smart city: hubballi- dharwad...underground ducting 83 106.92 abd dpr under process 20b junction...

15
SMART CITY: HUBBALLI- DHARWAD

Upload: others

Post on 15-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

SMART CITY: HUBBALLI- DHARWAD

Page 2: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Major Junctions of ABD

Area Profile (ABD)

Project Overview

Financial Plan

• Total 37 Projects

• ABD - 26 Projects (1410

Cr.)

• PAN City - 11 Projects (

252 Cr.)

Page 3: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

PROJECT STATUS AS ON 23rd Dec 2017

Sl. Name of the projectSCP

Allocation (in Cr.)

Project Cost (in Cr.)

Project Type

Status

FAST TRACK PROJECTS

1 Electric Crematorium -- 1.7 ABD

Tender Notified on 29-11-2017 & 30-11-2017

2Solid Waste Management – Litter Free Zones

0.54 3.205 PAN City

3 e-Toilets 0.96 1.55 ABD

4 Rain water harvesting 2 0.375 ABD

IMPACTFUL PROJECTS

5Nehru Stadium (Open Space Redevelopment)

-- 11.5 ABDDPR under process. Technical Sanction Done. BOD approved

subject to condition.

6Tolankere Lake (Open Space Redevelopment)

-- 15.7 ABD

DPR under process7

MG Park (Open Space Redevelopment)

-- 12 ABD

8 Multi Level Car Parking 66.1 42 ABDRFP Prepared. Approval from

ULB awaited.

Page 4: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

PROJECT STATUS (…Contd.)

Sl. Name of the projectSCP

Allocation(in Cr.)

Project Cost (in

Cr.)

Project Type

Status

ICT PROJECTS

9ICT Package-1 (Smart IT Solid waste Management, ICCC)

244.7

44.4 PAN City

Draft DPR submitted, KUIDFC review is awaited.

RFP under process.10

ICT Package-2 (Cashless & Paperless Office, Smart Property Tax Management System, Smart Public Advertisement Management System, Smart Public Works Management System, People Empowerment Platform)

18.9 PAN City

11 GIS Property Survey -- 8 PAN City

Draft RFP prepared.Subject is discussed in KUIDFC

& BOD meeting.Subject to integration to state’s project, SPV has

approved.

Page 5: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

PROJECT STATUS (…Contd.)

Sl. Name of the projectEstimated

Cost (in Cr.)

Revised Cost (in

Cr.)

Project Type

Status

PPP PROJECTS

12 LED street Lighting 6.86 37 PAN CityDraft RFP prepared & submitted

for IDD approval due to PPP project

13 Roof top Solar 128.76 2.3 ABD Tender to be floated soon.

14 IPT Connectivity (PBS) 4.75 8.9 ABDDraft DPR submitted,

RFP is prepared

15 Railway Station Redevelopment 54.45 54.45 ABDAfter discussion, proposal is

submitted to railway authorities

16 Smart Parking and Payment System -- N/A ABDDPR under process

17 Smart Poles -- N/A PAN City

18 Supermarket at Dharwad N/A 215 ABDDraft RFP prepared. First round

scrutiny done by KUIDFC

Page 6: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

PROJECT STATUS (…Contd.)

Sl. Name of the projectEstimated Cost

(in Cr.)Revised Cost

(in Cr.)Project Type Status

Major Infrastructure Projects

19 Renovation of Core city market area 114.78 108.6 ABD

KUIDFC technical scrutiny done.

Resettlement site to be finalized

20aStreet Scape Redesign, footpath improvement, underground ducting

83106.92

ABD

DPR under process

20b Junction Improvement 21.75 ABD

20cUnderground Ducting of electrical /data with Electrical Smart Metering

190 118 ABD

20d NMT Zones 4 4 ABD

21 Underground Drainage System 18.64 10.2 ABD

22 Nalla Renovation -- 29.32 ABD

23 Green Corridor 10 10 ABD

24 Storm Water Drains 5 4.29 ABD

25 Affordable Housing 103.32 41.3 ABD

Page 7: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

PROJECT STATUS (…Contd.)

Sl. Name of the projectEstimated

Cost (in Cr.)

Revised Cost (in

Cr.)

Project Type

Status

OTHER PROJECTS

26 SPV Website -- -- ABD Completed

27 Industrial Development 99.32 -- ABDMoU under progress with

Deshpande Foundation

28 Upgradation of SME 72.27 -- ABD Next phase

29 Ropeway to Hillock -- -- ABD Next phase

30 Intelligent Transport Management System -- -- PAN City Part of TTH Project

31 24x7 Water Supply 24.39 -- ABD By ILFS

32 Transport Terminal Hub 316.49 -- ABD By BRTS

Page 8: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

CITIZEN ENGAGEMENT ON SMART CITY PROJECTS

• Date: 7 Oct 2017

• Venue: Kannada Bhavan, Hubli

• Smart City Website was launched by Hn. Dist. Minister Shri

Vinay Kulkarni , GoK

• Citizen Engagement Brochure was released

• Key Experts from PMC explained the projects to the citizen

• Questions and Suggestions were taken and being

considered in applicable projects

Citizen Engagement Brochure

Citizen Engagement Workshop

Social Media Links Are created:

http://www.facebook.com/hubballidharwa

dsmartcityltd

http://twitter.com/hdsmartcity

http://www.Instagram.com/hubballidharw

adsmartcity/

http://hubballidharwadsmartcity.com/

Release of Brochure

Page 9: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Citizen Engagement: Supermarket Dharwad 17th Nov 2017

Page 10: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Citizen Engagement: Tolankere 16th Nov 2017

Page 11: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Citizen Engagement: Nehru Stadium 15th Nov 2017

Page 12: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Citizen Engagement: Janta Bazaar 14th Nov 2017

Page 13: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

Citizen Engagement: MG Market 13th Nov 2017

Page 14: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

MAJOR SMART CITY PROJECT DIAGRAMS

Janta Bazar

MG Market

MLCP

Smart Poles

Smart Solid Waste Management

Page 15: SMART CITY: HUBBALLI- DHARWAD...underground ducting 83 106.92 ABD DPR under process 20b Junction Improvement 21.75 ABD 20c Underground Ducting of electrical /data with Electrical Smart

MAJOR SMART CITY PROJECT DIAGRAMS

Nehru Stadium

Tolankere