SEMATECHTechnology Transfer 92111389B-TRG
Software Quality Engineering forManagers—Training Materials
© 1995 SEMATECH, Inc.
SEMATECH and the SEMATECH logo are registered service marks of SEMATECH, Inc.
Semiconductor Equipment Technology Center (SETEC), the SETEC logo, Sandia National Laboratories, andthe Sandia National Laboratories logo are trademarks of Sandia National Laboratories.
Software Quality Engineering for Managers—Training MaterialsTechnology Transfer # 92111389B-TRG
SEMATECHMay 31, 1995
Abstract: This document contains presentation and instructional materials for a four-hour seminar on theessential elements for developing high-quality, reusable software. The seminar includes sessionson process organization, managing software development, the software requirements specification(SRS) document, software reviews and inspections, software configuration management (SCM),and testing. The target audience for this course includes senior and middle managers, and projectand quality managers with little or no software quality engineering background. These trainingmaterials were developed at the Semiconductor Equipment Technology Center (SETEC) at SandiaNational Laboratories.
Keywords: Software Process Improvement, Software Development, Software Reliability, Training
Approvals: Harvey Wohlwend, Project ManagerDan McGowan, Technical Information Transfer Team Leader
iii
Technology Transfer # 92111389B-TRG SEMATECH
Table of Contents
1 EXECUTIVE SUMMARY........................................................................................................11.1 Introduction .......................................................................................................................11.2 Process Organization .........................................................................................................11.3 Project/Risk Management..................................................................................................11.4 Requirements .....................................................................................................................11.5 Reviews and Inspections (Formal In-Process Reviews)....................................................11.6 Configuration Management ...............................................................................................11.7 Testing ...............................................................................................................................21.8 Support ..............................................................................................................................2
2 COURSE SYLLABUS ..............................................................................................................2Course Schedule: .......................................................................................................................2Course Instructors: .....................................................................................................................2Target Audience:........................................................................................................................2Objectives: .................................................................................................................................2Course Material:.........................................................................................................................2
3 SCHEDULE...............................................................................................................................2
4 OUTLINE ..................................................................................................................................3Introduction................................................................................................................................3Process Organization .................................................................................................................3Project/Risk Management ..........................................................................................................3Requirements .............................................................................................................................4Reviews and Inspections (Formal In-Process Reviews) ............................................................4Configuration Management .......................................................................................................4Testing........................................................................................................................................4Support.......................................................................................................................................4
5 INTRODUCTION......................................................................................................................5
6 SOME WORKING DEFINITIONS.........................................................................................17
7 PROCESS ORGANIZATION.................................................................................................18
8 PROJECT / RISK MANAGEMENT.......................................................................................30
9 REQUIREMENTS...................................................................................................................40
10 REVIEWS AND INSPECTIONS............................................................................................47
11 CONFIGURATION MANAGEMENT ...................................................................................65
12 FORMAL SOFTWARE CONFIGURATION MANAGEMENT AND TIME-PHASEDVERSION (BASELINE) RELEASE .......................................................................................72Overview..................................................................................................................................72Structure...................................................................................................................................72Change Request/Problem Reporting........................................................................................74
iv
SEMATECH Technology Transfer # 92111389B-TRG
Change Control/Configuration Management...........................................................................75Software Engineering Activities ..............................................................................................77Summary ..................................................................................................................................77
13 GLOSSARY OF SOFTWARE CONFIGURATION MANAGEMENT TERMINOLOGY ..78
14 TESTING.................................................................................................................................81
15 SUPPORT................................................................................................................................90
16 QUESTIONS TO ASK ............................................................................................................98
17 ACTION PLAN FOR SOFTWARE QUALITY .....................................................................99
18 SEI MATURITY MODEL: LEVEL 2 – REPEATABLE PROCESS ...................................101
19 FOLLOW-UP QUESTIONS .................................................................................................104
20 SOME FURTHER READING ..............................................................................................105Articles Specific to Sessions..................................................................................................105On Software Project Management .........................................................................................105On Software Metrics ..............................................................................................................105
v
Technology Transfer # 92111389B-TRG SEMATECH
List of Figures
Figure 1 SCM Context ..................................................................................................................73
Figure 2 Normal Release Cycling .................................................................................................74
List of Tables
Table 1 Change Profiles................................................................................................................75
Table 2 Contents Of Change Request Analysis ............................................................................76
Table 3 Contents of Change Implementation Package .................................................................76
1
Technology Transfer # 92111389B-TRG SEMATECH
1 EXECUTIVE SUMMARY
This document contains presentation and instructional materials for a seminar on the essentialelements necessary to develop high-quality, reliable software. Included are several key questionsthat managers and executives can (and should) ask about a software development project. Asmall case study is used to illustrate important elements in the software development process andas a focus for discussion. The seminar is structured as follows:
1.1 Introduction
The seminar begins with an introduction and a query of participants’ expectations. Althoughcourse goals are presented, emphasis is placed on areas of common interest to the class. Softwareis defined and two views of software quality are offered. The following sessions all relate toactivities that denote a level of software engineering maturity that is well defined. Targetaudience includes project and quality managers with little or no background in software qualityengineering.
1.2 Process Organization
This session focuses on the importance of viewing software development and softwareengineering from a process perspective. Software life cycle activities and their interrelationshipsare discussed, with emphasis on devoting sufficient time to pre-implementation activities. Alsodiscussed are opportunities for quality improvement and use of some core metrics to trackcurrent processes and measure improvement.
1.3 Project/Risk Management
This session addresses a reasonable approach to the management aspects of softwaredevelopment. It teaches that each participant in a software development project must be aware ofthese activities, accompanying management planning, and what management planning does forthe project.
1.4 Requirements
This session describes and discusses a software requirements specification (SRS) as the mostimportant product definition document in software development. The reasons for an SRS and thecontent of an SRS also are presented.
1.5 Reviews and Inspections (Formal In-Process Reviews)
This segment covers the nature and purpose of software reviews, which satisfy both managementand technical aspects of software development. Levels and types of reviews are discussed, withappropriate life cycle review points highlighted.
1.6 Configuration Management
Software configuration management (SCM) is an essential aspect of the software developmentprocess. This session covers the elements and benefits of SCM, and answers common questionsabout SCM.
2
SEMATECH Technology Transfer # 92111389B-TRG
1.7 Testing
Regardless of the care taken in developing software, the need remains to test software at alllevels to validate it to requirements and ensure that it is as defect-free as possible before deliveryto the customer. This session stresses the concept of testing to detect defects. Test approachesand activities for testing are presented and discussed.
1.8 Support
This concluding session recaps the elements of software engineering that promote high qualityand high reliability. The session and the course is concluded by reviewing the softwareengineering Capability Maturity Model (CMM).
2 COURSE SYLLABUS
Course Schedule:
8:30 a.m. to 12:30 p.m.
Course Instructors:
Eric Tomlin, Sandia National Laboratories, Primary
Dave Peercy, Sandia National Laboratories, Alternate
Target Audience:
Senior and middle managers. Project and quality managers with little or no software qualityengineering background.
Objectives:
• Develop a framework for software engineering (and the software life cycle).
• Recognize the benefits of integrating software engineering techniques into a designfor quality and reliability.
• Outline an action plan for the manager to apply toward increasing the quality ofsoftware produced.
Course Material:
1. Course Notebook
2. Case Study Material - (Handouts at Seminar)
3 SCHEDULE
Seminar Length: 4 hours
8:30 AM
Introduction
3
Technology Transfer # 92111389B-TRG SEMATECH
Process Organization
Break
Project/Risk Management
Requirements
Review and Inspections (Formal In-Process Reviews)
Break
Configuration Management
Testing
Support
12:30 PM
Lunch
4 OUTLINE
Introduction
The course in introduced along with a query of the class participant's expectations. Althoughthere are course goals presented, emphasis will be placed on areas of common interest to theclass. A working definition of software is presented as well as two views of software quality. Thesoftware engineering CMM from the Software Engineering Institute (SEI) is introduced to causethe participants to consider where their organizations might be in their ability to consistentlyproduce high quality software. The following sessions all relate to activities that denote a level ofsoftware engineering maturity that is well defined.
Process Organization
This session focuses on the importance of viewing software development and softwareengineering from the perspective of a process. Software life cycle activities and theirinterrelationships are discussed with an emphasis on sufficient time spent on activities prior toimplementation. Opportunities for quality improvement are discussed along with some coremetrics that can be used to track current processes and measure improvement. This session startsa series of questions that managers could (and should) ask about software projects under theirdirection. An outline to action plan items also begins with this session.
Project/Risk Management
This session addresses a reasonable approach to the management aspects of softwaredevelopment. Each participant in a software development project must be aware of theseactivities, the accompanying management planning, and what management planning does for theproject.
4
SEMATECH Technology Transfer # 92111389B-TRG
Requirements
An SRS is the most important product definition document in software development. The SRS isdescribed and discussed in this session. The reasons for an SRS and the content of an SRS arealso presented.
Reviews and Inspections (Formal In-Process Reviews)
Reviews satisfy both management and technical aspects of software development. This sessioncovers the nature and purpose of software reviews. Levels of reviews and types of reviews arediscussed with appropriate life cycle review points highlighted.
This session focuses on one particularly important type of review, the software inspection. Itcovers the background of software inspections, discusses pros and cons of inspections, andpresents reported information of its return on investment. This session also describes theinspection process and roles and responsibilities of participants.
Configuration Management
SCM is an essential aspect of the software development process. This session covers theelements of SCM, benefits of SCM, and answers some common questions about SCM.
Testing
Regardless of the care taken in developing software, there is still a need to test software at alllevels to validate the software to requirements and to ensure that the software is as defect-free asit can be before delivery to the customer. This session stresses the concept of testing to detectdefects. Test approaches and activities for testing are presented and discussed.
Support
This concluding session recaps the elements of software engineering that promote high quality,high reliability software. The session and the course is concluded by revisiting the softwareengineering Capability Maturity Model.
5
Technology Transfer # 92111389B-TRG SEMATECH
5 INTRODUCTION
Sof
twar
e Q
ualit
y E
ngin
eeri
ngfo
rM
an
ag
ers
Spo
nsor
ed B
y
Dev
elop
ed B
yS
emic
ondu
ctor
Equ
ipm
ent
Tec
hnol
ogy
Cen
ter
(SE
TE
C)
San
dia
Nat
iona
l Lab
orat
orie
sC
opyr
ight
© 1
994
SE
MA
TE
CH
, In
c
Rev
isio
n D
ecem
ber
1994
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
1 (
12/9
4)
6
SEMATECH Technology Transfer # 92111389B-TRG
Who
Are
We?
W
hat
do W
e D
o?
•S
andi
a N
atio
nal L
abor
ator
ies
−O
pera
ted
by M
artin
Mar
iett
a fo
r th
e D
epar
tmen
t of
Ene
rgy
- ".
. .
in t
hena
tiona
l int
eres
t."
−P
art
of t
he N
ucle
ar W
eapo
ns C
ompl
ex
Hig
h R
elia
bilit
y -
Hig
h C
onfid
ence
Pro
duct
s
Ext
ensi
ve u
se o
f em
bedd
ed s
oftw
are
−R
esea
rch
exte
nds
to r
obot
ics,
mat
eria
ls s
cien
ce,
ener
gy s
ourc
es,
com
puta
tiona
l mec
hani
cs,
cryp
togr
aphy
and
man
y ot
her
area
s
•S
emic
ondu
ctor
Equ
ipm
ent
Tec
hnol
ogy
Cen
ter
(SE
TE
C)
−Id
entif
icat
ion
of c
ross
-sec
tion
of L
abor
ator
y as
sets
to
prov
ide
assi
stan
ce t
o S
EM
AT
EC
H a
nd t
he S
EM
I/S
EM
AT
EC
H m
embe
rco
mpa
nies
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
2 (
12/9
4)
7
Technology Transfer # 92111389B-TRG SEMATECH
Wha
t D
o M
anag
ers
Do?
"Man
agem
ent's
job
is t
o cr
eate
an
envi
ronm
ent"
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
3 (
12/9
4)
8
SEMATECH Technology Transfer # 92111389B-TRG
Why
are
YO
U h
ere?
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
4 (
12/9
4)
9
Technology Transfer # 92111389B-TRG SEMATECH
Why
is T
here
a
Pro
blem
?
Sof
twar
e as
% o
f
Dev
elo
pmen
t W
ork
05
1015202530354045
Pro
blem
Cre
ated
Rqm
ts
Des
ign
Cod
e
Tes
t
Sup
port
05
10152025
Clo
sure
Rqm
ts
Des
ign
Cod
e
S/W
Int
Sys
Int
Bet
a T
est
Sup
port
Ada
pted
fro
m S
oftw
are
Logi
stic
s N
atio
nal W
orks
hop,
Aug
ust
15-1
6, 1
989
0
255075
100
19
6019
7019
8019
90
Sm
all A
mou
ntof
Em
bedd
ed S
oftw
are
Ext
ensi
ve U
seof
Em
bedd
ed S
oftw
are
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
5 (
12/9
4)
Def
ects
: W
hen
Cre
ated
- W
hen
Fou
nd
10
SEMATECH Technology Transfer # 92111389B-TRG
Sem
inar
Obj
ectiv
es
•D
evel
op a
fra
mew
ork
for
soft
war
e en
gine
erin
g
−B
asis
for
: T
rack
ing
cost
& s
ched
ule,
(S
oftw
are)
Sys
tem
Dev
elop
men
tP
lan
•R
ecog
nize
the
ben
efits
of
inte
grat
ing
soft
war
een
gine
erin
g co
ncep
ts,
tool
s an
d te
chni
ques
into
ade
sign
for
qua
lity
and
relia
bilit
y
−R
educ
es r
isk,
impr
oves
vis
ibili
ty in
to t
he s
ched
ule,
and
impr
oves
the
qual
ity o
f de
liver
ed p
rodu
cts
•O
utlin
e a
n ac
tion
plan
for
YO
U t
o ap
ply
to in
crea
se t
hepr
obab
ility
of
prod
ucin
g hi
gh q
ualit
y so
ftw
are
−R
esul
ts c
an b
e pa
rt o
f a
Sof
twar
e Q
ualit
y P
lan
and
Sof
twar
eD
evel
opm
ent
Pla
n
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
6 (
12/9
4)
11
Technology Transfer # 92111389B-TRG SEMATECH
Sem
inar
For
mat
•P
robl
em/D
ilem
ma
Dia
san
Mar
ine
Har
dwar
e C
ompa
ny
•D
iscu
ssio
n
•P
rese
ntat
ion
on P
repa
red
Mat
eria
l
•Q
uest
ions
Enc
oura
ged
!
