REFERENCE LIST S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE 1 Process Design Engineering of PANYU FPSO Topsides China May 02 Design & Engineering of Oil Separation, Produced Water & Vent System 2 OKUME & OVENG Field’s – FPSO Topsides – Bid Support Equatorial Guinea Oct 03 230,000 BPD with 60% water cut. Gas Flow Rate 70 MMscfd 3 Turbine Enclosure Structural General Arrangement Dec 03 - 4 Espadarte Field Development Brazil Dec 03 Trouble Shooting of gas Dehydration Facility 5 BOABAB Field Development – FPSO Topside – Bid Support West Africa Nov 03 100 MMscfd 6 MISC – FPSO Project Thailand May 03 Gas Dehydration Package 7 KINARUT Development – ERB West Tie - In East Malaysia May 03 60 MMscfd / 14 GPM 8 Salman Oil & Gas Field Development Iran Offshore July 03 Gas Dehydration and TEG Regeneration Unit 9 Prai Power TENAGA Nazar – Combine Cycle Gas Turbine Project Malaysia Feb 03 Trouble Shooting of Diesel Handling Systems 10 Training for IBA / EXXON Mobil – Gas Dehydration and TEG Regeneration System – Bid Support Malaysia May 03 Training – Operators and Engineers 11 CO2 Removal Facility - Bid Support Thiland June 03 426 MMscfd, CO2 Mole Frac. 0.4535 12 Gas Dehydration and TEG Regeneration Facility Venezuela July 03 2x17 MMscfd / 3.4gpm

Upload: ngokhue

Post on 06-Mar-2018

229 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

1

Process Design Engineering of

PANYU FPSO Topsides China May 02

Design & Engineering of Oil

Separation, Produced Water & Vent

System

2

OKUME & OVENG Field’s – FPSO

Topsides – Bid Support

Equatorial

Guinea Oct 03

230,000 BPD with 60% water cut.

Gas Flow Rate 70 MMscfd

3

Turbine Enclosure Structural

General Arrangement Dec 03 -

4 Espadarte Field Development Brazil Dec 03

Trouble Shooting of gas

Dehydration Facility

5

BOABAB Field Development –

FPSO Topside – Bid Support West Africa Nov 03 100 MMscfd

6

MISC – FPSO Project Thailand May 03 Gas Dehydration Package

7

KINARUT Development – ERB

West Tie - In East Malaysia May 03 60 MMscfd / 14 GPM

8

Salman Oil & Gas Field

Development Iran Offshore July 03

Gas Dehydration and TEG

Regeneration Unit

9 Prai Power

TENAGA Nazar – Combine Cycle

Gas Turbine Project Malaysia Feb 03

Trouble Shooting of Diesel

Handling Systems

10

Training for IBA / EXXON Mobil –

Gas Dehydration and TEG

Regeneration System – Bid Support

Malaysia May 03 Training – Operators and Engineers

11 CO2 Removal Facility - Bid

Support Thiland June 03 426 MMscfd, CO2 Mole Frac. 0.4535

12

Gas Dehydration and TEG

Regeneration Facility Venezuela July 03 2x17 MMscfd / 3.4gpm

Page 2: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

13

BAOBAB FPSO Separation

Package – IV Skids West Africa May 04 Basic and Detailed Engineering

14

BAOBAB FPSO Gas Processing

Module West Africa May 04 Basic and Detailed Engineering

15

BR-E CO2 Removal Topsides Malaysia Dec 04

Condensate Stabilization and flash

Gas Recovery

16 AMB Malaysia

PCSB – Fuel Gas Package - Bid

Support Malaysia May 04 Fuel Gas Package

17 FPSO Hai Yang She You III – De-

bottlenecking Project China June 04 FPSO Capacity Upgrade Studies

18

Rehmat Gas Processing Facilities –

Bid Support Malaysia June 03 2X62MMscfd / 10 gpm

19

D1 WWIP India Sep 04 Fine Filters Package

20

BAK Processing Facility Block – 51 Yeman Mar 05 Onshore Processing Facility

21

FEED Mayanmar Mar 05 Pipeline Heaters

22

Capixaba FPSO of IHCGUSTO Brazil May 05 Gas Dehydration and TEG

Regeneration Package

23

Rong Doi Gas Field Development Offshore

Korea June 05

Gas Dehydration and TEG

Regeneration Package

Korean National Oil Corp.

