social resettlement & rehabilitation plan of cuttack - barang doubling 12.1 km orissa
TRANSCRIPT
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
1/19
1
RITES Ltd.
I DESCRIPTION OF PROJECT
The Cuttack -Barang single line section of East Coast Railway on Howrah- Chennai
main line is situated in district Cuttack of Orissa. The project area falls between
Longitude 8554 08 to 855000 and Latitude 202432 to 202741. The East
Coast main line passes through the thickly populated regions of Orissa and connects
important townships like Cuttack, Bhubaneshwar and Behrampur. Cuttack is a
growing commercial and business centre of East Coast of Orissa and Bhubeneshwar
has been growing very rapidly being the capital of the State. Behrampur is also an
important business town of South Orissa. Any increase in passenger services to
these cities has to pass through the project section. The Chief Transport and
Planning Manager, East Coast Railway has made a projection of passenger services
till 2009-10. The projections of passenger services in East Coast mainline are
presented at Table-1. As shown in the table the present 21 pairs of coaching trains
touching Cuttack are expected to increase to 36 pairs by the end of year 2009-2010.
It shows that there is a need for introduction of more coaching trains over the East
Coast main line touching Cuttack. With growth of freight traffic in the East Coast main
line, the numbers of freight trains, which are required to be routed through this
section, are expected to rise. In addition, Paradeep port on the East Coast of Orissa
is growing very fast and any traffic from South of Cuttack to the port or vice versa, will
be routed through this section.
TABLE- 1
PROJECTIONS OF PASSENGER SERVICES IN EAST COAST MAINLINE
S.No
Services Existing servicesDuring 2002
Projected servicesDuring 2009-10
1 Super fast/Express trains 15 29
2 Passenger trains 6 07TOTAL 21 36
Realizing the urgent need for augmentation of the section capacity, Railway Board in
1995-96, ordered for Preliminary Engineering cum Traffic Survey for doubling of this
section. In this background, Rail Vikas Nigam Limited has decided to take up the
doubling (provision of 2nd railway line parallel to the existing single line) of Cuttack
Barang broad gauge railway section.
The proposed project envisages construction of a second railway line parallel to the
existing one between Cuttack and Barang stations of East-Coast railway, covering
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
2/19
2
RITES Ltd.
11.715km-route length. There are two block sections in the project namely Cuttack
Gopalpur Balikuda and Gopalpur Balikuda-Barang. Kathjori passenger halt lies
between Cuttack and Gopalpur Balikuda stations. The layout plan of the project is
shown in Figure 1. Salient features of the project are given at Table- 2.
TABLE- 2
SALIENT FEATURES OF THE PROJECT
S. No. Parameter Value
1 Length of the Line 11.715km
2 Gauge 1676mm
3 No. of Stations 4 Including Cuttack And Barang
4 Ruling Gradient 1 In 150
5 Max. Length of Gradient in one Stretch 559m
6 Maximum Degree of Curvature 3.5o
7 No. of Curves 5
8 Length of Track in Curve 3.46 Km
9 No. of Bridges 12
10 Type of Loading for Bridge MBG Loading
11 Sleepers Pre-Stressed Concrete Sleepers
12 Signaling MACL
13 Width of Embankment 6.85 meter
14 Side Slope of Embankment 2H: 1V
15 No. of Road Crossings (Nos.) 3
16 Requirement of Governemt Land 1 hectare
17 Cost of Project (Gross) In Million Rupees 1276.17
60kg. 90UTS Rails with LWR on Main Line & 52kg 90UTS Rails with SWR on Loop
Line are proposed to Be used. The project is scheduled to be completed by March
2008 at a cost of Rs. 1276.17 million. It would involve construction of three important
and two major bridges. The construction shall be of MBG Loading.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
3/19
3
RITES Ltd.
FIGURE 1
LAYOUT MAP OF CUTTACK-BARANG DOUBLING OF RAILWAY LINE
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
4/19
4
RITES Ltd.
