Page 1: SMART SCALE Round 4 Update - fampo.gwregion.org

SMART SCALE Round 4 Update

February 3, 20201

Page 2: SMART SCALE Round 4 Update - fampo.gwregion.org

SMART SCALE Project Decisions Needed by February

2

Page 3: SMART SCALE Round 4 Update - fampo.gwregion.org

State Summary on Changes to SMART SCALE Timeline

3

Page 4: SMART SCALE Round 4 Update - fampo.gwregion.org

4

Draft Top 10 FAMPO/GWRC Regional Projects for Review and Discussion

FAMPO:1. I-95 Exit 130 to Exit 126 (Combination of Two Previous SMART SCALE Round 3)2. Exit 126 STARS (2 Options) (SMART SCALE Round 3)3. Lafayette Blvd Study Multimodal Improvements with base Transit and Bike/Ped

(City/Spotsylvania)4. Lafayette Blvd Study Multimodal Improvements with base + Hudgins Rd (City/Spotsylvania)5. US 1 City STARS Study Improvements

GWRC:1. US 17 Bus STARS Study Improvements and Commuter Lot (SMART SCALE Round 3 & Exit 133

Pedestrian accommodations option)2. US 1 North Stafford STARS Study Improvements (Option 1)3. US 1 North Stafford STARS Study Improvements (Option 2)4. US 301/Rte 207 Study Improvement in either Caroline or King George5. US 301/Rte 207 Study Improvement in either Caroline or King George

Page 5: SMART SCALE Round 4 Update - fampo.gwregion.org

I-95 Exit 130 to Exit 126 (Combination of Two Previous SMART SCALE Round 3)

Costs shown are from Rd 3 and are subject to change for a Rd 4application5

Page 6: SMART SCALE Round 4 Update - fampo.gwregion.org

Exit 126 STARS (Larger) Option 1: SMART SCALE Round 3

6

Estimate: ~ $28.5 to $30.2 MillionLeveraged Funding: $0SS Selection Outlook: Low (Scored #293 out of #404 in Round 3)How to Raise SS Score: Multimodal & Leveraged Funding

Page 7: SMART SCALE Round 4 Update - fampo.gwregion.org

Exit 126 STARS (Smaller) Option 2: Reduced Scope

7

Estimate: ~ TBD < $28.5 MillionLeveraged Funding: $0Only include Rte 1 and I-95 NB Onramp improvements plus Rte 208 PNR Lot VRE Feeder Bus and Bike/Ped shown in green boxes

Page 8: SMART SCALE Round 4 Update - fampo.gwregion.org

Lafayette Blvd Study Multimodal Improvements (City/Spotsylvania) Base Project: Only Transit and Bike/Ped

8

Improvements:1. Sidewalk along Eastside of

Lafayette Blvd from Twin Lakes Shared Use Path terminus to Southgate Avenue

2. Transit stop improvements from Study

3. New VRE Feeder Bus from Rte 208 PNR Lot to Fredericksburg AMTRAK/VRE

4. Multimodal improvements at the Rte 208 PNR Lot including Bike/Ped and new transit shelter

Page 9: SMART SCALE Round 4 Update - fampo.gwregion.org

Lafayette Blvd Study Multimodal Improvements (City/Spotsylvania) Base Project: Only Transit and Bike/Ped

9

Page 10: SMART SCALE Round 4 Update - fampo.gwregion.org

Lafayette Blvd Study Multimodal Improvements (City/Spotsylvania) Base Project: Only Transit and Bike/Ped

10

Page 11: SMART SCALE Round 4 Update - fampo.gwregion.org

Lafayette Blvd Study Multimodal Improvements (City/Spotsylvania) – Add Hudgins Rd highway and bike/ped improvements to base project Transit

11Recommended Highway Improvements

Lafayette Commons DevelopmentSome developer contribution – TBD

1. Intersection or Roundabout for Lafayette Blvd @ Hudgins Rd

2. Upgrade Hudgins to a 2-lane minor arterial

3. Intersection improvements for Rte1 @ Hudgins Rd

4. Bike/ped accommodations along Hudgins Rd

Would provide an additional connection between Lafayette Blvd and Rte 1

Proposed Lafayette Commons Dev.

Page 12: SMART SCALE Round 4 Update - fampo.gwregion.org

US 1 City STARS Study Improvements

12

Page 13: SMART SCALE Round 4 Update - fampo.gwregion.org

US 17 Bus STARS Study Improvements and Commuter Lot (SMART SCALE Round 3 & Exit 133 Pedestrian accommodations option)

13

Page 14: SMART SCALE Round 4 Update - fampo.gwregion.org

US 1 North Stafford STARS Study Improvements

12Route 1 & Garrisonville Road Intersection Improvements

Page 15: SMART SCALE Round 4 Update - fampo.gwregion.org

US 1 (Stafford) Improvements

13Route 1 & Layhill Road Intersection Improvements

Page 16: SMART SCALE Round 4 Update - fampo.gwregion.org

US 1 North Stafford STARS Study Improvements

14Route 1 & Bells Hill/Coal Landing Intersection Improvements

Page 17: SMART SCALE Round 4 Update - fampo.gwregion.org

US 301/Rte 207 Study Improvement in either Caroline and/or King George

17

Specific SMART SCALE project(s) to be determined

Page 18: SMART SCALE Round 4 Update - fampo.gwregion.org

18

Next Steps

February: Consensus on packaging of improvements into projects for pre-application process• May have application with multiple projects

March: Pre-Application period• Maximum of 5 pre-applications per applicant• A valid pre-application is required for all candidate projects

June 1st to August 1st: Application period• Maximum of 4 applications per applicant (one of the 5 pre-applications will not advance to the application stage)• Any scope change to a pre-application will require VDOT approval• FAMPO-GWRC and Locality resolutions of support• FAMPO approval of all applications within region for all applicants

August 1st: Application submission deadline