Page 3: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

24

SUMANDAK Processing Platform

– B Malaysia May 05

Sea water Treatment and

Deaeration – Conceptual Design

25

OKUME TLP Project

Equatorial

Guinea May 05 Chemical Injection System

26

OVENG TLP Project

Equatorial

Guinea May 05 Chemical Injection System

27

OKUME TLP Project

Equatorial

Guinea May 05 Methanol Injection System

28

OVENG TLP Project

Equatorial

Guinea May 05 Methanol Injection System

29

Panyu 4-2/ 5-1 Well head Platform

Modifications. China Sep 05

Pre-Commissioning and

Commissioning Procedure & IOM

30

HZ 19-2 Platform Development

Project China Dec 05 Feasibility Study

31

FPSO Kikeh-Murphy Sabah Oil Co.

Ltd.

Offshore

Malaysia Nov 05

Gas Dehydration and TEG

Regeneration Package

32

FPSO Kikeh-Murphy Sabah Oil Co.

Ltd.

Offshore

Malaysia Nov 05

Nitrogen Generator and Nitrogen

Intensifier Package

33

FPSO Kikeh-Murphy Sabah Oil Co.

Ltd.

Offshore

Malaysia Nov 05 Chemical Injection Package

34

SUMANDAK Processing Platform

- B Malaysia Dec 05 FEED For Gas Processing Facility

RNZ Integrated

RNZ Integrated

Page 4: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

35

Capixaba FPSO of IHCGUSTO Brazil July 05 Separators Design Assistance

36

HZ21-1 Development Project China Aug 05 Commissioning Services

37

Arthit Field Development Central

Facilities Thiland Nov 05

HP Production Separator Sand Jet

Design Case

38

TBA / TBC – Field Development China Apr 06 FPSO Topside Process and Utilities

39

Ujung Pangkah Development

Project Indonesia July 06

Gas Dehydration and TEG

Regeneration Package

40

F13 Glycol Dehydration Project Malaysia Mar 06 Gas Dehydration and TEG

Regeneration Package

41

PRA-1 FSO Project Brazil Feb 06 Fuel Gas Skid Package

42

EPCC for MOGA and Transit Line Sudan Mar 06 Produced Water Treatment System

43

POLVO FPSO Project Brazil May 06

Design, Review and Optimization

of Crude Oil Topping Plant(COTP)

44

MERU Project Indonesia July 06

Design, Review and Optimization

of Marine Energy Resource Unit

(MERU)

45

Kizomba – C FPSO MONDO Angola Sep 06

Design And Engineering of Gas

Dehydration and TEG Regeneration

Package

Shell

Global Techno Systems

Page 5: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

46

Petrobras Opportunity Oil FPSO Offshore

Brazil Sep 06

FPSO Topside Basic Design and

Engineering – Bid Support

47

FRADE FPSO Offshore

Brazil Dec 06

Design And Engineering of Gas

Dehydration and TEG Regeneration

Package

48

OAG DAS Field Development UAE Sep 06

Process Design Review of Gas

Compression and TEG

Regeneration System.

49

Saxi Bataque TEG Package Angola Dec 06

Design And Engineering of Gas

Dehydration and TEG Regeneration

Package

50

Common Sulphur Project Qatar Oct 06 Structural Design of Utility Building

51

TUI Area Development FPSO - Nov 06 Deluge Calculation and Drawing

52

FPSO Brotojoyo Project Indonesia Sep 06 Start up and Commissioning of

Process topsides

53

Petrobras Opportunity Oil FPSO Brazil Jan 07

FPSO Topside Basic Design and

Engineering

54

PLI BS2 Compression Project Russia Dec 06

Preparation of Mechanical GA

Drawings.

55

Armada Pekasha FPSO Malaysia Feb 07 Existing System Review and Design

Al Jaber Energy Services

Sakhlin Energy

BUMI

ARMADA

WGI Middle East Inc.

