Page 1: Smart Jacket  - corrected one
Page 2: Smart Jacket  - corrected one

What is Cost ???• An amount that has to be paid or given up

in order to get something.• In business, cost is usually a monetary

valuation of (1) effort, (2) material, (3) resources, (4) time and utilities consumed, (5) risks incurred, (6) opportunity for gone in production and

delivery of a good or service.

Page 3: Smart Jacket  - corrected one

What is Wastage ???

Loss time resulting from breakage of machinery, handling, double handling etc.

Page 4: Smart Jacket  - corrected one

Method of Increase the EfficiencyCreate a happy work place

Discipline

Lay out

Utilize the

existing machinery

Create a team work

Page 5: Smart Jacket  - corrected one

Use of Maximum Resources

Before After

Page 6: Smart Jacket  - corrected one

Profit Formula

Effort

Efficiency

Usage of existing

equipment

Technical development

Proper follow up

Page 7: Smart Jacket  - corrected one

Changes In Working ProcedureMorning meeting with all concern people and find out the issues and solve it with better ideas.

Page 8: Smart Jacket  - corrected one

Now we will see the difference what we made in Smart Jacket

Page 9: Smart Jacket  - corrected one

Cutting Section

Page 10: Smart Jacket  - corrected one

Change of formats in cutting

Before After

Page 11: Smart Jacket  - corrected one

Cutting Production follow up Hourly Chart

For every one awareness now its follow in chart which is easy to monitor :

Page 12: Smart Jacket  - corrected one

Machine Down time Chart

Before After

Page 13: Smart Jacket  - corrected one

Fabric Spreading Area

Before With 4 Person After With 2 Person

Page 14: Smart Jacket  - corrected one

Some Technical Changes To Make The Process Easier

Before After

Page 15: Smart Jacket  - corrected one

House Keeping Changes in Cutting Section

Before After

Page 16: Smart Jacket  - corrected one

Spreading Area

Before After

Page 17: Smart Jacket  - corrected one

Fusing Section

Before With 9 Person After with 3 Person

Page 18: Smart Jacket  - corrected one

New Tools To Make Things Easier

Before After

Page 19: Smart Jacket  - corrected one

Resource use To Make Things Easier

Before After

Page 20: Smart Jacket  - corrected one

Replace Panel Box Sharp Tool Keeping Box

Page 21: Smart Jacket  - corrected one

Fabric Relax Table

Page 22: Smart Jacket  - corrected one

Closely Monitor in cutting section

Page 23: Smart Jacket  - corrected one

Cost Reduce in cutting area

Before Total People was in cutting -101 person,Now total people in cutting after new Procedure-50 Person.

We save around 50% manpower and production also better then before. Day by day its increasing also.

Page 24: Smart Jacket  - corrected one

Production Comparison in cutting section

First Week Second Week

14000 26000

Page 25: Smart Jacket  - corrected one

Cutting Department Cost Savings

Page 26: Smart Jacket  - corrected one

Production bonusBefore Now Plan

Page 27: Smart Jacket  - corrected one

Finishing Area

Page 28: Smart Jacket  - corrected one

Some Compliance Issues

Page 29: Smart Jacket  - corrected one

Some Compliance Issues

Page 30: Smart Jacket  - corrected one

Changes in Process

Before Thread cut 16 Person After Thread Cut 10 Person

Page 31: Smart Jacket  - corrected one

Before Snap Button Attach 2 machine use 2 operator

After Snap Button Attach 2 machine join together use 1 operator

Page 32: Smart Jacket  - corrected one

Before Folding & Poly area use 9 Person After : Folding & Poly area use 4 Person

Double Handling New Method start & finish process

Page 33: Smart Jacket  - corrected one

Finishing Production Chart

Before After

Page 34: Smart Jacket  - corrected one

Finishing Cost Reduce

• Before Total People was in finishing -188 person, Now total people in finishing after new Procedure- 115 Person.

• Still the set up is running. Once we fix the quality team there then we will get the final summary of manpower in finishing area.

Page 35: Smart Jacket  - corrected one

Finishing Department Cost savings

Manpower Production/Day Cost in $/Month0

5000

10000

15000

20000

25000

BeforeAfter