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
7 (
12/9
4)
12
SEMATECH Technology Transfer # 92111389B-TRG
Wh
at
is s
oft
wa
re?
• D
oc
um
en
tati
on
(P
rod
uc
t D
efi
nit
ion
)
--
So
urc
e,
Ob
ject
s, E
xecu
tab
les
--
Co
mp
reh
en
siv
e w
ritt
en
de
scri
pti
on
- D
efi
ne
s re
qu
ire
me
nts
co
nte
nt,
co
mp
osi
tio
n,
de
sig
n,
pe
rfo
rma
nce
, te
stin
g,
use
an
d s
up
po
rt.
Incl
ud
es
pla
ns
as
ap
pro
pri
ate
(e
.g.,
de
velo
pm
en
t, t
est
, co
nfi
gu
rati
on
ma
na
ge
me
nt)
.
• C
od
e
Pro
gra
m
Lin
ke
rs
Ed
ito
rs
Ma
nu
als
Te
st
Pla
ns
De
ve
lop
me
nt/
Su
pp
ort
To
ols
Pro
ce
du
res
Op
era
tin
g S
ys
temD
iag
no
sti
c S
oft
wa
re
Inte
rfa
ce
Re
qu
ire
me
nts
So
ftw
are
De
sig
n D
es
cri
pti
on
s
Sp
ec
ific
ati
on
s
Co
mp
ile
rsS
oft
wa
re R
eq
uir
em
en
ts
"Ah
, it
's o
nly
co
de
!"
13
Technology Transfer # 92111389B-TRG SEMATECH
Sof
twar
e Q
ualit
y
Dep
ends
on
One
's P
ersp
ectiv
e!
•If
I h
ave
to u
se it
. .
.
•If
I'm
the
one
who
has
to
fix it
. .
.
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
9 (
12/9
4)
14
SEMATECH Technology Transfer # 92111389B-TRG
Sof
twar
e Q
ualit
yU
ser
Per
spec
tive
Usa
bilit
yT
he e
ffor
t re
quir
ed t
o le
arn,
ope
rate
, pr
epar
e in
put
and
inte
rpre
t ou
tput
of
a pr
ogra
m
S
afet
yT
he s
oftw
are
desi
gn c
onta
ins
posi
tive
mea
sure
s to
prev
ent
or r
educ
e to
an
acce
ptab
le le
vel o
f ri
sk,
syst
em
failu
res
that
cou
ld c
ause
inju
ry o
r de
ath,
or
seri
ous
dam
age
to c
ritic
al e
quip
men
t
Eff
icie
ncy
The
ext
ent
to w
hich
sof
twar
e pe
rfor
ms
its in
tend
ed
func
tions
with
a m
inim
um o
f co
mpu
ting
reso
urce
s (e
.g.,
Res
pons
e T
ime)
Rel
iabi
lity
The
pro
babi
lity
that
sof
twar
e w
ill n
ot c
ause
the
fai
lure
of
a sy
stem
for
a s
peci
fied
time
unde
r sp
ecifi
ed c
ondi
tions
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
10
(12/
94)
15
Technology Transfer # 92111389B-TRG SEMATECH
Sof
twar
e Q
ualit
yM
aint
aine
r's P
ersp
ectiv
e
Mai
ntai
nabi
lity
The
eas
e w
ith w
hich
sof
twar
e ca
n be
cha
nged
- "S
uppo
rtab
ility
"
P
orta
bilit
yT
he e
ase
with
whi
ch s
oftw
are
can
be
tran
sfer
red
from
one
com
pute
r sy
stem
or
envi
ronm
ent
to a
noth
er
Impl
ies
Reu
sabi
lity
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
11
(12/
94)
16
SEMATECH Technology Transfer # 92111389B-TRG
Whe
re is
YO
UR
Org
aniz
atio
n?(I
n its
Goa
l to
Pro
duce
Hig
h Q
ualit
y S
oftw
are)
Sof
twar
e E
ngin
eeri
ng C
apab
ility
Sof
twar
e E
ngin
eeri
ng I
nstit
ute
(S
EI)
, C
arne
gie
Mel
lon
Uni
vers
ity
RE
SU
LT
SP
RO
BLE
M A
RE
AS
AD
DR
ES
SE
D
5 -
OP
TIM
IZIN
G[F
eedb
ack]
4 -
MA
NA
GE
D[Q
uant
itativ
e]
3 -
DE
FIN
ED
[Qua
litat
ive]
2 -
RE
PE
AT
AB
LE[In
tuiti
ve]
1 -
INIT
IAL
[Ad
Hoc
]
Acq
uire
d C
apab
ilitie
s -
Ada
ptab
le t
o C
hang
e -
Aut
omat
ion
Pro
cess
Con
trol
- S
tatis
tical
Pro
cess
Con
trol
- C
hang
ing
Tec
hnol
ogy
- P
robl
em P
reve
ntio
n
Pro
cess
Mea
sure
men
t -
Fau
lt P
roje
ctio
n -
Tes
t &
Rev
iew
Cov
erag
e -
Pro
cess
Met
rics
Dat
abas
e
Pro
cess
Def
initi
on -
Qua
lity
Poi
nt R
evie
ws
- S
oftw
are
Eng
inee
ring
Tra
inin
g
Bas
ic M
anag
emen
t C
ontr
ol -
Pro
ject
Pla
nnin
g (C
ost,
Sch
edul
e) -
Con
figur
atio
n M
anag
emen
t -
Reg
ress
ion
Tes
ting*
- S
oftw
are
Qua
lity
Ass
uran
ce
Pro
duct
ivity
&Q
ualit
y
Ris
k
MA
TU
RIT
Y
LEV
EL
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56In
trod
uctio
n -
12
(12/
94)
* R
egre
ssio
n T
estin
g:
Sel
ectiv
e r
etes
ting
of a
sys
tem
or
com
pone
nt t
o ve
rify
tha
t
mod
ifica
tions
hav
e no
t ca
used
uni
nten
ded
effe
cts
and
that
the
sys
tem
or
com
pone
nt s
till c
ompl
ies
with
its
spec
ified
req
uire
men
ts
17
Technology Transfer # 92111389B-TRG SEMATECH
6 SOME WORKING DEFINITIONS
Baseline A baseline is the documented identification of a software productitscode and all its related documentation at some specific point in time. It isthe basis for all Software Configuration Management activities.
Error A human action that results in one or more faults being inserted into awork product.
Failure A departure of a computer program's operation from the user'srequirements.
Failure Intensity The number of failures occurring in a given time period.
Fault Defect in the software that can cause a failure. Defect and fault are termsthat are often interchanged.
Inspection A formal evaluation of work products or software elements (requirements,design, code, etc.) to detect faults, violations of development standards andother problems Participants have defined roles, minutes recorded andretained, results reported.
Review Any number of techniques where a work product, or a set of workproducts, are presented for comment or approval. Reviews includemanagement reviews.
Regression Testing Selective retesting of a system or component to verify that modificationshave not caused unintended effects and the system of component stillcomplies with its specified requirements.
Risk The probability (chance) of an unwanted event or outcome.
Version A version is a software product with a defined set of capabilities. A newversion is a variation of the previous version, in that it has a change in itsfunctionality or performance characteristics. An example of this is if thesystem is changed to include an additional process or new feature.
18
SEMATECH Technology Transfer # 92111389B-TRG
7 PROCESS ORGANIZATION
Pro
cess
Org
aniz
atio
n
Pro
cess
Org
aniz
atio
n -
1 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
19
Technology Transfer # 92111389B-TRG SEMATECH
Ses
sion
Goa
ls
•T
o es
tabl
ish
a fr
amew
ork
for
the
rem
aini
ng s
essi
ons
•T
o di
scus
s th
e im
port
ance
of
view
ing
soft
war
een
gine
erin
g fr
om t
he p
ersp
ectiv
e of
a p
roce
ss
•T
o di
scus
s qu
ality
impr
ovem
ent
in li
ght
of t
he s
oftw
are
engi
neer
ing
proc
ess
Pro
cess
Org
aniz
atio
n -
2 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
20
SEMATECH Technology Transfer # 92111389B-TRG
Rqm
ts.
Des
ign
Cod
e
Tes
t
Sup
port
6%5%
7%
15%
67%
Typ
ical
Allo
tmen
tfo
r Li
fe C
ycle
More
Id
eal A
llotm
en
tin
Deve
lop
me
nt
50%
10%
15%
25%
Req
mts
Des
ign
Cod
eT
est
Typ
ical
Allo
tmen
tin
Dev
elop
men
t
15%
35%
20%
30%
Req
uire
men
ts Des
ign
Impl
emen
tatio
n
Tes
t Pro
duct
ion Sup
port
Ret
irem
ent
Con
cept
Exp
lora
tion
21
Technology Transfer # 92111389B-TRG SEMATECH
Rel
atio
nshi
p of
Pro
cess
Act
iviti
es
Use
rs /
Cus
tom
ers
Pro
duct
ion
/ S
uppo
rt
(Use
rs /
Cus
tom
ers)
Req
uire
men
ts
Pre
limin
ary
Des
ign
Cod
ing
Det
aile
dD
esig
n
Sys
tem
Tes
tP
lann
ing
Inte
grat
ion
Tes
tP
lann
ing
Uni
tT
est
Pla
nnin
g
Sys
tem
Tes
ting
Inte
grat
ion
Tes
ting
Uni
tT
estin
g
Inte
grat
ed S
oftw
are
Man
agem
ent
Str
uctu
re
Pro
cess
Org
aniz
atio
n -
4 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
22
SEMATECH Technology Transfer # 92111389B-TRG
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Em
bedd
ed S
oftw
are
Life
Cyc
le M
odel
Ada
pted
from
"A
Spi
ral M
odel
of S
oftw
are
Dev
elop
men
t and
Enh
ance
men
t", B
. W. B
oehm
, IE
EE
Com
pute
r, M
ay 1
988.
Eva
luat
e A
ltern
ativ
es,
Iden
tify
& R
esol
ve R
isks
Dev
elop
, Ver
ifyN
ext-
Leve
l Pro
duct
s
Det
erm
ine
Obj
ectiv
es,
Alte
rnat
ives
, Con
stra
ints
Pla
n N
ext P
hase
s
Exp
lore
Con
cept
/C
usto
mer
Inp
utR
qmts
Ana
lysi
s, H
W-
SW
Tra
de
off
sP
roto
type
Bet
aS
yste
m
Pro
duct
ion
Sys
tem
Pol
icy/
Pro
c.fo
r S
W Q
ualit
y
Ge
n.
SW
D
ev.
Ap
pro
ach
Ris
k A
naly
sis
-C
ost,
Sch
edul
e, T
echn
ical
Ris
k A
naly
sis
-C
ost,
Sch
edul
e, T
echn
ical
Des
ign
Tra
deof
fs
Ref
ine
Sof
twar
eD
eve
lop
me
nt
Pla
n
Sof
twar
e S
yste
mT
est
Pla
nnin
g
Ref
ine
Sof
twar
eR
equi
rem
ents
Req
uire
men
tsIn
spec
tion
For
mal
ize
Sof
twar
eP
rodu
ctD
esig
n
Des
ign
Rev
iew
/In
spec
tion
Cod
e In
spec
tion
Sof
twar
e In
tegr
atio
nT
est
Pla
nnin
g
Har
dwar
e/
Sof
twar
e
Inte
grat
ion
T
est
Pla
nnin
g
Tes
t P
lan
Insp
ectio
n/R
evi
ew
Inte
grat
ion
and
Tes
t
Sys
tem
Tes
t
Acc
epta
nce
Tes
tN
ew F
eatu
res
:F
old
into
Pro
toty
pe,
Bet
a.or
Pro
duct
ion
Sys
tem
dep
endi
ngon
siz
e an
d co
mpl
exity
Pro
cess
Org
aniz
atio
n -
5 (1
2/94
)
23
Technology Transfer # 92111389B-TRG SEMATECH
Pro
cess
(M
odel
) D
efin
ition
- W
hy B
othe
r?
•A
ll w
ork
is a
pro
cess
−H
as in
put(
s) &
out
put(
s)
•D
efin
ition
is n
eede
d to
bas
elin
e pr
oces
s
−P
rovi
des
fram
ewor
k fo
r de
finin
g de
velo
pmen
t ac
tiviti
es
−P
rovi
des
the
foun
datio
n fo
r m
easu
ring
the
pro
cess
•D
efin
ition
req
uire
d fo
r re
peat
abili
ty
−P
oint
s to
are
as o
f pr
oces
s fo
r im
prov
emen
t
Pro
cess
Org
aniz
atio
n -
6 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
24
SEMATECH Technology Transfer # 92111389B-TRG
Sof
twar
e Q
ualit
y M
etri
csM
easu
ring
the
Pro
cess
and
Its
Pro
duct
s
Pro
cess
% o
f P
rodu
ct-D
efin
ition
Doc
umen
tatio
n In
spec
ted
% o
f P
rodu
ct-D
efin
ition
Doc
umen
tatio
n U
nder
Con
figur
atio
n M
anag
emen
t
% o
f R
equi
rem
ents
Im
plem
ente
d à
Tes
ted
(Tes
t C
over
age)
Def
ect
Det
ectio
n/C
orre
ctio
n R
ates
Pro
duct
•
Cor
rect
ness
Fau
lts p
er t
hous
and
lines
of
code
- F
ault
(Def
ect)
Den
sity
•R
elia
bilit
yF
ailu
re I
nten
sity
(F
ailu
res/
Hr
of O
pera
tion)
+
MT
BF
**
•A
vaila
bilit
yO
pera
tiona
l Upt
ime
•S
uppo
rtab
ility
$$$;
Per
cent
age
of O
rigi
nal C
ost
to P
rodu
ce
** M
TB
F -
Mea
n T
ime
Bet
wee
n F
ailu
res
Pro
ject
vs
His
tory
Pla
nned
vs
Act
ual (
Cos
t—C
ON
C*,
S
ched
ule
Mile
ston
es,
Pro
gram
Siz
e)
Man
agem
ent
(Res
ourc
es)
* C
ON
C
- C
ost o
f Non
Con
form
ance
Pro
cess
Org
aniz
atio
n -
7 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
25
Technology Transfer # 92111389B-TRG SEMATECH
Sof
twar
e Q
ualit
y M
etri
cs
•T
hree
vie
ws—
Col
lect
ing
the
righ
t m
easu
re a
t th
e ri
ght
leve
l . .