Page 6: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

56

TSJOC SRKP Phase 1 Development Vietnam Aug 07 FPSO Topside Detailed Design and

Engineering

57

SHELL BC -10 FPSO Project Malaysia June 07 Gas Dehydration and TEG

Regeneration Package

58

Cidade de Sao Mateus FPSO Gas

Project Brazil Aug 07

Detailed Engineering of Flare and

Drain Module, water Injection, and

gas dehydration / Fuel gas Module

59

RasGas Offshore Expansion Project

PH - 2 Middle East Apr 07

Design And Engineering of

Condensate and Water Strainers (

Basket Strainers )

60

Van Gogh FPSO Australia Oct 07 Design And Engineering of

Complete Topside Facilities

61

P – 57 FPSO Project Brazil July 07 Topside Facilities Design – Bid

Support

62

Cascade and Chinook FPSO Gulf of

Mexico Jan 08

Design And Engineering of Gas

Dehydration and TEG Regeneration

Package

63

Angsi Phase IV Development

Project Malaysia Feb 08

Detailed Engineering of Flow Line

Compact Manifold

64

Espoir Ivoirien FPSO West Africa June 08

Design And Engineering of Gas

Dehydration Module

65

Espoir Ivoirien FPSO West Africa June 08

Design And Engineering of Process

Separation Module

SM

Mc. Dermott

Technics Offshore

Page 7: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

66

FPSO East Fortune - May 08 Design Verification

67

FPSO East Challenge India May 08 Bid Support

68

Raydan Final Expansion Project Middle East July 08 PW Tank Design

69

North Pipeline Replacement

Project - Lekhwair Area Oman July 08 Process Design

70

North Pipeline Replacement

Project – Yibal Area Oman July 08 Process Design

71

Fahud Medium Term Surface

Facility Expansion Oman July 08 Process Design

72

OML 120 OYO Field Development

FPSO Nigeria Sep 08

Design and Engineering of

Compressor Module –

Reciprocating Compressors.

73

Gumusut Kakp Semi FPS Offshore

Malaysia Jan 09

Design And Engineering of Glycol

Regeneration Package

74

FPSO - Jubilee Field Unit Ghana Mar 09 Design And Engineering of Oil

Separation Module

75

FPSO - Jubilee Field Unit Ghana Mar 09 Design And Engineering of Gas

Processing Module

76

FPSO Capixaba Relocation Brazil Apr 09 Design And Engineering of Amine

Sweetening Unit

BUMI

ARMADA Technics Offshore

Nortechs FPSO

Western Tanks & Pipes

Nortechs FPSO

Page 8: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

77

OML 120 Oyo Field Development

Project Nigeria Oct 08

Detailed Engineering of Gas

Compressor

78

Tupi Pilot FPSO Brazil Apr 09 Design And Engineering of CO2

Membrane Module

79

OYO FPSO Nigeria Aug 08 E-House Design

80

FPSO P – 57 Jubarte Field

Development Project Brazil Jan 09

Design And Engineering of Gas

Dehydration and TEG Regeneration

Package

81

Dulang – B Compressed Gas

Enhancement Project Malaysia Jan 09

Design And Engineering of Gas

Dehydration Module

82

COSMOS South Field

Development Project Tunisia Aug 08 FEED – FPSO Topside

83

MHN – Process Platform and

Living Quarters Project

Mumbai,

India Nov 08 Bid Engineering

84

PY – 1 Gas Field Development

Project – Sun Wellhead Platform

Tamil Nadu,

India Mar 09

Preparation of O & M Manual for

offshore facilities

85

Safah & Wadi Latham Field BK9 Qatar Apr 09 Process Design of Gas Compressors

86

Al-Burj Full Field Water Injection

Project

Al-Burj,

Oman July 09

Reliability and Availability Study of

Water Injection Plant

BUMI

ARMADA Technics Offshore

BUMI

ARMADA

Technics Offshore

Page 9: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

87

Dulang – B Compressed Gas

Capacity Enhancement Project Malaysia May 09

Fuel Gas and Seal Gas Conditioning

System

88

SM

Platong II Project Fuel Gas & Seal

Gas Package Malaysia July 09 Fuel Gas and Seal Gas Package

89

Tangga Barat Cluster Development

Project Malaysia Sep 09 Fuel Gas Package

90

Tangga Barat Chemial Injection

Package Malaysia May 09 Chemical Injection Package

91

Dragon Tortoise Gas Utilization

Project

Offshore

Vietnam June 2009 FEED – Compressor System

92

ONGC B – 193 Project Mumbai,

India Aug 09

Well head Platform and process

cum Well Head Platform – Bid

Support

93

MHNRP – Well Head Platform

6WPP Project

Mumbai,

India Aug 09 Bid Engineering

94

Compressor Testing Facility Project India Nov 09 Detail and Design engineering of

