slc phase 2 st kenneths primary school parent council meeting respect integrity innovation...

17
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER

Upload: bryan-reeves

Post on 18-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

SLC PHASE 2 ST KENNETHS PRIMARY SCHOOLPARENT COUNCIL MEETING

respect

integrity

innovation

collaboration

excellence

1ALISDAIR ELLIOT – CONSTRUCTION MANAGER

ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING

SECT

ION

1

2.0 Project Overview & Images3.0 BLL Project Team & Logistics4.0 Current Progress & Phase 2 / 3 Transition5.0 Q & AClose

1.0 Introduction and Agenda

2

ST KENNETHS PRIMARY SCHOOL

SECT

ION

2 2.0 The Project

2.1 Project Overview2.2 Images

3

ST KENNETHS PRIMARY SCHOOL 2.1 Project Overview

Building: GIFA

ST KENNETHSPRIMARYSCHOOL

3569 m²

The project: This project is our fourth new-build primary school building to be constructed within Phase 2 Tranche 1 of the South Lanarkshire Primary Schools Modernisation Programme.

The Client: South Lanarkshire Council

The Contract: PPC 2000 (Partnering framework contract agreement)

Overview: The project comprises the tandem build construction of a new two-storey 16 classroom primary school. In addition to the classrooms, the building comprises private and main stream nurseries, a double gym hall, general purpose room, library and IT Suite. The new building is located within the existing school campus, formerly the location of the existing sport pitch and car park. The works are being carried out in two phases to allow the existing school to operate whilst the new building is under construction. On completion of the new school building the users will decant from existing to new allowing progression into phase 2 where the scope is to remove asbestos from the existing school, demolish the building, complete the sports pitch and finish the hard and soft landscaping.

Construction: The construction of the primary school is a steel frame structure with holorib decking topped with a concrete floor slab on pads/strip foundations. The building will have predominantly a facing brick outer leaf with areas of metal cladding and curtain walling on the elevations. The roof will be an aluminium standing seam roof throughout.

Internally, underfloor heating has been incorporated throughout the building with fit out specification aligning with other projects in the programme.

Externally, the scheme includes external hard and soft landscaping and lighting design scheme complete with a standard 60 x 40 metre sports pitch, car parking / pupil drop off with playground & soft play areas around the school/nursery. 4

ST KENNETHS PRIMARY SCHOOL 2.2 Images

5

ST KENNETHS PRIMARY SCHOOL 3.0 PROJECT TEAM / SITE LOGISTICS

SECT

ION

3 3.0 Project Team & Site Logistics

3.1 BLL Design Team3.2 BLL Construction Team3.3 Site Logistics

6

ST KENNETHS PRIMARY SCHOOL 3.1 BLL Design Team

Structural EngineerCost Consultant Services EngineerArchitect

This is the design team engaged upon the St Kenneth’s Primary School Project

7

ST KENNETHS PRIMARY SCHOOL3.2 BLL Construction Team

TRACEY-LEIGH FINDLAYFramework Commercial Manager

ANDY STRONACHFramework Manager

TOM CAIRNEYFramework

Safety Manager

BARRY O’HAGANFramework Delivery Manager

OMAR AHMED WAZIRPlanning Manager

Alisdair ElliotConstructionSite Manager

CO

RE

TEA

MD

ELIV

ERY

TEA

M

GORDON ANDERSONRegional Director

DES

IGN

TEA

M

ED PARRYCommercial Director

EMMA ROBBCommercial Manager

Michael McMullanConstruction

Manager (Part)

TBCFinishes Construction

Manager (Part) 8

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Overall Phasing Diagram

9

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 1 Logistics

10

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 2 Logistics

11

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 3 Logistics

12

ST KENNETHS PRIMARY SCHOOL 3.0 PROJECT TEAM / SITE LOGISTICS

SECT

ION

4 4.0 Programme

4.1 Current Progress4.2 Phase 2 / 3 Transition

13

ST KENNETHS PRIMARY SCHOOL 4.1 Current Progress

Works on site at present comprise the following:

External Works

•External Brickwork

•Curtain Walling Windows and Doors

•External Cladding

14

PROGRESS

Bovis Lend Lease are currently reporting works on programme with all works due for completion 23/07/10

ST KENNETHS PRIMARY SCHOOL 4.1 Current Progress

Internal Works

•Interior Fit Out (Joinerwork, floor finishes, suspended ceilings)• •Mechanical & Electrical Installation

•Architectural Metalwork

•Decoration

•Gym Fit Out

15

ST KENNETHS PRIMARY SCHOOL 4.2 Phase 2 / 3 Transition

Demolition of the existing school is scheduled to be completed during November 2010. Following which BLL will install synthetic sports pitch and carry out further hard and soft landscaping works

BLL are scheduled to complete all Phase 3 works during January 2011

BLL are intending to use the existing delivery entrance of East Mains Road to service the Phase 3 works

16

Bovis Lend Lease are scheduled to take possession of the Phase 3 site on the 30 July 2010 and commence preparation works for demolition of the existing school.

ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING

SECT

ION

5 5.0 Q & A

Close

17