to standards he pioneered the

Source of information and advice 

Page 371: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 371/373

quality movement in India. By his sustained efforts through TV, print

media and seminars he brought quality into national focus.

He is also an internationally recognized quality expert and his new book “ISO  9000 : Guidelines for developing countries”  has recently

 been published by ISO and UNCTAD/GATT. He is the chairman of

MSD Council of BIS which formulates national standards of quality

management . He is also an adviser to the UNITED NATIONS

DEVELOPMENT ORGANIZATION( UNIDO ).He is currently the Director General , FICCI Quality Forum.

FICCI CE

Research, Artwork, Design and Development 

Pravin Rajpal Mr.Pravin Rajpal is a Chartered Accountant with more than 15 years

of work experience in some of the best professionally managed

Page 372: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 372/373

p p y g

companies in India. He worked for Eicher Consultancy Services, a

 premier management consultany company in India for 4 years.

At present he is the CEO of Competitive Edge, ManagementConsultants.

FICCI CE

We shall be very pleased to receive your feedback on this product.Please contact us at the following address:- 

Feedback  

Page 373: Six Sigma Pgm

8/13/2019 Six Sigma Pgm

http://slidepdf.com/reader/full/six-sigma-pgm 373/373