Compressor Testing Facility

95

Doha North Sewage Treatment

Works Civil Project 682/1 Qatar Nov 09

Design Support for chemical Wash

Package

96

ONGC D1 – Development Project India Dec 09 Bid Engineering

97

TGT Field Development Project Offshore

Vietnam Jan 2010

Design of Compressor Module –

Bid Support BUMI

ARMADA

Page 10: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

98

TSJOC SRKP Phase 1 Development

– Water Injection System Vietnam Jan 2010 Commissioning Services

99

Rancador Field Development

Project Indonesia Feb 2010

Detailed Engineering of E-House

Cable Interconnection

100

ONGC B193 – 5 Wellhead Platform

Project India Feb 2010 Detailed Engineering

101

Revamp of Gas Dehydration Units

at Duyong and Pulai - A Malaysia Feb 2010 Principal Design Consultant

102

White Tiger Oil Field BK-14 / BT-7

Wellhead Satellite Platform project Vietnam May 2010 O&M Manual Preparation

103

ONGC B193 Process Platform India Mar 2010 Early Engineering

104

Lime Handling System - May 2010 Detailed Engineering Support

105

PUO FPSO - Pagerungan Utara

Development Project Indonesia Aug 2010

Detailed Engineering, Design

Modification & Project Management

106

Petrobras FPSO Cicade De Paulo

MV-23 Brazil Mar 2010 Nitrogen Generator Package

107

Baleia Azul FPSO

Offshore

Brazil June 2010

Detailed Engineering of Gas

Processing System

Technics Offshore

Page 11: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

108

Total CPF Tie-In Central

Production Facility Project Yemen July 2010

Design and Engineering of Inlet

Separator Package

109

FPSO for Terang Sirasun Batur

Field Development Project (TSB

FPSO)

offshore

Indonesia June 2010

Detailed Engineering of Complete

Topside Facility

110

Yemen Block-5 Development

Project Yemen Aug 2010 FEED Study of Halewah Gas Plant

111

Bien Dong 1 Project Vietnam Sep 2010

Detailed Engineering of Gas

Dehydration and TEG Regeneration

Package

112

TUPI - 3 FPSO Offshore

Brazil Nov 2010

Detailed Engineering of Gas

Dehydration Package

113

E-House Design and Engineering

Service Brazil Dec 2010 Design & Engineering

114 E-House Design for Jurong

Shipyard Brazil Dec 2010 Design & Engineering of E-House

115 RAK GAS Facility Modification

Project – Saleh Phase 1 UAE Jan 2011 FEED

116 Teekay Petrolarl Petrobras Tiro &

Sidon FPSO Brazil Jan 2011

Detailed Engineering of Sulphate

Removal Unit

117

RAK GAS Facility Modification

Project – Saleh Phase 1 UAE Jan 2011 Detailed Engineering

PRISMA CERAH

Page 12: S.N CLIENT CUSTOMER PROJECT L P S - · PDF file9 Prai Power TENAGA Nazar ... ONGC B – 193 Project Mumbai, India Aug 09 Well head Platform and process cum Well Head Platform – Bid

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

118

RAK GAS Facility Modification

Project – Saleh Phase 1 UAE Feb 2011 Compression System Review

119

Gas & Diesell Driven Generators

on Platform at Bokor Field Malaysia March 2011 Review of Structural Works

120

RAK GAS Facility Modification

Project – Saleh Phase 2 UAE April 2011 FEED

121

Harvest Blackgold Oil Sand Project Canada May 2011

Detailed Engineering of Free Water

Knock-out Vessel and Oil Treater

Package

122

Inlet Compression for RAK Gas Malaysia May 2011 Corrosion Study

123

TSP Offshore Crude Oil Treatment

Project Africa June 2011

Detailed Engineering of Heat

Exchanger, Storage Vessels & Pumps,

2 Nos. of Bulk Oil Separators and

Electrostatic Treaters

124

ONGC - Piping modifications at

SHP/SHG/S1-5/II platforms India July 2011 Piping Modification Works

125

RAK GAS Facility Modification

Project – Saleh Phase 1 UAE July 2011

Waste Water Treatment plant

review & de-bottlenecking

126

Kikeh Phase II Sand Management

System

Offshore

Malaysia Sep 2011 Detailed Drawings