Page 1: Software Outsourcing and New Model of Test Estimation for Agile Development

Over 40 -60% of the IT development are done through outsourcing

And day by day this is increasing

1

Offshore Software Development

Page 2: Software Outsourcing and New Model of Test Estimation for Agile Development

Software Outsourcing

RMIT University©2013 2

Country Name Revenue in 2012 Next Target By

Vietnam 2.3 B 6 B 2016

Philippines 1.2 B 2 B 2015

Bangladesh 15 M 2 B 2017

Page 3: Software Outsourcing and New Model of Test Estimation for Agile Development

50 -70% of companies are more likely to have a marginal project or outright failure:

Taking over 180% of target time to deliver; Consuming in excess of 160% of estimated budget; Delivering under 70% of the target required functionality.

3

Offshore Software Development

Page 4: Software Outsourcing and New Model of Test Estimation for Agile Development

Efficiency Factor and Risk Factor Based User Case Point Test Effort Estimation Model Compatible with Agile Software Development

Masud Parvez

Senior IT Project Manager, IT ServicesRMIT International University

Email: [email protected]

Page 5: Software Outsourcing and New Model of Test Estimation for Agile Development

Index

1.Estimation in software outsourcing

2.Our Investigation

3.Use Case Test Effort estimation

4.Our Developed New Layer

5.Project Demonstration

6.Performance Analysis

7.Future Research Opportunities

8.Question / Answer

5

Page 6: Software Outsourcing and New Model of Test Estimation for Agile Development

Software project bidding

Planning for whole project

Next cycle estimation

6

Estimation in Software outsourcing

Page 7: Software Outsourcing and New Model of Test Estimation for Agile Development

•FIA (finger in the air) or best guess •Use case point estimation method•Functional point estimation method•Ad-hoc method, WBS  •Function points / Test point Analysis •Percentage of development effort method •Percentage distribution •Etc.

7

Test Effort Estimation Models

Page 8: Software Outsourcing and New Model of Test Estimation for Agile Development

•Well Used in Agile Outsourcing industry

Investigation and Challenges :•Different teams

•Different skill set of the members

•Conversion Factor

•New / Young test studio

RMIT University©2013 8

Our Motivation and Investigation

Page 9: Software Outsourcing and New Model of Test Estimation for Agile Development

•Determine and compute the unadjusted use case point (UUCP).

•Determine and compute the technical complexity factor (TCF).

•Determine and compute the Environmental complexity factor (ECF).

•Calculate final (primary) Use case point (UCP).

RMIT University©2013 9

Use Case Test Effort Estimation

Page 10: Software Outsourcing and New Model of Test Estimation for Agile Development

•Efficiency Factor (EF)

•Risk Factor (RF)

10

Two Keys in our New Layer

Page 11: Software Outsourcing and New Model of Test Estimation for Agile Development

1. Test Cycle length and cycle weight

2. Test Team member definition

3. Compute efficiency factor

4. Determine Risk factor for each tester

5. Compute average efficiency factor

6. Effort adjustment

11

Steps to complete the new layer

Page 12: Software Outsourcing and New Model of Test Estimation for Agile Development

Test Cycle length and cycle weight

12

Class Duration of Test Cycle Cycle weight

Class 1 1-2 working days 0.2

Class 2 3-4 working days 0.4

Class 3 5-7 working days 0.6

Class 4 8-10 working days 0.8

Class 5 11- 12 working days 1.0

Page 13: Software Outsourcing and New Model of Test Estimation for Agile Development

Test Team member definition

13

Tester Level Skill Set Level weight

Level 1 Fresher / Young 1

Level 2 Average skill level 2

Level 3 Standard skill 3

Level 4 Expert 4

Page 14: Software Outsourcing and New Model of Test Estimation for Agile Development

Compute efficiency factor (EF)

Formula to compute the efficiency factor for tester n :

EFn = LWn * YEn * [{ ( Bug number of Cycle Z /Cycle weight) /100 +….…….+ (Bug number of Z-tc/Cycle weight) /100 }/tc]

RMIT University©2013 14

Tester No. Level weight (LW)

Year of exp. (YE)

Bug in each cycleCycle z Cycle z-1 …. Cycle z-tc

BN CW BN CW BN CW

Tester 1 LW1 YE1

…..