. a
nd f
or t
he r
ight
pur
pose S
trat
egic
â
Cus
tom
er B
ased
Tac
tical
â
Pro
ject
Man
agem
ent
Pro
cess
& P
rodu
ct
â E
ngin
eeri
ng
•In
tegr
atin
g lo
wer
leve
l mea
sure
s in
to t
he a
ppro
pria
tevi
ew
Pro
cess
Org
aniz
atio
n -
8 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
26
SEMATECH Technology Transfer # 92111389B-TRG
Pro
cess
Def
initi
onF
ound
atio
n fo
r Q
ualit
y Im
prov
emen
t
Rel
ies
On:
•F
ocus
on
proc
ess,
rat
her
than
the
pro
duct
•R
epea
tabi
lity
of p
roce
ss
•M
easu
rem
ent
Mea
suri
ng d
egre
e of
impr
ovem
ent
agai
nst
som
e st
anda
rd
•E
mph
asis
on
cont
inuo
us im
prov
emen
t
Pro
cess
Org
aniz
atio
n -
9 (1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
27
Technology Transfer # 92111389B-TRG SEMATECH
Pro
cess
Org
aniz
atio
n S
umm
ary
•S
oftw
are
deve
lopm
ent
can
(and
mus
t) b
e ap
proa
ched
in a
dis
cipl
ined
, en
gine
erin
g m
anne
r
•K
ey t
o im
prov
ing
soft
war
e qu
ality
is t
o im
prov
e th
epr
oces
s us
ed t
o de
velo
p so
ftw
are
•A
str
uctu
red
appr
oach
alo
ne d
oesn
't gu
aran
tee
qual
ityim
prov
emen
t
−W
e ne
ed a
litt
le m
ore
than
just
the
fra
mew
ork!
W
e ne
ed t
o fil
l in
the
activ
ities
•Q
uest
ion
you
shou
ld a
sk
−H
ave
we
real
ly d
efin
ed O
UR
pro
cess
?
Pro
cess
Org
aniz
atio
n -
10 (
12/9
4)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
28
SEMATECH Technology Transfer # 92111389B-TRG
Pro
cess
Org
aniz
atio
n S
umm
ary
Act
ion
Pla
n
Mak
e an
app
oint
men
t w
ith y
our
soft
war
e m
anag
er t
osk
etch
out
the
str
uctu
re o
f Y
OU
R s
oftw
are
deve
lopm
ent
proc
ess
−U
se b
lank
Em
bedd
ed L
ife C
ycle
Mod
el a
s ba
sis
or d
evel
op s
impl
er m
odel
−C
ompa
re t
o m
odel
in t
his
cour
se
−A
sk:
Is
ther
e el
emen
ts o
f th
e co
urse
mod
el t
hat
we
wan
t to
impl
emen
t?If
so:
W
hen
can
we
begi
n to
impl
emen
t th
em?
Wha
t ca
n w
e do
in t
hene
xt 6
mon
ths?
In
the
nex
t ye
ar?
Pro
cess
Org
aniz
atio
n -
11 (
12/9
4)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
29
Technology Transfer # 92111389B-TRG SEMATECH
Em
bedd
ed S
oftw
are
Life
Cyc
le M
odel
Ada
pted
from
"A
Spi
ral M
odel
of S
oftw
are
Dev
elop
men
t and
Enh
ance
men
t", B
. W. B
oehm
, IE
EE
Com
pute
r, M
ay 1
988.
Eva
luat
e A
ltern
ativ
es,
Iden
tify
& R
esol
ve R
isks
Dev
elop
, Ver
ifyN
ext-
Leve
l Pro
duct
s
Det
erm
ine
Obj
ectiv
es,
Alte
rnat
ives
, Con
stra
ints
Pla
n N
ext P
hase
s
Pro
toty
peB
eta
Sys
tem
Pro
duct
ion
Sys
tem
Pro
cess
Org
aniz
atio
n -
12 (
12/9
4)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
30
SEMATECH Technology Transfer # 92111389B-TRG
8 PROJECT / RISK MANAGEMENT
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 1
(12
/94)
Pro
ject
/Ris
k M
anag
emen
t
31
Technology Transfer # 92111389B-TRG SEMATECH
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 2
(12
/94)
Ses
sion
Goa
ls
•T
o un
ders
tand
tha
t pl
anni
ng,
and
docu
men
ting
the
plan
ning
, re
duce
s ri
sks
in s
oftw
are
deve
lopm
ent
•T
o di
scus
s ap
prop
riat
e le
vels
of
soft
war
e pl
anni
ng
•T
o sh
ow t
ypes
of
plan
ning
doc
umen
ts f
or s
oftw
are
deve
lopm
ent
32
SEMATECH Technology Transfer # 92111389B-TRG
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 3
(12
/94)
Wha
t D
o W
e N
eed
To
Pla
n F
or?
Wha
t A
ctiv
ities
Inf
luen
ce Q
ualit
y?
•R
equi
rem
ents
Ana
lysi
s, D
esig
n, C
ode,
and
Tes
ting
•R
evie
ws
and
Sof
twar
e In
spec
tions
(F
orm
al I
n-P
roce
ss
Rev
iew
s)
•C
onfig
urat
ion
Man
agem
ent
and
Cha
nge
Con
trol
•P
roto
typi
ng a
nd B
eta
Tes
ting
•S
uppo
rt P
roce
dure
s
•S
tand
ards
, P
ract
ices
and
Con
vent
ions
Reg
ardi
ng
Dev
elop
men
t an
d S
uppo
rt
33
Technology Transfer # 92111389B-TRG SEMATECH
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 4
(12
/94)
Pla
nnin
g D
ocum
ents
Onl
y 25
% o
f S
EM
I/S
EM
AT
EC
H C
ompa
nies
hav
eQ
ualit
y P
lans
for
Sof
twar
e
Sof
twar
e W
ithin
SE
MI/S
EM
AT
EC
H, 1
989
Sof
twar
e E
ngin
eerin
g S
urve
y (S
ET
EC
90-
003)
, SE
MA
TE
CH
Doc
umen
t 900
8031
4A-T
R, A
ugus
t 15,
199
0
•S
oftw
are
Qua
lity
Pla
n
−Li
st c
over
ed s
oftw
are
prod
ucts
(sc
ope
of p
lan)
−D
efin
e m
inim
um d
ocum
enta
tion
(pro
duct
def
initi
on)
requ
irem
ents
−D
efin
e m
inim
um r
evie
w r
equi
rem
ents
−Id
entif
y or
ref
eren
ce r
evie
w/
insp
ectio
n
crite
ria
−S
peci
fy s
tand
ards
, pr
actic
es,
and
conv
entio
ns
−S
peci
fy m
inim
um t
estin
g le
vels
- r
equi
red
test
typ
es
−D
efin
e co
nfig
urat
ion
man
agem
ent
polic
ies
−R
equi
re p
rodu
ct-l
evel
pla
ns a
s ne
cess
ary
Inst
itute
of E
lect
rical
and
Ele
ctro
nics
Eng
inee
rs (
IEE
E)
Std
s 73
0-19
89 a
nd 9
83-1
986
34
SEMATECH Technology Transfer # 92111389B-TRG
Pla
nnin
g D
ocum
ents
(con
tinue
d)
Sof
twar
e D
evel
opm
ent P
lan
(Pro
ject
Man
agem
ent P
lan)
-- P
roje
ct m
anag
emen
t - p
roce
ss m
odel
, org
aniz
atio
nal s
truc
ture
-- M
anag
emen
t obj
ectiv
es -
Ris
k m
anag
men
t--
Tec
hnic
al p
roce
sses
-- W
ork
pack
ages
, sch
edul
e, b
udge
t
Sch
edul
ing
expe
rienc
e
10 0203040506070
Pgm
1P
gm 2
Pgm
3P
gm 4
Pgm
5
36
4648
63
13
27
15
25
11
25
Pro
pose
d
Act
ual
Sch
edul
e(M
onth
s)
Sof
twar
e Lo
gist
ics
Nat
iona
l Wor
ksho
p, A
ugus
t 15-
16, 1
989
35
Technology Transfer # 92111389B-TRG SEMATECH
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 6
(12
/94)
Sof
twar
e D
evel
opm
ent
Pla
nnin
g
•P
roje
ct M
anag
emen
t−
Def
ine
Pro
cess
Mod
el -
Maj
or m
ilest
ones
−H
ow a
re t
he g
roup
s or
gani
zed
with
in t
his
fram
ewor
k?
- D
istin
ctha
rdw
are/
soft
war
e gr
oups
? -
S
ome/
all h
ighl
y in
tegr
ated
?
•M
anag
emen
t O
bjec
tives
- R
isk
Man
agem
ent
−R
equi
rem
ents
, S
ched
ule,
Bud
get
prio
ritie
s
−R
isks
- T
rade
offs
: C
ontr
actu
al a
nd T
echn
olog
ical
•T
echn
ical
Pro
cess
es
−T
ools
- T
echn
ique
s:
Ana
lysi
s an
d D
esig
n M
etho
ds -
Com
pute
r-A
ided
Sof
twar
e E
ngin
eeri
ng (
CA
SE
) to
ols
•W
ork
Pac
kage
s, S
ched
ule,
Bud
get
−D
epen
denc
y of
wor
k pa
ckag
es -
PE
RT
*, G
antt
Cha
rts
−C
ost
and
Sch
edul
e M
odel
s -
CO
CO
MO
* ba
sed
good
sta
rtin
g po
int
* P
ER
TP
rogr
am E
valu
atio
n an
d R
evie
w T
echn
ique
* C
OC
OM
OC
Ons
truc
tive
CO
st M
Ode
l
36
SEMATECH Technology Transfer # 92111389B-TRG
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 7
(12
/94)
Pla
nnin
g D
ocum
ents
(Con
clud
ed)
•S
oftw
are
Con
figur
atio
n M
anag
emen
t P
lan
–
Man
agin
g
the
soft
war
e pr
oduc
ts
−Id
entif
y so
ftw
are
prod
ucts
; co
ntro
l, im
plem
ent,
rep
ort
chan
ge
−C
hang
e au
thor
ity r
espo
nsib
ilitie
s (C
onfig
urat
ion
Con
trol
Boa
rd)
−S
uppo
rt t
ools
and
tec
hniq
ues
−S
oftw
are
Con
figur
atio
n M
anag
emen
t Li
brar
ies
- R
elea
se L
ibra
ry,
Pro
ject
Libr
ary,
. . .
.
•T
est
Pla
n (S
oftw
are
Por
tion)
Sof
twar
e In
tegr
atio
n,
Har
dwar
e -
Sof
twar
e in
tegr
atio
n,
Sys
tem
37
Technology Transfer # 92111389B-TRG SEMATECH
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 8
(12
/94)
Wha
t A
ffec
ts P
lan
Con
tent
?
•Y
our
own
corp
orat
e qu
ality
ass
uran
ce p
olic
y
•In
tern
al e
ngin
eeri
ng p
roce
dure
s &
gui
delin
es
•IE
EE
* st
anda
rds
and
guid
es
•S
ET
EC
* -
SE
MA
TE
CH
gui
des
•C
omm
on s
ense
−C
an u
se le
ss t
han
stan
dard
May
nee
d m
ore
than
sta
ndar
d
•In
form
atio
n ca
n be
com
bine
d in
one
doc
umen
t
* IE
EE
Inst
itute
of E
lect
rical
and
Ele
ctro
nics
Eng
inee
rs
* S
ET
EC
Sem
icon
duct
or E
quip
men
t Tec
hnol
ogy
Cen
ter
(San
dia
Nat
iona
l Lab
orat
orie
s)
38
SEMATECH Technology Transfer # 92111389B-TRG
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 9
(12
/94)
Ris
k M
anag
emen
t S
umm
ary
•P
lann
ing
is n
eces
sary
to
effe
ctiv
ely
and
cons
iste
ntly
prod
uce
qual
ity s
oftw
are
- R
educ
es R
isk
•A
dapt
a s
tand
ard
appr
oach
to
your
par
ticul
ar
envi
ronm
ent
-
Doc
umen
t th
is a
ppro
ach
•S
oftw
are
man
ager
s an
d de
velo
pers
nee
d yo
ur in
tere
st
and
supp
ort
to p
lan
effe
ctiv
ely
•Q
uest
ions
you
sho
uld
ask
−W
hat
is o
ur p
olic
y fo
r so
ftw
are
qual
ity?
−D
o w
e ha
ve s
tand
ards
for
sof
twar
e de
velo
pmen
t?
- W
hat
are
they
?
−D
o w
e ha
ve a
Sof
twar
e D
evel
opm
ent
Pla
n?
- I
s it
curr
ent?
−D
o w
e ha
ve a
cos
t an
d sc
hedu
le e
stim
ate?
−H
ow a
re w
e tr
acki
ng t
o th
e de
velo
pmen
t sc
hedu
le?
39
Technology Transfer # 92111389B-TRG SEMATECH
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56P
roje
ct/R
isk
Man
agem
ent
- 10
(1
2/94
)
Ris
k M
anag
emen
t S
umm
ary
Act
ion
Pla
n
•W
rite
out
a p
olic
y st
atem
ent
defin
ing
YO
UR
com
pany
's
conc
ept
of q
ualit
y fo
r so
ftw
are
–
Suc
h as
:
(Sam
ple
Pol
icy
Sta
tem
ent)
−"Q
ualit
y so
ftw
are
shal
l be
an o
bjec
tive
of t
his
com
pany
's q
ualit
y pr
ogra
m.
Thi
s ob
ject
ive
appl
ies
to t
he a
cqui
sitio
n, d
evel
opm
ent,
use
, an
d su
ppor
t of
soft
war
e"
"The
pro
gram
sha
ll ad
dres
s, a
s a
min
imum
:
Org
aniz
atio
n, ta
sks,
and
res
pons
ibili
ties;
sof
twar
e do
cum
enta
tion;
con
figur
atio
n m
anag
emen
t;te
stin
g, a
nd; r
evie
ws
and
audi
ts."
