NAVEEN KUMAR PANDEY C231/3, Rajendra Nagar, Bareilly, Uttar Pradesh
Mobile: +91 7715084766; Email: [email protected]
HEADLINE
SENIOR INSTRUMENTATION & CONTROL/ AUTOMATION ENGINEER
SUMMARY
I am an academically qualified Electronics & instrumentation Engineer with an experience in conceptual, basic and
detailed engineering activities for instrumentation control and automation, procurement, supervision of erection
and commissioning activities of projects. A team leader and a natural motivator I have always instilled confidence
among team members to realize their best performance levels.
In the course of different associations, I have demonstrated functional excellence in handling Operations, Distributed
Control System (DCS), PLCs and SCADA systems and done plenty of projects in DCS, PLC and SCADA based processes
and machineries. I have a proven track record of making significant contributions by deploying and setting systems,
at the same time bringing about considerable cost reductions, while ensuring efficiency and quality benchmarks of
the projects.
I have expertise in planning, designing and scheduling instrumentation projects including judicious deployment of
resources to achieve project completion within agreed time/cost parameters. I am a consummate professional with
excellence in Project Execution, Installation, Calibration, Testing, Commissioning, Maintenance of Automation, long
with the ability to support multiple and simultaneous projects in a matrix organizational structure
SKILLS
Installation & Commissioning ♦ Maintenance Operations ♦ Resource Management/ Optimization ♦ Team
Management ♦ Preventive/ Planned Maintenance ♦ Techno-commercial Operations ♦ Safety Operations ♦
Technology Integration ♦ General Administration ♦ Cross-functional Coordination ♦ Analytical Skills ♦ Fault Analysis
♦ Strategic Planning ♦ Troubleshooting
EXPERIENCE
Company Name – ABB Limited, Bangalore, December 2010 - Present
Title – Substation Automation Engineer
Description –
Identifying root cause of failures and implementing quick breakdown solutions to put the machines back in
operation within minimum turnaround time.
Adroitly monitoring and analyzing the equipments to avoid unexpected breakdown and efficiently handing
breakdown & modification by applying various efforts.
Planning the execution of maintenance activity, observing standard procedures for maintenance and
considerably reducing down time.
Reviewing the operational practices, identifying the areas of obstruction/ quality failures and advising on system
and process changes for qualitative improvement in productivity.
![Page 2: Social Profiler](https://reader038.vdocument.in/reader038/viewer/2022100723/58f09ced1a28abc0258b45cb/html5/thumbnails/2.jpg)
Possess good knowledge of the principles, policies, practices, procedures, and strategies required to properly
operate a comprehensive maintenance and operations program for equipment and facilities.
Skilfully developing, managing and monitoring the performance of multi-skilled work force thereby enhancing
productivity.
Consistently maintaining safety in the process and equipment as well as with operating personnel.
Developing and executing the best practices and standard operating procedures targeting at organizational
excellence. Implementing strategic vision and direction so as to meet the medium and long term objectives of
the organization.
Accountable for Design, programming & testing of machines using PLCs; providing technical support to various
PLC Engineers working on site.
Performing Instrument & Control activities as per drawings, specifications and project documents in accordance
with the project field procedures.
Involved in selection and sizing of field instruments, sizing calculations for control valve, safety and relief devices
and orifice.
Responsible for preparation and review of data sheets for field instruments, purchase specifications for field
instruments and systems like PLC-SCADA, DCS.
Coordinating with vendors, clients and inter department; managing GA drawings approval, FAT, instrument
inspections.