II METHODOLOGY
The study area covers the entire stretch of proposed doubling over a length of 11.715
km. The study covers the people and socio-economic resources affected as a result
of the proposed project. The methodology used for socio-economic data collection is
as under:
Terms of Reference were discussed with Rail Vikas Nigam Limited officials.
Joint site visits were made with the concerned railway officials, mainly the
engineers related with the project.
Data collection is based on household survey, personal observation and
opinion of the stakeholders, administrators and planners.
Based on the field visits and desktop research a list of affected people wasprepared.
Socioeconomic survey of about 18% of the affected households has been
undertaken to prepare demographic profile of affected people, assess
income & identify productive activities, plan for income restoration, study
relocation options and to identify needs of the society.
Discussions were held with the affected people keeping in view the
composition of the conglomeration and vulnerability of different groups. The
process of data collection included key informant interviews and community
consultations representing all classes/ caste/ tribes.
Objective of the survey has been to generate an inventory of social impacts on the
people affected by the project including their social profile and views about the
project, and on various options of rehabilitation and resettlement. A detailed
questionnaire used to collect information on these aspects is enclosed as Annexure
1.
III LAND ACQUISITION AND IMPACTS
The proposed doubling is planned on up-side (left hand side of the existing alignment
facing Barang) and shall be accommodated in the existing railway right of way
(ROW) except between kilometer 414 and 418, whereas, as per the Preliminary
Engineering cum Traffic Survey (PETS) report, a 10-meter wide strip in small patches
of 1km cumulative length i.e. one-hectare of land would be acquired. As observed at
site a small canal runs parallel to the railway line in the above said section between
km 414 to 418. The proposed land requirement (10 m wide strip) belongs to the
Irrigation Department and there is no private land between the railway line and the
irrigation canal in the affected portion. During field investigation, it has been noticed
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
5/19
5
RITES Ltd.
that a portion of the railway land near Kathjori passenger halt station required for
construction of the proposed doubling has been tresspassed. The settlements
(squatters) are locally known as Khannagar/Madhupatna. These squatters have
approximately 40 households/hutments (having about 200 project affected persons at
the average rate of 5 persons per family). In addition to this, about 8 small shops
(Khokas) are also observed near the Barang Station towards Cuttack, which might
have to be removed due to the construction of the 2nd railway line.
III 1 Measures taken to minimize Resettlement
Based on the engineering report and project social analysis, it is observed that to
minimize land acquisition, displacement and disruption to livelihood following steps
have been taken:
As far as possible, the proposed alignment has been kept within the existing
railway land.
Only about one hectare land pertaining to the irrigation department would be
required for the project between km 414 and km418.
No private land is proposed to be acquired for the project.
III-2 Project Affected Persons and Households
The proposed second railway line, parallel to the existing one, from Cuttack to
Barang stretches about 12 km in length. It is planned on the left hand side of the
existing line facing Barang. The proposed line, as per the Preliminary Engineering
cum Traffic Survey (PETS) report, shall be accommodated in the existing railway
Right of Way (ROW), except between km 414 and 418,where a 10 m wide strip in
small stretches of 1 km cumulative length e.g. one hectare area of land pertaining to
the irrigation department shall be required, however no private land/property is to be
acquired for the project.
During field investigation, it has been noticed that a portion of the railway land near
Kathjori passenger halt station required for construction of the proposed doubling has
been tresspassed. The settlements (squatters) are locally known as
Khannagar/Madhupatna. These encroachments have approximately 40
households/hutments (having about 200 project affected persons at the average
rate of5 persons per family). In addition to this, about 8 small shops (Khokas) are
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
6/19
6
RITES Ltd.
also observed near the Barang Station towards Cuttack, which might have to be
removed due to the construction of the 2nd railway line.
