slomin foundation & school of autism campus
DESCRIPTION
Design for the Slomin Foundation & School of Autism Campus in Boynton Beach, Fl. This is a one of a kind facility in the USA for research, development and implementation of studies for ASD. The foundation will house 200 students and faculty with auxillary fuctions and playfields, gymnasium and natatorium along with the Foundation's Headquarters and research institute.TRANSCRIPT
ARCHITECTURE URBAN DESIGN PLANNING INTERIORS
The Palm Beach County
Sandra C. SlominSchool & Foundation for Autism3005 S Congress Ave. Boynton Beach, Fl.
Master Plan & Facility Design
July 2, 2009 2OCAMPO & ASSOCIATES
Autism is a brain development disordercharacterized by impaired social interactionand communication, and by restricted and repetitive behavior.
July 2, 2009 3OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
July 2, 2009 4OCAMPO & ASSOCIATES
Existing Boynton Beach Site
July 2, 2009 5OCAMPO & ASSOCIATES
PROGRAM REQUIREMENTS:• SCHOOL FACILITY (MAX 200 STUDENTS) 25,000 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 25,000 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 54,500 SF
FACILITIES PROVIDED:• SCHOOL FACILITY (MAX 200 STUDENTS) 35,198 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 26,258 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 61,456 SF
July 2, 2009 6OCAMPO & ASSOCIATES
The CONCEPT AnalysisBefore 159 Parking Spaces Requirement
July 2, 2009 7OCAMPO & ASSOCIATES
The CONCEPT AnalysisPlus 159 Parking Spaces +/-
July 2, 2009 8OCAMPO & ASSOCIATES
The Master Plan CONCEPTAlternative A
July 2, 2009 9OCAMPO & ASSOCIATES
The Master Plan CONCEPTAlternative B
July 2, 2009 10OCAMPO & ASSOCIATES
The Master Plan CONCEPT (Alternative C)
July 2, 2009 11OCAMPO & ASSOCIATES
The Master Plan CONCEPT B
The Campus Design Concept Must:• Address the Uniqueness of the Autism School Program. • Address the Uniqueness of the Autism Campus Concept (One Stop
Shop) & the Connectivity of its functions.• Address the Need to Introduce Natural Light as a “special” benefit to
the Occupants.• Address the special spatial and orientation needs created by ASD.• Address Constraint of a “tight” site which must accommodate the very
high parking count required due to the unique teacher / student ratio.• Address the desire to develop a Concept that is environmentally
sensitive, sustainable (based on cost / benefit) and be “GREEN”. • Be capable of raising the community awareness (if not “national”
awareness) of ASD.
July 2, 2009 12OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
PLAY FIELDS
SCHOOL HOUSE
SLOMIN FOUNDATION
GYM
NATATORIUM
FOUNDATIONPLAZA
PARENT DROP OFF
July 2, 2009 13OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME C
PLAY FIELDS SCHOOL
HOUSE
SLOMIN FOUNDATION
SLOMIN FOUNDATION
OVERGYM
FOUNDATIONPLAZA
PARENT DROP OFF
July 2, 2009 14OCAMPO & ASSOCIATES
PHASE 1 PLANS
July 2, 2009 15OCAMPO & ASSOCIATES
FUNCTIONAL DIAGRAM
July 2, 2009 16OCAMPO & ASSOCIATES
July 2, 2009 17OCAMPO & ASSOCIATES
July 2, 2009 18OCAMPO & ASSOCIATES
July 2, 2009 19OCAMPO & ASSOCIATES
PHASE 1 ELEVATIONS
July 2, 2009 20OCAMPO & ASSOCIATES
July 2, 2009 21OCAMPO & ASSOCIATES
July 2, 2009 22OCAMPO & ASSOCIATES
July 2, 2009 23OCAMPO & ASSOCIATES
July 2, 2009 24OCAMPO & ASSOCIATES
PHASE 1 RENDERINGS
July 2, 2009 25OCAMPO & ASSOCIATES
School House Building SCHEME B
July 2, 2009 26OCAMPO & ASSOCIATES
Cross Section SCHEME B
July 2, 2009 27OCAMPO & ASSOCIATES
Transverse Section SCHEME B
July 2, 2009 28OCAMPO & ASSOCIATES
Cross Section SCHEME B
July 2, 2009 29OCAMPO & ASSOCIATES
Detail at Atrium SpaceSCHEME B
July 2, 2009 30OCAMPO & ASSOCIATES
PHASE 2 ELEVATIONS
July 2, 2009 31OCAMPO & ASSOCIATES
July 2, 2009 32OCAMPO & ASSOCIATES
PHASE 2 MASTER PLAN
July 2, 2009 33OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
July 2, 2009 34OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
July 2, 2009 35OCAMPO & ASSOCIATES
PHASE 2 RENDERINGS
July 2, 2009 36OCAMPO & ASSOCIATES
School House Entrance SCHEME B
July 2, 2009 37OCAMPO & ASSOCIATES
Campus Entrance SCHEME B
July 2, 2009 38OCAMPO & ASSOCIATES
View of Entry Plaza SCHEME B
July 2, 2009 39OCAMPO & ASSOCIATES
Cross Section of Foundation Building SCHEME B
July 2, 2009 40OCAMPO & ASSOCIATES
View of Natatorium Building SCHEME B
July 2, 2009 41OCAMPO & ASSOCIATES
Cross Section of Natatorium Building SCHEME B
July 2, 2009 42OCAMPO & ASSOCIATES
Cross Section of Natatorium & Gym Building SCHEME B
July 2, 2009 43OCAMPO & ASSOCIATES
View of Natatorium Building SCHEME B
July 2, 2009 44OCAMPO & ASSOCIATES
View of Natatorium Building SCHEME B
July 2, 2009 45OCAMPO & ASSOCIATES
Cross Section of Gymnasium Building SCHEME B
July 2, 2009 46OCAMPO & ASSOCIATES
Rear View of Foundation Building SCHEME B
July 2, 2009 47OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
July 2, 2009 48OCAMPO & ASSOCIATES
ALTERNATE MASTER PLAN
July 2, 2009 49OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME C
PLAY FIELDS SCHOOL
HOUSE
SLOMIN FOUNDATION
SLOMIN FOUNDATION
OVERGYM
FOUNDATIONPLAZA
PARENT DROP OFF
July 2, 2009 50OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME C
July 2, 2009 51OCAMPO & ASSOCIATES
View of Entry Plaza SCHEME C
July 2, 2009 52OCAMPO & ASSOCIATES
View of Natatorium & Gym SCHEME C
July 2, 2009 53OCAMPO & ASSOCIATES
Cross Section of Natatorium & Gym SCHEME C
July 2, 2009 54OCAMPO & ASSOCIATES
View of Rear of CampusSCHEME C
July 2, 2009 55OCAMPO & ASSOCIATES
MASTER PLANRECOMMENDATION
July 2, 2009 56OCAMPO & ASSOCIATES
MASTER SITE PLAN SCHEME B
ARCHITECTURE URBAN DESIGN PLANNING INTERIORS
This Presentation and its Content are the property of OCAMPO & ASSOCIATES, INC. and are protected by common copyright
law. No portion of this presentation may be reproduced in part or in its entirety without the written permission of
OCAMPO & ASSOCIATES, INC.