Tester n LWn YEn

Page 15: Software Outsourcing and New Model of Test Estimation for Agile Development

Define Risk factor for each tester (RF)

15

EF score range Comment Action Risk %

0.1 – 0.39 Very low

Remove from the team and engage in training ( if not

fresher) Replace

0.4 – 0.59 Low Add risk by considering KPIs 20 % - 45 %

0.6– 0.89 Fair Add risk 10 % - 20%

0.90–0.99 Good Add no risk 0%

1+ Excellent Round it to 0.95 0%

Page 16: Software Outsourcing and New Model of Test Estimation for Agile Development

Compute Average Efficiency Factor (AEF)

The formulate to complete Future efficiency factor :

• For Tester 1 , FEF1= (EF1 + RV1)/10

• ………….

• For Tester n, FEFn= (EFn + RFn)/10

Business formula to compute the average efficiency factor (AEF) :

• AEF= (FEF1+ FEF2+…………+FEFn) / n

16

Page 17: Software Outsourcing and New Model of Test Estimation for Agile Development

Test effort adjustment and Final Effort (FE)Test effort adjustment and Final Effort (FE)

The formulate to complete Final Effort (FE) :

•Final effort (FE) = Primary Total Effort (FE) / Average Efficiency Factor (AEF)

17

Page 18: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration Project Demonstration

Project Profile :

18

Project type Size Development methodology Team member

Web application Medium + Agile Scrum 14

Page 19: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration Project Demonstration

Project Profile :

•Unadjusted use case point (UUCP) = 44

•environmental complexity factor ( ECF) = 2.0335

•final use case point (UCP) = 76.32

•Conversion Factor (CF) = 10

• Primary total effort (PE) = 763.2Primary total effort (PE) = 763.2

19

Page 20: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration – Compute (EF)

RMIT University©2013 20

Tester No. Level weight (LW)

Year of exp. (YE)

Bug in each cycleCycle z Cycle z-1 Cycle z-tc

BN CW BN CW BN CW

Tester 1 3 3 30 0.5 50 0.6 30 0.4

Tester 2 3 2 40 0.6 55 0.6 45 0.5

Tester 3 2 3 30 0.5 45 0.5 25 0.3

Testers Profile :

Page 21: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration – Compute (EF)

Formula to compute the efficiency factor for testers :

EFn = LWn * YEn * [{ ( Bug number of Cycle Z /Cycle weight) /100 +….…….+ (Bug number of Z-tc/Cycle weight) /100 }/tc]

EF1 = 6.54

EF2 = 5.34

EF3 = 4.62

RMIT University©2013 21

Page 22: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration – Compute (RF)

Define the risks on testers:

RMIT University©2013 22

Testers Efficiency factor (EF) Risk factor (RF) Risk value (RV)

Tester 1 6.54 25% 1.63

Tester 2 5.34 35% 1.86

Tester 3 4.62 45% 2.07

Page 23: Software Outsourcing and New Model of Test Estimation for Agile Development

Project Demonstration – Compute (FRF) The formulate to complete Future Efficiency Factor (FEF) : •For Tester n, FEFn= (EFn + RFn)/10

•For Tester 1 , FEF1 = 0.81

•For Tester 2 , FEF2 = 0.72

•For Tester 3 , FEF3 = 0.66

Formula to compute the Average Efficiency Factor (AEF) :• AEF= (FEF1+ FEF2+…………+FEFn) / n

• AEF = 0.73

RMIT University©2013 23

Page 24: Software Outsourcing and New Model of Test Estimation for Agile Development

Test effort adjustment and Final Effort (FE)Test effort adjustment and Final Effort (FE)

The formulate to complete Final Effort (FE) :

•Final effort (FE) = primary total effort (FE) / average efficiency factor (AEF)

•FE= 1045 Hours.

24

Page 25: Software Outsourcing and New Model of Test Estimation for Agile Development

Performance Analysis

25

Type Size Expert (Hour) UC (Hour)

Our model (Hour)

Real effort (Hour)

Deviation with expert

Deviation with UC

Deviation with our model

Web Large 750 870 980 1090 -32% -21% -11%

Mobile Medium 484 420 530 520 -30 % -20% +2%

Web Medium 910 780 1015 985 -8% -21% +3%

Game Small 320 230 270 254 +21% -10% +6%

Page 26: Software Outsourcing and New Model of Test Estimation for Agile Development

Future Research Opportunities Future Research Opportunities

•Conversion factor (CF)

26

Page 27: Software Outsourcing and New Model of Test Estimation for Agile Development

Questions !

27

Thank you