III-3 Sample Size and Coverage
About 18% of the affected population has been surveyed for data collection. To
obtain a representative sample, the respondents were randomly identified using
cluster approach and interviews were conducted at scattered locations.
III-4 Socio-Economic Profile of PAPs
The socio economic profile has been prepared separately for each of the above
category and the summarized information is given in Table 3.
TABLE 3SUMMARY SOCIO ECONOMIC PROFILE OF THE PAPS
Family size Age Caste Literacy Income
S L Y O G S L I P NP
71 29 100 0 57 43 53 47 28 72
Legend
J : Joint, N : Nuclear, S : family size up to 5 persons, L : Family size over 5 persons,
Y : up to 60 years of age, O : Over 60 years of age, H : Hindus, M : Muslims,
G : General, S : Special (SC, ST, BC, OBC), L : Literate, I : Illiterate, P : Poor(BPL), NP:
Above BPL
III-5 Type of Loss
Depending upon the type of loss, the PAPs have been classified into 6 categories as
given in Table 3 above.
III-6 Nature of Loss
The nature of losses in the proposed railway project (doubling of railway line) has
been confined to squatters only. Amongst these squatters,100% are losing entire
holding and all the Khoka keepers will loose their economic base.
III-7 Loss of Crop
As mentioned earlier that no private land is likely to be acquired, hence the proposed
project will not cause any loss in terms of agriculture land and crop yield.
III-8 Vulnerable APs
The vulnerable groups identified during social analysis of the squatters have been
presented in Figure 2. The analysis shows that; 14% of the squatters belong to the
scheduled tribes, there are no scheduled caste. 29% of the squatters are below
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
7/19
7
RITES Ltd.
poverty line and none of the family is headed by a women. There are no squatters
above the age of 60 years.
FIGURE 2 : VULNERABLE POPULATION AMONG SQUATTERS
14
20
0 00
5
10
15
20
Percent
SC/ST
BPL
>60 years
WHH
III-9 Indigenous People
No Indigenous people are being affected due the construction of the proposed
project.
IV RESETTLEMENT PLAN OBJECTIVES AND POLICY FRAMEWORK
This short-term RP is designed to deal with limited impacts of the Cuttack-Barang
doubling of railway line Project. Only one hectare of government land is to be
acquired. The E Co R has taken the appropriate measures to minimise the amount of
land acquisition, taking into account the need of the project. Close vicinity of the
existing line has reduced linear disturbance in the form of land acquisition, loss of
infrastructure and additional facilities requirements. No private land acquisition is
involved in this project. However, squatters need to be compensated in accordance
with the Asian Development Bank policy on involuntary Resettlement (BP, December
2001).
V. ENTITLEMENT MATRIX
The resettlement principals and assistance have been designed to cover
compensation to restore or enhance the livelihoods of affected people. The matrix
given in Figure 3 identifies the PAPs and their losses and defines compensation and
entitlements.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
8/19
8
RITES Ltd.
FIGURE 3
DETAILS OFENTITLEMENT MATRIX
Type of
Loss
Application Unit Entitlement Expected Results
Loss of residential/commercialstructuresby ownersandinformalsettlers/squatters
Structure onthe ROW
(i) Ownersofstructuresidentifiedby DC; (ii)Owners ofstructuresidentifiedby censusand SES
Cash compensation
under Government ofIndia LandAcquisition Law andState Laws to be paidby DC (a depreciationvalue is deductedbased on the age ofthe structure)
The depreciated
value thus deducted
will be paid by theproject as additionalgrant to build newstructure
A lumpsum transfer
grant for shiftinghousehold assetsand other belongingsto relocated sites willbe paid at Rs. 1500/-per household.
Reconstruction of structure and relocation tonew sites
People affected will beallowed to salvagematerials from theirdemolished structures;the affected squatters willreceive transitionalallowance of Rs. 2,000per family lumpsum.