•M
ake
an a
ppoi
ntm
ent
with
you
r so
ftw
are
man
ager
to
outli
ne s
oftw
are
deve
lopm
ent
goal
s fo
r yo
ur
next
new
feat
ure
(or
next
gen
erat
ion
of e
quip
men
t)
−In
tegr
ate
Pro
cess
Mod
el f
rom
pre
viou
s ac
tion
item
- T
echn
ical
ris
ks -
Ana
lysi
s an
d D
esig
n m
etho
ds -
Ini
tiate
for
mal
sch
edul
e an
d bu
dget
estim
atio
n, d
efin
e w
ork
pack
ages
40
SEMATECH Technology Transfer # 92111389B-TRG
9 REQUIREMENTS
Req
uire
men
ts -
1
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56Req
uire
men
ts
41
Technology Transfer # 92111389B-TRG SEMATECH
Req
uire
men
ts -
2
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Ses
sion
Goa
ls
•T
o un
ders
tand
wha
t a
Sof
twar
e R
equi
rem
ents
Spe
cific
atio
n is
•T
o un
ders
tand
the
impo
rtan
ce o
f re
quir
emen
ts a
naly
sis
and
the
Sof
twar
e R
equi
rem
ents
Spe
cific
atio
n in
soft
war
e de
velo
pmen
t (a
nd s
uppo
rt)
42
SEMATECH Technology Transfer # 92111389B-TRG
Req
uire
men
ts -
3
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Wha
t is
a S
oftw
are
Req
uire
men
ts S
peci
ficat
ion?
WH
AT
: •C
onta
ins
a co
mpl
ete
desc
ript
ion
of
wha
t is
to
be d
one,
no
t ho
w t
odo
it
•A
n ag
reem
ent
betw
een
Sup
plie
r an
d C
usto
mer
(T
op le
vel -
Par
tner
ing
for
Tot
al Q
ualit
y is
sue)
, an
d,
Sys
tem
and
S
oftw
are
Dev
elop
ers
(Low
leve
l - R
equi
rem
ents
allo
catio
n to
em
bedd
edso
ftw
are)
•T
he
mos
t im
port
ant
docu
men
t de
scri
bing
the
sof
twar
e
A S
oftw
are
Req
uire
men
ts S
peci
ficat
ion
is
not
a D
esig
n D
ocum
ent
. .
. an
d W
HY
:
•P
rote
cts
both
sof
twar
e de
velo
per
(or
supp
lier)
and
sys
tem
dev
elop
er(o
r cu
stom
er)
from
mis
unde
rsta
ndin
g th
e ot
her's
inte
ntio
n
•H
ow c
an "
corr
ectn
ess"
be
dete
rmin
ed w
ithou
t a
spec
ifica
tion?
•S
erve
s as
the
ba
selin
e f
or s
ubse
quen
t de
velo
pmen
t an
d ve
rific
atio
n
activ
ities
43
Technology Transfer # 92111389B-TRG SEMATECH
Why
Bot
her
with
Req
uire
men
ts?
25-8
0% o
f fau
lts tr
acea
ble
to e
rror
s in
def
inin
g th
e re
quire
men
ts
Onl
y 23
% o
f SE
MI/S
EM
AT
EC
Hco
mpa
nies
alw
ays
writ
e re
quire
men
ts
Cos
t of F
ix a
Fau
lt(G
iven
the
faul
t was
cre
ated
dur
ing
requ
irem
ents
tim
e fr
ame)
Dur
ing
Req
mts
$
195
Dur
ing
Des
ign
48
9D
urin
g C
odin
g
997
Dur
ing
Tes
t
7,13
6D
urin
g S
uppo
rt
E
ven
mor
e!
Rog
er F
ujii,
Log
icon
, Inc
.
45 40 35 30 25 20 15 10 5 0
Req
mts
Des
ign
Cod
eT
est
Sup
port
Whe
n D
efec
ts In
trod
uced
NS
IA J
oin
t C
on
fere
nc
e,
19
87
25 20 15 10 5 0W
hen
Def
ects
Fou
nd/F
ixed
Req
mts
Des
ign
Cod
eTe
st (S
/W In
t)Te
st (S
ys In
t)B
eta
Test
Sup
port
44
SEMATECH Technology Transfer # 92111389B-TRG
Req
uire
men
ts -
5
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Sof
twar
e R
equi
rem
ents
Spe
cific
atio
n
•W
hat
does
an
SR
S c
onta
in?
−G
ener
al D
escr
iptio
n of
the
Req
uire
d S
oftw
are
−C
onst
rain
ts,
Ass
umpt
ions
, an
d D
epen
denc
ies
−S
peci
fic R
equi
rem
ents
−S
uppo
rtin
g In
form
atio
n
•IE
EE
Gui
de t
o S
oftw
are
Req
uire
men
ts S
peci
ficat
ions
,
IEE
E S
TD
830
-198
4
−A
n in
dust
ry-w
ide
cons
ensu
s do
cum
ent
−R
ecom
men
ded
outli
ne f
or a
n S
RS
−T
empl
ates
ava
ilabl
e (D
esig
n an
d S
yste
m T
est
tem
plat
es a
lso!
)
45
Technology Transfer # 92111389B-TRG SEMATECH
Req
uire
men
ts -
6
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Req
uire
men
ts S
umm
ary
•S
RS
is t
he
MO
ST
impo
rtan
t so
ftw
are
docu
men
t
−E
mbo
dies
the
res
ults
of
requ
irem
ents
ana
lysi
s
•S
RS
spe
cifie
s W
HA
T is
to
be d
one,
but
N
OT
HO
W
•Q
uest
ions
you
sho
uld
be a
skin
g
−D
o w
e kn
ow w
hat
the
requ
irem
ents
are
?
−W
hat
anal
ysis
tec
hniq
ues
are
we
usin
g to
def
ine/
refin
e re
quir
emen
ts?
−A
re t
he r
equi
rem
ents
doc
umen
ted?
−W
ho i
s o
ur c
usto
mer
? -
Who
is t
he u
ser?
−H
ave
we
draf
ted
the
Sys
tem
Tes
t P
lan?
•D
on't
ask!
−H
ow m
uch
code
hav
e yo
u w
ritt
en?
46
SEMATECH Technology Transfer # 92111389B-TRG
Req
uire
men
ts -
7
12/9
4T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Req
uire
men
ts S
umm
ary
Act
ion
Pla
n
•M
eet
with
(in
terv
iew
) cu
stom
er p
rodu
ctio
n m
anag
ers.
Ask
: W
hat
are
thei
r to
p fiv
e re
quir
emen
ts f
or y
our
com
pany
's
equi
pmen
t.
•M
eet
with
you
r sy
stem
/pro
ject
and
sof
twar
e m
anag
ers
Ask
: H
ow a
re w
e m
eetin
g th
ese
requ
irem
ents
?
47
Technology Transfer # 92111389B-TRG SEMATECH
10 REVIEWS AND INSPECTIONS
Rev
iew
s &
Ins
pect
ions
- 1
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Rev
iew
s an
d In
spec
tions
48
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 2
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Ses
sion
Goa
ls
•Id
entif
y ch
arac
teri
stic
s of
a r
evie
w
•D
iscu
ss t
ypic
al li
fe c
ycle
rev
iew
poi
nts/
type
s of
re
view
s
•C
onvi
nce
you
that
for
mal
rev
iew
s ar
e im
port
ant
49
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 3
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056S
oftw
are
Rev
iew
s
•W
hat
is r
evie
wed
?
−S
oftw
are
elem
ents
or
proj
ect
stat
usP
rodu
ct
- P
lans
- P
roce
sses
Sch
edul
e -
Cos
t -
Res
ourc
es A
vaila
ble
•W
hy a
re r
evie
ws
held
?
−Id
entif
y di
scre
panc
ies
(A
s th
ey o
ccur
! -
Ins
tead
of
findi
ng t
hem
late
r,
e.g.
, du
ring
sys
tem
tes
t or
lett
ing
the
cust
omer
fin
d th
em)
Def
ects
- N
on-c
onfo
rman
ce -
Inc
onsi
sten
cies
/Am
bigu
ities
•W
hat
are
the
resu
lts o
f th
e re
view
s?
−R
ecom
men
datio
ns f
or im
prov
emen
tsP
riorit
ize
- O
wne
rshi
p -
Val
idat
e w
ith fo
llow
-up
revi
ew (
as n
eces
sary
)
50
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 4
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Typ
ical
Sof
twar
e Li
fe C
ycle
Rev
iew
Poi
nts
•R
equi
rem
ents
Rev
iew
•D
esig
n R
evie
w
•C
ode
Rev
iew
•T
est
Rev
iew
•R
elea
se R
evie
w
51
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 5
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Req
uire
men
ts R
evie
ws
SU
CC
ES
S T
IP
* P
roje
ct s
ucce
ss d
epen
ds o
n a
good
und
erst
andi
ng
of t
he r
equi
rem
ents
•T
echn
ical
pro
ject
rev
iew
of
Sof
twar
e R
equi
rem
ents
Spe
cific
atio
n –
B
asel
ine
•F
orm
al R
evie
w (
Insp
ectio
n) o
f S
oftw
are
Req
uire
men
ts
Spe
cific
atio
n fo
r di
scre
panc
ies
•M
anag
emen
t w
alkt
hrou
gh w
ith c
usto
mer
Onl
y 18
% o
f S
EM
I/S
EM
AT
EC
H C
ompa
nies
alw
ays
form
ally
rev
iew
Req
uire
men
ts -
8%
nev
er d
o
52
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 6
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Des
ign
Rev
iew
•T
echn
ical
pro
ject
rev
iew
of
Sof
twar
e D
esig
n D
ocum
ent
−C
ritic
al D
esig
n R
evie
w;
Bas
elin
e
•P
eer
wal
kthr
ough
of
mod
ule
desi
gn
•In
spec
tion
of S
oftw
are
Des
ign
Doc
umen
t fo
r de
fect
s
•M
anag
emen
t w
alkt
hrou
gh w
ith c
usto
mer
Onl
y 19
% o
f S
EM
I/S
EM
AT
EC
H C
ompa
nies
alw
ays
hold
Des
ign
Rev
iew
s -
3% n
ever
do
53
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
-7#
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Cod
e R
evie
w
•P
eer
wal
kthr
ough
of
mod
ules
•P
eer
wal
kthr
ough
of
unit
test
pla
n/re
sults
•In
spec
tion
of s
ourc
e co
de f
or d
efec
ts
−S
tron
gly
Rec
omm
end!
Onl
y 8%
of
SE
MI/
SE
MA
TE
CH
Com
pani
esal
way
s fo
rmal
ly I
nspe
ct C
ode
- 29
% n
ever
do
54
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 8
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Tes
t R
evie
ws
Pee
r w
alkt
hrou
gh o
r In
spec
tion
of T
est
Pla
ns a
nd R
esul
ts
Onl
y 5%
of
SE
MI/
SE
MA
TE
CH
Com
pani
esal
way
s fo
rmal
ly r
evie
w T
est
Pla
nnin
g -
40%
nev
er d
o
Sta
tus
Re
vie
ws
•T
rans
ition
poi
nts
- M
inim
um
•P
lann
ed v
s A
ctua
l
Cos
t, s
ched
ule,
and
tec
hnic
al p
rogr
ess
•R
esul
ts o
f te
chni
cal r
evie
ws
Tec
hnic
al p
roce
sses
in c
ontr
ol -
Too
man
y/to
o fe
w d
iscr
epan
cies
55
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 9
12
/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Sof
twar
e In
spec
tions
*(F
orm
al I
n-P
roce
ss R
evie
ws)
•D
efin
ition
:
−A
for
mal
eva
luat
ion
tech
niqu
e in
whi
ch s
oftw
are
prod
ucts
(req
uire
men
ts,
desi
gn,
code
, et
c.)
are
exam
ined
in d
etai
l by
a gr
oup
to
dete
ct f
aults
, vi
olat
ions
of
deve
lopm
ent
stan
dard
s, a
nd o
ther
pro
blem
s
−A
str
uctu
red
pee
r re
view
req
uiri
ng p
lann
ing,
adv
ance
pre
para
tion,
an
d
poss
ible
rew
ork
and
follo
w-u
p
−A
sta
tic t
est
of
the
soft
war
e
•P
urpo
se:
−P
reve
nt t
he p
ropa
gatio
n of
def
ects
into
the
op
erat
iona
l pro
duct
−K
ey f
acto
r in
roo
t-ca
use
anal
ysis
to
impr
ove
proc
ess
−P
roce
ss c
ontr
ol m
etri
c
* T
he te
rm S
oftw
are
Insp
ectio
n ha
s re
mai
ned
the
com
mon
nam
e fo
r th
is ty
pe o
f For
mal
Rev
iew
.
56
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 1
0 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Insp
ectio
ns
•C
reat
ed in
197
2 at
IB
M -
Mic
hael
Fag
an
−In
stitu
tiona
lized
by
larg
e so
ftw
are
deve
lopm
ent
orga
niza
tions
(e.
g.,
IBM
, H
P,
AT
&T
)
•P
roce
ss I
mpr
ovem
ent
inpu
t
−W
hen/
Why
did
err
or o
ccur
tha
t cr
eate
d th
e de
fect
?
−H
ow c
an t
his
be p
reve
nted
in t
he f
utur
e?
•T
HE
P
roce
ss C
ontr
ol M
echa
nism
for
sof
twar
e
−A
n ai
d to
pro
duct
ivity
as
wel
l as
qual
ity
−F
indi
ng a
nd f
ixin
g de
fect
s as
the
y oc
cur
inst
ead
of t
ryin
g to
tes
t th
em
out
57
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 1
1 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Com
pari
son
of D
efec
t Id
entif
icat
ion
Tec
hniq
ues
Met
hod
Cos
tE
ffic
ienc
y
Insp
ectio
nsM
ediu
m-H
igh
>60
%
Wa
lkth
rou
gh
Me
diu
m<
50
%
Pee
r R
evie
wLo
w<
35%
Sel
f C
heck
ing
Low
<20
%
Sou
rce:
Cap
ers
Jone
s,
Sof
twar
e M
easu
rem
ent a
nd E
stim
atio
n
Why
?
−M
ore
form
ality
and
rig
or
−D
efin
ed m
etho
dolo
gy f
or in
spec
tions
−R
ecor
ds c
aref
ully
kep
t
−A
ll pa
rtic
ipan
ts a
re a
ctiv
e an
d re
spon
sibl
e
−R
epea
tabl
e -
re
peat
-
Rep
eata
ble!
