Page 1: Solar Net Metering

Solar Net MeteringGreen India Clean India

Replacing conventional energy with Green energy

Page 2: Solar Net Metering

CONTENTS

IntroductionWhy Net metering is required?Structure of Net metering systemBlock DiagramBenefits of Net meteringLimitationsNet metering in IndiaCredentials

Page 3: Solar Net Metering

INTRODUCTIONDemand for electricity is growing day by dayPower generation is not up to the markDeficit about 6-8% in IndiaNeed for developing alternatives to reduce

power deficitPower generation through rooftop solar is

considered as the best alternativeSolar has some drawbacksNet metering is the solution for those

drawbacks

Page 4: Solar Net Metering

Why net metering is required?

Solar power is not continuousExpensive batteries are neededBackup generators are requiredCannot be transported to long

distances

Page 5: Solar Net Metering

NET METERING NET METERING

Page 6: Solar Net Metering
Page 7: Solar Net Metering

Block diagram of net metering system

Page 8: Solar Net Metering

Benefits of net metering Financial Credit for Extra Solar Power

Produced No Battery Storage System Needed No Backup Generator for when Solar Power is

Not AvailableReduces electricity lost over wiresPressure on the grid is reducedEnvironment pollution can be reducedAwareness on power consumption will be

increased

Page 9: Solar Net Metering

Net metering in India

• Started in 2009• MNRE is undertaking this. Govt. is

facilitating 30% of the total money as subsidy needed for equipping net metering system

• For generating 1MW of electricity through net metering it costs about 7-8 crores in India. After installation plant gains about 1.6 crores per annum for 25 years

Page 10: Solar Net Metering

CREDENTIALS

TURNKEY SOLUTIONS:• 100 KWp Solar Single System- SS College Hailakandi Assam

(Running for Last 3 years)• 50 KWp Single System at Kolkata Cancer Hospital (Running for

last 2 years)• 40 KWp Single System for WBSEDCL, West Bengal, Kolkata• 25 KWp for Arunachal Government• 20 KWp for TERI at Orissa• 456 KWp for TERI at Orissa and Meghalaya• 500 KWp at West Bengal for WREDA (420 KWp Completed and

handed Over)

Page 11: Solar Net Metering

Consultancy• 10 MWp solar DPR and Building for PPA with subsidiary

company of welspun Urja which has got the sanction in First Phase of MNRE, JNNSM

• Turnkey Mandate for 10 MWp project ConZun, Kolkata• 25 MWp Solar project feasibility, DPR and other advisory with

WBSEDCL.• Other 500 KWp Solar project DPR preparation and Feasibility

Study.• More than 500 KWp Solar Project Installation Experience.