Loss of income and
workdaysdue todisplacement
Householdsaffected by
ROW
Head of households
identifiedby DC listand SES
Cash assistance for 30
days at the local
agricultural wage rate Additional cash
assistance to vulnerablegroups includingwomen-headedhouseholds.
Assistance to
vulnerable; grants willbe paid to those belowthe poverty line, and thevulnerable, includingwomen-headedhouseholds, at the rateof Rs. 5,000 per eligible
household. One familymember from theaffected household willalso receive skilltraining linked toemploymentopportunities at Rs.2,000 per household byway of rehabilitation.
Temporary
employment in theproject constructionwork to APs withparticular attension to
APs below poverty lineby the project
Subsistence and incomein post-displaced period
and poverty-reduction.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
9/19
9
RITES Ltd.
Type of
Loss
Application Unit Entitlement Expected Results
contractor.
Measures towards income restoration and skill training
Following measures shall be taken towards income restorationand skill trainingHead of households identified by the District Collector and through the socio-
economic survey shall be compensated in the following way:
a) There is a provision for additional support to the vulnerable people
including the female-headed households. Grants will be paid to those below the
poverty line and the vulnerable people including women-headed households at
the rate of Rs. 5,000 per eligible household. One family member from the
affected household will also receive skill training linked to employment
opportunities at Rs. 2000 per household by way of rehabilitation.
b) Temporary employment in the project construction work to APs with
particular attention to APs below poverty line(BPL) by the project contractor.
c) Cash assistance for 30 days at local agricultural wage rate to the head of
households identified by the DC list and SES.
Inter Agency Linkages for Income Restoration
Majority of the eligible families for income restoration earn their livelihood form
marginal agriculture or petty business, and it is imperative to ensure that the AP are
able to reconstruct their livelihood. Based on the market feasibility study the list of
livelihood schemes will be developed, and based on felt needs of the target group
population the activities will be prioritized through peoples participation. Further,
these options will be tested for their viability against availability of skill, raw material
and available appropriate technology. Suitable alternative livelihood schemes will be
chosen finally, where training on skill up gradation, capital assistance and assistance
in the form of backward-forward linkages (with respect to the selected livelihood
schemes) can be provided for making these pursuits sustainable for the
beneficiaries, of the target group. Income generation schemes will be developed in
consultation with the project affected/ displaced families. The grants received for
such purpose for the project, will be used for the skill development training to
upgrade their existing skill, purchase of small scales capital assets etc. While
developing the enterprise development or the income generation activities, the NGOs
will contact the local and Lead Bank officers for financing the economic ventures. The
making and milk federations will also be contacted for planning sustainable economicdevelopment opportunities.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
10/19
10
RITES Ltd.
The PIU along with NGOs will play a proactive role to mobilize the various
government schemes and ensure their accessibility and benefits to the APs. Some of
these schemes are as follows.
Sampoorna Grameen Rozgar Yojana(SGRY)
SGRY is a programme started with merger of Employment Assurance Programme
(EAS) and Jawahar Gram Samridhi Yojana (JGSY) with effect from 25th sept.2001.
SGRY is expected to take care of food security, additional wage-employment and
village infrastructure as food grains provided here is an additionality. Guidelines of
SGRY.
Primary objective of this scheme is the creation of demand driven community village
infrastructure including durable assets at the village level and to enable the rural
poor to increase the opportunities for sustained employment. Secondary objective of
this scheme is the generation of supplementary employment for the unemployment
poor in the rural area. First Stream (SGRY-1) is implemented through Zilla Parishad
and Panchayat Samity in the ratio of 40:60.Second Stream (SGRY-2) of 50% funds
are earmarked for implementation through Gram Panchayats. Special
component(SGRY-3) of SGRY is demand-driven food security for natural calamity
affected rural areas. Fund sharing between Government of India and Government of
Orissa is 75 : 25 .Swarnajayanti Gram Swarozgar Yojana (SGSY)
Objectives : SGSY was started on 1st April,1999 after restructuring erstwhile IRDP
,TRYSEM, SITRA GKY and MWS. The basic objective is to bring assisted poor
families (Swarozgaris) above the poverty line by providing income generating assets
through mix of bank credit and subsidy. The SGSY aims at establishing micro
enterprises in rural areas based on the ability of poor and potential of each area. It
coveres all aspects of self employment viz. organization of poor in the Self Help
Group (SHG) and their capacity building, training and selection of key activities,
planning of activity clusters, infrastructure build up, technology transfer and
marketing linkage.
