slick line

86
Typical Wireline Rig-up Wireline Unit Stuffing Box Lubricator swab valve master valve Lower Sheave Upper Sheave Springs Slickline No conductor Single strand wire 8/25/2015 1 George E. King Engineering GEKEngineering.com

Upload: kevin-steinbach

Post on 10-Apr-2016

76 views

Category:

Documents


13 download

DESCRIPTION

Slick Line

TRANSCRIPT

Page 1: Slick Line

Typical Wireline Rig-up

Wireline Unit

Stuffing Box

Lubricator

swab valve

master valve

Lower Sheave

Upper Sheave

Springs

Slickline •No conductor

•Single strand wire

8/25/2015 1 George E. King Engineering

GEKEngineering.com

Page 2: Slick Line

8/25/2015 2 George E. King Engineering

GEKEngineering.com

Page 3: Slick Line

8/25/2015 3 George E. King Engineering

GEKEngineering.com

Page 4: Slick Line

Wireline Surface Equipment

• Reels and Controls

• BOP

• Lubricators

• Grease (oil) Seals

8/25/2015 4 George E. King Engineering

GEKEngineering.com

Page 5: Slick Line

8/25/2015 5 George E. King Engineering

GEKEngineering.com

Page 6: Slick Line

Wireline BOP

8/25/2015 6 George E. King Engineering

GEKEngineering.com

Page 7: Slick Line

Lubricator Layout and Loading – wireline operations

8/25/2015 7 George E. King Engineering

GEKEngineering.com

Page 8: Slick Line

Lubricator Length

• “Consider the tool string length when sizing the lubricator length. The available length to swallow a tool string is from the top of the swab valve to the bottom of the flowtubes. This length should be the TOTAL tool length, line head to bottom nose, plus 3 extra feet.”

8/25/2015 8 George E. King Engineering

GEKEngineering.com

Page 9: Slick Line

Stuffing Box – the Main Seal on the Wire

• Braided Line – Grease Injector

• Slick Line - Rubber elements with and without oil injection capacity. A hydraulic oil is usually used for sealing and lubrication of the wire.

8/25/2015 9 George E. King Engineering

GEKEngineering.com

Page 10: Slick Line

Schematic of a Grease Injector for Braided Line

Rubber Elements

Flow Tubes

Grease Injection

8/25/2015 10 George E. King Engineering

GEKEngineering.com

Page 11: Slick Line

Braided Line Grease Injector

– Blowing grease in the air? - the rubber is worn out.

– Loosing grease in the well? -flow tubes too big/worn, braided line worn. Either way, too much clearance.

– Number of tubes depends on the pressure. Bottom flow tube must be close to diameter of braided line.

– If grease use is high (over 10 lb/day) operator may be pumping too much grease - more than needed.

– Greases comes in different viscosities, formulated for pressure and temperature combinations .

– If hanging gauges in well on braided cable during a job, do not pump grease - just tighten rubbers.

– Some greases thicken and/or emulsify with well or injected fluids. Formation damage can be severe.

8/25/2015 11 George E. King Engineering

GEKEngineering.com

Page 12: Slick Line

Wireline Fishing/Jarring Best Practices

• Maximum fishing time of 45 minutes to 1 hour before reheading wire – move the fatigue point (fatigue caused by continual working over the shieves during jarring) – usually cut off 100 ft.

• Work to 50% of max load.

• Use of 0.125 and braided wire considered?

8/25/2015 12 George E. King Engineering

GEKEngineering.com

Page 13: Slick Line

8/25/2015 13 George E. King Engineering

GEKEngineering.com

Page 14: Slick Line

Some Wire Types

• Bright Steel – most widely used, not for H2S or CO2

• AISI 304 – H2S service

• AISI 316 - H2S service

8/25/2015 14 George E. King Engineering

GEKEngineering.com

Page 15: Slick Line

Wire Limits (Bright Steel) (estimates only)

Wire Size Minimum Tensile Strength MaximumWork Level

0.072” 972 lb. 500 to 600 lb. ?

0.082” 1239 lb. 850 lb. ?

0.092” 1547 lb. 1000 lb. ?

0.108” 2436 1400 lb. ?

0.125” 3200 1800 lb. ?

Minimum tensile is 75% of rated break strength.