58
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 1
2 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Sof
twar
e In
spec
tions
•C
ON
S
−M
IST
AK
EN
AS
A "
FIN
AL
INS
PE
CT
ION
" IN
TH
E D
EM
ING
SE
NS
E
−C
an a
dd 5
-15%
to
net
reso
urce
s up
fro
nt*
−R
equi
res
som
e tr
aini
ng
−M
ista
ken
as t
oo "
low
tec
h" t
o be
so
effe
ctiv
e
•P
RO
S
−H
igh
retu
rn o
n in
vest
ed t
ime
and
effo
rt
−F
eedb
ack
to d
evel
oper
s -
avoi
d in
ject
ing
defe
cts
in f
utur
e w
ork
−S
erve
s as
che
ckpo
ints
to
faci
litat
e pr
oces
s m
anag
emen
t
−M
easu
re p
erfo
rman
ce o
f to
ols
and
tech
niqu
es
−T
rain
ing
aid
to n
ew o
r le
sser
cap
able
peo
ple
*A
bout
the
sam
e am
ount
of t
ime
is s
pent
pre
parin
g fo
r th
e in
spec
tion
as th
e in
spec
tion
itsel
f —R
ates
are
appr
oxim
atel
y on
e ho
ur p
er 1
0 do
cum
ent p
ages
, or
one
hour
per
100
line
s of
non
-com
men
ted,
non
-bla
nk
sour
ce c
ode
59
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Insp
ectio
ns -
13
12/
94T
echn
olog
y T
rans
fer
# 92
1113
89B
-T
RG
/ S
ET
EC
94-0
56
Ben
efits
of
Insp
ectio
ns
•D
efec
t R
educ
tion
50 -
90%
of
all d
efec
ts d
isco
vere
d by
insp
ectio
n
•C
ost
Impr
ovem
ent
10-2
5% r
educ
tion
in d
evel
opm
ent
cost
s
95%
red
uctio
n in
cor
rect
ive
mai
nten
ance
cos
ts
•S
taff
-Hou
rsO
vera
ll re
duct
ion
by 1
0-40
%
Sho
rten
s ta
il en
d of
sch
edul
e
Mye
rs,
Com
pute
r,
Aug
ust
1990
60
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 1
4 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Insp
ectio
n E
xper
ienc
e S
umm
ary
•In
spec
tions
are
thre
e tim
es m
ore
effe
ctiv
e th
an o
ther
met
hods
•S
ave
appr
oxim
atel
y $1
600
for
ever
y de
fect
bef
ore
test
(C
ost t
o fix
late
r -
cost
to fi
nd &
fix
in
insp
ectio
n: $
1700
- $
105)
•A
vera
ge in
spec
tion
disc
over
s 16
def
ects
(4
maj
or, 1
2 m
inor
) fo
r $2
5,00
0 sa
ving
s
•S
ome
defe
cts
cost
as
muc
h as
$10
,000
eac
h to
fix
late
r
JPL*
Exp
erie
nce
IEE
E,
Exp
erie
nce
Rep
ort,
Aug
ust 1
990
* Je
t Pro
puls
ion
Labo
rato
ry
The
diff
eren
ce in
the
are
aun
der
thes
e tw
o cu
rves
afte
r th
ey in
ters
ect
repr
esen
ts th
e "F
inal
Insp
ectio
n" to
det
ect a
llth
e de
fect
s in
trod
uced
durin
g a
deve
lopm
ent
proc
ess
in w
hich
the
softw
are
insp
ectio
nte
chni
que
is n
ot u
sed.
Peo
ple
Res
ourc
es
Pla
nnin
g
Req
uire
men
ts
Des
ign
Shi
pC
odin
gT
estin
g
With
out
Sof
twar
eIn
spec
tions
With
Sof
twar
eIn
spec
tions
Sch
edul
e
(Fag
an '8
6)
61
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 1
5 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Insp
ectio
ns
•P
artic
ipan
ts h
ave
defin
ed r
oles
Mod
erat
orpl
ans
agen
da, d
eter
min
es a
dequ
ate
prep
arat
ion,
run
mee
ting,
set
tone
and
pac
e, a
ct a
s in
spec
tor
Aut
hor
prov
ides
cla
rific
atio
n, a
ct a
s in
spec
tor(
usua
lly th
e be
st)
Re
ad
er
para
phra
ses
line-
by-li
ne c
onte
nt, a
ct a
s in
spec
tor
Rec
orde
rre
cord
s pr
oble
m a
nd p
robl
em c
lass
ifica
tion,
act
s as
insp
ecto
r, c
an
be m
oder
ator
Insp
ecto
rspr
ovid
es e
xper
tise
in r
elat
ed m
atte
rs; r
epre
sent
ativ
es o
f pre
viou
s
and
subs
eque
nt p
hase
s
•In
spec
tions
hav
e de
fined
ste
ps
1.
Pla
nnin
g4.
In
spec
tion
Mee
ting
2.
Ove
rvie
w
(if
nece
ssar
y)5.
R
ewor
k
3.
Pre
para
tion
6.
Fol
low
-up
62
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- #
16 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056W
hat
Can
You
Do?
•D
o no
t a
tten
d!
Insp
ectio
ns a
re n
ot a
pla
ce f
or m
anag
ers
•A
sk f
or a
Sum
mar
y R
epor
t
•R
EJO
ICE
whe
n lo
ts o
f de
fect
s ar
e di
scov
ered
in
insp
ectio
ns!
Don
't us
e in
spec
tion
resu
lts a
s a
basi
s fo
r m
erit
or c
ompe
nsat
ion
revi
ew
- U
se t
est
resu
lts
•E
ncou
rage
you
r st
aff
63
Technology Transfer # 92111389B-TRG SEMATECH
Rev
iew
s &
Ins
pect
ions
- 1
7 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Rev
iew
s an
d In
spec
tions
Sum
mar
y
•R
evie
ws
mar
k tr
ansi
tion/
clos
ure
•S
oftw
are
Insp
ectio
n is
the
rec
omm
ende
d T
otal
Qua
lity
Man
agem
ent
tech
niqu
e fo
r so
ftw
are
proc
ess
cont
rol
•Q
uest
ions
you
sho
uld
ask
Wha
t re
view
s ar
e pl
anne
d?
- W
hich
one
s sh
ould
I a
tten
d?
How
hav
e w
e in
sure
d th
e re
quir
emen
ts s
peci
ficat
ion
(des
ign)
is c
orre
ct
(com
plet
e)?
How
muc
h of
the
req
uire
men
ts s
peci
ficat
ion
(des
ign,
cod
e, t
est
plan
)
has
been
(w
ill b
e) in
spec
ted?
-
May
I s
ee t
he I
nspe
ctio
n M
anag
emen
t
Rep
ort?
64
SEMATECH Technology Transfer # 92111389B-TRG
Rev
iew
s &
Ins
pect
ions
- 1
8 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B -
TR
G /
SE
TE
C94
-056
Rev
iew
s an
d In
spec
tions
Sum
mar
yA
ctio
n P
lan
•D
eter
min
e w
hat
kind
of
revi
ews
are
curr
ently
bei
ng
cond
ucte
d to
con
trol
sof
twar
e qu
ality
Dis
cuss
with
sof
twar
e m
anag
er -
Thi
s ca
n be
don
e th
is a
fter
noon
!
•In
itiat
e an
eva
luat
ion
of s
oftw
are
insp
ectio
ns
−H
ave
soft
war
e m
anag
er s
ched
ule
soft
war
e de
velo
pers
(an
d m
anag
er)
for
trai
ning
in s
oftw
are
insp
ectio
ns
Cla
sses
taug
ht r
egio
nally
(ea
st &
wes
t coa
st)
and
in-h
ouse
−A
pply
insp
ectio
n to
a c
urre
nt w
ork
prod
uct
Tw
o im
med
iate
ben
efits
:
(1)
Impr
oved
wor
k pr
oduc
t
(2)
Insi
ght i
nto
nece
ssar
y im
prov
emen
ts in
dev
elop
men
t act
iviti
es le
adin
g up
tocu
rren
t wor
k pr
oduc
t
65
Technology Transfer # 92111389B-TRG SEMATECH
11 CONFIGURATION MANAGEMENT
Con
figur
atio
n M
anag
emen
t -
1 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Con
figur
atio
n M
anag
emen
t
66
SEMATECH Technology Transfer # 92111389B-TRG
Con
figur
atio
n M
anag
emen
t -
2 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Ses
sion
Goa
ls
•In
trod
uce
you
to e
lem
ents
of
the
Sof
twar
e
Con
figur
atio
n M
anag
emen
t pr
oces
s
•H
elp
you
unde
rsta
nd t
hat
Sof
twar
e C
onfig
urat
ion
Man
agem
ent
is a
n es
sent
ial a
spec
t of
the
sof
twar
e
deve
lopm
ent
proc
ess
67
Technology Transfer # 92111389B-TRG SEMATECH
Con
figur
atio
n M
anag
emen
t -
3 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Sof
twar
e C
onfig
urat
ion
Man
agem
ent
(SC
M)
•Id
entif
icat
ion
−La
bel,
num
ber,
and
cat
alog
pro
cedu
res
•C
ontr
ol
−P
rodu
ct c
hang
e au
thor
ity a
nd c
ontr
ol p
roce
dure
s
−S
oftw
are
Con
figur
atio
n C
ontr
ol B
oard
•S
tatu
s A
ccou
ntin
g
−P
rodu
ct c
hang
e re
cord
ing
and
repo
rtin
g
•A
udits
−P
hysi
cal a
nd f
unct
iona
l com
plia
nce
with
req
uire
men
ts p
rior
to
rele
ase
Onl
y 28
% o
f S
EM
I/S
EM
AT
EC
H C
ompa
nies
alw
ays
use
Con
figur
atio
n M
anag
emen
t
68
SEMATECH Technology Transfer # 92111389B-TRG
Con
figur
atio
n M
anag
emen
t -
4 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56Ben
efits
of
SC
M
•C
ontr
ol a
nd m
anag
e so
ftw
are
thro
ugho
ut it
s lif
e cy
cle
•R
educ
e ef
fort
to
iden
tify
and
impl
emen
t ch
ange
s
•E
nsur
e on
ly n
eces
sary
cha
nges
will
be
mad
e
•E
xten
d th
e us
eful
life
of
soft
war
e pr
oduc
ts
•R
educ
e de
fect
s in
sof
twar
e re
leas
es
•Im
prov
e cu
stom
er s
atis
fact
ion
•P
rovi
de a
nat
ural
fee
dbac
k m
echa
nism
69
Technology Transfer # 92111389B-TRG SEMATECH
Con
figur
atio
n M
anag
emen
t -
5 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Som
e C
omm
on Q
uest
ions
for
SC
M
•W
hich
sof
twar
e pi
eces
/par
ts d
o w
e co
ntro
l?
−In
tern
ally
dev
elop
ed p
lans
, sp
ecifi
catio
ns,
sour
ce,
obje
cts,
tes
ts,
data
,
envi
ronm
ent
−P
urch
ased
sof
twar
e do
cum
enta
tion
and
code
•W
hen
does
Sof
twar
e C
onfig
urat
ion
Man
agem
ent
begi
n?
−D
urin
g ex
plor
atio
n -
S
omet
imes
Pla
nnin
g, in
form
al c
ontr
ol
−D
urin
g de
velo
pmen
t -
Alw
ays
Pla
nnin
g, p
erso
nal &
dev
elop
men
t lib
rarie
s* -
con
trol
boa
rds
−D
urin
g su
ppor
tP
rodu
ct o
r re
leas
e lib
rarie
s -
rele
ase
cont
rol
* L
ibra
ries
are
def
ined
in a
ttac
hed
pape
r
70
SEMATECH Technology Transfer # 92111389B-TRG
Con
figur
atio
n M
anag
emen
t -
6 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Som
e C
omm
on Q
uest
ions
for
SC
M(C
ontin
ued)
•H
ow d
o w
e co
ntro
l cha
nge/
rele
ase
of t
he s
oftw
are?
Bas
elin
e* c
ontr
ol p
oint
s -
S
oftw
are
Con
figur
atio
n C
ontr
ol B
oard
-
Cha
nge
log
mec
hani
sm
- S
oftw
are
libra
ry-m
anag
emen
t to
ols
•W
hat
do w
e re
port
abo
ut c
hang
es?
Wha
t ch
ange
s w
ere
mad
e -
W
ho a
ppro
ved
-
Who
mad
e ch
ange
-
Whe
n ch
ange
was
mad
e -
H
ow m
uch
time
was
req
uire
d
•H
ow d
o w
e ch
eck
for
com
plet
enes
s, c
orre
ctne
ss?
Aud
it -
B
efor
e te
st,
befo
re r
elea
se
* B
asel
ine
- T
he d
ocum
ente
d id
entif
icat
ion
of a
pro
duct
(w
ith a
kno
wn
set o
f ele
men
ts)
afte
r so
me
perio
d of
dev
elop
men
t
71
Technology Transfer # 92111389B-TRG SEMATECH
Con
figur
atio
n M
anag
emen
t -
7 1
2/94
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Con
figur
atio
n M
anag
emen
t S
umm
ary
•S
oftw
are
Con
figur
atio
n M
anag
emen
t
−Is
an
impo
rtan
t m
anag
emen
t pr
oces
s
−Is
mor
e th
an v
ersi
on c
ontr
ol
−C
an b
e ta
ilore
d to
the
pro
duct
line
or
proj
ect
•Q
uest
ions
you
sho
uld
ask
−D
o w
e ha
ve a
Sof
twar
e C
onfig
urat
ion
Man
agem
ent
Pla
n?
−C
an w
e re
build
the
cur
rent
rel
ease
(ba
selin
e)?
−C
an w
e re
build
the
pre
viou
s re
leas
e (b
asel
ine)
?
•A
ctio
n P
lan
−A
sk f
or a
n ov
ervi
ew o
f ho
w p
robl
em r
epor
ting,
and
req
uest
s fo
r ne
w
feat
ures
, ar
e re
ceiv
ed,
revi
ewed
, an
d so
ftw
are
chan
ges
inco
rpor
ated
in
your
com
pany
72
SEMATECH Technology Transfer # 92111389B-TRG
12 FORMAL SOFTWARE CONFIGURATION MANAGEMENTAND TIME-PHASED VERSION (BASELINE) RELEASE
Overview
SEMI/SEMATECH companies should adopt a more formal software configuration management(SCM) methodology to manage change activity and control the system software configuration.Part of the methodology should be to adopt a time-phased version (baseline) release processunder the more formal SCM approach. (A glossary is attached that provides some commondefinitions of SCM terms.)