Rural Housing: Indira Awaas Yojana(IAY)
To help construction of dwelling units by members of scheduled caste/ scheduled
tribe, free bonded labourer, and also non- S.C/S.T rural poor below the poverty line
by providing them the permissible financial assistance. Credit-cum-subsidy scheme
is also available for families having annual income upto Rs.32000/.Fund sharing
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
11/19
11
RITES Ltd.
between Government of India and Government of Orissa is 80 : 20.The unit cost -
Rs.20,000/- plain area, Rs.22,000/- hilly area . Special thrust has been given for
construction of IAY houses with R.C.C roof in natural calamity-prone areas.
Prime Ministers Gramodaya Yojana (PMGY)
This programme will generally be based on the pattern of Indira Awas Yojana and
will be implemented in the rural areas. The target group for houses under the
scheme will be people who are living below poverty line in the rural areas belonging
to SC/ST, Freed Bonded Labourer and SC/ST categories.
Operation Black Board(OBB)
To construct Primary School Buildings for building-less Primary Schools in rural
areas.Unit cost of the school building with two rooms and varandah - Rs. 1.5 lakhs
Special Schemesi) Mission Danapaniii) Sakti Gaoniii) IT Kiosk
Integrated Child Development Services Scheme (ICDS)
The Scheme targets the most vulnerable groups of population including children upto
6 years of age, pregnant women and nursing mothers belonging to poorest of the
poor families and living in disadvantaged areas including backward rural areas, tribal
areas and urban slums. The identification of beneficiaries is done through surveying
the community and identifying the families living below the poverty line.
Education of SC/STChildren
The educational development of children belonging to the Scheduled castes and
Scheduled Tribes is a special focus in the Sarva Shiksha Abhiyan. Every activity
under the Project must identify the benefit that will accrue to children from these
communities. Many of the incentive schemes will have a sharper focus on children
from these communities. The participation of dalits and tribals in the affairs of theschool will be specially encouraged to ensure ownership of the Abhiyan by all social
groups, especially the most disadvantaged.
Grievances Redressal Committees(GRC)
The project will establish a Grievance Redressal Committee (GRC) in respective
districts, headed by the District Collector, with members from local NGO, the Land &
Revenue department, project implementation unit and selected local leaders from
Panchayat / municipalities and representatives of affected people. The main
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
http://orissagov.nic.in/panchayat/scheme/mission_danapani.htmhttp://orissagov.nic.in/panchayat/shaktigaon.htmhttp://orissagov.nic.in/panchayat/sancharsathi.htmhttp://orissagov.nic.in/panchayat/scheme/mission_danapani.htmhttp://orissagov.nic.in/panchayat/shaktigaon.htmhttp://orissagov.nic.in/panchayat/sancharsathi.htm -
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
12/19
12
RITES Ltd.
objective of the grievance redressal procedure will be to provide a mechanism to
mediate conflict and cut down on lengthy litigation, which often delays infrastructure
projects. It will also provide people who may have objections or concerns about the
assistance that they have received, a public forum to raise their objections and
through conflict resolution, addresses these issues adequately.
The functions of the Grievance Redressal Committee shall be to: (i) provide support
for the PAFs on problems arising out of their land/property acquisition; (ii) record the
grievance of the PAFs, categorize and prioritize the grievances that need to be
resolved by the Committee; and (iii) report to the aggrieved parties about the
development regarding their grievances and the decision of the Project Authorities
.GRC will meet at least once a month and the decision of the GRC would be final.
