sl002014 village hall june 24, 2002 village of freeport, new york freeport electric village of...
TRANSCRIPT
SL002014
Village Hall
June 24, 2002
Village of Freeport, New YorkFreeport ElectricVillage of Freeport, New YorkFreeport Electric
SL002014
Description of the Project Description of the Project
Two separately owned and operated natural gas fueled 44 MW combustion turbines with ancillary equipment to be constructed adjacent to existing power plant
Noise wall construction reduces noise levels Construction of near GEP stacks and Selective
Catalytic Reduction (SCR) to mitigate air impacts, in compliance with LAER, Lowest Achievable Emissions Rate
State of the Art technology to reduce existing air and noise impacts
Two separately owned and operated natural gas fueled 44 MW combustion turbines with ancillary equipment to be constructed adjacent to existing power plant
Noise wall construction reduces noise levels Construction of near GEP stacks and Selective
Catalytic Reduction (SCR) to mitigate air impacts, in compliance with LAER, Lowest Achievable Emissions Rate
State of the Art technology to reduce existing air and noise impacts
SL002014
Construction of: Construction of:
2 Natural Gas fueled Power Plants, clean – state of the art – technology, one owned by the Village to serve native load and one merchant facility
Cooling Tower replacement for Village of Freeport Gas supply line from KeySpan to two power plants Electric Interconnection from 2 power plants to New
Switching Station Switching Station to connect Village of Freeport
and PPL to LIPA and the rest of LI
2 Natural Gas fueled Power Plants, clean – state of the art – technology, one owned by the Village to serve native load and one merchant facility
Cooling Tower replacement for Village of Freeport Gas supply line from KeySpan to two power plants Electric Interconnection from 2 power plants to New
Switching Station Switching Station to connect Village of Freeport
and PPL to LIPA and the rest of LI
SL002014
Existing Power Plant Viewed from Creek Existing Power Plant Viewed from Creek
SL002014
Computer Enhanced View from CreekComputer Enhanced View from Creek
SL002014
Computer enhanced Image of Switching StationComputer enhanced Image of Switching Station
SL002014
Village of Freeport Plant and Merchant PlantVillage of Freeport Plant and Merchant Plant
independent/separate facilities Natural Gas-fueled Combustion turbines Air Pollution Control Equipment Ammonia scrubbing equipment Low Sulfur Fuel for back-up use
shared facilities Secondary containment system (with existing tanks) Noise Wall Natural Gas pipeline and Electric Transmission
line, however will meter separately
independent/separate facilities Natural Gas-fueled Combustion turbines Air Pollution Control Equipment Ammonia scrubbing equipment Low Sulfur Fuel for back-up use
shared facilities Secondary containment system (with existing tanks) Noise Wall Natural Gas pipeline and Electric Transmission
line, however will meter separately
SL002014
SEQRA – Unlisted Action vs. Type 1 ActionSEQRA – Unlisted Action vs. Type 1 Action
“Determination of Significance” Positive Declaration or Negative Declaration?
Unlisted doesn’t require Coordinated Review
Type 1 require Coordinated Review
The Village as Lead Agency is performing a Coordinated Review
“Determination of Significance” Positive Declaration or Negative Declaration?
Unlisted doesn’t require Coordinated Review
Type 1 require Coordinated Review
The Village as Lead Agency is performing a Coordinated Review
SL002014
Purpose of SEQRAPurpose of SEQRA
To incorporate the consideration of environmental factors into the local agency’s
decision-making process at the earliest possible time
To incorporate the consideration of environmental factors into the local agency’s
decision-making process at the earliest possible time
SL002014
Decision is primarily based on the Environmental AssessmentDecision is primarily based on the Environmental Assessment
SL002014
What is an EA? What is an EA?
An EA is an evaluation of the known or potential environmental consequences of a proposed action
EAs help involved and interested agencies identify their concerns about the action and provide guidance to the lead agency in making its determination of significance
An EA is an evaluation of the known or potential environmental consequences of a proposed action
EAs help involved and interested agencies identify their concerns about the action and provide guidance to the lead agency in making its determination of significance
SL002014
The EA for the Freeport Electric Plant No. 2 Generating ProjectThe EA for the Freeport Electric Plant No. 2 Generating Project
SL002014
Social IssuesSocial Issues
Land Use and Zoning Community Facilities Cultural Resources Visual Resources Socioeconomic and Environmental Justice Public Health and Safety
Land Use and Zoning Community Facilities Cultural Resources Visual Resources Socioeconomic and Environmental Justice Public Health and Safety
SL002014
Existing and Proposed Viewsfrom Norman Levy PreserveExisting and Proposed Viewsfrom Norman Levy Preserve
SL002014
Technical IssuesTechnical Issues
Traffic and Transportation – no change from existing
Air Quality – better than in full compliance, LAER and SCR
Noise – in full compliance Infrastructure – no impacts Contaminated Materials – no impacts Soils, Geology, and Seismology – no impacts
Traffic and Transportation – no change from existing
Air Quality – better than in full compliance, LAER and SCR
Noise – in full compliance Infrastructure – no impacts Contaminated Materials – no impacts Soils, Geology, and Seismology – no impacts
SL002014
Existing and Proposed View looking East from East First St. Existing and Proposed View looking East from East First St.
SL002014
Environmental Issues Environmental Issues
Natural Resources, including wetlands, restored to better than existing conditions
Water Resources – no impact Storm Water Management – no impact Coastal Zone Management/Coastal Storms
Natural Resources, including wetlands, restored to better than existing conditions
Water Resources – no impact Storm Water Management – no impact Coastal Zone Management/Coastal Storms
SL002014
Construction Impacts – TemporaryConstruction Impacts – Temporary
Warehousing, Noise Abatement and Traffic Abatement Procedures Implemented
Warehousing, Noise Abatement and Traffic Abatement Procedures Implemented
SL002014
Determination of SignificanceImpact or No Impact ?
Determination of SignificanceImpact or No Impact ?
SL002014
Determination of SignificanceDetermination of Significance
The project conforms to standards designed to protect the environment and appropriate design parameters have been imposed to
ensure standards are enforced
The project conforms to standards designed to protect the environment and appropriate design parameters have been imposed to
ensure standards are enforced
SL002014
Negative DeclarationNegative Declaration
No significant impact is expected to occurto: air, land resources, visual resources, groundwater resources, surface water,
cultural resources, open space and recreation, transportation, energy and public
health. Furthermore, no significant noise and odor impacts are expected
No significant impact is expected to occurto: air, land resources, visual resources, groundwater resources, surface water,
cultural resources, open space and recreation, transportation, energy and public
health. Furthermore, no significant noise and odor impacts are expected