The general benefits to SEMI/SEMATECH companies of a more formal SCM approach includean increased confidence in the ability to preserve the integrity of their software configuration; anability to provide complete identification of prior, current release, and developmental baselines;and a ready accounting of the status of changes completed, in progress and awaiting work atscheduled times. The benefits to developers include a more stable development environment. Adefined set of changes can be integrated as a common development objective and adequatetesting can be completed to validate the reliability of the system. The benefits to managementinclude insight into the software engineering process. This allows management to effectivelyaddress the long term quality of the equipment software while attending to customer prioritiesand other market considerations. The benefits to the customer include more accurate informationas to when corrections to problems can be expected or when new features will be available.
Structure
An outline of a formal SCM approach is shown in Figure 1. Highlights of this approach include(1) establishment of a six month normal release cycle; (2) an automated change request log basedon the current problem report format; (3) establishment of an automated change controlmechanism to include a hierarchy of SCM Libraries (Personal or Developmental, Project orIntegration, and Release) for control of requirements, design information, code, and testdocumentation; and (4) establishment of a change control authority (Software ConfigurationControl Board or SCCB) consisting of representatives from the subsystem groups.
73
Technology Transfer # 92111389B-TRG SEMATECH
TestCCBChair
1
Analysis
Field Log
CustomerChangeAuthority
2
Developmentor New Engineering
Originator
TechComm
Evaluation Personal Lib
3
SoftwareInspection
Development Lib
ReleaseVersion
ReleaseControl
Release Lib
Test Failure
Field Report
CustomerRequest
Report
Report
Defer
AcceptReject
Change Activity
Promotion
Implementation
CopyImplementation
Promotion
Version ReleaseControl
Next VersionNext Version
AnalysisResults
Copy
Promotion
User Info
Figure 1 SCM Context
Establishment of a release cycle timeframe is essential to the overall success of maintaining orimproving software quality and reliability. Every release of the software, even a “patch,” incurs alevel of overhead not only in preparing and shipping the release, but in other activities, such asintegration and system testing. Normally, each change has some individual testing performedagainst it. However, if a release is made for a small number of changes, and the releases arefrequent, the system (and regression) testing to support each release becomes a significanceportion of the overall support cost. By maintaining a scheduled release cycle, integration andsystem (regression) testing of the combined release package reduces these overhead costs whilesignificantly increasing the confidence in the delivered software. The increased confidence isattributable to being able to test more thoroughly since (1) each system test can directly orindirectly exercise more of the changed software (many times, the same test is performed toactivate two or more components of the software in a sequential process), and (2) there is time toperform more tests because such activities as test setup can be combined. Note that a time-phasedrelease cycle does not mean that no work is performed on the next release until the previousrelease is shipped. There is usually some overlap if resources will allow it. A six-month releasecycle could actually produce releases five months apart as shown in Figure 2.
74
SEMATECH Technology Transfer # 92111389B-TRG
Release 1.26 Months
Release 1.36 Months
Release 1.46 Months
1Mon
1Mon
5Mon
Figure 2 Normal Release Cycling
An automated change request log is necessary to accurately keep track of change requests andreduce the burden on personnel to manually mark, retrieve, sort, store, etc., the change requestsin hardcopy form.
Establishment of a hierarchy of libraries provides a more secure mechanism to maintain theintegrity of released software through promotion from one library to the next. Promotion is acontrol mechanism that requires changed software to be subjected to an established level ofscrutiny before it is formally approved for entry into a higher level library. (The SCCB or aninspection team acting for the SCCB may promote software components). This control, coupledwith the ability to manage the configuration of the documentation defining the software system,reduces the defects because of incorrect or outdated support documentation, and increases thepotential to reuse significant portions of the software when developing the next generationequipment.
The change control authority would normally consist of a few software developers, systemengineers, and test/quality engineers (if they exist). These would be personnel most capable ofrendering accurate decisions about the mix of change activity that should be attempted for anygiven release cycle. Completing this decision process sometimes forces issues to be addressedand resolved that would perhaps go unresolved (or even unnoticed) until the consequencesbecome unrecoverable. Customer requests (demands) for new features may or may not be moreimportant than the correction of defects affecting operational uptime and throughput.
Change Request/Problem Reporting
All change activity is processed through a Log function. A Librarian would log the changerequest. The change request could be for a problem report (e.g., field failure report) a request fora new feature or a request for a conversion effort to accommodate new hardware or software(e.g., extensive update to operating system impacting application programs). Table 1 contains asummary of change types appropriate for software.
75
Technology Transfer # 92111389B-TRG SEMATECH
Table 1 Change Profiles
Correction New Feature Conversion
Principle InputSource(s)
Field Report, TestFailures
Customer Request,SEMATECH Initiative,Internal Initiative
Internal Initiative-(Hardware TechnologyDriven), Vendor Driven- (Hardware or SupportSoftware)
Origin Requirement NotCorrect, Non-conformance toRequirements (Design,Code Defect) - (Bug orPossible Bug)
New/ChangedRequirement -(Suggestion, New Item,or Improvement)
New/ChangedRequirement - (NewItem or Improvement)
Priority Level Normal, Important(Urgent), or Critical(Emergency)
Usually Normal orImportant (Urgent)
Usually Normal
Complexity Low, Medium, High Low, Medium, High Low, Medium, High
The change request/problem report log becomes the basis for tracking status (open, closed,deferred, or rejected) and implementation in releases.
Change Control/Configuration Management
The activities of change control would be performed by a group commonly referred to as theSCCB. The SCCB should have a Chairperson, a Librarian (maybe one for each engineeringgroup or a single person if dedicated to Librarian functions), and sufficient representation anddecision authority to determine the change activity for each release cycle. This may requirecoordination with other groups within the company or within the development project, withindividual customers, and with SEMATECH. The coordination would establish thatfeatures/customer requests and initiatives can be accommodated within a given release cyclealong with corrections needed based on field reports and internal test failures. The SCCB shouldplan to meet on a regular basis, and whenever emergency requests must be processed.
Preliminary analysis (Figure 1) is accomplished to provide the SCCB with sufficient informationto make decisions quickly as to accept, defer, or reject changes. The information necessary forpreliminary analysis is highlighted in Table 2. It is essential that the SCCB not get sidetracked ontroubleshooting or design issues at this point in the process. The purpose is to weigh the analysisinformation against the resources available and establish a status for the change. Depending onthe nature of the change, the board may have to suspend activity on one or more changes toaccommodate an extremely sensitive change. The value of the preliminary analysis in thissituation is to provide enough insight into that sensitive change to determine if it is even possibleand really prudent to take such action at that time. A decision to reject a change is usuallyaccompanied by the reasoning used to make that decision, which could be that insufficientinformation precluded the ability to analyze the problem. A decision to defer is usually based oninsufficient analysis and the change request is returned to the analyst for more information. Adecision to accept is accompanied by a decision as to which release the change should bescheduled for. The change implementation package is then sent to the developer forimplementation. The decision is also communicated back to the originator.
76
SEMATECH Technology Transfer # 92111389B-TRG
Table 2 Contents Of Change Request Analysis
Correction New Feature Conversion
Estimated Time:(Person-Months)
Estimated Time Estimated Time
Possible causes/Most likely Sizing/Timing Estimate -Addition computational resourcesrequired?
Relevant impact of new hardware -new operating system/application
Hardware/Software interfaceimpact?
Hardware/Software interfaceimpact?
Hardware/Software interfaceimpact?
Software only to correct? Test Outline
Modify existing tests? - New testsrequired?
Modify existing tests? - New testsrequired?
Changes required to Userinformation?
New User information required? New User information required?
The mechanism to handle a safety-related (personnel or equipment) critical or "emergency"change (perhaps even a market-strategic change) is to send the change directly into development,apply all available resources to make the change, test it (usually limited testing), and issue an“interim release.” Changes of this nature are usually folded back into the normal SCM processfor a thorough review and complete testing before inclusion into the next normal version release.
The development activity proceeds through testing of the change and completion ofdocumentation. As soon as practical, user information is passed to any documentation group suchas a Technical Communications group for inclusion into user publications and feedback to theoriginator or a representative user group. The SCCB evaluates the results of each completedchange package (Table 3) for promotion into the Release Library. The change package itself canconsist of the output and reporting of very structured verification and validation activitiesdepending on the nature of the change. The entire SCCB or a portion of it may function in thisevaluation activity. Promotion from the Personal Library to the Project (Integration) Library maybe the result of an inspection of the change. Small groups (3 to 5 people) have been shown tovery effective at discovering defects prior to test by using the inspection technique. Acting as thechange control authority, inspection teams form to approve changes (singularly or in groups) forpromotion to the Project Library for integration and system testing.
Table 3 Contents of Change Implementation Package
Correction New Feature Conversion
Actual Time
(Person-Months)
Actual Time Actual Time
Old & New files or New file and"Diff List"
Requirements and Designinformation - Source Code
Old & New files or New file and"Diff List"
Inspection Report, Peer Reviewcomments and/or Walkthroughresults
Inspection Report Inspection Report and/orWalkthrough Results
Tests completed - New Test Cases -Results
Test Cases - Results Tests completed - New Test Cases -Results
Updated documentation Updated documentation
77
Technology Transfer # 92111389B-TRG SEMATECH
Prior to final release, the SCCB insures sufficient system testing has been completed (either in-house or at a Beta site) to establish the overall integrity and reliability of the version to bereleased.
Note the metric of estimated time (Table 2) and actual time (Table 3). This information and anestimate of the complexity of the change (Table 1) could provide the basis of a longer term effortto more accurately estimate the resources required to perform support activities.
Software Engineering Activities
The software engineering activities center on analysis, development and some of the promotionmethods. Analysis is performed by a person knowledgeable in the area of the change request. Thesoftware developer benefits from this exercise because it provides him or her a preliminary lookat the request and the opportunity to begin thinking about the problem without the pressure toimmediately start solving it.
Development is of course the application of the same engineering activities in the supportenvironment that occurred in the original development. Taken as a group, the approved changesfor any particular release are in fact, a whole new development effort. Part of the engineeringactivity should include software inspections also mentioned as part of the change control activity.Software inspections are an engineering activity that serves management issues as well. Becausesoftware inspections are performed on completed products (at least a minimum number of TBDsin the case of requirements), they herald milestones and transitions as well as being the mostefficient defect removal mechanism in the software developer's inventory.
The SCM Library hierarchy must not be confused with other libraries that are used to groupsimilar software entities such as support tools, scripts, include files, test files, etc. Some of theselibraries may be found at multiple levels of the SCM Library structure depending on whetherthey have files being modified as part of a change package.
Summary
The proposed Software Configuration Management philosophy and Time-Phased version releaseprocess are not readily separable. They are both key components to improving the quality andreliability of equipment software.
As mentioned earlier, a software package specifically designed to automate much of the reporttracking and control of the SCM Libraries is important to the success of this concept.
78
SEMATECH Technology Transfer # 92111389B-TRG
13 GLOSSARY OF SOFTWARE CONFIGURATION MANAGEMENTTERMINOLOGY
Baseline: A baseline is the documented identification of a software product CI -- itscode and all its related documentation at some specific point in time. It is thebasis for all SCM activities.
CCB: Configuration Control Board. A Configuration Control Board is a group ofpeople responsible for evaluating and approving or disapproving proposedchanges to configuration items, and for ensuring implementation of approvedchanges. A CCB is sometimes referred to as a Change Control Board.
CI: Configuration Item. A collection of (software) elements (or components)treated as a unit for the purpose of configuration management. ConfigurationItems can vary in size, complexity, and type. A CI may also be called aComputer Software CI (CSCI) or Computer Program CI (CPCI).
CM: Configuration Management.
CPC: Computer Program Component, same as CSC.
CSC: Computer Software Component. A lower level entity of a CI. A CSC may bethe requirements or a collection of the design information for a CSCI.
Inspection: (1) A formal evaluation technique in which software requirements, design, orcode are examined in detail by a group to detect faults, violations ofdevelopment standards, and other problems. (2) A structured peer reviewrequiring advance preparation and planning. (3) Software inspections areformal peer reviews of code or associated documentation includingrequirements specifications, design descriptions, and test plans. Any productgenerated during the course of the software life-cycle can be inspected,although it may not always be advantageous to do so. Software inspectionsare formal in that there is a set agenda. A limited amount of material iscovered in a set amount of time. Those attending the review have clearlydefined roles. All issues raised at the inspection are rigorously recorded andresolved. Software inspections are peer reviews in that management isgenerally not invited to attend.
Personal Library: The Personal Library (also termed the dynamic or programmer's library) isused for holding newly created or modified software entities. This libraryconstitutes a software developer's workspace for writing new code ordocumentation, and may take any form suitable to the developer's needs, butshould have a degree of order to it that allows the status of its entities to bedetermined easily. Each software developer may have a Personal Libraryfrom which project entities can be linked and/or copied. Or, each small teammay have a Personal Library assigned to the team with lower level personallibraries assigned to each individual, especially in a local area network (LAN)or mainframe environment. Access to the Personal Library is controlled by,and usually limited to, the software developer.
79
Technology Transfer # 92111389B-TRG SEMATECH
Project Library: The Project Library (also termed the controlled or "master" library) is a libraryused for managing the current internal developmental baselines and forcontrolling changes made to them. This library represents the latest internally-approved version of the software product being developed. Changes tosoftware entities in the Project Library should have gone through formalapproval procedures established in a configuration management plan. Code inthis library should have been tested sufficiently to assure that it is ready forintegration. Copies may be freely made for use by the software developers andothers, but changes must be strictly controlled and documented in order toascertain at any given point its exact configuration. Even for simple projects inwhich there is only one code developer, there still should be functionalseparation between the Personal Library and the Project Library.
Promotion: A promotion is an action taken with a software component to increase thelevel of authority needed to approve changes to it. For example, a top-levelsoftware design description is promoted or moved into the Project Librarywhere all developers can view, but not modify it without proper authority.This allows the developers to work on issues that may concern detaileddesigns and implementation.
Release: A release is a copy of the software CI that is turned over to the customer oruser. It is a promotion of that CI outside of the development organization.
Release Library: The Release Library (also termed the static or "software repository" library) isa library used to archive the various baselines released for general use. Thislibrary is never changed (except to add a new release baseline), since it mustbe able to duplicate results from software that has been released foroperational use by other organizations. Access should be limited to "readonly" for the purpose of making copies.
Revision: A revision is a formal change to a software CI that does not alter itsdocumented functional or performance capabilities. An example of this is whencode is changed to correct a fault.