The Committee shall deliver its decision within 4 weeks of the case registration.
Public/Community Consultation
The project authorities would continue to ensure that the affected population and
other stakeholders are informed, consulted and allowed to participate actively in the
social resettlement process. This has been and would be done throughout the project
at every stage of the project. i.e. during preparation, implementation and monitoring
of the project. The public/community participation and consultation would be done at
three broad levels: namely I) disseminating information and requesting villagers to
attend the public consulting meetings; ii) listing to the opinions and preferences of the
APs. During the preparation stage, consultations were held at local level. Additional
rounds of consultations with APs would be through appointed NGOs during RP
implementation. The other round of consultation will occur when compensation and
assistance are provided and actual resettlement begins.
Information DisclosureFor the benefit of the community in general and APs in particular, RP and R&R Policy
will be disclosed on RVNL and ADB websites.
VI CONSULTATION AND STAKEHOLDER PARTICIPATION
During the social assessment, the consultants, assisted by the EA officials,
conducted consultative meetings with the squatters. The policy framework and the
compensation principles defined earlier are based on the feedback from consultation
meetings. This interactive approach and processes will continue during the
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
13/19
13
RITES Ltd.
implementation of the project. The EA will inform the affected people of their
entitlements and benefits and implementation schedules. The Short RPs shall be
made available in local language i.e. Oriya to the affected people and
NGOs/community groups during focus group discussions and meetings at the
village/community level. Copies of RPs will be available at the local level to
stakeholders for local inputs.
VII INSTITUTIONAL RESPONSIBILITIES
RVNL will be responsible for project development, resource mobilization and
execution of projects for Cuttack-Barang-doubling of Railway line. Various
components related to compensation would be implemented through agency-
department with which it is related. The affected parameters and its implementingagency are summarized in Table 4.
TABLE 4IMPLEMENTING AGENCY FOR LAND ACQUISITION AND RESETTLEMENT
S.No. Parameter Implementing Agency
1. Information and CommunityConsultation Program,Stakeholders Participation anddisclosure of RP
policies/entitlements
Chief Resettlement Officer (CRO) andNGO
2. Distribution of Payments CRO, District Collector, localresettlement committees,
3. Internal Monitoring CRO and his staff
4. External Monitoring Sub-Project monitoring andimplementation consultants
VIII IMPLEMENTATION FRAMEWORK AND COST ESTIMATES
The ESDU from RVNL will have overall responsibility for policy guidance,
coordination, planning, implementation and financing. RVNL will appoint a senior
staff at the rank of Deputy General Manager at Bhubneshwar as Chief Resettlement
Officer (CRO). The CRO will closely work in coordination with the ESDU/Head
Quarter.
Experienced local NGOs will be hired (immediately after ADBs approval of the RP) to
assist CRO in RAP implementation with clearly defined tasks and schedules. The
appointed NGO will be responsible for information campaign, regarding RAP
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
14/19
14
RITES Ltd.
policies/entitlements as described in the matrix, and pay special attention to
livelihood programs for vulnerable groups. The NGO will open field offices and will
involve affected persons, including women in the implementation process.
CRO will also coordinate with representatives from the district administration, local
government departments like revenue, and affected persons including womens
representatives. The CRO will work closely with the District Collector to expedite the
payments of all compensation and other benefits as per the framework adopted for
sub projects. The CRO will monitor the progress of the work and ensure co-
ordination between the relevant departments and RAP implementation committees.
Sub-project monitoring and implementation consultants are being hired and engaged
to monitor and evaluate the project independently.
