Solar Net MeteringGreen India Clean India
Replacing conventional energy with Green energy
CONTENTS
IntroductionWhy Net metering is required?Structure of Net metering systemBlock DiagramBenefits of Net meteringLimitationsNet metering in IndiaCredentials
INTRODUCTIONDemand for electricity is growing day by dayPower generation is not up to the markDeficit about 6-8% in IndiaNeed for developing alternatives to reduce
power deficitPower generation through rooftop solar is
considered as the best alternativeSolar has some drawbacksNet metering is the solution for those
drawbacks
Why net metering is required?
Solar power is not continuousExpensive batteries are neededBackup generators are requiredCannot be transported to long
distances
NET METERING NET METERING
Block diagram of net metering system
Benefits of net metering Financial Credit for Extra Solar Power
Produced No Battery Storage System Needed No Backup Generator for when Solar Power is
Not AvailableReduces electricity lost over wiresPressure on the grid is reducedEnvironment pollution can be reducedAwareness on power consumption will be
increased
Net metering in India
• Started in 2009• MNRE is undertaking this. Govt. is
facilitating 30% of the total money as subsidy needed for equipping net metering system
• For generating 1MW of electricity through net metering it costs about 7-8 crores in India. After installation plant gains about 1.6 crores per annum for 25 years
CREDENTIALS
TURNKEY SOLUTIONS:• 100 KWp Solar Single System- SS College Hailakandi Assam
(Running for Last 3 years)• 50 KWp Single System at Kolkata Cancer Hospital (Running for
last 2 years)• 40 KWp Single System for WBSEDCL, West Bengal, Kolkata• 25 KWp for Arunachal Government• 20 KWp for TERI at Orissa• 456 KWp for TERI at Orissa and Meghalaya• 500 KWp at West Bengal for WREDA (420 KWp Completed and
handed Over)
Consultancy• 10 MWp solar DPR and Building for PPA with subsidiary
company of welspun Urja which has got the sanction in First Phase of MNRE, JNNSM
• Turnkey Mandate for 10 MWp project ConZun, Kolkata• 25 MWp Solar project feasibility, DPR and other advisory with
WBSEDCL.• Other 500 KWp Solar project DPR preparation and Feasibility
Study.• More than 500 KWp Solar Project Installation Experience.