What is Cost ???• An amount that has to be paid or given up
in order to get something.• In business, cost is usually a monetary
valuation of (1) effort, (2) material, (3) resources, (4) time and utilities consumed, (5) risks incurred, (6) opportunity for gone in production and
delivery of a good or service.
What is Wastage ???
Loss time resulting from breakage of machinery, handling, double handling etc.
Method of Increase the EfficiencyCreate a happy work place
Discipline
Lay out
Utilize the
existing machinery
Create a team work
Use of Maximum Resources
Before After
Profit Formula
Effort
Efficiency
Usage of existing
equipment
Technical development
Proper follow up
Changes In Working ProcedureMorning meeting with all concern people and find out the issues and solve it with better ideas.
Now we will see the difference what we made in Smart Jacket
Cutting Section
Change of formats in cutting
Before After
Cutting Production follow up Hourly Chart
For every one awareness now its follow in chart which is easy to monitor :
Machine Down time Chart
Before After
Fabric Spreading Area
Before With 4 Person After With 2 Person
Some Technical Changes To Make The Process Easier
Before After
House Keeping Changes in Cutting Section
Before After
Spreading Area
Before After
Fusing Section
Before With 9 Person After with 3 Person
New Tools To Make Things Easier
Before After
Resource use To Make Things Easier
Before After
Replace Panel Box Sharp Tool Keeping Box
Fabric Relax Table
Closely Monitor in cutting section
Cost Reduce in cutting area
Before Total People was in cutting -101 person,Now total people in cutting after new Procedure-50 Person.
We save around 50% manpower and production also better then before. Day by day its increasing also.
Production Comparison in cutting section
First Week Second Week
14000 26000
Cutting Department Cost Savings
Production bonusBefore Now Plan
Finishing Area
Some Compliance Issues
Some Compliance Issues
Changes in Process
Before Thread cut 16 Person After Thread Cut 10 Person
Before Snap Button Attach 2 machine use 2 operator
After Snap Button Attach 2 machine join together use 1 operator
Before Folding & Poly area use 9 Person After : Folding & Poly area use 4 Person
Double Handling New Method start & finish process
Finishing Production Chart
Before After
Finishing Cost Reduce
• Before Total People was in finishing -188 person, Now total people in finishing after new Procedure- 115 Person.
• Still the set up is running. Once we fix the quality team there then we will get the final summary of manpower in finishing area.
Finishing Department Cost savings
Manpower Production/Day Cost in $/Month0
5000
10000
15000
20000
25000
BeforeAfter