RAP Implementation Schedule
The period for implementation of RAP has been taken as five years starting from
October, 2004 to March, 2008. Planning, surveying, assessing, policy development,
institution identification, PAF participation, income restoration, and implementation are
typical RAP related activities, which have been considered. However, sometimes,
sequence may change or delays witnessed due to circumstances beyond the control
of the project. PIU will initiate actions to start implementation of RAP efficiently by
April, 2005. A time bound implementation schedule has been prepared and presented
in Figure 4 in accordance to the timing of civil works. The project will provide adequate
advance notification of 30 days to the PAPs prior to relocation and will pay their
compensation by the time commensurate with starting of the construction works. Both
internal and external monitoring will be completed by March, 2008.
The estimated budget for compensation to the squatters and implementation of the
project RP will be about Rs 2.33 million. The details are given in Table 5.The RVNL
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
15/19
15
RITES Ltd.
will bear all the land acquisition and resettlement costs and would ensure timely
release of funds during implementation. The squatters will receive compensation
prior to the start of the construction work.
TABLE 5
RAP **BudgetS. No. Description Quantity Rate(RS.) Total (Rs.)
A Compensation for Squatters
1 Replacement cost of commercial structures * 40 * 20000 8,00,000
2 Shifting allowance 40 1500 60,000
3 Transitional allowance 40 2,000 80,000
4 Skill training linked to employmentopportunities
40 2,000 80,000
5 Cash assistance for 30 days for loss of income and workdays
40 50X30 1,80,000
Sub-Total A 12,00,000B Assistance to Vulnerable People
5 BPL/ SC/ ST/ WHH/ Old Age people *18 5000 90,000
Sub-Total B 90,000
6 Compensation for Khokas 8 5000 40,000
C Sub-Total C 40,000
D Miscellaneous
5 Establishment and Support Staff 10,00,000
Sub-Total (C) 10,00,000
GRAND TOTAL (A+B+C) 23,30,000
*Nos based on Pro-Rata basis
** The is indicative & likely to change after the detailed design study and census surveyis done.
IX MONITORING AND EVALUATION
Monitoring and Evaluation are critical activities in involuntary resettlement. Monitoring
involves periodic checking to ascertain whether the activities are progressing as per
schedule while evaluation is essentially a summing up, at the end of the project,
assessment of the actual achievement in comparison to those aimed at during the
implementation. RP implementation will be monitored both internally and externally.RVNL will be responsible for internal monitoring through their NGO, CRO and PIU
and will prepare quarterly reports on the progress of RP implementation. Sub-project
monitoring and implementation Consultants will monitor the RP implementation and
will report on a half yearly basis to RVNL and ADB on the progress of implementation
activities. These consultants shall be appointed by RVNL following ADBs guidelines
for procurement of consultants. It will have social and environmental consultants as a
part of the team.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
16/19
16
RITES Ltd.
Internal Monitoring
The RP includes indicators and benchmarks for achievement of the objectives under
the resettlement program, which can be categorizes as follows: I) Process Indicators,
which includes project inputs, expenditures, staff deployments, etc.; ii) Output
indicators are results in terms of numbers of affected persons compensated and
resettled, incomes restored, additional assistance provided etc; and iii) Impact
indicators related to the long-term effect of the project on peoples lives in the project-
affected area.
The first two types of indicators, related to process and immediate outputs and
results, will be monitored internally by RVNL through CRO. RVNL will collect this
information from the project site and assimilate in the form of monthly progress reportto assess the progress and results of RP implementation, and adjust the work
program, where necessary, in case of any delays or problems. Specific activities
under RP implementation that will be monitored internally by RVNL are the following:
Information campaign and consultation with PAPs; Compensation of affected
structures and other assets; Relocation of PAPs; Payments for loss of income; and
Income restoration activities.
CRO will be responsible for monitoring the day-to-day resettlement activities of the
project. Baseline socio-economic census provide the necessary benchmark for field
level monitoring. Field level monitoring will be carried out through (i) review of census
information for all PAPs; (ii) consultation and informal interviews with PAPs; (iii) in-
depth case studies; (iv) informal sample survey of PAPs; (v) key informant interviews;
and (vi) community public meetings.
