software problem reporting

4
Software Problem Reporting (SPR) Process Checklist Dat e(s ) of Asse ssment: _____ _ Pr oje ct: _______ ___ Assessor(s): ______________________ Process Assessed: ___  _______________________________________________________________________________ Y, N,  NA F, O Comments ASSESSMENT PREPARATION 1 Ha ve sta nd ar ds be en ide nt ifi ed to clearly define the process assessment? 2 Wer e g ui de line s us ed to pr ep ar e fo r  the assessment? 3 Ha s t he pr oj ect sub mi tte d any reques t for deviations or waivers to the defined process? 4 Ha ve entra nc e and exit c ri ter ia bee n established for the assessment? 5 Wer e t he ap pr opriate stake ho lders in attendance? PROBLEM REPORTING PROCESS 6 Have proce dures assuring prompt detection and correction of deficiencies/problems been established? 7 Have t he software probl ems been described (including identification of the software items and life cycle phase in which the problems were discovered) to enable problem resolution? 8 Ha ve the or igi na tors of so ftware  problem reports and the originator’s assessment of priority/severity been  provided? 9 Are data ana lyzed and prob lem and deficiency reports examined to determine extent and causes? 10 Ar e t rends in per forma nc e of wor k  analyzed to prevent development of nonconforming products? Revision: 1.0 Page 1 of 4 Y=Yes, N=No, NA=Not Applicable, F=Finding, O=Observation For more information, please visit the NASA GSFC Software Assurance Website, at http://sw-assu rance.gsfc.nasa. gov.

Upload: sabahat-hussain

Post on 08-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

8/6/2019 Software Problem Reporting

http://slidepdf.com/reader/full/software-problem-reporting 1/4

Software Problem Reporting (SPR) Process Checklist

Date(s) of Assessment: ______________ Project: ____________________________________ 

Assessor(s): ______________________ Process Assessed: ____________________________ 

 _______________________________________________________________________________ 

Y, N, NA

F, O Comments

ASSESSMENT PREPARATION

1 Have standards been identified to

clearly define the process assessment?

2 Were guidelines used to prepare for 

the assessment?

3 Has the project submitted any request

for deviations or waivers to the

defined process?4 Have entrance and exit criteria been

established for the assessment?

5 Were the appropriate stakeholders in

attendance?

PROBLEM REPORTING PROCESS

6 Have procedures assuring prompt

detection and correction of deficiencies/problems been

established?

7 Have the software problems been

described (including identification of the software items and life cycle phasein which the problems were

discovered) to enable problem

resolution?

8 Have the originators of software

 problem reports and the originator’s

assessment of priority/severity been provided?

9 Are data analyzed and problem anddeficiency reports examined to

determine extent and causes?10 Are trends in performance of work 

analyzed to prevent development of 

nonconforming products?

Revision: 1.0 Page 1 of 4

Y=Yes, N=No, NA=Not Applicable, F=Finding, O=Observation

For more information, please visit the NASA GSFC Software Assurance Website, at http://sw-assurance.gsfc.nasa.gov.

8/6/2019 Software Problem Reporting

http://slidepdf.com/reader/full/software-problem-reporting 2/4

Software Problem Reporting (SPR) Process Checklist

Y, N,

 NA

F, O Comments

11 Have corrective actions been

documented accurately on problem

reports?

12 Have corrective actions been reviewed

and monitored to determine adequacy,

effectiveness, and whether contractrequirements are being met?

13 Are all corrective action reports andanalyses on file?

14 Is there management support for thecorrective action system?

15 Are discrepancies generated by non-deliverable computer programs treated

the same as those for deliverables?

16 Are problem reports pertaining to a

unit contained/identified within thesoftware development folder for that

unit?

17 Are the software developers

complying with the requirement togenerate problem reports during

integration?

18 Do all problem reports have required

approval/disapproval signatures?

POST REVIEW ACTIVITIES

19 At the conclusion of the assessment isan understanding reached on the

validity and degree of completeness of 

the Software Problem ReportingProcess?

20 Did all designated parties concur inthe acceptability of the Software

Problem Reporting Process?

21 Are there any risks, issues, or requestfor actions (RFAs) that require follow-

up?

22 Is there a process in place for 

reviewing and tracking the closure of 

risks, issues, or RFAs?

23 Were Lessons Learned addressed and

captured?

Revision: 1.0 Page 2 of 4

Y=Yes, N=No, NA=Not Applicable, F=Finding, O=Observation

For more information, please visit the NASA GSFC Software Assurance Website, at http://sw-assurance.gsfc.nasa.gov.

8/6/2019 Software Problem Reporting

http://slidepdf.com/reader/full/software-problem-reporting 3/4

Software Problem Reporting (SPR) Process Checklist

Y, N,

 NA

F, O Comments

 REFERENCE ITEMS/DOCUMENTS 

GPR 1710.1H, Corrective and Preventive Action

 NPR 7150.2, Software Engineering Requirements [SWE-113]

GPR 5340.2I, Control of Nonconformances

Revision: 1.0 Page 3 of 4

Y=Yes, N=No, NA=Not Applicable, F=Finding, O=Observation

For more information, please visit the NASA GSFC Software Assurance Website, at http://sw-assurance.gsfc.nasa.gov.

8/6/2019 Software Problem Reporting

http://slidepdf.com/reader/full/software-problem-reporting 4/4

Software Problem Reporting (SPR) Process Checklist

Date(s) of Assessment: ________________ Project: ______________________________________ 

Assessor(s): _________________________ Process Assessed: ______________________________ 

 _________________________________________________________________________________ 

COMMENTS PAGE _____ of _____ 

# Comments from assessment

Revision: 1.0 Page 4 of 4

Y=Yes, N=No, NA=Not Applicable, F=Finding, O=Observation

For more information, please visit the NASA GSFC Software Assurance Website, at http://sw-assurance.gsfc.nasa.gov.