Small Scale Embedded Generation TrainingMarch 2019

Renewable Energy: Palma Maluleke

Page 2: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Application Process

1.Installer Enquiry

2.Creat

Application at COJ

3.PlanningDepartment

4.Technology

Services-Renewable

Energy

5.RE send technical

application forms

6.Applicant resend the forms with detailed

information

7.Preliminary approval from

CP to applicant

sent

2

City Power alone has

authorized over 26 MW

of private PV power on

its grid.

Page 3: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

3

NRS 097-2-3-

2014

Page 4: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Commissioning Process

Information to be enclosed-from the installer

Copy of final single line diagram

Inverter type test Certificate of Compliance and Test Report according to NRS 097-2-1 issued.

Electrical installation Certificate of Compliance.

Operational philosophy and maintenance procedure

Compulsory declaration form – to be completed by ECSA registered Pr Eng or Pr Tech Eng

The PV installation complies with the relevant sections of NRS 097-2-1.

The loss of mains protection has been proved by a functional test carried out as part of the on-site commissioning, e.g. a momentary disconnection of the supply to the PV in order to prove that the loss of mains protection operates as expected.

Safety labels have been fitted in accordance with NRS 097-2-1

The PV installation complies with the relevant sections of SANS 10142-1 and an installation certificate of compliance is attached. 4

Page 5: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Witnessed by City Power

5

Witnessed and Approved by City Power

Tick below where

applicable

Comments

Safety labels on the City Power Mini substation /

Distribution Transformer

Current rating of grid connection equipment(s)

satisfactory

Residual current protection device installed

Anti-islanding tested

Name: Date: Signature:

Title: Departments Involved:

QOS

Metering

Page 6: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Residential Hybrid system

6

Page 7: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Cont-PnP Steeledale

7

Page 8: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Cont-

8

Page 9: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Balfour Mall

9

Page 10: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

From GIS

10

Page 11: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Greenstone Mall

11

Page 12: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Tariff

Embedded Generator Tariff

(These pilot/interim tariffs payable for energy generated by embedded generator and sold to City Power)

Domestic Embedded Generator

• Energy Charge 43.77c/kWh

Business and Large Power Users Embedded Generator (<=1 MW)

• Energy Charge 36.96c/kWh

12

Page 13: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Challenges

Metering

• City Power has already enrolled smart metering systems.

• All Smart Meters(Hexing ,Itron and L&G) are 3-phase bi-directional/4 quadrants.

• Commercial are billed from 1st and 4th quadrants.

• Hexing meters register’s adds the export and import as one consumptions where else Itron and L&G ignores the power coming from 2nd and 3rd Quadrants.

Solutions.

The Metering Specs are being reviewed to accommodate the SSEG requirements.

13

Page 14: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Lessons Learned

Disadvantages • Grid electricity supply might not be

sufficient enough to cover peak demand, due to limited capacity on the municipal bulk distribution network.

• City Power will lose revenue, since customers will become their own independent power producers.

• Grid supply therefore needs to be incorporated with technologies such as ‘Solar PV plus Storage’ (Hybrid systems) and LPG for cooking and water heating purposes (thermal)

.

Advantages• The Grid will be more stable since

the load connected will be reduced.

• City power can purchase power at the lower rate as compared to Eskom.

• The available capacity at City Power’s network can be transmitted to the needy

14

Page 15: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Other Stakeholders to be evolved

• Metering

• Asset Management

• Operations

• Planning Department

• Finance

15

Page 16: Small Scale Embedded Generation Training · Small Scale Embedded Generation Training March 2019 Renewable Energy: Palma Maluleke. Application Process 1.Installer Enquiry 2.Creat Application

Thank you

16

Questions?