A work-site road comes off of Route 8 to allow all of the heavy equipment
and efforts to begin. July 2011
A small pile of dirt starts off the large movement of topsoil from the site to help develop the pad for the new building. July
2011
A closer view of site work for the road and drainage for the main
entryway off of Route 8. July 2011
More soil movement from an area that will be the new high school. The location that the photographer is standing on will be a
future practice field.
The view between the trees shows soil movement for underground power lines to be placed. August
2011
The view from the Carey farmhouse road in July. Now more soil has been moved and work on underground
cables has changed the view. The future practice fields will sit here. August 2011
August work shows the soil from the pond excavation sitting on the largest “mountain”
in Kent County.
The large pond and equipment in the background mark a large project just waiting for the next step. September 2011
September is ending and the large pond will be near the main road and Route 8 to allow for
proper drainage of the site. September 2011
The overhead power lines will be placed underground and PP&G has started their efforts to help this happen.
September 2011
The end of September shows more equipment on the site with a great deal of soil movement
and wells getting ready to be drilled.