A performance data sheet will be developed to monitor the project at the field level.
Quarterly reports will be received from the field offices and the RVNL will be
responsible for overall project level monitoring. Also, Project Supervision Consultants
(PSC) will monitor the RP implementation and will report on a quaterly basis to
RVNL/EoCR and the ADB on the progress of all aspects of resettlement activities.
External Monitoring
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
17/19
17
RITES Ltd.
As mentioned earlier, Sub-Project monitoring and implementation consultants will
monitor the RAP implementation and will report on a half yearly basis to RVNL and
ADB on the progress of implementation activities. These consultants shall be
appointed by RVNL following ADBs guidelines for procurement of consultants. It will
have social and environmental consultants as a part of the team. The appointment of
these consultants will be approved by ADB.
The work of the panel of experts will start from October, 2005. The team of experts
will review the status of the Resettlement implementation in light of the targets,
budget and duration that has been laid down in the Resettlement plan. The key tasks
during external monitoring include: I) review and verification of the internal monitoring
reports prepared by CRO; ii) Review of the socio-economic baseline census
information of pre-displaced persons; iii) Identification and selection of impact
indicators; Impact assessment through formal and informal surveys with the affected
persons; Consultation with PAPs, officials, community leaders for preparing review
report; Assess the resettlement efficiency, effectiveness, impact and sustainability,
drawing lessons for future resettlement policy formulation and planning.
Monitoring will also pay close attention to the status of project affected vulnerable
groups such as female-headed households, disabled/elderly and economically
backward families (i.e., below poverty line). The following should be considered as
the basis for indicators in monitoring and evaluation of the project: (i) socio-economic
conditions of the PAPs in the post-resettlement period; (ii) communications and
reactions from PAPs on entitlements, compensation, options, alternative
developments and Economic Rehabilitation timetables etc., (iii) changes in housing
and income levels; (iv) rehabilitation of informal settlers; (v) status of Economic
Rehabilitation; and (vi) level of satisfaction of PAPs in the post resettlement period.
Reporting Requirements
The Addistional General Manager(PP&D),RVNL responsible for supervision and
implementation of the RP will prepare half yearly progress reports on resettlement/
Economic Rehabilitation activities and submit to the ADB for review. The Sub-project
monitoring and implementation Consultants will also monitor RAP implementation
and submit half
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
18/19
18
RITES Ltd.
yearly reports to RVNL and to the ADB. They will determine whether resettlement
goals have been achieved, more importantly whether livelihoods and living standards
have been restored/enhanced and suggest suitable recommendations for
improvement.
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)
-
7/28/2019 Social Resettlement & Rehabilitation Plan of Cuttack - Barang Doubling 12.1 Km Orissa
19/19
19
RITES Ltd.
FIGURE 4
RAP IMPLEMENTATION SCHEDULE
FIGURE 4: RAP IMPLEMENTATION SCHEDULE
Year
2004 2005 2006 2007
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Land Acquisition
1 Socio Economic Survey & SA & RAP Report
2 Draft SA & RAP Report
3 Review and approval of SA &RAP
4 LA Proposal
5 Appointment of CRO
6 Hiring of NGO for assistance to CRO
7 Appointment of External M&E Agency
8 Disclosure of RAP
9 Information dissemination and PublicConsultation
RAP Implementation
1 CRO and Staff Training
2 LA completed and preparation of award
3 Final list of PAPs and distribution of ID cards
4 LA payments by DC office
5 Formation of GRC
6 Provision of basic Amenities and Areadevelopment
7 Payments of all other eligible assistance
8 Land Transfer to Railways
Monitoring and Evaluation
1 Internal Monitoring.
2 External Monitoring
As and when required
Cuttack-Barang Doubling of Railway Line : ShortResettlement Plan (Final)