Data for “bright plow steel wire”

8/25/2015 15 George E. King Engineering

GEKEngineering.com

Page 16: Slick Line

Wire Limits - AISI 304 (estimates only)

Wire Size Minimum Tensile Strength MaximumWork Level

0.082” 1280 lb. 850 lb. ?

0.092” 1582 lb. 1000 lb. ?

0.105” 2070 lb. 1400 lb. ?

Minimum tensile is 75% of rated break strength.

8/25/2015 16 George E. King Engineering

GEKEngineering.com

Page 17: Slick Line

Wireline breaks involve fatigue, physical damage to the wire, corrosion and other factors.

8/25/2015 17 George E. King Engineering

GEKEngineering.com

Page 18: Slick Line

Nominal Weight of Wire

Wire Size Wt per 1000 ft of wire

0.072 14 lb

0.082 18 lb

0.092 22.6 lb

0.108 31 lb

0.125 44 lb

8/25/2015 18 George E. King Engineering

GEKEngineering.com

Page 19: Slick Line

Selecting Wireline

• What devices have to be pulled (weights, loads)?

• What impact forces are needed?

• What are the tubing sizes? – Small tubing – smaller wire, easier to work and

recover.

• Corrosion potential?

• Local preferences?

8/25/2015 19 George E. King Engineering

GEKEngineering.com

Page 20: Slick Line

Braided line – stronger (2800 to 3500 lb working strength, but less “feel” when fishing and slower line speed.

Watch abrasion of steel by braided wire.

Harder to get a seal in stuffing box/grease injector

8/25/2015 20 George E. King Engineering

GEKEngineering.com

Page 21: Slick Line

Wireline Operations

• Common workovers with wireline

– liquid and fill tags

– gauge running and retrieval

– gas lift valve replacement

– sleeve shifting

– plug and packer setting

– bailer runs

8/25/2015 21 George E. King Engineering

GEKEngineering.com

Page 22: Slick Line

Wireline Operations

• Advantages - speed, cost, footprint, “feel”

• Disadvantages – low wire strength

– lack of rotation

– lack of circulation

• Problems – lack of experienced operator

– poorly maintained units

– impatience

– poor well records

8/25/2015 22

George E. King Engineering GEKEngineering.com

Page 23: Slick Line

Common Problems with Wireline

• Wire breaks

– Fatigue (work hardening failure)

– corrosion (H2S, CO2, acids)

– load failure

• Damage to well equipment and coatings from wire abrasion

8/25/2015 23 George E. King Engineering

GEKEngineering.com

Page 24: Slick Line

Slick Line Torsion Tester - Twist testing has eliminated wire breakage in many areas.

8/25/2015 24 George E. King Engineering

GEKEngineering.com

Page 25: Slick Line

8/25/2015 25 George E. King Engineering

GEKEngineering.com

Page 26: Slick Line

Wire Fatigue – Number of turns to break wire

• Wire Size New Min turns to break

– 0.072 29

– 0.082 26

– 0.092 23

– 0.108 20

– 0.125 22 18

8/25/2015 26 George E. King Engineering

GEKEngineering.com

Page 27: Slick Line

Look at the type of break

• Smooth – no problem

• Jagged – embrittlement possible, even if the turn count is within minimum tolerance, put new wire on the unit.

– Corrosion by H2S and CO2

– Fatigue mixed with embrittlement

8/25/2015 27 George E. King Engineering

GEKEngineering.com

Page 28: Slick Line

Wireline Fatigue

• Limit the wireline crews to 50 - 60 jar cycles prior to POOH and cut of +/- 50m wire

8/25/2015 28 George E. King Engineering

GEKEngineering.com

Page 29: Slick Line

Some Very Basic Learnings

• About “90%” of success is in the operator selection.

• Wire line breaks can be almost totally eliminated by torsion testing of wire and limiting jarring times.

• When wire breaks, always expect a little wire above the rope socket.

• When possible, run a fishing tool that has a release.

• H2S wells can be wireline nightmares

8/25/2015 29 George E. King Engineering

GEKEngineering.com

Page 30: Slick Line

Wireline Equipment Checks

• 1. Measure and record data for all equipment that goes in the hole.

