SOLID WASTE MANAGEMENT

BALIKPAPAN CITY 2014

2

Introduction Of Balikpapan

• THE ENTRANCE GATE OF EAST KALIMANTAN PROVINCE

• WIDTH : 83.189 hectare (land : 50.330 hectare, sea : 32.859 hectare)

• TOPOGRAPHY : 85% HILLY & 15% FLAT

• THE CITY OF MICE (MEETING, INCENTIVE, CONFERENCE, EXHIBITION)

• CENTRE OF OIL REFINERY FOR THE EASTERN PART OF INDONESIA

•POPULATION IN 2012 : 637.488 PEOPLE •POPULATION IN 2013 : 660.437 PEOPLE

•POPULATION GROWTH : 4,89 %

Waste Stream Balikpapan City

71%

7%

10% 13%

Transported to TPA

composted

Recycled

Untreated

0

20000

40000

60000

80000

100000

120000

140000

2011

2012

2013

5

SOURCE OF WASTE

NEIGHBOURHOOD WASTE/DOMESTIC

WASTE

MARKET/SHOP WASTE

ROAD/STREET WASTE

WASTE SORTING

INORGANIC WASTE

ORGANIC WASTE

WASTE RESIDUE

WASTE BANK

COMPOST HOUSE

FINAL DISPOSAL

AREA

SOLID WASTE MANAGEMENT

163,269 tons/year 203.03 tons/year

11,008 tons/year

115,266 tons/year

Waste Collection System

Motto : No Waste Stays in Waste Container

There Are 4 shift for collection the waste

1. Shift 1, (00-08.00 am),60 truck, all waste container in

the city

2. Shift 2, (03.00-11.00 am), 5 truck, residu from shift 1

3. Shift 3, (07.00 am- 03.00 pm), 5 truck, residu from shift

2 and new waste

4. Shift 4, (07.00 am- 03.00 pm), 8 pick up,sweep the

waste on the main street and new waste

7

KEBIJAKAN PEMERINTAH KOTA BALIKPAPAN DALAM MANAJEMEN PENGELOLAAN SAMPAH 3 R

1. REVISION OF LOCAL REGULATION ABOUT SOLID WASTE 2. COMPOSE FEASIBILITY STUDY FOR SOLID WASTE MANAGEMENT IN CITY

BALIKPAPAN PADA TAHUN 2013 3. RECOMENDED INTERMEDIATE TREATMENT FACILITY FOR CITY OF

BALIKPAPAN (ITF) - STAGE 1 : MATERIAL RECOVERY FACILITY ( MRF )

- STAGE 2 : AN-AEROBIC DIGESTION PLANT ( AD ) - STAGE 3 : ELECTRICITY PRODUCTION 4. DEVELOPMENT CWB ( CENTRAL WASTE BANK ) 5. DEVELOPMENT WASTE WATER TREATMENT PLANT( IPAL) OFF-SITE. 6. 2013-2016 : PROJECT FOR CAPACITY DEVELOPMENT OF CENTRAL AND

LOCAL GOVERMENT FOR 3Rs AND DOMESTIC SOLID WASTE MANAGEMENT SYSTEM BY JICA

There are 65 units of WASTE BANK

WASTE MANAGEMENT Innovation

Compost House (There are 38

units)

FINAL DISPOSAL AT MANGGAR LANDFILL

OVERVIEW OF FINAL DISPOSAL AT MANGGAR

LANDFILL

1. Location : Jl. Proklamasi RT 036 Manggar

2. Width : 27,1 Ha

3. Land Status : Property of Balikpapan City

Government

4. System : Sanitary Landfill

5. Built in : 1997/1998

6. Fund Resource : KUDP (Kalimantan Urban Development

Programme)

7. Operated since : 13 Januari 2002

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER

95,900

109,700

93,500 96,300 96,800 91,300

111,400

98,300 97,500 89,700

181,800

104,200

DATA OF INORGANIC WASTE COLLECTED

BY COLLECTORS

IN 2013

2009 2010 2011 2012 2013

607,800

686,100

915,040

800,200

910,300

42,546 48,027 65,883 57,885 70,605

22,752 31,592 28,540 37,210 34,095

SAMPAH ORGANIK

HASIL KOMPOS

PENGAMBILAN KOMPOS

DATA OF COMPOST MANAGEMENT AND DISTRIBUTION

IN 2009 - 2013

ROUTE OF WASTE PROCESS INTO FINAL WASTE

DISPOSAL AREA

1 2 3

4 5 6

Truck entering TPA Unloading Scaling

Washing

TPA HUMAN RESOURCES & OPERATION

Currently, TPA Manggar has 65 personnel consisting

of:

1.Civil Servants : 10 Person

2.Administrative Staffs : 2 Person

3.Operational Personnel : 51 Person

4.The employees above get the average salary of

1,000,000 IDR to 1,500,000 IDR per month

FACILITIES AND INFRASTRUCTURE IN FINAL WASTE DISPOSAL

AREA

NO FACILITY QUANTITY

1 HEAVY EQUIPMENT 9 UNIT

2 TRANSPORTATION EQUIPMENT 9 UNIT

3 3 R EQUIPMENT 6 UNIT

4 METHANE GASS BIO

EQUIPMENTS 6 UNIT

5

OTHER EQUIPMENTS 39 UNIT

NO INFRASTRUCTURE QUANTITY

1 LANDFILL 1 UNIT

2 SCALING 1 UNIT

3 WASTE WATER TREATMENT

PLANT 1 UNIT

4 COMPOSTING BUILDING 1 UNIT

5. 3R BUILDING 1 UNIT

6. EDUCATIONAL PARK AND

GAZEBO 1 UNIT

7 HEAVY EQUIPMENT GARAGE 1 UNIT

8 METHANE GASS AREA 1 UNIT

9 SECURITY POST 1 UNIT

WASTE STACK LOCATION

The land arrangement uses Cut and Fill system.

The waterproof layer (Geomembrane) with an area of 26,000 m2 in Zone I and 30,000 m2 in Zone

II is given a 40 cm-thick layer of red soil. The Leachate and gas pipeline installation has the distance

of 20 m (10) lines. The Waste Destroying System is Sanitary Landfill. Final Waste Disposal Area

Manggar is located on Jl. Proklamasi RT 036, Manggar subdistrict, East Balikpapan district or ± 23

Km from the city center

WASTE IS UNLOADED USING THE EXCAVATOR

WASTE IS UNLOADED USING THE EXCAVATOR

WASTE IS LEVELED USING THE BULL DOZER

COVER THE WASTE USING THE LAND AS MAXIMUM AS POSSIBLE TRY TO

HAVE NO MORE WASTE AND ODOR

WASTE STACK IMAGE DESCRIPTION

IN ZONE II

BLOK A

BLOK B

BLOK C

CELL BOUNDARY OF WEEKLY

STACK

ACCESS TO THE STACK

DAILY CELL POSITION

MASUK

B2

B9 B7

B9 B10

B1

1

B12

B13

B14

B15

B16

B3

B4

B5

B6

C1 C2 C3

B1

CITY OF BALIKPAPAN CLEANSING, PARKS, AND CEMETERIES MANAGEMENT DEPARTMENT

FINAL DISPOSAL AT MANGGAR LANDFILL

WASTE STACK AREA OPERATION BASED ON DAILY CELL

C4 C5

C6 C7

C8

C9

C10 C11

C12 C13

C14

C15 C16

C17 C18

A1 A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

A14

A15

A16

A17

A18

A19

A20

A21

A22

B17 B18

B19

B20 B21

B22

B23

B24

B25

B26

B27

B28

B29

B30

B31

B32

B33

B34

B35 B36

B37

A23

A24

A25

A26

A27

A28

A29

A30

A31

A32

A33

A34

A35

A35

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

Leachate Treatment System

Compost Production Facilities

1 2 3

5 6

DESCRIPTION KETERANGAN :

1. Compost Material

2. Material grinding

3. Fermentation

4. Reversal

5. Drying in the sun

6. Grinding

7. Packing

7

4

Plastic Cutting Facilities

The house to cut up the plastic is still

under construction

Cutting Machine

Waste Recycle Process

Methane Gass Production Facilities

Description Keterangan :

1. Stacking

2. Methane gass well

3. Separating tool of gass I and II

4. Gauge

5. Pipe transmitting methane gass to

the population

6. Methane gass is utilised by the

people

1 2 3 4

6

5

FINAL WASTE DISPOSAL AREA AS THE

EDUCATION FACILITY

1. Change the people’s point of view regarding the TPA that it is no longer dirty and smelly

2. Nursery house for education

Nursery House

3. Education on inorganic waste / use the waste for handicraft

Handicraft

resulted from

inorganic waste

4. Education on organic waste/use the waste for compost.

Compost resulted from organic waste is ready to be distributed to the community free of charge.

5. Education on the methane gass

Methane gass utilised

by the community

6. Education on reading park

Reading park

FINAL WASTE DISPOSAL AREA AS THE

RECREATION FACILITY

The recreation facilities are among others:

1. ATP Car Mobil ATP

2. Suspended bridge and other playing facilities

3. Flying fox

4. Cafe Methane

THANK YOU