SCCB: Software Configuration Control Board. A Software Configuration ControlBoard is a group of individuals who oversee the software change process, withultimate authority for approving a change and promoting a software unit fromone library to another. The individuals may be from the project, relatedorganizations and management levels, the customer, or some combination.During the development process, the SCCB controls promotions into theProject Library from the Personal Library and changes to the products in theProject Library. During the support phase, the project CCB and SCCB providethe authority to make changes to products already promoted to the ReleaseLibrary, and to promote software products from the Project Library to theRelease Library. May also be referred to as a Software Change Control Board.The SCCB and the CCB may be the same in many applications.
SCM: Software Configuration Management.
SCMP: Software Configuration Management Plan.
80
SEMATECH Technology Transfer # 92111389B-TRG
Software Component: A distinct part of a Software Configuration Item (CI). A softwarecomponent may also be called a Computer Software Component (CSC)or Computer Program Component (CPC). CSCs may also be furtherdecomposed into other CSCs or individual units. If a large analysisprogram is called out as a CI, some of the CSCs could be arequirements document or major groupings of the software modules.
Version: A version is a software CI with a defined set of capabilities. A new version is avariation of the previous version, in that it has a change in its functionality orperformance characteristics. An example of this is if the system is changed togenerate a different output.
81
Technology Transfer # 92111389B-TRG SEMATECH
14 TESTING
Tes
ting
- 1
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Tes
ting
82
SEMATECH Technology Transfer # 92111389B-TRG
Tes
ting
- 2
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Ses
sion
Goa
ls
•T
o un
ders
tand
the
pur
pose
of
soft
war
e te
stin
g
•T
o in
trod
uce
test
ing
appr
oach
es a
nd a
ctiv
ities
83
Technology Transfer # 92111389B-TRG SEMATECH
Tes
ting
- 3
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Bas
ic G
oal o
f S
oftw
are
Tes
ting
The
bas
ic g
oal o
f so
ftw
are
test
ing
is t
he e
limin
atio
n of
defe
cts
in t
he s
oftw
are
prod
uct
An
addi
tiona
l ben
efit
is t
hat
we
show
tha
t it
wor
ks in
the
oper
atio
nal e
nvir
onm
ent
84
SEMATECH Technology Transfer # 92111389B-TRG
Tes
ting
- 4
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
A T
estin
g P
hilo
soph
y
•T
estin
g is
the
act
of
perf
orm
ing
test
(im
plie
s fo
rmal
ity)
•S
oftw
are
requ
irem
ents
are
ess
entia
l to
test
ing
•T
estin
g is
pre
dom
inat
ely
an e
ffor
t to
sho
w t
hat
the
soft
war
e do
es
not
mee
t its
spe
cific
atio
n
Em
phas
is o
n "N
egat
ive
Tes
ting"
-
But
the
re is
an
addi
tiona
l ben
efit!
•E
ffec
tive
test
ing
dete
cts
def
ects
•D
efec
ts c
an o
ccur
at
man
y st
ages
−R
equi
rem
ents
Spe
cific
atio
n
C
Des
ign
C
Im
plem
enta
tion
C
Inte
grat
ion
C
S
uppo
rt
−M
ust
test
at
each
ste
p (r
evie
ws/
insp
ectio
ns a
re a
lso
test
act
iviti
es)!
85
Technology Transfer # 92111389B-TRG SEMATECH
Tes
ting
- 5
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56A T
est
Phi
loso
phy
(Con
tinue
d)
•T
estin
g to
det
ect
all
the
defe
cts
is m
uch
like
usin
g "F
inal
Insp
ectio
n" t
o se
para
te g
ood
prod
uct
from
bad
•R
egre
ssio
n te
stin
g sh
ould
be
used
for
cha
nge
pack
ages
and
criti
cal o
r m
ajor
cha
nges
•S
oftw
are
cann
ot b
e co
mpl
etel
y te
sted
—S
elec
t su
bset
of
all p
ossi
ble
test
cas
es t
hat
have
the
hig
hest
pro
babi
lity
of d
etec
ting
the
mos
t de
fect
s
Fun
ctio
nal (
Fea
ture
) -
Str
uctu
ral -
Per
form
ance
and
Str
ess;
com
bine
d
care
fully
to
perf
orm
Rel
iabi
lity
test
ing
Reg
ress
ion
Tes
ting:
Sel
ectiv
e r
etes
ting
of a
sys
tem
or
com
pone
nt to
ver
ify th
at m
odifi
catio
ns h
ave
not
caus
ed u
nint
ende
d ef
fect
s an
d th
at th
e sy
stem
or
com
pone
nt s
till c
ompl
ies
with
its
spec
ified
req
uire
men
ts
86
SEMATECH Technology Transfer # 92111389B-TRG
Tes
ting
- 6
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56Tes
ting
App
roac
hes
•S
tatic
Tes
ting
−T
estin
g ac
tiviti
es c
ondu
cted
dur
ing
soft
war
e de
velo
pmen
t th
at d
o no
t
invo
lve
the
exec
utio
n of
the
sof
twar
e -
Sta
tic a
naly
zers
, In
spec
tions
•D
ynam
ic T
estin
g
−T
estin
g pr
oces
ses
that
are
per
form
ed o
n ex
ecut
able
or
exec
utin
g
soft
war
e
−"W
hite
Box
" T
estin
g:
Req
uire
s kn
owle
dge
of c
ode
stru
ctur
e -
Impl
emen
ts lo
gic,
sta
tem
ent,
and
pat
h co
vera
ge
−"B
lack
Box
" T
estin
g:
Cle
ar,
com
plet
e sp
ecifi
catio
ns n
eces
sary
-
Kno
wle
dge
of p
rogr
am s
truc
ture
not
nec
essa
ry
−B
oth
requ
ire:
Inge
nuity
- In
tuiti
on -
Exp
erie
nce
Kno
wle
dge
of p
revi
ous
defe
cts
and
wea
knes
ses
87
Technology Transfer # 92111389B-TRG SEMATECH
Tes
ting
- 7
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Dev
elop
ing
/ R
ecor
ding
Tes
ts
•T
est
Pla
n
•T
est
Des
ign
•T
est
Cas
e S
peci
ficat
ion
•T
est
Pro
cedu
re S
peci
ficat
ion
•T
est
Rec
ords
Onl
y 8%
of
SE
MI/
SE
MA
TE
CH
Com
pani
esal
way
s pr
oduc
e a
Tes
t P
lan
-
15%
nev
er d
o
Onl
y 3%
of
SE
MI/
SE
MA
TE
CH
Com
pani
esal
way
s m
aint
ain
a te
st lo
g -
20
% n
ever
do
88
SEMATECH Technology Transfer # 92111389B-TRG
Tes
ting
- 8
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56Tes
ting
Sum
mar
y
•T
estin
g sh
ould
det
ect
defe
cts;
pro
per
func
tioni
ng is
an
addi
tiona
l ben
efit
•R
equi
rem
ents
are
cri
tical
•A
dequ
ate
test
ing
requ
ires
pla
nnin
g
•T
est
docu
men
tatio
n is
a "
mus
t" -
Reg
ress
ion
test
ing
•Q
uest
ions
you
sho
uld
ask
−D
o w
e ha
ve a
tes
t pl
an?
-
Are
tes
ts d
efin
ed?
−H
ave
we
save
d th
e re
sults
?
−C
an w
e re
run
the
test
s an
d co
mpa
re w
ith p
revi
ous
resu
lts?
89
Technology Transfer # 92111389B-TRG SEMATECH
Tes
ting
- 9
(12
/94)
Tec
hnol
ogy
Tra
nsfe
r #
9211
1389
B-T
RG
/ S
ET
EC
94-0
56
Tes
ting
Sum
mar
yA
ctio
n P
lan
•R
evie
w t
he s
ched
ule
for
test
ing
with
you
r so
ftw
are
man
ager
−A
sk f
or a
n op
timal
est
imat
e to
ade
quat
ely
test
−Is
the
diff
eren
ce t
oo u
ncom
fort
able
?
•A
sk f
or a
n ov
ervi
ew o
f th
e te
st c
over
age
and
the
tren
ds
of t
he r
ate
of f
ailu
res
disc
over
ed a
nd d
efec
ts c
orre
cted
−Is
the
rat
e of
fai
lure
s di
scov
ered
gre
ater
or
less
tha
n th
e ra
te o
f de
fect
s
corr
ecte
d?
−D
oes
this
mak
e yo
u fe
el g
ood
abou
t re
leas
ing
the
prod
uct?
•S
erio
usly
con
side
r th
e ap
prop
riat
enes
s of
the
tar
get
rele
ase
date
giv
en t
hese
tw
o se
ts o
f in
puts
90
SEMATECH Technology Transfer # 92111389B-TRG
15 SUPPORT
Sup
port
- 1
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Sup
port
(Rev
iew
and
Dis
cuss
ion)
91
Technology Transfer # 92111389B-TRG SEMATECH
Sup
port
- 2
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Bui
ldin
g R
elia
bilit
y In
to S
oftw
are
•D
efin
e/U
nder
stan
d th
e P
roce
ss
The
fra
mew
ork
in w
hich
dev
elop
men
t oc
curs
•A
dopt
a D
evel
opm
ent
Met
hodo
logy
−N
ot w
heth
er w
e'll
have
a m
etho
dolo
gy,
but
how
rig
orou
s w
ill it
be
−R
equi
rem
ents
Ana
lysi
s an
d D
esig
n T
echn
ique
s -
"O
bjec
t
Ori
ente
d"/"
Str
uctu
red"
, C
ompu
ter
Aid
ed S
oftw
are
Eng
inee
ring
(C
AS
E)
Too
ls,
Tra
inin
g
−In
vest
men
t in
sof
twar
e en
gine
erin
g m
etho
ds (
Too
ls -
Tra
inin
g) w
ill
prov
ide
high
ret
urn
on in
vest
men
t
•D
evel
op C
lear
, U
nam
bigu
ous
Req
uire
men
ts
Com
mon
fau
lts:
Om
ittin
g re
quir
emen
ts n
eede
d to
sat
isfy
cus
tom
er
need
s; u
ntra
ceab
le r
equi
rem
ents
; co
mpl
ex w
ritin
g st
yles
92
SEMATECH Technology Transfer # 92111389B-TRG
Sup
port
- 3
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Bui
ldin
g R
elia
bilit
y In
to S
oftw
are
Con
tinue
d
•U
se S
oftw
are
Insp
ectio
ns (
For
mal
In-
Pro
cess
Rev
iew
s)−
A "
Val
ue A
dded
" ac
tivity
- R
educ
es t
otal
cos
t (d
evel
opm
ent
and
supp
ort)
, te
st t
ime
(with
out
sacr
ifici
ng c
over
age)
, an
d de
fect
s in
shi
pped
soft
war
e -
Par
t of
the
inve
stm
ent
in s
oftw
are
engi
neer
ing
met
hods
−K
ey in
put
to p
roce
ss im
prov
emen
t ac
tiviti
es
−A
llow
s ch
ecki
ng -
On
Tra
ck?
- O
n S
ched
ule?
•A
pply
Con
figur
atio
n M
anag
emen
t−
Cha
nge
cont
rol:
Aut
omat
e
−P
art
of t
he in
vest
men
t in
sof
twar
e en
gine
erin
g m
etho
ds
•P
lan
for
Tes
ting
−A
ll te
stin
g is
impo
rtan
t:
Fun
ctio
nal (
Fea
ture
), S
truc
tura
l, P
erfo
rman
ce
and
Str
ess:
ê
R
elia
bilit
y .
. .
and
Reg
ress
ion
−Is
the
re s
uffic
ient
tim
e in
the
sch
edul
e?
Or
is it
bei
ng s
quee
zed?
93
Technology Transfer # 92111389B-TRG SEMATECH
Sup
port
- 4
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Bui
ldin
g R
elia
bilit
y In
to S
oftw
are
Con
clud
ed
•M
easu
re t
he P
roce
ss
−P
lann
ed v
s A
ctua
l: S
ize,
Cos
t, P
eopl
e, S
ched
ule
−D
efec
ts r
emov
ed b
y ph
ase
(Req
uire
men
ts,
Des
ign,
Cod
ing)
vs
failu
res
duri
ng t
est
(cau
sed
by d
efec
ts)
vs f
ield
rep
orts
(m
ore
defe
cts)
•P
erfo
rm R
oot-
Cau
se A
naly
sis
−W
hat
type
of
faul
t; w
hen,
why
intr
oduc
ed;
whe
n fo
und;
why
not
dete
cted
; w
hat
coul
d ha
ve b
een
done
to
prev
ent
•F
ollo
w-u
p w
ith A
udits
and
Les
sons
Lea
rned
−R
evie
w e
xist
ing
prac
tices
- h
eade
d in
the
rig
ht d
irec
tion?
−A
naly
sis
of c
usto
mer
fee
dbac
k (n
eed
to a
sk f
or it
!)
−W
hat
wor
ked
and
wha
t di
dn't
94
SEMATECH Technology Transfer # 92111389B-TRG
Sup
port
- 5
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
RE
SU
LTS
PR
OB
LEM
AR
EA
SA
DD
RE
SS
ED
MA
TU
RIT
YLE
VE
L
5 -
OP
TIM
IZIN
G[F
eedb
ack]
4 -
MA
NA
GE
D[Q
uant
itativ
e]
3 -
DE
FIN
ED
[Qua
litat
ive]
2 -
RE
PE
AT
AB
LE[In
tuiti
ve]
1 -
INIT
IAL
[Ad
Hoc
]
Acq
uire
d C
apab
ilitie
s -
Ada
ptab
le t
o C
hang
e -
Aut
omat
ion
Pro
cess
Con
trol
- S
tatis
tical
Pro
cess
Con
trol
- C
hang
ing
Tec
hnol
ogy
- P
robl
em P
reve
ntio
n
Pro
cess
Mea
sure
men
t -
Fau
lt P
roje
ctio
n -
Tes
t &
Rev
iew
Cov
erag
e -
Pro
cess
Met
rics
Dat
abas
e
Pro
cess
Def
initi
on -
Qua
lity
Poi
nt R
evie
ws
- S
oftw
are
Eng
inee
ring
Tra
inin
g
Bas
ic M
anag
emen
t C
ontr
ol -
Pro
ject
Pla
nnin
g (C
ost,
Sch
edul
e) -
Con
figur
atio
n M
anag
emen
t -
Reg
ress
ion
Tes
ting
- S
oftw
are
Qua
lity
Ass
uran
ce
Pro
duct
ivity
& Q
ualit
y
Ris
k
Whe
re is
YO
UR
Org
aniz
atio
n?S
oftw
are
Eng
inee
ring
Cap
abili
ty
62
%87
%
23%
9%
15%
4%
Sof
twar
e P
roce
ss M
atur
ity D
istr
ibut
ion
SE
I-as
sist
ed:
13 s
ites,
63
Pro
ject
s
Sel
f-as
sess
men
t: 4
6 si
tes,
233
Pro
ject
s
Dav
id K
itson
& S
teve
Mas
ters
, An
Ana
lysi
s of
SE
I Sof
twar
eP
roce
ss A
sses
smen
t R
esul
ts:
1987
-199
1, C
MU
/SE
I-92
-TR
-24
95
Technology Transfer # 92111389B-TRG SEMATECH
Sup
port
- 6
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
You
r R
ole
in S
oftw
are
Dev
elop
men
t
•U
nder
stan
d th
e di
scip
line
and
cont
rols
of
soft
war
e
engi
neer
ing
•A
sk t
he R
IGH
T q
uest
ions
The
last
tw
o:
How
do
we
plan
to
mai
ntai
n th
is s
oftw
are?