– diameters of every component

– tool body lengths

– thread patterns of each component

– Tapers, shoulders, unusual equipment

– compressed and extended jar lengths

8/25/2015 30 George E. King Engineering

GEKEngineering.com

Page 31: Slick Line

Wireline Equipment Checks

• 2. Wire history

– size, material

– use history

– corrosion treatment

– torsion testing (turns before breaking)

– jarring time in one spot (working continuously over the shieve or pulley thins and fatigues wire)

8/25/2015 31 George E. King Engineering

GEKEngineering.com

Page 32: Slick Line

Wireline Equipment Checks

• 3. Equipment

– working condition

– support for loads

– lubricator pressure limit

– seal equipment capability and backup

– seal equipment sizing

8/25/2015 32 George E. King Engineering

GEKEngineering.com

Page 33: Slick Line

0.125” Wireline

extra pulling cap. advantage, w/stubborn SSSV's

need 16" shieves and winch, tools etc., to match

more muscle required to make the rope socket

when fishing, it tends to come out in 2-10' lengths.

consider use of sidewall cutters, box off wire if break

main hurdle is education of the operators

extra weight when deep cancels out extra pulling cap.

less "feel", less accelaration when jarring

8/25/2015 33 George E. King Engineering

GEKEngineering.com

Page 34: Slick Line

Wireline Basic Equipment

• Rope Socket

• Jars

• Tools

• Wireline torsion testers

8/25/2015 34 George E. King Engineering

GEKEngineering.com

Page 35: Slick Line

8/25/2015 35 George E. King Engineering

GEKEngineering.com

Page 36: Slick Line

8/25/2015 36 George E. King Engineering

GEKEngineering.com

Page 37: Slick Line

8/25/2015 37 George E. King Engineering

GEKEngineering.com

Page 38: Slick Line

There are many different types of rope rockets.

The number of turns in the wire influences breaking strength.

If wire breaks prematurely during rope sock makeup , do a torsion test.

8/25/2015 38 George E. King Engineering

GEKEngineering.com

Page 39: Slick Line

8/25/2015 39 George E. King Engineering

GEKEngineering.com

Page 40: Slick Line

Wire Cutter Problems in Deviated Wells

• When the tool string is stuck, the most common approach is to cut the wire as close to the BHA as possible with a drop-type cutter.

• In high angle wells there is potential for a traditional wire cutter not to get to bottom.

• Need for a releasable rope socket?

8/25/2015 40 George E. King Engineering

GEKEngineering.com

Page 41: Slick Line

Junk in the bottom of a well

8/25/2015 41 George E. King Engineering

GEKEngineering.com

Page 42: Slick Line

Jars

• Mechanical or spang jars – old design, but very effective – Mostly for near vertical wells, but have been used

in deviated sections (losese effectiveness as deviation increases)

• Hydraulic jars – Much slower acting

– Less (?) affected by deviation – still requires a tight wire above the jar.

8/25/2015 42 George E. King Engineering

GEKEngineering.com

Page 43: Slick Line

8/25/2015 43 George E. King Engineering

GEKEngineering.com

Page 44: Slick Line

Fishing neck must be in good shape with sharp shoulders. Also, look for any damage to threads.

8/25/2015 44 George E. King Engineering

GEKEngineering.com

Page 45: Slick Line

Hydraulic Jars

•Hydraulic Jars – initial problems.

- Problematic operation in gas & hot wells.

- Minimal impact forces due to short stroke length.

• Spring Jars were developed with longer stroke leading to

greater impact forces.

- Fixed spring value - jar had to be disassembled to change.

- Typically only 3 different values of spring available.

•Adjustable Upstroke Jar (PAJ) (Petroline- Weatherford)

• - Longer stroke leading to greater impact forces.

- Jar setting can be changed across a wide range and without disassembly.

- Disc spring stack design a highly efficient stored energy medium.