Company Name – Larsen & Toubro (L&T) Automation, July 2008 – November 2010
Title – Site in Charge
Company Name – AI Automation Pvt Ltd, July 2007 – July 2008
Title – PLC & VFD Commissioning Engineer
Projects Executed
SCADA System Designing and Development for 400/220/132 KV and Gateway configuration for IEC101/IEC104
NTPC Mauda
SCADA System Designing and Development for 400/220/132 KV and Gateway configuration for IEC101/IEC104
NTPC Nabi Nagar
SCADA System Designing and Development for 765/400KV and Gateway configuration for IEC101/IEC104 Adani
Tiroda
SCADA System Designing and Development for 220/132KV and Gateway configuration for IEC101/IEC104
MSETCL Aurangabad
SCADA System Designing and Development for 200/132/33KV and Gateway configuration for IEC101/IEC104
MSETCL Solapur
SCADA System Designing and Development for 200/132/33KV MSETCL Pune
SCADA Testing Commissioning for L&T A/C ONGC-URAN
SCADA Testing and Commissioning of 400/220/132 KV PGCIL BYRNIHAT
ALSTOM Extension Bay integration in SCADA & Gateway Configuration work for RLDC and WRLDC at KOTRA
PGCIL Raigarh 400/220 KV
SCADA Testing and Commissioning for 220/132 KV at KOPILI Substation and gateway configuration work RLDC &
SLDC
![Page 3: Social Profiler](https://reader038.vdocument.in/reader038/viewer/2022100723/58f09ced1a28abc0258b45cb/html5/thumbnails/3.jpg)
SCADA Testing and Commissioning of pending points at 220/132 KV at Rangia Substation
SAS Commissioning at 400kv and 132kv switchyard project at NTPC, Mouda
SCADA Testing and Commissioning of GT/UT For Unit-2 and SLDC& RLDC for 400KV and 765 KV Of Adani Power
Ltd Tiroda
SCADA Testing and Commissioning of 220/132/33 KV MSETCL Solapur
SCADA Testing and commissioning of 220/132/33 KV MSETCL Pune A/C Voltage Infra
SCADA Testing and Commissioning of 765 KV Adani Tiroda
Testing of 220kV Line Bay Control & Protection Panels with REC 670, REL 670 for Punjab State Electricity
Transmission Company Limited
Testing of 220kV Line Bay Control & Protection Panels with REC 670, REL 670, Micom P444
ABB Micro SCADA and testing of Protection Panels, Relays at:
o Power Grid Corporation India Limited (Pgcil), Talegaon Pune
o Power Grid Corporation India Limited, Bilaspur
o 400/220/132 Kv Pgcil Bilaspur
o Power Grid Corporation India Limited, Wardha
o Punjab State Transmission Corporation Limited,
o Power Grid Corporation India Limited, Agra Delhi
o Damodar Valley Corporation – Giridih, West Bengal
o Maytas-Aptransco
o Gujarat Energy Transmission Corporation Limited
o Gujarat Energy Transmission Corporation Limited –Lalpur
o Vedanta Project: Sterlite Energy Limited Indepentent Power Plant (Ipp) At Jharsuguda, Orissa
132/66kV Transformer Control & Protection Panels with RET 670, REF 615-Gujarat Energy Transmission
Corporation Limited –Lalpar, Various Substations
Testing of 220kV Line Bay Control & Protection Panels with REC 670, REL 670, and REF 615,220kV Bus bar
Protection Panel with REB 670Damodar Valley Corporation – Giridih
Testing of 132kV Line Control & Protection Panels with REL 650, 132/33kV Transformer Control & Protection
Panels with RET 670, REF 615- Jammu Kashmir Substations
Testing of 220kV Line Control & Protection Panels with REL 670, MiCOM P444-APTRANSCO Ltd
2 x 45 MW Power Plant Project for Bajaj Infrastructure development company Ltd., Barkhera, Pilibhit, UP
Control Logix for Rockwell Automation at Reliance Refinery in Jamnagar, Gujarat
Programming of Servo Drive, Micrologix 1200 and Panel View 400 Plus used in Elmec Industries Pvt Ltd, Bhopal
Commissioning of Power Flex @ ( 4, 40,70, 400, 700 ) for conveyor application, ID fans & crane application at
HEG Ltd, Bhopal
EDUCATION
B.Tech (Electronics & Instrumentation) 2007 Radha Govind Engineering College, UPTU
Industrial Training
Sofcon Automation Pvt. Ltd.