(Thi
s qu
estio
n sh
ould
be
aske
d ea
rly in
the
proj
ect!)
How
can
I h
elp?
•E
ncou
rage
−M
otiv
atio
n to
do
it ri
ght
com
es f
rom
the
top
!
−Q
ualit
y im
prov
emen
t st
arts
with
you
96
SEMATECH Technology Transfer # 92111389B-TRG
Sup
port
- 7
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Su
mm
ary
•H
igh
qual
ity,
relia
ble
soft
war
e do
esn'
t ju
st h
appe
n
•H
igh
qual
ity s
oftw
are
requ
ires
suf
ficie
nt f
ront
-end
load
ing—
Tra
inin
g &
Too
ls
•T
wo
high
va
lue-
adde
d a
ctiv
ities
—R
equi
rem
ents
&
Insp
ectio
ns
•A
dher
ence
to
proc
ess
redu
ces
risk
of
poor
sof
twar
e
•Im
prov
ing
the
proc
ess
begi
ns w
ith m
anag
emen
t
97
Technology Transfer # 92111389B-TRG SEMATECH
Sup
port
- 8
(1
2/94
)T
echn
olog
y T
rans
fer
# 92
1113
89B
-TR
G /
SE
TE
C94
-056
Su
mm
ary
Act
ion
Pla
n
Inve
stig
ate
the
mat
urity
of
your
com
pany
's s
oftw
are
deve
lopm
ent
proc
ess
capa
bilit
y
−A
sk y
our
soft
war
e m
anag
er (
lead
eng
inee
r) t
o in
form
ally
app
ly t
he S
EI
Leve
l Tw
o S
oftw
are
Mat
urity
Sur
vey
ques
tions
to
your
sof
twar
e
deve
lopm
ent
proc
ess
and
repo
rt o
n th
e re
sults
−S
tres
s be
ing
fran
k an
d op
en
−T
oget
her,
tar
get
one
or t
wo
area
s th
at w
ill im
prov
e yo
ur c
ompa
ny's
abili
ty t
o m
eet
leve
l tw
o at
trib
utes
−R
e-as
sess
thi
s ar
ea in
4 t
o 6
mon
ths
−T
arge
t on
e or
tw
o m
ore
. .
. .
. .
98
SEMATECH Technology Transfer # 92111389B-TRG
16 QUESTIONS TO ASK
1. Have we really defined OUR process?
2. What is our policy for software quality?
3. Do we have standards for software development? - What are they?
4. Do we have a Software Development Plan? - Is it current?
5. Do we have a cost and schedule estimate?
6. How are we tracking to the development schedule?
7. Do we know what the requirements are?
8. What analysis techniques are we using to define/refine requirements?
9. Are the requirements documented?
10. Who is our customer? - Who is the user?
11. Have we drafted the System Test Plan?
12. What reviews are planned? - Which ones should I attend?
13. How have we insured the requirements specification (design) is correct (complete)?
14. How much of the requirements specification (design, code, test plan) has been (will be)inspected?
15. May I see the Inspection Management Report?
16. Do we have a Software Configuration Management Plan?
17. Can we rebuild the current release (baseline)?
18. Can we rebuild the previous release (baseline)?
19. Do we have a test plan? - Are tests defined?
20. Have we saved the results?
21. Can we rerun the tests and compare with previous results?
22. How do we plan to maintain this software?
23. HOW CAN I HELP?
99
Technology Transfer # 92111389B-TRG SEMATECH
17 ACTION PLAN FOR SOFTWARE QUALITY
1. Make an appointment with your software manager to sketch out the structure ofYOUR software development process
Use blank Embedded Life Cycle Model as basis or develop simpler model
Compare to model in this course
Ask: Are there elements of the course model that we want to implement? If so: When canwe begin to implement them? What can we do in the next 6 months? In the next year?
2a. Write out a policy statement defining YOUR company's concept of quality forsoftware
Sample Policy Statement
“Quality software shall be an objective of this company's quality program. This objectiveapplies to the acquisition, development, use, and support of software. The program shalladdress, as a minimum:
Organization, tasks, and responsibilities; software documentation; configurationmanagement; testing, and; reviews and audits.”
2b. Make an appointment with your software manger to outline software developmentgoals for your next new feature (or next generation of equipment)
Integrate Process Model from previous action item - Technical risks - Analysis andDesign methods - Initiate formal schedule and budget estimation, define work packages
Use as basis for a more formal Software Development Plan
3a. Meet with (interview) customer production managers
Ask: What are their top five requirements for your company's equipment.
3b. Meet with your system/project and software managers
Ask: How are we meeting these requirements?
4a. Determine what kind of reviews are currently being conducted to control softwarequality
Discuss with software manager - This can be done this afternoon!
4b. Initiate an evaluation of software inspections
• Have software manager schedule software developers (and manager) for training insoftware inspections
Classes taught regionally (east and west coast) and in-house.
• Apply inspection to a current work product
Two immediate benefits: Improved work product - Insight into necessaryimprovements in development activities leading up to current work product
100
SEMATECH Technology Transfer # 92111389B-TRG
5. Ask for an overview of how problem reporting, and requests for new features, arereceived, reviewed, and software changes incorporated in your company.
6a. Review the schedule for testing with your software manager
Ask for an optimal estimate to adequately test
Is the difference too uncomfortable?
6b. Ask for an overview of the test coverage and the trends of the rate of failuresdiscovered and defects corrected
Is the rate of failures discovered greater or less than the rate of defects corrected?
Does this make you feel good about releasing the product?
6c. Seriously consider the appropriateness of the target release date given these two setsof inputs
7. Investigate the maturity of your company's software development process capability
Ask your software manager (lead engineer) to informally apply the SEI Survey Level Twoquestions to your software development process and report on the results
Stress being frank and open
Target one or two areas to improve your company's ability to meet level 2 attributes
Re-assess this area in 4 to 6 months . . . . . Target one or two more
101
Technology Transfer # 92111389B-TRG SEMATECH
Adapted from "A Spiral Model of Software Development and Enhancement", B. W. Boehm, IEEE Computer, May1988.
Evaluate Alternatives,Identify & Resolve Risks
Develop, VerifyNext-Level Products
Determine Objectives,Alternatives, Constraints
Plan Next Phases
PrototypeBetaSystem
ProductionSystem
18 SEI MATURITY MODEL: LEVEL 2 – REPEATABLE PROCESS
At Maturity Level 2, the organization uses standard methods and practices for managing softwaredevelopment activities such as cost estimating, scheduling, requirements changes, code changes,and status reviews. An organization qualifies at Level 2 if the percentage of affirmative answersis at least 80% and the percentage of affirmative answers to shaded questions is at least 90%.(The answers to these questions should reflect standard organizational practices)
SEI defines mechanism and formal procedure as follows:
Mechanism—a means whereby the performance of a task, procedure, or process is assured.
Formal Procedure—a documented series of steps with guidelines for use.
102
SEMATECH Technology Transfer # 92111389B-TRG
Ques.No. SEI Question – Level 2
Proj1
Proj2
Proj3
Notes(Follow-up Ques)
1.1.1 For each project involving software development, isthere a designated software manager?
1
1.1.2 Does the project software manager report directly to theproject (or project development) manager?
1
1.1.3 Does the Software Qualtiy Assurance (SQA) functionhave a management reporting channel separate from thesoftware development project management?
1
1.1.6 Is there a software configuration control function foreach project that involves software development?
2
1.2.2 Is there a required training program for all newlyappointed development managers designed tofamiliarize them with software project management?
3
1.3.1 Is a mechanism used for maintaining awareness of thestate-of-the-art in software engineering technology?
4
2.1.3 Is a formal procedure used in the management reviewof each software development prior to makingcontractual commitments?
4
2.1.4 Is a formal procedure used to assure periodicmanagement review of the status of each softwaredevelopment project?
4
2.1.5 Is there a mechanism for assuring that softwaresubcontractors, if any, follow a disciplined softwaredevelopment process?
4
2.1.7 For each project, are independent audits conducted foreach step of the software development process?
8
2.1.9 Are coding standards applied to each softwaredevelopment project?
4
2.1.14 Is a formal procedure used to make estimates ofsoftware size?
4
2.1.15 Is a formal procedure used to produce softwaredevelopment schedules?
4
2.1.16 Are formal procedures applied to estimating softwaredevelopment cost?
4
2.1.17 Is a mechanism used for ensuring that the softwaredesign teams understand each software requirement?
4
2.2.1 Are software staffing profiles maintained of actualstaffing versus planned staffing?
5
103
Technology Transfer # 92111389B-TRG SEMATECH
Ques.No. SEI Question – Level 2
Proj1
Proj2
Proj3
Notes(Follow-up Ques)
2.2.2 Are profiles of software size maintained for eachsoftware configuration item, over time?
5
2.2.4 Are statistics on software code and test errorsgathered?
5
2.2.7 Are profiles maintained of actual versus plannedsoftware units designed, over time?
5
2.2.8 Are profiles maintained of actual versus plannedsoftware units completing unit testing, over time?
5
2.2.9 Are profiles maintained of actual versus plannedsoftware units integrated, over time?
5
2.2.10 Are target computer memory utilization estimates andactuals tracked?
5
2.2.11 Are target computer throughput utilization estimatesand actuals tracked?
5
2.2.12 Is target computer I/O channel utilization tracked? 5
2.2.16 Are software trouble reports resulting from testingtracked to closure?
5
2.2.18 Is test progress tracked by deliverable softwarecomponent and compared to the plan?
5
2.2.19 Are profiles maintained of software build/releasecontent versus time?
5
2.4.1 Does senior management have a mechanism for theregular review of the status of software developmentprojects?
4
2.4.5 Is a mechanism used for regular technical interchangeswith the customer?
4
2.4.7 Do software development first-line managers sign offon their schedules and cost estimates?
8
2.4.9 Is a mechanism used for controlling changes to thesoftware requirements?
4
2.4.17 Is a mechanism used for controlling changes to thecode? (Who can make changes and under whichcircumstances?)
4
2.4.20 Is there a mechanism for assuring that regressiontesting is routinely performed?
4
104
SEMATECH Technology Transfer # 92111389B-TRG
19 FOLLOW-UP QUESTIONS
When performing a self assessment, use the requested information inthese follow-up questions as benchmarks to determine if your
organization/project should answer Yes to the original question.
1. Where responsibility assignments are questioned, request the name of a specific individual,tenure in job, job description, and evidence of activity, such as monthly reports, meetingreports, control logs.
2. Where the existence of a group is questioned, request names of members, the organizationrepresented, and recent meeting agendas and minutes.
3. Where the existence of education or training programs is questioned, request the schedule ofrecent courses offered, course outlines, names of attendees, and qualifications of instructorsand students.
4. Where the existence of a mechanism, procedure, standard, criteria, or guideline is questioned,request a copy of the controlling document, its revision history, the name of the individual(s)responsible for tracking, job description(s), and recent issue/activity reports.
5. Where the use of profiles, tracking reports, planned vs. actual comparisons, andmeasurements are questioned, request the three most recent reports, measurement summaries,or comparisons.
6. Where computations or analysis of data is questioned, request copies of the most recentcomputations, analysis reports, or summaries showing results or conclusions reached.
7. Where the initiation of actions are questioned, request copies of recent action tracking and/orsummary reports.
8. Where the conduct of certain actions or use of facilities is questioned, request evidence in theform of procedures, responsibilities, or tracking systems to demonstrate performance.
9. Where the existence of a facility, capability, practice, or method is questioned, requestsupporting evidence in the form of inventory lists, tracking and usage reports, instructionmanuals, education programs, etc.
10. Where the use of an automated tool or facility is questioned, request a demonstration of thattool or facility.
105
Technology Transfer # 92111389B-TRG SEMATECH
20 SOME FURTHER READING
Articles Specific to Sessions
Introduction
Humphrey, Watts S.
"Characterizing the Software Process: A Maturity Framework," IEEE Software,March 1988, pp 73-79.
Process Organization
Basili, Victor R., and Musa, John D.
"The Future Engineering of Software: A Management Perspective," IEEE Computer,September 1991, pp 90-96.
Project/Risk Management
Boehm, Barry W.
"Software Risk Management: Principles and Practices," IEEE Software, January 1991,pp 32-41.
Reviews and Inspections
Fagan, Michael E.
"Advances in Software Inspections," IEEE Transactions on Software Engineering,Vol. SE-12 No. 7, July 1986, pp 744-751.
On Software Project Management
Brooks, Fred
The Mythical Man-Month - Essays on Software Engineering, Addison-Wesley, 1975.
DeMarco, Tom
Peopleware, Yourdon Press, 1987.
Glib, Tom
Principles of Software Engineering Management, Addison-Wesley, 1988.
Utz, Walter J., Jr.
Software Technology Transitions, Prentice-Hall, 1992.
On Software Metrics
Boehm, Barry
Software Engineering Economics, Prentice-Hall, 1981.
DeMarco, Tom
106
SEMATECH Technology Transfer # 92111389B-TRG
Controlling Software Projects: Management, Measurement, and Estimation, YourdonPress, 1982
Fenton, N. E.
Software Metrics: A Rigorous Approach, Van Nostrand Reinhold, 1991.
Grady, R. and D. Caswell
Software Metrics: Establishing a Company-Wide Program, Prentice-Hall, 1987.
Jones, Capers
Programming Productivity, McGraw-Hill, 1986.
Putnam, L. H., and Myers, W.
Measures for Excellence: Reliable Software on Time, within Budget, Yourdon Press,1992.