8/25/2015 45 George E. King Engineering

GEKEngineering.com

Page 46: Slick Line

Tools

• Basic Tool String Design

• Running Tools

• Fishing Tools

8/25/2015 46 George E. King Engineering

GEKEngineering.com

Page 47: Slick Line

Pulling Weight Into the Well – The Problems

• Long lubricators required

• Rig up height increased

• Added friction in deviated wells from longer weight stem

• Less wireline load capacity

8/25/2015 47 George E. King Engineering

GEKEngineering.com

Page 48: Slick Line

8/25/2015 48 George E. King Engineering

GEKEngineering.com

Page 49: Slick Line

8/25/2015 49 George E. King Engineering

GEKEngineering.com

Page 50: Slick Line

Tools

• Stem

• Knuckles

• Various Tools

8/25/2015 50 George E. King Engineering

GEKEngineering.com

Page 51: Slick Line

8/25/2015 51 George E. King Engineering

GEKEngineering.com

Page 52: Slick Line

8/25/2015 52 George E. King Engineering

GEKEngineering.com

Page 53: Slick Line

8/25/2015 53 George E. King Engineering

GEKEngineering.com

Page 54: Slick Line

Gauge ring cutters

Problems in highly deviated wells - sticking

8/25/2015 54 George E. King Engineering

GEKEngineering.com

Page 55: Slick Line

Dimension should closely follow id of tube - this allows check for partial collapse and prevents material from getting on top of tool string.

Camco 8/25/2015 55

George E. King Engineering GEKEngineering.com

Page 56: Slick Line

CT Fishing Survey Tools

Tools and devices which help determine fish type and orientation

Lead impression blocks: Provide information on profile and orientation of the fish

Experience required to interpret recovered impression

Downhole cameras transmit images/video to surface: Clean wellbore fluid required

Temperature/time limitations

High cost of service

8/25/2015 56 George E. King Engineering

GEKEngineering.com

Page 57: Slick Line

Set down once and retrieve. Multiple set downs only confuse the imprint.

Also known as a “confusion block” - generally for good reason.

8/25/2015 57 George E. King Engineering

GEKEngineering.com

Page 58: Slick Line

8/25/2015 58 George E. King Engineering

GEKEngineering.com

Page 59: Slick Line

Lead Impression Block Interpretation

Offset and

incomplete

impression

Fish lying on side

of wellbore

8/25/2015 59 George E. King Engineering

GEKEngineering.com

Page 60: Slick Line

8/25/2015 60 George E. King Engineering

GEKEngineering.com

Page 61: Slick Line

Some lead impression blocks may be made in various shapes for assistance in describing shapes or locations of fish.

8/25/2015 61 George E. King Engineering

GEKEngineering.com

Page 62: Slick Line

Impression Block Best Practices

• Run a near drift block

• Set down one time and POOH

• Keep a file of paper cut-outs of pipe body diameters, connection diameters, tool connections, etc., that might look up. Helps to match the cut-out to the shape of the impression.

8/25/2015 62 George E. King Engineering

GEKEngineering.com

Page 63: Slick Line

Downhole video much better than impression blocks for real information

8/25/2015 63 George E. King Engineering

GEKEngineering.com

Page 64: Slick Line

8/25/2015 64 George E. King Engineering

GEKEngineering.com

Page 65: Slick Line

One type of running tool

8/25/2015 65 George E. King Engineering

GEKEngineering.com

Page 66: Slick Line

8/25/2015 66 George E. King Engineering

GEKEngineering.com

Page 67: Slick Line

JD Pulling Tools – note sharp shoulders and clean tool bodies

8/25/2015 67 George E. King Engineering

GEKEngineering.com

Page 68: Slick Line

JD Pulling tool – commonly run just below the jar in the BHA.

JD tools are used for external fishing necks.

8/25/2015 68 George E. King Engineering

GEKEngineering.com

Page 69: Slick Line

The tops of fishing necks are usually tapered to assist the fishing tool in locating and attaching.

Note sharp shoulders

Note the extended body of the neck – this allows some extension above the top of debris that may settle on top of the plug.

8/25/2015 69 George E. King Engineering

GEKEngineering.com

Page 70: Slick Line

Outside fishing neck with flow through capacity.

8/25/2015 70 George E. King Engineering

GEKEngineering.com

Page 71: Slick Line

One problem with inside fishing necks is that debris may prevent the prong from entering and latching.

8/25/2015 71 George E. King Engineering

GEKEngineering.com

Page 72: Slick Line

Inside fishing neck for a GS running tool

8/25/2015 72 George E. King Engineering

GEKEngineering.com

Page 73: Slick Line

Fish Type and Dimensions

•Many fishing tools only catch on limited size range (OD or ID)

•When dimensions of fish are known: –Prepare accurate fishing diagram

–Prepare wellbore or completion diagram

•Factors influencing selection of tools/techniques: –Fish stuck/free

–Fill or junk on top of fish

–Fish material properties • e.g. small ferrous objects retrieved by magnetic devices

8/25/2015 73 George E. King Engineering

GEKEngineering.com

Page 74: Slick Line

Fishing Diagram - Fishing Neck Detail

4.250 in. 3.500 in.

2.000 in. 1.500 in.

3.750 in.

2.313 in.

2.000 in.

1.813 in. Depth to top of fish

3455.50 ft

Wellbore tubular

Fish OD and length information

are presented in a general

fishing diagram

8/25/2015 74 George E. King Engineering

GEKEngineering.com

Page 75: Slick Line

8/25/2015 75 George E. King Engineering

GEKEngineering.com

Page 76: Slick Line

The top of a gas lift valve, bent over in the wellbore.

DHV Inc.

8/25/2015 76 George E. King Engineering

GEKEngineering.com

Page 77: Slick Line

Wellbore and Completion Geometry

•Minimum tubular or restriction size –Determines maximum OD of CT/toolstring which can be used

•When assessing drift clearances –Consider removal of fill

•Pressure differential may exist across the fish –Can force toolstring up or down wellbore

•When determining overpull available at fish –Consider wellbore geometry

8/25/2015 77 George E. King Engineering

GEKEngineering.com

Page 78: Slick Line

8/25/2015 78 George E. King Engineering

GEKEngineering.com

Page 79: Slick Line

Bailer Bottom

Flapper in the bottom of the bailer tube.

8/25/2015 79 George E. King Engineering

GEKEngineering.com

Page 80: Slick Line

Tools for running and retrieving gas lift valves – note: maximum length of tools and valve or dummy must fit into the tool body. Latching too long a valve can stick assembly.

Detent finger on tool body – indexes tool and orients for running and retrieval.

8/25/2015 80 George E. King Engineering

GEKEngineering.com

Page 81: Slick Line

Tubing End Locator - Problem

• “Upon RIH with the tool, we encountered high pick-up weights and were unable to enter the liner and the 7" section where the finger should open up. In this scenario we began to POOH with the pin unsheared. Since the spring was forcing the finger out, it would act as a hook on any nipples/restrictions encountered while pulling out of hole. However, because of the smaller ID, the finger would be unable to push out more than approx 45 degrees and hence the shear pin would never see any force - the pivot pin would see all the stress.”

8/25/2015 81 George E. King Engineering

GEKEngineering.com

Page 82: Slick Line

End of Tubing Locator. Arm is spring loaded and tucked into the tubing with end pointing upward. At end of tubing, the arm is deployed by the spring. It cannot swing into the slot in the body until it shears the pin.

It is normal to pin with a small pin, perhaps even steel – but watch the profiles and unusual diameter changes.

8/25/2015 82 George E. King Engineering

GEKEngineering.com

Page 83: Slick Line

High Angle Wells

• Rollers

– Used for getting wireline assemblies into deviated wells.

– Most needed for heavy tool strings

– Can increase application of wireline into wells to over 80 degrees.

• Friction Reduction

– Chemical additives reduce friction by 30%

8/25/2015 83 George E. King Engineering

GEKEngineering.com

Page 84: Slick Line

Roller stem used in higher deviation wells. Watch problems with deposits such as scale, paraffins, and asphatenes.

8/25/2015 84 George E. King Engineering

GEKEngineering.com

Page 85: Slick Line

8/25/2015 85 George E. King Engineering

GEKEngineering.com

Page 86: Slick Line

Wireline Checklist – a few pointers

1. Check pipe connection connection and pressure rating of lubricator and BOP

2. Check mandrel profiles and other tools to be run for correct OD, profile type and function.

3. Check pressure equalization features on all pulling and retrieving tools

4. Check that running, pulling and fishing tools have the correct latch mechanism for the tool being run or retrieved.

5. Check wireline unit for proper function (engine, clutch and line)

6. Check wire with twist test for fatigue

7. Have emergency plan for handling breaks and leaks.

8/25/2015 86 George E. King Engineering

GEKEngineering.com